Taehwa 6 Tool Motor Audit-II
Taehwa 6 Tool Motor Audit-II
CONTENTS
1
2 3 4 5 6
Process audit list : 6 Tool Process audit list : Condition control Process Audit List : Outgoing assurance /CTQ Control Process audit list : T5S NC point of Process Audit
C&M Go
In charge
approval
approval
Obtained mark 99
Grade A, B, C, D
category
Item
Quality meeting OS&D control Sequential inspection Key process control T/Check Q-audit Total Man Machine /tools Materials
Allotted mark
9
[Good points) Time Check Customer Critical Process Control Incoming inspection started
[Major problems] Review Mgmt poor - No weekly Q review - No Monthly Q-Review Supplier control Weak Process Control not OK LG Return Rej Analysis Gauge R&R Plan not available Machine Maint./ Tooling mgmt not OK.
5.8 6.3
6-tools
5.9
9 8 50 5 5 5 10 5
6.8 4.0
33.9
Mark 55
Grade D
Audit dt.
Mark
Grade
4 M control
30 20 50
19.5 11.6 34
Grade (Grade A : 150~131 points, Grade B : 130~111 marks, Grade C : 110~91 mark, Grade D : lower than 90) F/up of result (Higher than Grade B : Pass, to publish NCR report, Lower than Grade C : re-audit and to link to biz wrap up???)
1 / 7
Excellent -- Bad
4 3 2 1
calculatio n
Obtained mark
. 1)
2) xi 1.8 n 5.1
Weekly and monthly quality meeting not being held. Action Plan not available for weekly Quality Meeting
1) 2)
Second vendor follow-up not available Improvement action plan for supplier improvement not available
5.8
xi 1.6 n
1) Overall, sequential inspection activity is lacking. 2) Operator wise self & sequential record not maintained
6.3
xi 1.9 n
2 / 7
Excellent -- Bad Item 4) Key process control (8 points) Detailed audit item 1) Has key process sign board been attached on the problem process? 2) Is check sheet being made and is supervisor checking the performance? 3) Is key process control liked with history control and improvement activity? 5 4 3 2 1
calculatio n
Obtained mark
xi n 2.3
5.9
xi
n 1.8
1) Is T/Check being carried out time wise (initial, mid, final)? 2) Has surface plate, measuring equipment, jig, and check sheet etc. been displayed? 3) Is actual set being kept as first set, mid production set, and final set wise? 4) Is line leader, production head checking whether T/Check is being done? 5) Is NG immediately corrected and its improvement activity being carried out? 1) Is Q-audit system been assigned? 3) Q-Audit System 2) Is A-audit being carried out on a monthly basis? 3) Is checking being carried out as per Check standard? 4) Is Q-Audit evaluation sheet being made? 5) Is improvement activity being carried out for the NC item? 6) Is audit result (mark, NC point) being displayed and shared?
5) T/Check
6.8
4.0
xi n 1.6
3) Q-system Audit Action Plan not available Audit grade comparison not available
3 / 7
Item
xi n 1
3.5
1) 2) Overall Equipment control lacking Preventive maintenance check point & check sheet to be implemented
xi n 1
3.0
3.3
xi n 1
2) Is incoming low wise materials report (mill sheet) been obtained and controlled?
3) Is materials incoming and outgoing log book being controlled? 4) Is tracing system available in case there is problem in raw materials?
4 / 7
Calculation
Obtain ed mark
1) Motor runout check point put in drg but not added in Patrol inspection check sheet 2) There is no audit report for the 2nd vendor.
xi 2.0
6.4
3.3
xi
n 1
8) Is incoming quality inspection and history control for the 2nd vendor being carried out?
9) Is necessary measuring instrument available and calibration being carried out periodically? (Measuring equipment history card) 1) Is raw materials report (std.) available? 3) Materials (5 marks)
2) Is incoming low wise materials report (mill sheet) been obtained and controlled?
3) Is materials incoming and outgoing log book being controlled? 4) Is tracing system available in case there is problem in raw materials?
5 / 7
Item
Calculation
xi n 4
1 ) Gauge R&R Plan not available 2) CTP Item not selected 3) For critical processes like Crimping ht CTQ value not monitored , neither Z value trend made available.
11.6
6 / 7
C/List T5S
Audit item 5S Arrangement and organization 10 Grade E Unnecessary item, NG item, left over from production are left at site without marking 2 Grade D Unnecessary item being handled without any plan Part mixed stacked. 4 Grade C Temporary disposal place assigned, periodically disposed Depot area control 6 Grade B Whenever unnecessary item is found, it is disposed as per rule Standard inventory /stock quantity is being complied 8 Equipment cleaning is being done periodically Equipment in charge posted and operated 8 Right container, right quantity is being complied and kept at right location 8 The system in which anyone can find out problem and solve Abnormal condition is controlled cumulative way and linked to improvement 8 Time wise target and result, line loss status is being marked. Status board is being maintained item wise and element wise. 10 Grade A Basic system to prevent defect recurrence is available Linked to decreases in inventory/ stock 10 Obtained mark Opinion from Auditor
8 points
Cleaning tools control, drinking water control, dressing place control OK Floor, wall, and ceiling is clean 4 Having concept of gangway and having simple concept of right location level. 4 The system by which operator can not report by self when any problem is occurred. The condition in which only related personal handles. 4 Production status, loss status not being controlled Status board control lacking 1
Cleaning area, in charge frequency clear. Corner, drinking water, dressing area 6 Controlling the system by which location, item, and amount can be figured out. 6 The system by which operator can report by self when any problem is occurred. Controlling done by linking to related dept. 6 Production target vs. result control Cleanness of Status board so so 6
Habituated cleaning and maintaining cleanness Basic improvement activity is being done 6 points to prevent contamination The system by which 3 R is being complied. Bin /pallet /container 10 Problem condition is being controlled in the form of data, systemization 10 8 points
3R
Inventory stacked on gangway, floor. Part, tools left on the floor 2 The system by which normal and abnormal can not be figured out. 2
Visible manageme nt
The system by which production status, loss can not be figured out. 2
Production status and distribution status of loss can be seen immediately Maintaining 6 points cleanness of data sheet in status board 10
Item wise detail with idle time not monitored on display board
Total 34 marks