Master
Master
(Mandatory for To be used for all critical parts (imported) changes , B/D more than a shift and/or Top 1 Major B/D in Hrs analysis ) (Maint/WW-001/00)
Machine No.: Haeing Furnace Process Heating ICA Dt. 27.01.22 Doc No.:- GMT-FR-11A
RC establishment
Why 4 MONTH 2
Why 5 MONTH 3
Immediate /
Corrective Action
Taken (By Maint)
RC establishment
Why 1
Why 3 MONTH 1
Why 4 MONTH 2
Why 5 MONTH 3
RC:- STANDARDIZATION
Machine No.: Shotpeening 1st Process ICA Dt. 09.03.22 Doc No.:- GMT-FR-11A
RC establishment
Why 3 MONTH 1 ok
Why 4 MONTH 2 ok
Why 5 MONTH 3
Machine No.: Shotpeening # 1 Process Shotpeening ICA Dt. 22.03.22 Doc No.:- GMT-FR-11A
23.03.22
Physical Spring Stuck in Transfer conveyor & Damage Idea / Actions and Status:
observation by (Eg. Design change /Drg change / Spare Part increase /PM freq.increase /PM c/point add)
Maint. :-
Sl. Actions Resp Tgt Status
No
Immediate / Remove Spring Form Transfar Metal 1 Remove Spring From Metal Conveyor Sudheer 22.03. ok
Corrective Action Conveyor 22
Taken (By Maint)
2 Replace Conveyor Metal To Rubber Sudheer 03.04. ok
22
RC establishment
Why 4 MONTH 2
Why 5 MONTH 3
Machine No.: Quench Tank Process Quenching ICA Dt. 08.04.22 Doc No.:- GMT-FR-11A
(Spring)
RC establishment
Machine No.: TransPorter Process Maint Shop ICA Dt. 02.05.22 Doc No.:- GMT-FR-11A
Physical Transporter Not run in Auto Mode Idea / Actions and Status:
observation by (Eg. Design change /Drg change / Spare Part increase /PM freq.increase /PM c/point add)
Maint. :-
Sl. Actions Resp Tgt Status
No
RC establishment
Why 4 MONTH 2
Why 5 MONTH 3
Immediate /
Corrective Action
Taken (By Maint)
RC establishment
Why 1
Why 3 MONTH 1
Why 4 MONTH 2
Why 5 MONTH 3
RC:- STANDARDIZATION
Machine No.: Paint Shop Process Transporter ICA Dt. 25.07.2022 Doc No.:- GMT-FR-11A
Immediate / Re Setting Transporter 1 Replace Dubble Side Suport Wheel Sudheer 01.08. ok
Corrective Action 2022
Taken (By Maint)
RC establishment
Why 4 MONTH 2
Why 5 MONTH 3