Routing

SAP PP
Agenda: Task list - Routing
 What is Task List - Routing
 Different Types of Task lists
 Importance of Routing
 Creati0n of Routing
 Component assignment to Operations
 Group Routing - Material Assignment
 Alternate Routings
 User Defined Fields
 Standard text key
 Control key
 Reporting in Routings
 Configuration related to Routing
Task List - Routing
 Routing determines the sequence of individual
operations that are necessary to produce a
product.
 It describes the sequence of activities, where
the work is performed and how much of the
work center's resources will be consumed.
 A routing is made up of operations to which
work centers are assigned.
 Routing determines the operations to be
performed as well as
 Where the work is performed
 How long the work should take
 What materials to use for each operation
 What special tools, jigs etc. to be used
Routing Example
Creation of Routing
Create-CA01
Change-CA02
Display-CA03
Path-SAP Menu>Logistics>Production>Master
Data>Routing>Routing>Standard
Routing
After Filling the
Data go to the
Operations tab.
TO create a product we have to Perform Various
Operations like lathe, Drill ,Boring, Polishing , Painting so
we created work Centre for each Process and input their
description and press ENTER
Now input the setup time, Machine time, Labour time for
each process is respective work centre.
COMPONENT
ALLOCATION
In BOM we Created a List of Materials ,In work-
Centre we created the List Activities to be
Performed, Now in Component Allocation we
Assign our BOM products to the Process.
On Routing main page go to the CompAlloc at
the top
The BOM will open, select a material and click on NEW ASSIGNMENT on
the top.

Then 1st tab will open, click on oper/act.list to open the list of
material, see the SN no of the activity and input it to activity
tab at the 1st.Do that for all the Material.
DEFAULT VALUE TAB
While Creating Routing we can set the defaults
tabs. For this we need to do some configurations.
Path-SPRO>IMG>Production>Basic
Data>Routing>Control Data>Define profiles with
Default Values. Then click on Profile General
Data.
Input The Now
detailscopy
like a existing default values and edit
it. Description,
name,
Plant, usage, status
and op/act incrmt.
Then save it. Select our
profile on Ca01.
Material Assignment
Go to the Change Mode of the routing
(CA02) ,then go to the header then go to
MatlAssignment .A new tab will open
Now input
the new
material
number for
which we
want to
extend our
routing,
This is a way
Input the
of extending
plant and
a material to
save it.
routing,
where work
centre and
Routing is
copied, but
we have to do
component
MULTIPLE PRODUCT-ONE ROUTING

Here the BOM Material is different but the


Routing process is same.
TO create
a Group
Routing we
do not
input the
Material
we just
give the
PLANT
name and
After filling all the Basic Fields Go to
the operations.
Creation of Multiple Product one Routing.
First of all we create a group Routing, for
that we go to CA01 and input any number
just input the plant no .

Fill everything same in operation tab. Till now we have


created a common routing, now we will assign materials
Now
to it. come back and go to mat assignment.
One Product – Multiple Routings

When we create
Multiple Routing
for one Product
then group
Counter number
will Increase by
one and Group
number will
remain the
same.
Material 1012 has a
Normal Routing and
a Group Routing. So
for the 50000009 is
for normal routing
and 500000010 is
for group routing.

So when we Proceed
next with group blank
system ask for which
type routing we want
to create another
routing so we here
select a normal routing
Click on New
Entries

In the new Tab


open, we can
see Group
counter has
increased by
1.Fill out all the
necessary fields
and click on
operations.
Fill out all the details and we can so to
compalloc to allocate components to
process.
User Defined Fields
User define fields is used
to add our own fields . It
has some Limitations

Go to Change
routing>Operations
tab>Select a work
centre and click on
details at
top>Operational
PATH TO CREATE USER DEFINED FIELDS

Create our own Fields


NOTE- WE CAN DEFINE
USER DEFINE FIELDS TO
Then Click On New
EACH
Control Key
A control key is used to determine
how an operation or a sub-
operation is to be processed in a
task list.

You might also like