Learning
Objectives
At the end of this chapter the students will be able
to:
Prepare and implement elimination plan of MUDA
Aware necessary attitude to eliminate MUDA
Describe the ten basic principles to eliminate
MUDA
Discuss tools and techniques to eliminate
wastes/Muda.
Reduce and eliminate Wastes/MUDA.
Report Improvements
03/06/2025 2
Preparing and Implementing
Plan of MUDA Elimination
Planning for Elimination of the 7 Types of
Wastes
A plan prepared to eliminate MUDA/waste
should identify
what the muda is,
what is its cause,
how it is fixed (methods used to fix or eliminate
the MUDA) and
when to fix the problem (the time plan).
03/06/2025 3
Cont.…
The following sample action plan may be used
as an action plan to eliminate any of the seven
MUDA in the work place.
03/06/2025 4
4.2 Adopting the
Necessary Attitude to
eliminate
MUDA
First you must adopt an attitude that supports
your ability to see waste.
Waste is hard enough to find when you want
to find it;
if you don‘t want to find it, or
if your response to find it is denial or resistance,
then it will never be possible for you to root out
waste and make your work environment stress
free.
03/06/2025 5
Cont.…
It is very important that you understand that
one purpose of discovering waste is to take
the frustration out of your work.
Many people will resist seeing the waste in
their work.
Just don‘t let it be you.
You may hear yourself or others saying things
like:
Let‘s not fix what is not broken.
Can‘t we live well enough alone?
03/06/2025 6
Cont.…
This is just another attempt to make us work
harder for the same amount of money.
It looks good on paper, but it will never work on
the floor.
We tried that twenty years ago.
It didn‘t work then; it won‘t work now.
That is not my job. and so on.
Resistance is normal.
Just don‘t let it keep you from learning to see
the waste in your work.
03/06/2025 7
Cont.…
In the end, you are the one who suffers most
from the results of waste.
03/06/2025 8
4.3 The ten basic
principles to eliminate
MUDA
Throw out all of your fixed ideas about how to do
things.
Think of how the new method will work-not how it
will not.
Don’t accept excuses. Totally deny the status quo.
Don’t seek perfection. A 50 percent
implementation rate is fine as long as it is done
on the spot.
Correct mistakes the moment they are found.
Don’t spend a lot of money on improvements.
03/06/2025 9
Cont.…
Problems give you a chance to use your brain.
Ask “Why?” at least five times until you find
the ultimate cause.
Ten people’s ideas are better than one
person’.
Improvement knows no limit.
03/06/2025 10
Methods of Eliminating
Wastes/Muda.
Waste of overproduction (largest waste)
Just-in-time production systems create
products at the rate they are needed
Pull systems in production can be used to
tailor production to meet demand
More accurate sales projections can reduce
overly-high targets and rebalance production
priorities
03/06/2025 11
Cont.…
Waste of time on hand (waiting)
Process mapping and BPMN techniques allow
managers to see an overview of entire flows
Increased communication with suppliers or
deliveries to combat downtime
Flexible labor force capable of taking on
responsibilities across different company areas
03/06/2025 12
Cont.…
Waste of transportation
Moving aspects of production to be localized,
possibly as part of increased vertical
integration
Mapping transport flows in the production
process and seeking to streamline and
standardize these patterns
Increased digitization or paperwork reduction
to decrease movement in business processes.
03/06/2025 13
Cont.…
Waste of processing itself
Value stream analysis, also known as
information-flow mapping
Waterfall diagrams help companies measure
the cumulative effect of sequential variables
Streamlining standard operating procedures to
reduce overall volume of documentation
03/06/2025 14
Cont.…
Waste of stock at hand
Tackle waste of overproduction if it is seen to
be the underlying cause
Reassess production targets in order to better
meet demand
Analyze the production rates of slow-moving
stock with variable demand
03/06/2025 15
Cont.…
Waste of movement
motion is not the same as transportation
waste.
Assembly lines can minimize worker
movements
Clear categorization and availability of needed
tools or equipment
Effective training procedures and easily
accessible and actionable standard operating
procedures
03/06/2025 16
Cont.…
Waste of making defective products
Avoid segmenting quality control
departmentally;
quality control can benefit from a holistic
perspective
Use techniques like the DMAIC process and
other Six Sigma methodologies to tackle
defects
Make sure workers are appropriately trained
and standardized processes are being
adequately followed
03/06/2025 17
4.4 Tools and techniques
to eliminate wastes/MUDA
5S (Five S)
It involves implementing 5S/workplace
organization to eliminate Wastes/Muda.
Problems cannot be clearly seen when the
work place is disorganized.
Cleaning and organizing the workplace helps
the team to uncover problems.
Making problems visible is the first step of
improvement.
03/06/2025 18
Cont.…
Layout Improvement
Is to plan the placement of machineries, raw
materials, workers, etc. in order to produce
raw materials, parts or products economically.
When the layout of a shop floor is decided, it
is necessary to plan considering production
conditions and environmental conditions
appropriately.
Layout improvement is important technique to
avoid Muda, Mura and Muri due to placement
in production activities.
03/06/2025 19
Cont.…
Brainstorming
Brainstorming can be used to list down all the
problems faced by an organization, their causes
and the potential effects if a certain suggestion
is implemented.
Rules of brainstorming process are:
The subject for brainstorming should be clear and
accurate.
Each member will give only one opinion / idea at
each turn regardless of the number of ideas he /
she may have.
03/06/2025 20
Cont.…
A tension-free atmosphere must be maintained
to encourage free expression of ideas.
Every idea expressed should be written on the
black / white board, flip chart or noted down by
a secretary.
At the end of the brainstorming session, all the
ideas expressed should be evaluated one by
one and short-listed.
03/06/2025 21
Cont.…
And on
Is an indicator informing team leaders and
supervisors of the current workshop situation
with color boards, flash lights, and automated
announcement.
U-line
Is a layout in which the inlet and outlet are
positioned in the same direction to avoid
walking back for a single operator
03/06/2025 22
Cont.…
Multi-process handling and Multi-skilled
operators
Multi-process handling- means that a single
operator manages multiple machines and
processes in product processing and
assembling.
This is the primary factor for constructing lines
by a small number of operators.
A multi-skilled Operator- can deal with several
machines or processes as described above.
03/06/2025 23
Cont.…
The supervisor can make a flexible placement
of operators when someone within the same
team or section is absent.
control (Two point control): Is a devised
automatic control function.
It controls the machine movement when they
come to start or stop working depending upon
the number of work pieces piled up between
the preceding process and the following
process.
03/06/2025 24
Cont.…
Line balancing:
Refers to the state where there is a difference in time
required for each process of a production line.
It is determined that the line balance is good if this
difference is small (usually smaller than 15%), but in
a bad case the line balance should be improved by
leveling out the work time through
shortening that of a very time-consuming process and
increasing loads of processes consuming less time.
03/06/2025 25
Cont.…
Build in quality at each process
1. Quality should be built into each process.
2. Guarantee the quality in each process.
Do not make Defect
Do not pass defect
Work to standard
03/06/2025 26
Cont.…
If machines stop abnormally during operation:
Worker stops operation, if he/she finds
abnormality.
Don‘t send the next process the defects.
Abnormality will understood simply.
Visual control
visually control the states,
ANDON,
Production analysis board,
Standardized work chart etc.
03/06/2025 27
Cont.…
Kanban System
It‘s a TOYOTA Production System
manufacturing tool.
Kanban is not inventory control system rather
it is scheduling system.
In production it tells us:
What to produce
When to produce it
How much to produce
03/06/2025 28
Cont.…
Total Productive Maintenance (TPM)
Total means all individuals in the organization
working together.
Productive means Production of goods that
meet or exceed customer‘s expectations.
Maintenance means keeping equipment and
plant in good condition at all times.
03/06/2025 29
Cont.…
Total Productive Maintenance (TPM) is a
maintenance program which involves a newly
defined concept for maintaining plants and
equipment.
The goal of the TPM program is
to markedly increase production
while, at the same time, increasing employee
morale and job satisfaction.
03/06/2025 30
Cont.…
TPM was introduced to achieve the following
objectives.
The important ones are listed below.
Avoid wastage in a quickly changing economic
environment.
Producing goods without reducing product quality.
Reduce cost.
Produce a low batch quantity at the earliest possible
time.
Goods send to the customers must be non-
defective.
03/06/2025 31
4.5 Reducing and eliminating
Wastes/MUDA
Eliminating waste
You should always start with identifying the
value according to the customer.
Make that value adding processes flow through
your organization at the pull of the customer.
"When you go out into the workplace, you
should be looking for things that you can do for
your people there.
You've got no business in the workplace if
you're just there to be there.
03/06/2025 32
Cont.…
You've got to be looking for changes you can
make for the benefit of the people who are
working there.
Before one can stop waste,
he/she should able to see it,
recognize it as waste,
identify who is responsible, and
finally appreciate its size and magnitude.
03/06/2025 33
Cont.…
Waste that is not seen cannot be eliminated.
When something is denied as waste, it also
cannot be stopped.
When one refuses to accept responsibility for
the waste, then he will not eliminate it.
Finally, when the waste is not measured,
people may think it is small or trivial and
therefore will not be motivated to stop it.
As the saying goes
What is not measured, is not improved.
03/06/2025 34
Strategies used for reducing the seven
types of Muda
03/06/2025 35
4.6 Reporting
Improvements
Reporting means relating to the issuing of reports.
A reporting entity is an organization or company,
or group of companies that prepares financial
reports.
Reports communicate information which has been
compiled as a result of research and analysis of
data and of issues.
Reports can cover a wide range of topics, but
usually focus on transmitting information with a
clear purpose, to a specific audience.
03/06/2025 36
Cont.…
Types of report
There are different types of reports.
Among those the following are listed below.
Formal or Informal Reports
Short or Long Reports
Informational or Analytical Reports
Proposal Report
Vertical or Lateral Reports
Internal or External Reports
Periodic Reports
03/06/2025 37
Cont.…
Structure material in a logical and coherent
order;
present your report in a consistent manner
according to the instructions of the report
brief;
make appropriate conclusions that are
supported by the evidence and analysis of the
report;
make thoughtful and practical
recommendations where required.
03/06/2025 38
Cont.…
Characteristics of Good or Essential report
Suitable Title
Simple
Comparability
Consistency.
Precise and Accurate
Relevant Information
Presented to Required Person or Group or
Department
03/06/2025 39
Thank you
03/06/2025 40