Lecture 3_Flow Interruptions_Setup Times(1)
Lecture 3_Flow Interruptions_Setup Times(1)
Product H: high-
specfication requires
additional work.
Reducing Setup Times
• Calculate the effect of reduced setup times on capacity
• List and explain the 6 stages in the Single Minute Exchange of Die
(SMED) approach.
• Explain the difference between “internal” and “external” setups and
give examples from industry.
• Understand and discuss the impact of reducing setup time in Lean
Production.
https://www.youtube
.com/watch?v=RRy_7
3ivcms