0% found this document useful (0 votes)
86 views29 pages

Colombia Dt Phu Guide

Uploaded by

arletnaranjo7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views29 pages

Colombia Dt Phu Guide

Uploaded by

arletnaranjo7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 29

PHU and Task execution GUIDE

Prepared by: Michael Luna


Reviewed by: -
Versión: 1.0 - 2025-01-08

HUAWEI TECHNOLOGIES CO., LTD.


Objective

• Facilitate and enhance the process of executing the task assigned to the cooperator.

• Improve the execution of task and understand the test protocol used in the project.

• Enhance the efficiency of avoiding incomplete tasks.


ITEM distribution and tool used for TEST
• Each team counts with:

1. 6 or 12 UEs P30 PRO – P20 – P40 – Y70. 1. The task will be share by email in order to
2. PHU software. identify if the test includes TIGO and TEF
3. License for PHU.
4. OSMAND tool for Route follow up.
5. KMZ route.
6. Task assignment.
7. Test Protocol • Is important to have daily
communication with the coordinator
from Cooperator Side to have the
check list and items to test per site.

UEs KMZ PHU


ITEM distribution and tool used for TEST
• Standard location of phones in the vehicle:

• Wrong location of phones in the vehicle:

Floor
Main operation for Drive Test
• The main operations for performing drive tests or cluster tests on the PHU Smart are as
follows:

• This doesn’t mean manual test protocol can be configured.


Uniportal User

User Creation

STEP 1 Enter Uniportal URL.


uniportal.huawei.com/uniportal1/login-pc.html

STEP 2 Register new user

STEP 3 Share user name to Huawei Engineer to include it


in Genexcloud

NOTE: cooperator coordinator should create the user with controlled phone number for easy access and avoid loosing the
user.
PHU tool

Preparing for the Test

STEP 1 Obtain the software from Huawei Engineer.


STEP 2 Copy the PHU Smart apk to the SD card of a mobile phone.
STEP 3 Open the file manager on the mobile phone, touch the PHU Smart apk, and install the software as prompted

NOTE: After the software is installed for the first time, the PHU Smart automatically prompts you to update the software.
You can upgrade the software as required.
PHU tool

PHU first login:

STEP 1 Click PHU app.

STEP 2 Install Ueservice if prompted and touch Done.

STEP 3 Enter the login information and touch LOGIN.

STEP 4 Agree TERMS. Otherwise, the PHU cannot be


used.

NOTE: for Colombia use MexicoGDE server.


PHU tool

Optional configuration for PHU:

STEP 1 Touch the settings icon.

STEP 2 Enter the keywords app launch and click it.

STEP 3 disable the PHU Smart switch and enable the


Manage manually switches.

NOTE: this switches is to prevent the PHU close and run in background.
PHU tool

Optional configuration for PHU:

STEP 1 Touch the settings icon.

STEP 2 Enter the keywords Battery optimization and


click it.

STEP 3 Click on Not allowed and choose All apps.

STEP 4 Search for PHU Smart and select Don’t allow.

NOTE: this switch is to prevent the PHU close due to battery saving feature.
PHU tool

Project Selection:

STEP 1 Login PHU Smart first time.

STEP 2 After accepting the agreements the Project


window will prompt.

STEP 3 Select the Project that Huawei Engineer


confirms.

STEP 4 wait until Project download.

NOTE: for Colombia Netco: Colombia Rep OfficeTelefonica Colombia


SubsidiaryGSM_LTE_NR_UMTSONE Network TEM project.
PHU tool

Check List:

STEP 1 GPS active.

STEP 2 File Size configuration 1


to 70Mb. 2
2
STEP 3 UE identification.
2
STEP 4 Task assigned.

NOTE: for Colombia Netco: Colombia Rep OfficeTelefonica Colombia


SubsidiaryGSM_LTE_NR_UMTSONE Network TEM project.
PHU tool

Check List:
3
STEP 1 GPS active.

STEP 2 File Size configuration

Name of Test 1

Name of Test 3

Name of Test 4

Name of Test 5

Name of Test 6
Name of Test 2
to 70Mb.
4
STEP 3 UE identification.

STEP 4 Task assigned. In this field the


task will display

NOTE: use masking tape to identify the phones according to the test plan that
the project uses.
Test Protocol
Test Protocol: Test Protocol: Test Protocol:

SWAP Rollout 5G

NOTE: use masking tape to identify the phones according to the test plan that
the project uses.
Test Protocol

Test Protocol:

MOCN + Manual Test Protocol


for Trial pourpose

NOTE: use masking tape to identify the phones according to the test plan that
the project uses.
Task Execution
Ways to execute the Drive Test
By TASK MANUAL

1 2

In this field the Create the Test


Microsoft Word
task will display Plan Document
Task Execution

In the Cluster Icon the team will find all


the task that have been assigned :

STEP 1 Search the task the team will 2


execute (Site-Cluster)
2

STEP 2 As each team have 6 phones or


more, ONLY accept 1 task per phone (the
one that the phone will execute). Or Task
similar to the description of the Phone 1
2
(VOLTE LTE TIGO – VOLTE LTE TEF - XXXXXX
All task will be
showed here
After the task is accepted,
the task status changes to
Start

NOTE:.
Task Execution
TASK 1 LTE TASK 2 UMTS

TASK 8
TASK 7
TASK 6
TASK 1 TASK 1 TASK 1 TASK 1 TASK 1 TASK 1
TASK 5 TASK 2 TASK 2 TASK 2 TASK 2 TASK 2 TASK 2
TASK 4 TASK 3 TASK 3 TASK 3 TASK 3 TASK 3 TASK 3
TASK 4 TASK 4 TASK 4 TASK 4 TASK 4 TASK 4
TASK 3
TASK 2
TASK 1

TASK 1 TASK 2
Task Execution Example

TASK 1 1 6
TASK 2
TASK 3
TASK 4

3
4
1 2
Task Execution Example

UE1
CHECK THAT VOICE CALLS ESTABLISH AND FTP DL START AND SHOW THP
Task Execution Errors
UE1 UE2

SELECT SAME TEST PROTOCOL IN 2 PHONES


Task Execution Errors
UE1

EXECUTE TIGO TEST PROTOCOL WITH TELEFONICA SIM


Task Execution Errors
UE1

AM PM

EXECUTE DIFFERENT TEST AFTER GOING LUNCH


Task Execution Errors
UE1

DON’T CHECK THE EXECUTION


Task Execution Errors
UE1

TRY UPLOAD DATA FROM INCORRECT TASK


TASK EXECUTED

DURING THE UPLOAD PROCESS ENTER THE INCORRECT


TASK IN THE PHONE THAT DID NOT EXECUTE THE
CORRECT TASK
Task Execution Stop Example
GO TO OTHER POINT FROM THE ROUTE

CLICK AND
1 3 CONTINUE
2 4

UE1
IF ALL ROUTE IS FINISH GO BACK
Task Execution Upload Example
TASK 1 TASK 2

TASK 5 TASK 6
TIGO

STATIC TEST TIGO LTE AND UMTS

UE1 UE2 UE3 UE4 UE5 UE6

STATIC TEST TEF LTE AND UMTS


TEF

TASK 7 TASK 8

UPLOAD ALL DATA ENTERING


UE1 UE2 UE3 UE4 UE5 UE6 EACH TASK
TASK 3 TASK 4
NO PARTIAL DATA UPLOAD
Task Execution Upload Example

1 2
THANK YOU

Page 29