0% found this document useful (0 votes)
50 views36 pages

KPI Security

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views36 pages

KPI Security

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 36

64th SENIOR SECURITY COURSE-2025

Exercise Name: KPI SECURITY


Group: A

Code No: 01,09,17,25,33

DS: Major (Retd.) Md. Alamgir Hossain, PBGMS


Additional Director
Date - 13 January 2025

RESTRICTED
GROUP MEMBERS
Sl No. Name Code
01 Md. Shahidullah Rayhan 01
02 Dhiraj Kumar Kundu 09
03 Md. Abdur Rahman 17
04 S.M. Mahmud Hasan 25
05 Jahirul Islam Chowdhury 33
Description of the installation-
The Nawabpur Power Station Company Ltd (NPSCL)
is a significant power generation entity in
Bangladesh, operating under Bangladesh Power
Development Board.

It was established in 1990.

The present power generation capacity of NPSCL is


1250 MW.
 Address of the installation- The NPSCL is located on the

bank of Surma river besides the Nawabpur highway.

 Classification and Area- It is an 1A category KPI

 Numbers of officers- More than 400 officers

 Important phone and Fax no.- 01556-235483


Description of the infrastructure Around (within 20\15\10 meter)-

 Within 15 meter-
 A four storied building at the south side
 A ten storied building at the east side

 Within 10 meter-
 An under construction underground market at the south side of this
KPI
 A madrasa at the south side

 Within 20 meter-
 A five storied residential building at the south side of this KPI
MAIN TASK OF THE INSTITUTION

The main task of this institution is generation of power.


Probable info regarding sabotage/subversion-

# A fire incident occurred at warehouse on 01 January 2024


(Time: 01 am).

# On 30 November 2023 a fire incident also occurred at


sub-station due to the flying of air balloon.
Vulnerable Paints (VP) and Vulnerable Areas (VA)-

→ 650 MW power generation unit


→250 MW power generation unit
→200 MW power generation unit
→150 MW power generation unit
→ Control unit
→Sub-station
→Foreigners resident area at Block-B
’গোপনীয়’
INTERNAL SECURITY MEASURES-
 Boundary wall:
6 feet with barbed wire.
 Number of the sentry posts:
NO CLUE.
 Number of Gates:
14 gates with 2 pocket gates
 Access control-
→ Hand Metal Detector
→Vehicle Search mirror
→ Scanner
→CCTV
→ Archway

 Security personnel-
• Police in block A and gate-3 in block c
• Ansar
• Departmental security
INTERNAL SECURITY SYSTEM-
Visitor’s ID-
Visitor register maintain at gate-1 of Block-A
and gate-3 of Block-C.

 Security keys- N/A

 Escort System- N/A


Deployment of
Electronic Gadgets
(a) Hand Metal Detector:
Existing setup: 03
Sl Place of
Number Justification
no. Employment
01 Block-A (Gate-3) 01
02 Block-B (Gate-3) 01 To Control access in VP/VA
03 Block-C (Gate-4) 01

Required setup: 03
Place of
Sl Number Justification
Employment

01 Block-A (Gate-4) 01
To mitigate the security
02 Block-B (Gate-5) 01
lapse of respective area
03 Block-C (Gate-1) 01
(b) Vehicle Search Mirror:
Existing setup: 02

Place of
Sl Number Justification
Employment

01 Block-A (Gate-4) 01
To Control access in VA
02 Block-C (Gate-5) 01

Required setup: 02

Place of
Sl Number Justification
Employment

01 Block-A (Gate-3) 01
To increase security in these
blocks and in Admin building
03 Block-C (Gate-4) 01
(c) Scanner:
Existing setup: 02
Place of
Sl Number Justification
Employment
01 Block-A (Gate-3) 01 To scan suspicious person
02 Block-C (Gate-4) 01 & object to enter into VA

Required setup: 02
Place of
Sl Number Justification
Employment

To control access in
01 Block-B (Gate-2) 01
foreigner residence
(d) Archway:
Existing setup: 02
Place of
Sl Number Justification
Employment
01 Block-A (Gate-3) 01 To scan suspicious person &
02 Block-C (Gate-4) 01 object to enter into VA

Required setup: 01
Place of
Sl Number Justification
Employment
To control access in foreigner
01 Block-B (Gate-1) 01
residence
(e) Closed Circuit Camera:
Existing setup: 22

Place of
Sl Number Justification
Employment
01 Block-A 08 Block-A & Block-C contains all VPs.
02 Block-B 06 So they are equipped with more
03 Block-C 08 cameras

Required setup: 20

Place of
Sl Number Justification
Employment
01 Block-A 06 To increase internal & external
02 Block-B 06 monitoring & enhance security of
03 Block-C 08 the plant
(f) Search Light:
Existing setup: 05
Sl Place of Employment Number Justification

Watch Towers of
01 02 To watch clearly from the watch
Block-C
towers and other places of sensitive
02 Block-B 01 areas
03 Block-A 02

Required setup: 05

Sl Place of Employment Number Justification

01 Block-A 01

02 Block-B 02 To enhance security in these blocks

03 Block-C 02
(g) Flood Light:
Existing setup: 03

Place of
Sl Number Justification
Employment

01 Block-A, VA 01
As these blocks contain all VA, so
02 Block-C, VA 01
more lighting is required
Block-B, VA
03 01

Required setup: 02

Place of
Sl Number Justification
Employment

01 Block-A, VA 01
To enhance security in these blocks
02 Block-C, VA 01
(h) Fire Extinguisher:
Existing setup: 50

Sl Place of Employment Number Justification

01 Block-A 17
02 Block-B 11 To provide security from fire incident
03 Block-C 22

Required setup: 50

Sl Place of Employment Number Justification

01 Block-A 15 Previous quantity of fire extinguisher


02 Block-B 15 was not enough to secure the huge
03 Block-C 20 number of structure
(i) Automatic Siren System:
Existing setup: 02

Place of
Sl Number Justification
Employment

01 Block-C, Control Unit 01


To protect these areas from
Block-C, Admin sabotage
02 01
Building

Required setup: 02

Place of
Sl Number Justification
Employment

01 Block-A 01
To enhance security in these areas
02 Block-B 01
a. Deployment of Departmental Security Officers/ Employees-
i) Existing Manpower: 18

Ser Place of Employment No Justification

01 BLOCK-A, 03 These points are vital to the Security of VPs of


GATE-4 this KPI. Therefore, trained and departmental
personnel are needed to deploy in these gates
02 Block-A, Gate-3 03

03 Block-C, Gate-1 03

04 Block-C, Gate-4 & 5 06

05 Block-C , Gate-3 03
ii) Required Manpower: 39
iii ) Employment of Required Manpower:

Ser Place of Employment No Justification

01 Block-A 15 These points are vital to the Security of VPs of this


KPI. Therefore, trained and departmental personnel
are needed to deploy in these gates

02 Block-B 06

03 Block-C 15
b. Police:
i) Existing Manpower: 06
ii) Employment of Existing Manpower: 06

SL Place of Employment No Justification

01 Block-A, Gate-2 03 They will support other security personnel in


these gate by doing rotation duty

02 Block-C,Gate-4 03
iii) Required Manpower: 06
iv) Employment of Required Manpower: 06
Sl Place of Employment No Justification
01 BLOCK-A, GATE-3 03 If this additional number of police are available
then the security of this KPI will be stronger than
02 Block-C ,GATE-5 03
the previous
c. Ansar:
i) Existing Manpower: 12
ii) Employment of Existing Manpower: 12
Sl Place of Employment No Justification
01 Block-C (Watch tower-1) 03 They will work in there position as per *
hour rotation duty
02 Block-C (Watch tower-2) 03

03 Block-C (Gate-2) 03

04 Block-B (Gate-1) 03
iii) Required Manpower: 46
iv) Employment of Required Manpower:
Sl Place of Employment No Justification
01 Block-A 15 For rotation duty existing manpower is not
adequate
02 Block-B 09
03 Block-C 18
Existing Security Lapse & Threats-
 Boundary wall height of NPSCL is only 6 feet.
 A high-voltage electric line over the power station.
 The trees adjacent to the boundary wall on the western
and southern sides make it easy access for the
intruder.
 Several multi-stored building within 10, 15 & 20 meter
of boundary.
 No security inspection done last 3 years.

 Nepotism and corruption in requiting process.


 The barbed wire fence is missing between the region
of pocket gate-1 of Block-C and gate-1 of Block-B.
 Number of security personnel, security posts and
equipment are not adequate.
Comments
Nowabpur power station is 1(A) category KPI but the kind of
security required for a 1(A) KPI is absent in many cases.
Officers and employees here seems to be unaware of the
security of the KPI from their activities.
There are enough reasons and opportunities to carry out
invasive activities.
In a word, the security system of NPSCL is not satisfactory .
Recommendations
 The number of gates or entrances of the KPI should be
reduced.
 A boundary wall of at least 8 feet height with 2.5 feet Y-
shaped barbed wire should be built around the KPI.
 The trees along with the boundary wall should be cut
down.
 The concerned authorities must be informed to take
measures regarding the structure located at a distance
less than 20 meters from the boundary wall.
 Nepotism and Corruption should be eradicated from the
recruitment system.
 Security-related training should be arranged for the officers
and employees by NSI.
 The necessary number of CCTV cameras should be installed to
cover the entire establishment.
 Vetting for the security personnel should be conducted every
six months interval.
 High-voltage electric line passing through the southern
side of the KPI should be removed at immediate effect.
 A strong access control system should be established
for the Vulnerable Area (VA).
 Air balloon launching should be banned in the
residential area.
----------------------------