0% found this document useful (0 votes)
30 views13 pages

Final Presentation Isl BRT

How to prepare BRT and it's presentation

Uploaded by

Fazl e Akram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views13 pages

Final Presentation Isl BRT

How to prepare BRT and it's presentation

Uploaded by

Fazl e Akram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Islamabad

BRT
Project JAMAL UD DIN
01-398232-043
QUALITY WASIM ABBAS

REPORT 01-398232-145
Objective

To provide a sustainable,
efficient, and high-quality
public transport system for
the cities of Islamabad and
Rawalpindi while adhering to
ISO standards and
incorporating the PDCA cycle
for continuous quality
improvement.
The Islamabad Metro Bus Rapid Transit
Executiv (BRT) system aims to improve traffic flow,
reduce travel time, and offer a sustainable
e alternative to private vehicles.
Summar The project adheres to ISO 9001, ISO
14001, and ISO 45001 standards, ensuring
y quality, environmental sustainability, and
safety.
Project Overview

 Total Length: 23 km (Red Line), with future expansion to 25.6


km (Orange Line)

 24 stations with Intelligent Transportation Systems (ITS)

 E-ticketing and real-time tracking for passengers

 Greenbelt initiatives for improved air quality


Quality Assurance Framework

 ISO 9001: 2015 - Quality management and operational


processes

 ISO 14001: 2015 - Environmental management and pollution


reduction

 ISO 45001: 2018 - Occupational health and safety compliance


PDCA Implementation

 Plan: Needs identification, strategic planning, sustainability


goals
 Do: Construction of metro lanes, ITS deployment, safety
compliance
 Check: Audits, performance assessments, environmental
monitoring
 Act: Feedback integration, system expansion, technology
upgrades
Results and Observations

Successes:
 30% reduction in travel time
 Decreased traffic congestion
 135,000 daily passengers
 Reduced urban pollution

Challenges:
 Initial construction delays
 Capacity constraints during peak hours
Quality Metrics
Execution Phase:
 Construction Quality
 Project Management
 Environmental Impact Assessment
 Environmental compliance
 Safety standards compliance (e.g., OSHA standards)

Operational Phase:
 Service Quality
 Safety
 System reliability
 Financial Performance
Lessons Learned

 Address last-mile connectivity

 Improve integration with other transport modes

 Ensure robust maintenance schedules

 Reduce reliance on subsidies through diverse revenue


streams

Contd….
Lessons Learned
Lesson Learned Description Action to be Taken

Insufficient consideration of
last-mile connectivity Conduct detailed studies to identify and address last-mile connectivity issues in future projects.
Planning and Design
Limited integration with other Develop integrated transport plans that consider all modes of transport, including cycling and
modes of transport walking.

Inadequate maintenance and


Operations and
repair Implement robust maintenance schedules and allocate sufficient resources for timely repairs.
Maintenance
Inefficient fare collection
systems Invest in advanced fare collection systems to streamline the boarding process and reduce delays.

Financial Sustainability Reliance on government Explore diverse revenue streams, such as advertising, property development, and public-private
subsidies partnerships, to reduce reliance on subsidies.

Limited consideration of Conduct thorough environmental impact assessments and implement mitigation measures to
Social and Environmental environmental impact minimize negative impacts.
Impact
Insufficient community Establish strong communication channels with local communities and actively involve them in the
engagement planning and implementation process.
Lack of effective project Implement robust project management practices, including clear timelines, regular monitoring, and
Project Management
management risk management.
Continuous Improvement Strategy

 Expand metro lines to key economic hubs

 Introduce electric buses and AI-powered traffic systems

 Enhance passenger experience with mobile apps and


upgraded facilities
Thank you
QUESTIONS?

You might also like