Building Information Modelling
                         HMG Strategic Overview




                                   Mark Bew
                             Chairman HMG BIM Working Group
                               Chairman BuildingSMART UK
                                     Director ECS Ltd
1 | WWW.BENTLEY.COM
Introduction

 • HMG BIM Strategy
 • Where are we?
 • Progress Update
 • Early Adopters
 • Questions




2 | WWW.BENTLEY.COM
What is BIM & why is the Government
seeking its adoption?




3 | WWW.BENTLEY.COM
What is BIM & why is the Government
seeking its adoption?




4 | WWW.BENTLEY.COM
Hypothesis


Government as a client can
      derive significant
   improvements in cost,
      value and carbon
  performance through the
 use of open sharable asset
        information”




5 | WWW.BENTLEY.COM
Hypothesis

                              1. Valuable
Government as a client can    2. Understandable
      derive significant      3. General
                              4. Non Proprietary
   improvements in cost,      5. Competitive
      value and carbon        6. Open
  performance through the     7. Verifiable
                              8. Compliant
 use of open sharable asset   9. Funded
        information”          10. Five Year Programme




6 | WWW.BENTLEY.COM
What is the Strategy?
      • Pull (Government)
             – Be good a buying data (as well
               as assets and services)
             – Do it consistently                                              PROJECT



             – Leave the “How” to the Supply
               Chain                                   PUSH                                            PULL


      • Push (Supply Chain)                     How can we make it
                                                easier for the supply chain
                                                                                         How do we ensure we get the
                                                                                         information we need to
                                                                                         operate the Asset we have
                                                to move forward?                         bought?


             – Early Warning to Mobilise        But not force or distort the
                                                market?
                                                                                         How do we gather the
                                                                                         information we need to
                                                                                         manage the asset?
                                                ·

             – Training
                                                    Contracts
                                                ·   Training                             How do we make it fair so we
                                                ·   Technology                           don’t force or distort the
                                                ·   Legal's                              market?



             – Methods & Documentation
                                                                                         ·   Make it clear what we want
                                                                                         ·   When we want it
                                                                                         ·   Collect it electronically
                                                                                         ·   Keep it simple to start




      • Deliver Level 2 BIM by 2016


7 | WWW.BENTLEY.COM
What is BIM?




8 | WWW.BENTLEY.COM
Programme
                                                                                       Active Management
                                                                                       Building Management
                                                                                       Strategic Management
                                                                                       Budgets
                                                                                       Carbon
                                                                                       Enable IGT Delivery
                                                                Live Operations        Green Economy Roadmap
                                                                 Resilience
                                                                  Carbon
                                       Early Adopters            Cost
                                                                 Planning
                                       O& M Handover             etc
                                       Consistency
                                       Cultural Change
                                       Packaging
                                       PUSH - PULL

                                                                  COBIE               Web                  Web
                                                                Enriched Data     “Data” Driven       “Process” Driven

                                             COBIE
                                                                   Database
                                          File Based
                                                                  Repository

                      Mobilisation          Phase 1                 Phase 2         Phase 3               Phase 4




                                           Five Years                                               More Years


                             Red Team Projects


                                          Blue Team Projects



                                                           Live Operations



9 | WWW.BENTLEY.COM
Structure
                              GCB Steering Group
                                                                                                                                  HMG BIM Mobilisation Structure
                                   Paul Morrell                                                                                              1 January 2012 v5
                                   Dept Heads




                        Work stream Coordination Group

                             Andrew Wolstenholme
                              Work stream Chairs




                               BIM Work Stream
                                Steering Group

                                   Mark Bew




                                  Head of BIM
          Pull                  Implementation                              Push

                                   David Philp




                                                                                                                                                                 Media Liaison
 BIM Implementation                                                                                                                        Training
       Group                                                                                        Delivery              Operational         &
                          BIM Project                    Software Vendors   CIC - Institution’s
                                                                                                  Supply Chain           Supply Chain     Education
                         Supply Chain                         Group               Group
        BIM PM
  Andy Watson/HA
                           David Philp                      Bill Healey       Rob Manning                                                                            Paul
      Rachel /P4S                                                                                   Bill Price             D Rowland    Adam Matthews
                                                                                                                                                                   Fletcher
Keith Heard/IESE and
                         Software Team
          NIEP
                       Documentation Team
  David Holmes/DIO
                        Deliverables Team
Bill Davis/MoJ/NOMS
                                etc
 Cliff Jones/DoH/P21
Rosie Seymour/CLG



     Departmental           Delivery                                                                             Stakeholder
       Groups               Groups                                                                                 Groups

10 | WWW.BENTLEY.COM
·   Vision & Value
   ·   SME/Localism
   ·   Media & Communications
   ·   Project Management
   ·   Stakeholder Management
                                                                                             ·   Plan of Works
                                                                                             ·   Level of Definition (Detail)
                                                                                             ·   COBie-UK-2012
                                                                                             ·   PAS 1192:2/3
                                                                                             ·   Data Management
                                          Training                 Delivery
                                             &                        &
                                         Academia                 Productivity
               ·   Academic Forum
               ·   Construction Skills
               ·   Technical Training
               ·   APM
               ·   Accreditation                     Commercial
               ·   Supply Strategies                     &
                                                       Legal                ·    Contracts
                                                                            ·    Copyright
                                                                            ·    IP
                                                                            ·    PI




                                                                                                       · Departmental Strategies
                                              Departmental Engagement                                  · Early Adopters
                                                                                                       · Sustained Embedded
                                                                                                         Change




11 | WWW.BENTLEY.COM
Delivery Standards & Documentation
B/555 Roadmap                                        Level 0                            Level1                         Level 2                 Level 3




                                                                                                                                                                   Lifecycle Management
                                                                                                                                                iBIM
                                                                                                                               BIMs




                                                                                                                       BSI M
                                                                                                         SI M




                                                                                                                               BRI M
                                                                                                  AI M


                                                                                                                FI M
                                                                             2D             3D                                             IDM      IFD
                                                                                                                                           IFC
                                                                              CPIC
                                                                             AVANTI
                                                          CAD               BS 1192:2007
                                                                                                              ISO BIM
                                                                                                                © 2008/10 Bew - Richards
                                                                               User Guides CPIC , Avanti, BSI
                                Drawings , lines arcs text etc
                                                         .                              Models, objects,                  collaboration Integrated, Interoperable Data


                                                    BS 1192:2007                                                                                          IFC
                Standards                                                                          BS1192:2                    BS1192:3
                                                                                                    CAPEX                       OPEX
                                                    BS 7000 : 4                                                                                          IDM

                                                                           BS 8541:2               BS 8541:1:3:4                                          IFD

                  Guides       Building Information Management : inc Guide to BS 1192

                                                                                    Guide1                              Guide 2                          Guide 3


             Classifications                     CPIC Uniclass/CAWS                                                       New classifications to assist lifecycle delivery


                                                                           CPIC RIBA/ACE/BSRIA Plan of work
                  Delivery                                                 Includes contractual and level of detail

                                                                                                                           Increase level of detail and content as lifecycle
                                                                                                                                          knowledge grows




12 | WWW.BENTLEY.COM
Generic & Specific Building and Civils Delivery Stages

                                                                          The Project




Plan of Works
                                                                          Management
                                                                           Framework
                                                                                                                       Stage 1                                                   Stage 3                 Stage 4                                                              Stage 6                                     Stage 7
                                                                             (PFM)           Stage 0                                                   Stage 2                                                                              Stage 5
                                                                                                                      Outcome                                                    Concept                 Detailed                                                             Project                                     Benefits
                                                                                             Strategy                                                 Feasibility                                                                           Delivery
                                                                            Lifecycle                                 Definition                                                 Design                  Design                                                                Close                                     Realisation


                                                                                                              Gate 0                           Gate 1                Gate 2                     Gate 3                     Gate 4                            Gate 5                         Gate 6                                              Gate 7



                                                                                                                                                                                                           C
                                                                              TfL                                                                                                                      Pre-tender
                                                                            (CGAP)                                                            A                     B Option                                                 D                                                                    E
                                                                                                                                           Commence                  Select                                                Award                                                                Close




                       CIOB RICS RIBA ICE ACE CIBSE BSRIA HVCA BRE BIFM
                                                                                             Develop                                           Develop                    Undertake                                       Design
                                                                                                                                                                                                                                                                             Establish                                     Manage
                                                                                             Business                                          Delivery                  Competitive                                       Build
                                                                                                                                                                                                                                                                              Service                                       Asset
                                                                             OGC              Case                                             Strategy                  Procurement                                       Test
                                                                           Gateways
                                                                                                              Gate 1                                                Gate 2                      Gate 3                                                       Gate 4                         Gate 5


                                                                                                                                                                                 GRIP 4                                                     GRIP 6/7
                                                                          Network Rail                                GRIP 1                          GRIP 2/3                                           GRIP 5                                                              GRIP 8
                                                                                                                                                                                 Single                                                    Const, Test
                                                                                                                      Output                        Pre Feasibility                                      Detailed                                                             Project
                                                                             GRIP                                    Definition                     Option Select
                                                                                                                                                                                 Option
                                                                                                                                                                                                         Design
                                                                                                                                                                                                                                            Comm &
                                                                                                                                                                                                                                                                             Closeout
                                                                                                                                                                                Selection                                                  Handback



                                                                              TfL                                                                      Define                    Procure /                                                                                    Deliver /
                                                                                             Pipeling                 Startup                                                                                          Develop (Build)
                                                                             CIMM                                                                   Requirements                  Design                                                                                       Close




                                                                              TfL
                                                                                                                      Startup                                                        Initiation                                                    Delivery                    Close
                                                                           Spearmint




                                                                                                                                                                                                                           Documentation


                                                                                                                                                                                                                                            Tender Action
                                                                                                                                                                       Development




                                                                                                                                                                                                                                                                                Construction
                                                                                                                                                                                                                                                                                 to Practical
                                                                                                                                                                                                                                                              Mobilisation




                                                                                                                                                                                                                                                                                Completion
                                                                                                                          Des ign Br ief




                                                                                                                                                                                                         Information
                                                                                                                                                                                                         Production
                                                                                                                                                                                          Technical
                                                                                                Appraisal




                                                                                                                                                          Concept




                                                                                                                                                                         Des ign




                                                                                                                                                                                           Design
                                                                            RIBA




                                                                                                                                                                                                                              Tender
                                                                                                                                                                                                                                                                                                                    Post Practical Completion
                                                                          Work stage

                                                                                                  A                      B                                 C              D                  E               F                 G               H                 J                   K                                           L
                                                                                                            P re perat i on                                         Design                                   Pre-Construction                                          Construction                                       Operational Use




                                                                            Gather
                                                                                                                                           1                                         2                                      3                                                            4
                                                                                                                                                                                                                                                                                                                                                         20




                                                                                                                                                                                                                                                                                                                                                         40
                                                                           Maintain                                                                                                                                                                                                                     N      N                        N          N




                                                                                                                                                                                                                                                                                                                                                              % Benefit
                                                                                                                                                                                                                                                                                                    Data and information to manage the asset base        60
                                                                                                                                                          Check against                                                                                     O&M Data
                                                                                             Check against                                                                                             Package                                                                                      in a safe, clean and cost effective manner.
                                                                                                                                                          project brief                                                                                     Handover
                                                                                             clients brief                                                                                             Scope check                                          Actual Costs
                                                                                                                                                          Cost planning
                                                                              Use            Cost planning                                                                                             Cost Checks                                                                                  Data drops (N) will be provided as often as is
                                                                                                                                                          Tender                                                                                            Actual
                                                                                             Risk                                                                                                      Carbon                                                                                       necessary, reflecting notifiable changes to the
                                                                                                                                                          transparency                                                                                      Programme
                                                                                             Management                                                                                                Checks                                                                                       asset either through maintenance or re-              80
                                                                                                                                                          Environmental                                                                                     Actual Carbon
                                                                                                                                                          Checks                                                                                            Performance                             purposing

                                                                                             Does the brief                                               Has anything                                Has anything                                          Did I get what I                        Transparency and clear availability of
                                                                                             meet my                                                      changed?                                    changed?                                              asked for?                              information to proactively managed cost and
                                                                              Key            requirements in                                              What is being                               Has the design                                        Data to                                 carbon performance of the asset.
                                                                             Client          terms of                                                     priced by the                               been over value                                       effectively
                                                                            Benefits         function, cost                                                                                                                                                                                         Easy presentation of HMG reporting systems for
                                                                                                                                                          main contractor?                            engineered?                                           manage my asset
                                                                                             and carbon?                                                                                                                                                                                            future planning and performance management




                                                                                       Key

                                                                                         X    Data Drops                                                                                              Savings Achieved
                                                                                                Data
                                                                                             Management
                                                                                                                                                                                                      Anticipated Savings
13 | WWW.BENTLEY.COM
                                                                                                 Industry
                                                                                             Delivery Stages
What is COBie?




14 | WWW.BENTLEY.COM
Supply Chain Management
                                PUSH SIDE – SUPPLY CHAIN                PULL SIDE - CLIENT



                                             E
                                                                    1

                                             S

                                                           LD       2
                                             ME




                                              A            MC       3

                                              C
                                                                           Portfolio
                                                                             Mgt

                                              M
                                                                    4
                                                                             PPM
                       Tier N    Tier 3     Tier 2         Tier 1



                                                                    5

                                                                    N


                                                                    N


                                                                    N
15 | WWW.BENTLEY.COM
·   Implementation Plan
·   EIR
·   Tender Documents
·   Scoring Process
·   Framework Training
·   Framework Support                               · Departmental Strategies
                          Departmental Engagement   · Early Adopters
                                                    · Sustained Embedded
                                                      Change



16 | WWW.BENTLEY.COM
Questions




                  www.bimtaskgroup.org
                        @BIMgcs
17 | WWW.BENTLEY.COM
18 | WWW.BENTLEY.COM
19 | WWW.BENTLEY.COM
20 | WWW.BENTLEY.COM
21 | WWW.BENTLEY.COM
Questions




                  www.bimtaskgroup.org
                        @BIMgcs
22 | WWW.BENTLEY.COM

More Related Content

PPT
Hmg bim stategy v1
PDF
Presentation Infra And Cobit
PPT
Network rail - Benefits Management
PPTX
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
PDF
CITE - Recent Progress on Electronic Business
PPTX
А.Просвирнов. Новое поколение стандартов инженерного кодирования: RDS PP
PPT
How Sustainable Procurement Policies Deliver Better Facilities and Benefit th...
PDF
Claiming Love Consciousness
Hmg bim stategy v1
Presentation Infra And Cobit
Network rail - Benefits Management
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
CITE - Recent Progress on Electronic Business
А.Просвирнов. Новое поколение стандартов инженерного кодирования: RDS PP
How Sustainable Procurement Policies Deliver Better Facilities and Benefit th...
Claiming Love Consciousness

Viewers also liked (20)

PPTX
Internationalisation of Developments and Residential Estates - Professor Mark...
PDF
Cobuilder's construction industry glossary
PPT
The Changing Landscape in NHS Construction Programmes - Professor Duane Passman
PPTX
buildingSMART Hong Kong Introduction
PPTX
Кобилдър България
PPTX
What is a Declaration of Performance?
PDF
PPTX
The ProductInfoX project and its R&D results
PPTX
Client procurement strategies shape the construction industry? – A discussion...
PPT
Competitive Advantage through Corporate Social Responsibility (CSR) - Profess...
PDF
Driving down Energy Consumption within Complex Facilities - Professor Matthew...
PDF
BIM to support DfMA and Lean Construction
PDF
BIM from Manchester City Council Perspective - Liam Brady
PDF
BIM – Just another buzzword or a real change in the Industry? - Professor Art...
PDF
Tall Buildings Value Perspectives Salford December 2010 - Professor Ali Parsa
PDF
BIM in Infrastructures - Derek Drysdale
PDF
CTM Program: Terminology, Vocabularies, and BIM
PPTX
ProductInfoX - goals and results
PDF
Presentation of coBuilder solutions - and our work
PDF
Internationalisation of Developments and Residential Estates - Professor Mark...
Cobuilder's construction industry glossary
The Changing Landscape in NHS Construction Programmes - Professor Duane Passman
buildingSMART Hong Kong Introduction
Кобилдър България
What is a Declaration of Performance?
The ProductInfoX project and its R&D results
Client procurement strategies shape the construction industry? – A discussion...
Competitive Advantage through Corporate Social Responsibility (CSR) - Profess...
Driving down Energy Consumption within Complex Facilities - Professor Matthew...
BIM to support DfMA and Lean Construction
BIM from Manchester City Council Perspective - Liam Brady
BIM – Just another buzzword or a real change in the Industry? - Professor Art...
Tall Buildings Value Perspectives Salford December 2010 - Professor Ali Parsa
BIM in Infrastructures - Derek Drysdale
CTM Program: Terminology, Vocabularies, and BIM
ProductInfoX - goals and results
Presentation of coBuilder solutions - and our work
Ad

Similar to HMG BIM Stategy - Mark Bew (20)

PDF
Tim platts
PPTX
How to succesfully marry content and information5
PDF
Cks Brochure 10.31.11
PDF
NESHEP Planet Positive Presentation
PDF
Strategic Mgmt Of Techn In Tough Times V1.0
PDF
Ariba Knowledge Nuggets - Strategic Sourcing
PDF
Charles Watt - The argument for supporting Open Access to incumbent shareholders
PDF
Agile-To Infinity and Beyond and So Much More Than Just Agile Software
PDF
Nearshoring Mmi
PDF
Nearshoring 4 25 12
PDF
Pm Intro (Blk)
PPTX
James Alexander - Pazarlama Zirvesi 2012
PPT
Where is your key business information?
PPT
Sharepoint & TRIM integration
PDF
IBM Smarter Water Keynote, IWA Montreal September 2010
PDF
Strategies for making the most of SAP technology that supports Sales and Oper...
PPT
Water conference presentation nigel broomhall ibm (final)
PDF
Transform Your Application Portfolio - and Keep Your Focus!
PDF
Steve Strutt & Mark Tomlinson from IBM UK and Ireland - Cloud is changing the...
PDF
Going All XP On Your Business
Tim platts
How to succesfully marry content and information5
Cks Brochure 10.31.11
NESHEP Planet Positive Presentation
Strategic Mgmt Of Techn In Tough Times V1.0
Ariba Knowledge Nuggets - Strategic Sourcing
Charles Watt - The argument for supporting Open Access to incumbent shareholders
Agile-To Infinity and Beyond and So Much More Than Just Agile Software
Nearshoring Mmi
Nearshoring 4 25 12
Pm Intro (Blk)
James Alexander - Pazarlama Zirvesi 2012
Where is your key business information?
Sharepoint & TRIM integration
IBM Smarter Water Keynote, IWA Montreal September 2010
Strategies for making the most of SAP technology that supports Sales and Oper...
Water conference presentation nigel broomhall ibm (final)
Transform Your Application Portfolio - and Keep Your Focus!
Steve Strutt & Mark Tomlinson from IBM UK and Ireland - Cloud is changing the...
Going All XP On Your Business
Ad

More from School of the Built Environment - University of Salford (11)

PDF
BIM Interoperability - Andrew Bellerby
PDF
BIM from Designers Perspective - Rob Jackson
PDF
BIM at Salford - Professor Arto Kiviniemi
PPT
Sustainability Interventions for Managers of Projects and Programmes - Profes...
PDF
Building in Sustainability - Professor Graham Hillier
PDF
Built Environment Futures - Professor John Ratcliffe
PPTX
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
PPT
Urban Regeneration in Greater Manchester - Professor Steve Curwell
PDF
Travelling Through Time in Aid of Sustainability by Prof Farzad Khosrowshahi
PPT
Knowledge Management in Complex Projects by Professor Charles Egbu
BIM Interoperability - Andrew Bellerby
BIM from Designers Perspective - Rob Jackson
BIM at Salford - Professor Arto Kiviniemi
Sustainability Interventions for Managers of Projects and Programmes - Profes...
Building in Sustainability - Professor Graham Hillier
Built Environment Futures - Professor John Ratcliffe
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
Urban Regeneration in Greater Manchester - Professor Steve Curwell
Travelling Through Time in Aid of Sustainability by Prof Farzad Khosrowshahi
Knowledge Management in Complex Projects by Professor Charles Egbu

Recently uploaded (20)

PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
VCE English Exam - Section C Student Revision Booklet
PPTX
GDM (1) (1).pptx small presentation for students
PDF
Microbial disease of the cardiovascular and lymphatic systems
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Classroom Observation Tools for Teachers
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PDF
01-Introduction-to-Information-Management.pdf
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
Complications of Minimal Access Surgery at WLH
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Orientation - ARALprogram of Deped to the Parents.pptx
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Microbial diseases, their pathogenesis and prophylaxis
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
VCE English Exam - Section C Student Revision Booklet
GDM (1) (1).pptx small presentation for students
Microbial disease of the cardiovascular and lymphatic systems
human mycosis Human fungal infections are called human mycosis..pptx
2.FourierTransform-ShortQuestionswithAnswers.pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Classroom Observation Tools for Teachers
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
01-Introduction-to-Information-Management.pdf
Abdominal Access Techniques with Prof. Dr. R K Mishra
Weekly quiz Compilation Jan -July 25.pdf
Complications of Minimal Access Surgery at WLH

HMG BIM Stategy - Mark Bew

  • 1. Building Information Modelling HMG Strategic Overview Mark Bew Chairman HMG BIM Working Group Chairman BuildingSMART UK Director ECS Ltd 1 | WWW.BENTLEY.COM
  • 2. Introduction • HMG BIM Strategy • Where are we? • Progress Update • Early Adopters • Questions 2 | WWW.BENTLEY.COM
  • 3. What is BIM & why is the Government seeking its adoption? 3 | WWW.BENTLEY.COM
  • 4. What is BIM & why is the Government seeking its adoption? 4 | WWW.BENTLEY.COM
  • 5. Hypothesis Government as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information” 5 | WWW.BENTLEY.COM
  • 6. Hypothesis 1. Valuable Government as a client can 2. Understandable derive significant 3. General 4. Non Proprietary improvements in cost, 5. Competitive value and carbon 6. Open performance through the 7. Verifiable 8. Compliant use of open sharable asset 9. Funded information” 10. Five Year Programme 6 | WWW.BENTLEY.COM
  • 7. What is the Strategy? • Pull (Government) – Be good a buying data (as well as assets and services) – Do it consistently PROJECT – Leave the “How” to the Supply Chain PUSH PULL • Push (Supply Chain) How can we make it easier for the supply chain How do we ensure we get the information we need to operate the Asset we have to move forward? bought? – Early Warning to Mobilise But not force or distort the market? How do we gather the information we need to manage the asset? · – Training Contracts · Training How do we make it fair so we · Technology don’t force or distort the · Legal's market? – Methods & Documentation · Make it clear what we want · When we want it · Collect it electronically · Keep it simple to start • Deliver Level 2 BIM by 2016 7 | WWW.BENTLEY.COM
  • 8. What is BIM? 8 | WWW.BENTLEY.COM
  • 9. Programme Active Management Building Management Strategic Management Budgets Carbon Enable IGT Delivery Live Operations Green Economy Roadmap Resilience Carbon Early Adopters Cost Planning O& M Handover etc Consistency Cultural Change Packaging PUSH - PULL COBIE Web Web Enriched Data “Data” Driven “Process” Driven COBIE Database File Based Repository Mobilisation Phase 1 Phase 2 Phase 3 Phase 4 Five Years More Years Red Team Projects Blue Team Projects Live Operations 9 | WWW.BENTLEY.COM
  • 10. Structure GCB Steering Group HMG BIM Mobilisation Structure Paul Morrell 1 January 2012 v5 Dept Heads Work stream Coordination Group Andrew Wolstenholme Work stream Chairs BIM Work Stream Steering Group Mark Bew Head of BIM Pull Implementation Push David Philp Media Liaison BIM Implementation Training Group Delivery Operational & BIM Project Software Vendors CIC - Institution’s Supply Chain Supply Chain Education Supply Chain Group Group BIM PM Andy Watson/HA David Philp Bill Healey Rob Manning Paul Rachel /P4S Bill Price D Rowland Adam Matthews Fletcher Keith Heard/IESE and Software Team NIEP Documentation Team David Holmes/DIO Deliverables Team Bill Davis/MoJ/NOMS etc Cliff Jones/DoH/P21 Rosie Seymour/CLG Departmental Delivery Stakeholder Groups Groups Groups 10 | WWW.BENTLEY.COM
  • 11. · Vision & Value · SME/Localism · Media & Communications · Project Management · Stakeholder Management · Plan of Works · Level of Definition (Detail) · COBie-UK-2012 · PAS 1192:2/3 · Data Management Training Delivery & & Academia Productivity · Academic Forum · Construction Skills · Technical Training · APM · Accreditation Commercial · Supply Strategies & Legal · Contracts · Copyright · IP · PI · Departmental Strategies Departmental Engagement · Early Adopters · Sustained Embedded Change 11 | WWW.BENTLEY.COM
  • 12. Delivery Standards & Documentation B/555 Roadmap Level 0 Level1 Level 2 Level 3 Lifecycle Management iBIM BIMs BSI M SI M BRI M AI M FI M 2D 3D IDM IFD IFC CPIC AVANTI CAD BS 1192:2007 ISO BIM © 2008/10 Bew - Richards User Guides CPIC , Avanti, BSI Drawings , lines arcs text etc . Models, objects, collaboration Integrated, Interoperable Data BS 1192:2007 IFC Standards BS1192:2 BS1192:3 CAPEX OPEX BS 7000 : 4 IDM BS 8541:2 BS 8541:1:3:4 IFD Guides Building Information Management : inc Guide to BS 1192 Guide1 Guide 2 Guide 3 Classifications CPIC Uniclass/CAWS New classifications to assist lifecycle delivery CPIC RIBA/ACE/BSRIA Plan of work Delivery Includes contractual and level of detail Increase level of detail and content as lifecycle knowledge grows 12 | WWW.BENTLEY.COM
  • 13. Generic & Specific Building and Civils Delivery Stages The Project Plan of Works Management Framework Stage 1 Stage 3 Stage 4 Stage 6 Stage 7 (PFM) Stage 0 Stage 2 Stage 5 Outcome Concept Detailed Project Benefits Strategy Feasibility Delivery Lifecycle Definition Design Design Close Realisation Gate 0 Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 C TfL Pre-tender (CGAP) A B Option D E Commence Select Award Close CIOB RICS RIBA ICE ACE CIBSE BSRIA HVCA BRE BIFM Develop Develop Undertake Design Establish Manage Business Delivery Competitive Build Service Asset OGC Case Strategy Procurement Test Gateways Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 GRIP 4 GRIP 6/7 Network Rail GRIP 1 GRIP 2/3 GRIP 5 GRIP 8 Single Const, Test Output Pre Feasibility Detailed Project GRIP Definition Option Select Option Design Comm & Closeout Selection Handback TfL Define Procure / Deliver / Pipeling Startup Develop (Build) CIMM Requirements Design Close TfL Startup Initiation Delivery Close Spearmint Documentation Tender Action Development Construction to Practical Mobilisation Completion Des ign Br ief Information Production Technical Appraisal Concept Des ign Design RIBA Tender Post Practical Completion Work stage A B C D E F G H J K L P re perat i on Design Pre-Construction Construction Operational Use Gather 1 2 3 4 20 40 Maintain N N N N % Benefit Data and information to manage the asset base 60 Check against O&M Data Check against Package in a safe, clean and cost effective manner. project brief Handover clients brief Scope check Actual Costs Cost planning Use Cost planning Cost Checks Data drops (N) will be provided as often as is Tender Actual Risk Carbon necessary, reflecting notifiable changes to the transparency Programme Management Checks asset either through maintenance or re- 80 Environmental Actual Carbon Checks Performance purposing Does the brief Has anything Has anything Did I get what I Transparency and clear availability of meet my changed? changed? asked for? information to proactively managed cost and Key requirements in What is being Has the design Data to carbon performance of the asset. Client terms of priced by the been over value effectively Benefits function, cost Easy presentation of HMG reporting systems for main contractor? engineered? manage my asset and carbon? future planning and performance management Key X Data Drops Savings Achieved Data Management Anticipated Savings 13 | WWW.BENTLEY.COM Industry Delivery Stages
  • 14. What is COBie? 14 | WWW.BENTLEY.COM
  • 15. Supply Chain Management PUSH SIDE – SUPPLY CHAIN PULL SIDE - CLIENT E 1 S LD 2 ME A MC 3 C Portfolio Mgt M 4 PPM Tier N Tier 3 Tier 2 Tier 1 5 N N N 15 | WWW.BENTLEY.COM
  • 16. · Implementation Plan · EIR · Tender Documents · Scoring Process · Framework Training · Framework Support · Departmental Strategies Departmental Engagement · Early Adopters · Sustained Embedded Change 16 | WWW.BENTLEY.COM
  • 17. Questions www.bimtaskgroup.org @BIMgcs 17 | WWW.BENTLEY.COM