This document provides assembly instructions for a final drive in 29 steps. It begins by cleaning all parts and checking seals. It then details assembling bearings and gears in sequence using various tools. Precise measurements are taken to determine the correct shim thickness for proper bearing preload. Multiple planetary gear carrier assemblies are installed along with retaining rings and bolts. Proper torque specifications are listed throughout.