Prepared By Approved By
Manoharan R P. Elaiyaraja
Reason For Color Change in Parts
Cu%
As per our discussion with Fork Bolt
supplier
0.4%
“SIGMA CNC” and R.M Supplier “JINDAL”
the variation in color is due to variation in
copper percentage in raw material as
0.3% shown in Picture in left .
RM:RM:
6061
6001
View point : Variation in Cu% causes the change in shade from light to dark
Process Flow of Trial
R.M 10 Bars R.M Marking
Available Total 10 bars of single cast Multiple markings done on bars to identify the parts
taken for trial easily while doing parting process
Button Sample
Button Sample Cutting
All Bars Parting Done & packed in same View point : 10 bars used for inspection of Spectro and trial for
manner and brought back to cold forge shade variation
Trail 1: Copper % Graph of Button Samples
0.400%
Bar no . 8, 9 having high
cu%
0.384%
0.376%
0.350% Center %
CU %
0.300%
0.275% 0.275% 0.275% 0.275% 0.275% 0.275% 0.275% 0.275% 0.275% 0.275% 0.275% 0.275%
0.234%
0.225%
0.200% 0.203%
0.193% Bar no . 3,7 having
0.183% lower cu%
0.150%
1 2 3 4 5 6 7 8 9 10A 10B 10C
Bar no.
View point : On the basis of Spectro test it is observed that difference in Cu % is 0.201
Process Flow of Trial
MACHINING CNC Turning Operation -1 Threading & grooving Operation Etching done in I.D for
done In 1St setup further Identification
OPERATION -1
MACHINING
OPERATION -2
MACHINING
OPERATION -3 View point : After
Cutting each part is
engraved to avoid
the Mixing in
Hex formation done in 3rd setup Anodizing process
ANODIZING PROCESS FLOW
SIGMA CNC PRODUCTS FORMAT NO DD/F/04
S
C
P
PQCS REV. NO 0
Key Contact
Control Plan Number ST/CP/100 Issue No. 01 Rev. 0
Phone:
Core Team:
Prototype Pre-launch Production Date (Original) 18.10.2020 Date (Revised) N/A
Part no./ Latest change no 13001-34060 Customer Engineering approval /Date if required
Part Name / Description- Cap Customer Quality Approval Date (if required)
Customer / Other Approval
Plant Supplier Code Date(if Other Approval /Date (if required)
SIGMA CNC required)
Anodizing stage
Anodizing
80.1 Anodizing 20~25µ thickness 1 1 Every Lot Insp
tester
Compare with
80.2 Color Natural 1 10 Pieces Operator 1 Every Lot Insp
master
Time-20-30
Timer 1 Each Setup Sup.
sec.
Temp. (45-
1 Etching Thermometer 1 Each Setup Sup.
50)°c
Time -20-30
Visual 1 Each Setup Sup.
sec.
4 Desmuting
Conc.(40-50)% Titration 1 Each Setup Sup.
Time 20-25
Timer 1 Each Setup Sup.
min
10 Cold sealing
Conc.3-5 g/l Titration 1 Each Setup Sup.
Temp.(80-
Thermometer 1 Each Setup Sup.
100)°C
12 Oven
Time 8-10 min. Timer 1 Each Setup Sup.
Thermomete 15.6°c
Temp. Silver 14-17°c 2 Shift
r
7 Anodizing Conc. (160-200)g/l Titration 1/Day 181.3
Level 6" bellow Visual 100% OK
Bath Cleaning By News paper Manual 1/Day OK
8 Water rinsing P.H of water (2-5) pH meter 2 Shift 3.2
S
C
P
Product Parameter
View point : After validation it was observed that there is very minor variation in shade which is negliable
HANGER DETAIL
10 9 8 7
6 5 4 3 2 1
R9
L1
R1
L9