05 Types of Well Completion

The document outlines various types of well completion methods used in drilling and production processes, including single, dual, horizontal, and smart/intelligent wells. It also discusses the rationale behind different completions based on reservoir characteristics and production requirements. Additionally, it covers artificial lift techniques such as gas lifting and electrical submersible pumps.

Uploaded by

Boas Kota
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

05 Types of Well Completion

The document outlines various types of well completion methods used in drilling and production processes, including single, dual, horizontal, and smart/intelligent wells. It also discusses the rationale behind different completions based on reservoir characteristics and production requirements. Additionally, it covers artificial lift techniques such as gas lifting and electrical submersible pumps.

Uploaded by

Boas Kota
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 46

BASIC WELL COMPLETION Types of Well Completion

Types of
Well Completion

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Drilling and Completion


Processes

To
Production
reservoir reservoir system

reservoir reservoir well Production


header

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Learning Objectives

At the end of the session, the participants will be able :

• To recognise and describe types of well completion

• To explain the rationale for various types of well completion

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

There are various types of well completion :


• single
• selective single
• dual
• gravelpack
• monobore
• horizontal
• multilateral
• slim well
• twin well
• triple well
• Y block completion
• smart/intelligent well
PE Skill Group 10 May 2003
BASIC WELL COMPLETION Types of Well Completion
Open Hole Cased Hole

Methods of
Well
Completion

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Injector
Oil Producer Gas Producer
(water/gas)

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Open Hole Open Hole Open Hole
Barefoot Pre-perforated liner Gravelpack

Open Hole
Completion

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Cased Hole Cased Hole
Conventional Gravelpack
Cased Hole
Completion

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Single Selective Single

Single
Conventional

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Selective
Single Single
Gravelpack Gravelpack
Single
Gravelpack

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Dual Conventional

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Dual
Gravelpack

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Dual Conventional
4 zones

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Dual Combination
Gravelpack gravelpack/
4 zones conventional
4 zones

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

There are many other types and combinations of


completion zones to meet reservoir and production
requirement (and restrictions) such as :

•Production rate
•Reservoir pressure
•Temperature
•Production system
•Type of reservoir
•Fluid type
•etc

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

There are many new ways of completing the wells :

•Horizontal well
•Monobore well
•Slim well
•Twin well
•Triple well
•Multilateral well
•Y Block completion
•Smart/intelligent completion

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Horizontal
Well

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Monobore Bigbore
(e.g. 3 1/2” Monobore
tubing with 4”-7” tubulars
3 1/2” liner)

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Slim well

Drilling small hole sizes and completing with smaller


casing scheme. This will enable faster drilling with
less casing tubular, cement and associated drilling
materials hence lower cost.

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Twin well

Two wells in
one Conductor

Requires special wellhead


and x-mas tree arrangement

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Triple well

Three wells in one conductor

Requires special wellhead


and x-mas tree arrangement

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Triple well

• Three wells drilled


and completed
from one shared
conductor

• It provides 6
production strings

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

• The Triple Wellhead is


now a proven technology

• It will make a marginal


field economical to be
developed

• It has the potential also


to enhance project
economics with
installation of smaller
BO-311 platforms to drill the
same number of wells

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
TAML (Technology Advancement MultiLateral)

Size 51B Baker GT


Dual 3.1/2"X3.1/2" Dual Completion

Baker 9.5/8"X3.1/2"X3.1/2"
Dual Completion Module (DCM)

Level 6 FORMation
Junction 9.5/8"X7"X7"

Size 80-40 Locator Seal Assembly

7" SC1AH Packer

- 4.00" Sealbore Extension

- Xover 4.1/2" 12.6 N Vam to 3.1/


2" 9.2ppf New Vam

- 7" SC1AH Packer


3.1/2" Float Shoe, - 4.00" Sealbore Extension
Float Collar and
Landing Collar - Xover 4.1/2" 12.6 N Vam to 3.1/2" 9.2ppf New Vam

- Perforations in - Perforations in
N-Series Sands 3.1/2" Float Shoe, Float
N-Series Sands
Collar and Landing Collar

LOW ER
LATERAL

Level 6

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Y Block
Completion

Without Y Block,
selectivity on short
string is not possible
(for gravelpack
completion).

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
SCSSV Line PES 5 Line Flatpack
PT Gauge I Wire
Control Valve Hydraulic Line
Over the Coupling
Umbilical Clamp

SMART well with PES Taper Lock Clamp


(Stabilizes Flatpack End)

downhole inflow 9 5/8" PES HF-1 Hydraulic Feed Through Packer


control and P/T
Note all lines fed thru from Flatpack to respective tool

gauges
3 1/2" SCSSV

3 1/2" PES Triple Gauge


1/4" Hydraulic
Tube from Gauge w External Port to Lower
transducer to LV
Valve Zone

Hydraulic Splice Sub w Cover Sleeves


(Acts as Hydraulic Termination Point & Take off for Hydraulic lines
to surface, also a hydraulic tee for "common hydraulic line")

3 1/2" CC-1 Sleeve

bottom CC-1 Sleeve)

3 1/2" LV Ball Valve


1/4" Hydraulic
Tube terminated
from PDG to LV

Dual Zone Completion with Triple P/T


Gauge Mandrel

Advantages
1-Shorter Manufacturing Time
2-Significantly Lower Capex
3-Two Less Electronic Connections

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
26” conductor
SMART
• Under Balanced Drilling
@ 600 ftah

18 5/8” surface casing


@ 1600 ftah (1445 ft.tvd,
• SMART Commingling
• Expandable Sand Screen
37 deg)

7” Tbg L80 CS

2 SMART VALVES
13 3/8” csg at 4000 ftah
(2461 ftss, 69 deg) • Triple Gauge
• Interval Control Valve
• Lubricator Valve
••••

3 1/2” Tbg L80 CS


3.1/2” SSD
H1 1
3.1/2” Ball Valve
with P/T gauges H 2 ICV
LV
SSD 3
9 5/8” csg @ 7864 ftah
(3630 ftss, 69 deg)

150 ftah (50 ft tvd)


8 1/2” hole,
L1 L
TD at 8113 ft
(3890 ftss, 69 deg) L2
PE Skill Group 10 May 2003
BASIC WELL COMPLETION Types of Well Completion

There are different ways of completing wells


with different types of artificial lift
Types of artificial lift :
• Gaslifting
• Sucker rod (Bean Pump)
• Progressing Cavity Pump (PCP)
• Electrical Submersible Pump (ESP)
• Subsurface Hydraulic Jet Pump (SHJP)
• Plunger Lift

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Gaslifting

Produced fluid Gas Sold or Flared

SEPARATOR
Injection
gas
GAS LIFT WELL

Oil & Water out

GAS SOURCE
WELL

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Sucker Rod Pump

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Sucker Rod Pump

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Progressing Cavity Pump (PCP)

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

HEGLIG
Well
Design
with PCP

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Electrical Submersible Pump (ESP)

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Electrical Submersible Pump (ESP)

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Hydraulic Jet Pump (HJP)

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Plunger Lift

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Subsurface Hydraulic Jet Pump (SHJP)

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion

Well Completion in PCSB Operations

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
DATE OF COMPLETION : CASING : 26" DRIVE PIPE @ 152.0mMDDF DATE OF COMPLETION : CASING : 26" DRIVE PIPE @ 152.0mMDDF

Resak
: Resak A5/Loc-7 WELL 13 3/8" N-80 INTER. CSG 54.5 PPF @ 1796.0mMDDF
WELL 13 3/8" N-80 INTER. CSG 54.5 PPF @ 1265.0mMDDF : Resak A10-Loc-1 9 5/8" L- 80 PROD. CSG 43.5 PPF @ 3535.0 mMDDF
TUBING :3 1/2" , 9.2 ppf, S13Cr - 95, Vam Ace 9 5/8" L-80 PROD. CSG 43.5 PPF @ 2656.0 mMDDF 7" L- 80 PROD. LINER CSG 29.0 PPF @ 3956.0 mMDDF
TUBING : 3 1/2" , 9.2 ppf, S13Cr-95, Vam Ace
X-MAS TREE :FMC 3 1/8", 5000# DUAL COMPLETION
PBTD : 2653.0 mMDDF X-MAS TREE : FMC 3 1/8", 5000# DUAL COMPLETION PBTD : 3935.0 mMDDF
PACKER FLUID :CaCl2 Brine treated with 1.5% CONQOR 303A + RTE TBG HANGER : 18.03 m CaCl2 Brine treated with 1.5% CONQOR303A + RTE TBG HANGER : 18.03 m
0.3ppb BIOCIDE + 0.3 ppb Oxygen Scavanger
PACKER FLUID :
MAXIMUM DEV. 0.3ppb BIOCIDE per+0.3 ppb Oxygen Scavanger MAXIMUM DEV.
: 26.76 DEG @ 517.46mMDDF : 48.43 DEG @ 687.03 mMDDF
MIN.ID MAX.OD SHORT STRING TOP DEPTH TOP DEPTH LONG STRING MIN.ID MAX.OD MIN.ID MAX.OD SHORT STRING TOP DEPTH TOP DEPTH LONG STRING MIN.ID MAX.OD
(IN) (IN) 3-1/2"VAM ACE- S13CR mMDDF mMDDF 3-1/2" VAM ACE -S13CR (IN) (IN) (IN) (IN) 3-1/2"VAM ACE - S13CR mMDDF mMDDF 3-1/2" VAM ACE -S13CR (IN) (IN)
(ALL EQUIPMENT IN S13 CR)
(ALL EQUIPMENT IN S13 CR)
2.88 4.06 FLOW COUPLING 150.77 2.88 4.06 FLOW COUPLING
2.813 5.00 3-1/2" TSM-5 SCSSSV 151.61 2.813 5.00 3-1/2" TSM-5 SCSSV
143.42
159.61 FLOW COUPLING 2.88 4.06 FLOW COUPLING 2.88 4.06
160.45 3-1/2" TSM-5 SCSSSV 2.813 5.00 153.78 3-1/2" TSM-5 SCSSV 2.813 5.00

2136.15 X-LANDING NIPPLE 2.813 3.96 3436.58 X-LANDING NIPPLE 2.813 3.96
2.813 4.55 DURASLEEVE SLIDING SIDE
DOOR 2145.57 2.813 4.55 DURASLEEVE SLIDING SIDE
DOOR
3446.09
2.88 8.57 9 5/8" BHD HYD. PACKER 9 5/8" BHD HYD. PACKER 2.88 8.57
2154.29
2.88 8.57 9-5/8" BHD HYD. PACKER 3454.80 9-5/8" BHD HYD. PACKER 2.88 8.57

SET PXN PLUG IN X-N NIPPLE


PROFILE
2.69 3.96 X-N NIPPLE 2156.79 2.69 3.96
1.48/3.0 3.92 POP ASSEMBLY X-N NIPPLE
EOT 2158.09 3.012 3.92 WL ENTRY GUIDE
EOT 3458.14
DURASLEEVE SLIDING SIDE 2.813 4.55 9-5/8" CSG
2163.11 DOOR 3466.17
2168.0 BLAST JOINT 2.88 4.02
I-20.1 SAND @2171.5m - 2178.0mMDDF 3535.0 DURASLEEVE SLIDING SIDE 2.813 4.55
3655.26 DOOR

9 5/8" BHR SINGLE HYD. J-10.2 SAND 3665.0 - 3673.0 mMDDF 3660.15 BLAST JOINT 2.88 4.02
2.88 8.38
2194.02 PACKER 3681.0 - 3684.0 mMDDF
DURASLEEVE SLIDING SIDE 2.813 4.55
2202.75 DOOR

2226.83 BLAST JOINT 2.88 4.02 3691.41 7" BHR SINGLE HYD. PKR 2.94 6.00
I-30.1 SAND @2235.5m - 2241.0mMDDF
I-40.1 SAND @2270.0m - 2274.0mMDDF
3696.50 DURASLEEVE SLIDING SIDE 2.813 4.55
9 5/8" BHR SINGLE HYD. DOOR
2.88 8.38
2323.47 PACKER J-10.3 SAND 3707.0 - 3709.0 mMDDF 3701.39 BLAST JOINT 2.88 4.02
DURASLEEVE SLIDING SIDE 2.813 4.55 3715.0 - 3718.0 mMDDF
2591.40 DOOR
2615.49 BLAST JOINT 2.88 4.02
J-20.1 SAND 3742.0 - 3752.0 mMDDF
I-100.1 SAND @2621.0m -
LOCATOR SEAL ASSEMBLY 2.90 4.25
2631.0mMDDF
LOCATOR SEAL ASSEMBLY 2.90 4.25 3755.0
7" X 4.0" PERM. PACKER 4.00 5.875
9-5/8" X 4.0" PERM. PKR. 4.00 8.12
2636.0 4.0" SEAL BORE EXTENSION
4.0" SEAL BORE EXTENSION
END OF SEAL BORE EXT. END OF SEALBORE EXT.
3764.27 X-N NIPPLE 2.69 3.96
X-N NIPPLE 2.69 3.96 POP ASSEMBLY ( 2 PINS ) 1.48/3.0 3.92
2642.17
POP ASSEMBLY 1.48/3.0 3.92 3765.57 EOT

2644.75 EOT J-20.2 SAND 3768.0 - 3771.0 mMDDF 7" LINER


9 5/8" CSG
I-100.2 SAND @2645.0m -
2650.0mMDDF J-20.3 SAND 3795.0 - 3819.0 mMDDF
PBTD : 2653.0m

PBTD : 3935.0
REVISED DATE -09-02-2000
TD
REVISED DATE - 17 - 5 - 2000
:2656.0 TD : 3956.0

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Location: TBG-A
COLLAR : IN 7" CASING @ 5900 MD FT.BRT. CASING : 30"X56 CONDUCTOR @ 505 MD FT.BRT.
ELEVATION RT TO TUBING HANGER : 52 FT. 16"K-55,75 PPF CASING@ 824 MD FT.BRT.
MAXIMUMFLUIDS
PACKER ANGLE : 8.5 PPG KCI BRINEW/CORROSION INHIBITED 351
: 59 9.5/8"N-80,47PPF CASING@ 4022 MD.FT.BRT.
DEGREES 7" N-80,26PPT CASING@ 10199 MD FT.BRT.
PBTD : 10150 MD FT.BRT. (7502 TVD FT.BRT.

Tembungo
STAGE CEMENTING : IN 9.5/8" CASING @ 840 MD FT.BRT. TUBING : 2.7/8",6.5IB/FT,N-80EUE.

DEPTH(FT) DESCRIPTION O.D.(IN) I.D.(IN) STATUS

566 FLOW COUPLING 3.670 2.440


OTIS TR-SCSSV (FLAPPER
569 TYPE) 4.760 2.313

x 1014 OTIS 'X' LANDING NIPPLE 3.670 2.313

2018 OTIS ''WB' SPM 4.760 2.350 GLV

4216 OTIS ''WB' SPM 4.760 2.350 GLV

6744 OTIS ''WB' SPM 4.760 2.350 GLV

7993 OTIS ''WB' SPM 4.760 2.350 GLV

8740 OTIS ''WB' SPM 4.760 2.350 DUMMY

9113 OTIS ''WB' SPM 4.760 2.350 DUMMY

9515 OTIS 2.313" 'XD' SLIDING SLEEVE 3.750 2.313

9539 LOCATER SEAL ASSEMBLY W/ 5 SEAL 4.800 2.440


9529 OTIS 'WD' PACKER 4.5" / 4.0 " BORE 5.050 4.000
OTIS 'XD' SLIDING
9549 SLEEVE 3.750 2.313

L - 1 x 9669 OTIS 'X' LANDING NIPPLE 3.670 2.313

9677 OTIS 'WD' PACKER 4.5 "/4.0" BORE 5.880 4.000


9688 X- OVER, 5.1/2" LCT box X 2.7/8" EU pin 5.880 2.440
OTIS SLIDING
9699 SLEEVE 3.750 2.313

L - 2 9759 BLAST JOINT 3.700 2.440

x 9849 OTIS 'X' LANDING NIPPLE 3.670 2.313

9862 LOCATOR SEAL ASSEMBLY W/5 SEAL 4.800 2.440


9860 OTIS 'WD' PACKER 5.880 4.000
OTIS 'XD' SLIDING
9871 SLEEVE 3.750 2.313 PERFORATION
MD FT.BRT. MD FT.BRT.
x 9906 OTIS 'XN' NIPPLE 3.670 2.205 L-1 : 9629-9640 7003-7013
9652-9665 7024-7036

L - 3 REMARKS: L-2 : 9772-9785 7134-7146


1. THE 9.5/8",7" AND 2.7/8" TUBULARS ARE BRAND NEW 9807-9827 7166-7184
1. THE 9.5/8" CASING WAS DOWNGRADED TO N-80
43.5 LB/FT. L-3 : 9942-9982 7290-7327

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
Well No. : SM-51 Location : SMDP-B Date Completed
Samarang
: 15-OCTOBER-1992 Well No. : SM-D1(SM-91) Date
19-Oct-97
:
Wellhead : McEvoy Dual All Depths BTHF Location : SMJT-D
Tubing : 3.1/2"X9.2#NEW VAM;2.7/8"X6.4#NSCT. Maximum Deviation : 28 DEG@ 5266 BTHF Wellhead : Single - Ingram Cactus All Depth in : ft-MDDF
Standard Well Type : X5230 THF = 42.3 FT.AH.BTHF. Tubing : 2 7/8" x 6.4 ppf New Vam RKB :
MIN MIN MIN 104 ft (Rig Ensco 52) MIN MAX
DEPTH DEPTH
STATUS I.D. SHORT STRING LONG STRING I.D. STATUS STATUS) I.D DEPTH SINGLE Max DeviationDEPTH
SINGLE : 44.4
I.D deg O.D
@
(FT) (FT)
(IN) (IN) (IN) (FT) STRING 2253
STRING (FT) (IN) (IN)
2.910 3.1/2" FLOW COUPLING 403 441 3.1/2" FLOW COUPLING 2.910
FXE 2.813 3.1/2" XXO NIPPLE 406 FLOW COUPLING 2.360 3.210
457
444 3.1/2" XXO NIPPLE 2.813 FXE TR-SC-SSSV 2.313 4.650

BKR-5 2.875 3.1/2" TMFX 2624 1569 3.1/2" TMFX 2.875 BKR-5
2279 3.1/2" TMFX 2.875 BKR-5
BKR-5 2.875 3.1/2" TMFX 2996
3184 3.1/2" TMFX 2.875 BKR-5
BKR-5 2.875 3.1/2" TMFX 3406
3684 3.1/2" TMFX 2.875 BKR-5 BKR-5 2.375 1619 WLD - 1558 FT - SPM
BKR-5 2.875 3.1/2" TMFX 3809
4185 3.1/2" TMFX 2.875 BKR-5
BKR-5 2.875 3.1/2" TMFX 4217
4685 3.1/2" TMFX 2.875 BKR-5
BKR-5 2.875 3.1/2" TMFX 4588 2 7/8" TUBING
5183 3.1/2" TMFX 2.875 BKR-5 2.441 2.875
BKR-5 2.875 3.1/2" TMFX 4962 5782 3.1/2" TMFX 2.875 DK-1
BKR-5 2.375 2247 WLD - 2186 FT - SPM
NO 6156 3.1/2" TMFX 2.875 DK-1
PLUG 2.750 3.1/2"X-NIPPLE(CAMCO) 6737 X
6717 3.1/2" X-SSD
2.900 3.1/2"LOCKABLE COLLET 6769 V 2.750 CLOSED
DKO-2 2.375 2863 WLD 2802 FT - SPM
6768 9.5/8" RDH PACKER 2.900
2.900 3.1/2"TELESC.SWIVEL JT. 6781 (40 - 47#)
CLOSED 2.750 3.1/2"CMD-SSD 6815 SSD
2.900 3.1/2"B/JTS(6872'-6940') CLOSED 2.313 3420
3.1/2" BLAST JTS 2.900
M7 (6872' - 6940')
6882 - 6935 9 5/8" X 5" 5.00" TBG SEAL ASSY 3447
2.900 3.1/2"SAFETY SHEAR JT. 7239 S 3447 WD PKR
2.900 3.1/2"LOCKABLE COLLET 7239 V 7207 3.1/2" CMD-SSD 2.750 CLOSED
7241 9.5/8" RDH PACKER 2.900 GP EXTENSION
2.347 3.1/2"X2.7/8"X-OVER 7251 (40 - 47#)
SSD 3515
CLOSED 2.313 2.7/8"CMD-SSD 7278 WIRE WRAPPED SCREEN 2.313 3.850
2A - G4/5 SAND
NO 2.205 2.7/8"XN-NOGO WITH 7312 (3554-3620 ft-MDDF) 4.50" SEAL BORE SUB
PLUG CHAMFERED BOTTOM LOWER TELL TALE
7324 3.1/2" CMD-SSD 2.750 CLOSED
P1 3.1/2" BLAST JTS 2.900 COLLET LATCH ASSY 4.00" LOCATOR SEAL ASSY
7353 - 7359 (7343' -7362')
9 5/8" X 6" X 4" 3655
6.000 9.5/8"X6"X5" WD PKR 7728
7727 3.1/2" TBG SEAL ASSY+ 2.867 3633 WD PKR
4.500 SBE 7734
10 SEAL UNITS. SIZE : CLOSED
4.500" SSD
7829 3.1/2" CMD-SSD 2.750 CLOSED 3668
2.313 3.850
NO GO NIPPLE
Q6 (GROSS) 3.1/2" BLAST JTS 2.900
7856 - 7902 POP ASSY. WITH
(7848' - 7907') 2.205 3.210
WL RE-ENTRY GUIDE
7907 3.1/2" X 2.7/8" LOCATOR 2.347 3696
4.000 9.5/8"X4" WD PKR 7910 TBG SEAL ASSY + 10 2.420 3.210
SEAL UNITS. SIZE : 4.000"
Q8
2.7/8" BLAST JTS 2.380 9 5/8" X 5"
7930 - 7950 WD PKR
(7926' - 7965')
8005 3.1/2" CMD-SSD 2.313 CLOSED 3702

2.347 GP EXTENSION
8034 2.7/8" TBG SEAL ASSY +
4.000 9.5/8"X4" WD PKR 8038
15 SEAL UNITS SIZE:4.000"
2A - G7/8 SAND
8058 3.1/2" CMD-SSD 2.313 CLOSED WIRE WRAPPED SCREEN
(3812-3828 ft-MDDF)
8090 2.7/8" XN-NOGO WITH 2.205 XN PLUG 4.50" SEAL BORE SUB
CHAMFERED BOTTOM LOWER TELL TALE
R(GROSS) 3833
8196 - 8240 (CAMCO) 9-5/8" X 6" X5"
WD PACKER 9 5/8" CASING
FLOAT COLLAR@ 8254
9.5/8" CASING SHOE @ 4199
8347 3841 PBTD
TOTAL DEPTH @ 8360 UPDATED:27/02/2000
UPDATED : 25.03.97

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
TIONG A-29 WELL COMPLETION SCHEMATIC TIONG A-27 WELL COMPLETION SCHEMATIC

Well : TiA-29 Location/Slot : EE/16 Well : TiA-27 Location/Slot : FF/11 Casing/Liner : 9-5/8" Csg @ 3433 m MDDF
Casing/Liner : 9-5/8" Csg @ 2851 m MDDF
7" Liner @ 3764 m MDDF : Single Selective Oil Producer (Horizontal) 7" Liner @ 4096 m MDDF
Well Type : Single Oil Producer (Horizontal) Well Type
4-1/2" Liner @ 4322 m MDDF
4-1/2" Liner @ 4247 m MDDF Tubing : 3-1/2", 9.2 ppf, N-80, New Vam
Tubing : 3-1/2", 9.2 ppf, N-80, New Vam Perforation : 3445 - 3515, 3630 - 3670
Perforation : 4054 - 4244 m MDDF 3765-3810 m MDDF
Wellhead : 3-1/2" Cameron, Single Wellhead : 3-1/2" Cameron, Single
RKB : 30.91 m above MSL RKB : 30.91 m above MSL
Completion Date : 01 Nov 1998 RTE to Tubing Hanger : 13.38 m Completion Date : 02 April 1998 RTE to Tubing Hanger : 13.38 m

Depth Max OD Min ID Depth Max OD Min ID


STRING CONFIGURATION STRING CONFIGURATION
m MDDF inch inch m MDDF inch inch

1/4" CONTROL LINE 1/4" CONTROL LINE

1 150 1 1 FLOW COUPLING 150.4 4.250 2.867


1 FLOW COUPLING 4.250 2.867
2 2
2 SURFACE CONTROLLED SUB SURFACE 2 SURFACE CONTROLLED SUB SURFACE
151 5.030 2.813 151.2 5.030 2.813
SAFETY VALVE (SCSSV) SAFETY VALVE (SCSSV)

3 3 SELECTIVE LANDING NIPPLE 170 3.920 2.813 3 3 SELECTIVE LANDING NIPPLE 170.0 3.920 2.813

4 4 GASLIFT MANDREL 1220 5.187 2.867 4 4 GASLIFT MANDREL 1222.9 5.187 2.867

5 5 GASLIFT MANDREL 2130 5.187 2.867 5 5 GASLIFT MANDREL 2269.8 5.187 2.867

6 GASLIFT MANDREL 3194.3 5.187 2.867


6

6 6 GASLIFT MANDREL 2700 5.187 2.867 7 9-5/8" HYD. RETRIEVABLE PACKER 3204.1 8.450 2.880

7 3223.2
8 SLIDING SIDE DOOR 4.375 2.813
2720 3.920 2.750/
7 NO GO NIPPLE
2.690 2.750/
7 9 NO GO NIPPLE 3242.2 3.920
2.690
Top of Tieback packer Top of Liner
@ 2736 m MDDF 8 @ 3217.6 m MDDF
10 7" HYD. RETRIEVABLE PACKER 3903.8 5.980 2.885
8 7" HYD. RETRIEVABLE PACKER 3640 5.980 2.885
9 11 7" JUNK PUSHER 6.230 2.867
3920.4
9-5/8" Csg 9-5/8" Csg
9 SHEAR-OUT PLUG 4.250 2.630 12 MIRAGE DISAPPEARING PLUG 4026.2 5.500 2.867

Top of Liner Top of Liner


@ 3664 m MDDF @ 4042.8 m MDDF
4-1/2" Liner Flapper Valve
w/prop

8 10 12
9
11

6" Openholew/4-1/2"
J-18 Sand Perforation ECP 7" Liner Pre-Perf. Liner
7" Liner
(4054 - 4244 m MDDF) J-19 Sand Perforations
(3445-3515, 3630-3670 J-18 Sand
& 3765-3810 m MDDF)

bm\tiong\compl\tia-29\diagram.prz bm\tiong\compl\tia-27\diagram.prz

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
WELL :STG-05 DIAGRAM. STG-05/ LOC-02/ SLOT-01 ATTACHMENT 5

MULTILATERAL COMPLETION

Well : STG-05 Location : 02 Completion Date :


Tubing : 3-1/2" x 9.2 #/ft ANTARES M28

Sotong
All Depths in m MDDF
Wellhead : FMC, Single DFE to THF :
Well Type : MULTI LATERAL Max. Deviation : 90 deg @ HEP.

Min Min LONG STRING Min Max


DEPTH DEPTH

Multilateral
ID(in) ID(in) ID(in) OD(in)
(m) (m)

3.905 2.910 FLOW COUPLING 150


5.000 2.813 TRSCSSSV 151

5.313 2.920 GLM + dummy


GLM + dummy
800
1500

4.281 2.813 3.1/2" SSD 2495

9.5/8"SINGLE HYD 2500


8.500 2.813
PKR

4.281 2.813 3.1/2" SSD


2505 LATERAL 3 (K2.0 SAND)

3075.00- 3375.00

8.500 2.813 9.5/8" SINGLE


VTL packer +flapper
HYD PKR. 2580

LATERAL 2 (K-2.0 SAND)


4.281 2.813 3.1/2" SSD 2585
2950.00- 3320.00

9.5/8"SINGLE VTL packer +flapper


8.500 2.813
HYD PKR 2630

4.281 2.813 LANDING NIPPLE 2680


4 FT PERFORATE 2684
PUP. 2642
3.96 2.75 NO-G0 NIPPLE 2687
WIRELINE ENTRY
2690
GUIDE LATERAL 1 (K-2.0 SAND)

CIV

3419.50-3720.00
DESIGN BY : M ZAKI AWANG
DATE : 11/9/99 (rev)

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
PETRONAS 26" CONDUCTOR, X-65, XLC DRIVEABLE 152m-MDDF
Well : RB-12P Location : RBDP-A CARIGALI
VIETNAM 13-5/8", SURFACE, N-80/68, BUTTRESS m-MDDF
Tubing: 2.7/8" x 6.4 #/ft N 80 AMS 28 9-5/8", PRODUCTION, N-80/47, BUTTRESS m-MDDF.

Ruby
Wellhead : KVAERNER 7",LINER, N-80/29, BUTTRESS m -MDDF.
Well Type Single Selective Oil Producer
:
MAX O.D. MIN I.D. DEPTH
in in m-RKB

3.668 2.347 FLOW COUPLING


4.650 2.313 TR-SCSSSV

4.750 2.347 SIDE POCKET MANDREL

TOP OF LINER @
xxxx

3.850 2.313 SLIDING SIDE DOOR (SSD #3)

5.980 2.347 SINGLE HYD. PACKER (PKR#2)

3.850 2.313 SLIDING SIDE DOOR


(SSD #2)
3.668 2.347 BLAST JOINT

MI-09 sand m MDDF

5.875 4.000 SINGLE HYD.PACKER (PKR#1)

3.850 2.313 SLIDING SIDE DOOR


(SSD #1)

3.260 2.205 XN-NIPPLE

3.260 2.205 WIRELINE RE-ENTRY GUIDE WITH


POP ASSY.

MI-10 sand m MDDF

6.250 7"LINER
DRAWN BY :MOHD ZAKI
DATE : 13/11/2000

PE Skill Group 10 May 2003


BASIC WELL COMPLETION Types of Well Completion
EW-117
OPERATOR :PETRONAS CARIGALI
WELL NO : ERB WEST 117 ST1
DATE : 05 AUGUST 2000
Notes:
All Dimensions are in Measured depth

Level 6 Multilateral
(ft)
Figures indicate the top of the tool item

Baker 2.81"TSE5 TRSCSSV 473.32'


Baker 2.81"TSE5 TRSCSSV 504.1'
Gas Lift Mandrels ( Top - Down)
GLM #6 2062.6'
GLM #5 3335.4'
Gas Lift Mandrels ( Top - Down) GLM #4 4290.2'
GLM #6 2093.3' GLM #3 4925.6'
GLM #5 3368.8' GLM #2 5401.2'
GLM #4 4352.8' GLM #1 5685.9'
GLM #3 5020.6'
GLM #2 5496.1'
GLM #1 5940.0'

XO-SSD 6670.8'
X Nipple 8435.5'
BX 2.75 Nipple 6641.2'
Top of FORMation Junction 8483'
Model GT Dual Packer 8385.7' End of S/S Mandrel 8487.9'
XO-SSD 8420.0'

Baker 9.5/8"X3.1/2"X3.1/2"
Dual Completion Module
(DCM)
DCM Locator 8485.0'

Level 6 FORMation
Junction 9.5/8"X7"X7"

80-40 LTSA , 8500.5'

7" SC1AH Liner Packer Top 8501.04'


7" Lateral #2 Shoe 8518.0'
NoGo Hanger 8517.0'
Xover 5" N Vam X 3.1/2"tbg 8520.6'
ECP 8606.7' 17.5" Undeream Section 8468-8568'
TOC @ 8718'

7" Model DB Packer Top 8743.6'

4ft 80-40 Locator Seal Assy 8759.2'

4" ID Sealbore 8759.9'


ECP 8802.6'

LATERAL
LEG #2 3.1/2" Float Shoe (15233.7'')
3.1/2" 5ft Perforated Pup (15229.9')
3.1/2" Landing Collar (14807.9') 3.1/2" Float Collar (15228.8')
3.1/2" Float Collar (14841.5') 3.1/2" Float Collar (15195.1')
3.1/2" Float Shoe (14878.7') 3.1/2" Landing Collar (15161.9')

LATERAL
LEG #1

PE Skill Group 10 May 2003