0% found this document useful (0 votes)
183 views

Training R&M C&I

The document outlines the renovation and modernization of various control and instrumentation (C&I) systems at a power plant. It describes updating key systems such as the power supply, boiler and plant auxiliary systems, field devices, control systems, HMI/MMI, sampling analysis, station-wide LAN, fire fighting systems, and other auxiliary systems. The renovation aims to modernize aging C&I infrastructure to improve plant performance and operations.

Uploaded by

Sam
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
183 views

Training R&M C&I

The document outlines the renovation and modernization of various control and instrumentation (C&I) systems at a power plant. It describes updating key systems such as the power supply, boiler and plant auxiliary systems, field devices, control systems, HMI/MMI, sampling analysis, station-wide LAN, fire fighting systems, and other auxiliary systems. The renovation aims to modernize aging C&I infrastructure to improve plant performance and operations.

Uploaded by

Sam
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 12

Renovation & Modernization of C&I Systems

May 24, 2012 PMI Revision 00 1

C&I Renovation & Modernization


Power Supply Systems BoP C&I Systems Field Devices Control Systems HMI or MMI SWAS Station Wide LAN

May 24, 2012

PMI Revision 00

C&I Renovation & Modernization Power Supply Systems


UPS System DC Supply System

May 24, 2012

PMI Revision 00

C&I Renovation & Modernization BoP C&I Systems


DM Plant and WTP Fuel Handling (HFO & LDO) Auxiliary Boiler CW System Ash Handling System

May 24, 2012

PMI Revision 00

C&I Renovation & Modernization Field Devices


Pressure Elements Flow Elements Temperature Elements Level Elements

Includes Gauges, Switches, & Transmitters

May 24, 2012

PMI Revision 00

C&I Renovation & Modernization Control Systems


FSSS / BMS ATRS ATT TSI GAMP Station C&I

May 24, 2012

PMI Revision 00

C&I Renovation & Modernization HMI or MMI


IPBs Servers Network Processing Units I/Os Work Stations Data Base

May 24, 2012

PMI Revision 00

C&I Renovation & Modernization SWAS


Sampling Table Chiller Units Analyzers

May 24, 2012

PMI Revision 00

C&I Renovation & Modernization Station Wide LAN


Servers All PLCs Work Stations

May 24, 2012

PMI Revision 00

C&I Renovation & Modernization Other Systems


Fire Fighting System APH Fire fighting System PA System Grounding & Earthing Performance Optimizers APS Flame Analysis System

May 24, 2012

PMI Revision 00

10

C&I Renovation & Modernization Other Systems


Acoustic Pyrometers Bunker Level System Merit Order Rating System On line coal sampler system Mill reject Handling System

May 24, 2012

PMI Revision 00

11

THANK YOU

May 24, 2012

PMI Revision 00

12