Management of Change
Management of Change
Purpose: To Manage all the changes through a process that ensures identification and control of potential process hazards.
Change: Any deviation from design intent is called change
Sources of Changes
• Employee suggestion scheme
• Department / Unit SHE committee
• Cost optimization Energy / Water conservation
initiatives
• Benchmarking to other plant
• Statutory safety audits
• HAZOP study recommendations
• Process incident investigation recommendations.
• Sharing of best practices
DCS Data change
• Long term asset management plan (LAMP)
Document Change
Chemicals
• Any other source
HR Change
Type of Change:
• Hard Change: Physical changes that would appear on a P&ID.
• Soft Change: The soft changes would not necessarily appear on a P&ID.
Permanent Change: A Change that will exist for the entire life of the plant.
Temporary Change: Approved changes that have specific start & ending dates and are not intended to be permanent.
Emergency Change: Changes that must be implemented immediately to correct existing hazardous conditions which pose an
immediate danger to life, property or the environment.
• Other Changes: Changes, which may affect OHS only. e.g. - Installing a new ladder or platform in plant, Floor paving changes in any of
the plant, Replacing flat CS plates with gratings, Providing railings around pits etc.
10/04/2025 2
Current Practices for MOC at site
• All changes are processed through the MOC process for centralized control and tracking. MOC Application Power App
• This process does not apply to replacement in kind.
• A replacement that satisfies the original design specifications.
• Replacing the transmitter with a transmitter meeting the design specifications, Replacement of carbamate condenser with
same specifications, Replacement of E-510 tube bundle with exact specifications,
• Replacing an electric motor with of exact specifications etc.
Everyone can view MOC status- initiated, pending, approved, and rejected through MOC Yara Power BI Report - Power BI
Identify the Type of Changes
Change Hard or Soft Permanent/Temporary/Emergency MOC 1/2/3 or No MOC
04/10/2025 4
Identify the type of changes
Change Hard or Soft Permanent/Temporary/Emergency MOC 1/2/3 or No MOC
04/10/2025 5
Management of Change – Key Activity:
Identificatio Principle Basic Approval of Issue of job Procureme Pre-Start- Handing Updating of
n of type of agreement engineerin project by order to nt of up and over to Document
change by Head- g, techno PSM the services Safety owner in
depending Safety economical Coordinator concerned and Review department Departmen
upon Head- feasibility and Sr. agency for execution for t PSI folder
classificatio Environme and PHA Manageme detailed of proposed commissioni F: Drive
n and nt Sr. study by nt. engineerin modificatio ng and put Library
register Manageme Process g and n. into
them on nt Team. Engineerin material operation
online g procureme
MOC Applic nt for job
ation portal execution.
by Initiator.