Service Repair Manual
Models
D11T CARRY DOZER
TRACK-TYPE TRACTOR
Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR JNS
Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011
i04407756
Recoil Spring - Install
SMCS - 4158-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
8S-7640 Stand 1
8S-7611 Tube 1
8S-7615 Pin 1
8S-8048 Saddle 1
B 3S-6224 Electric Hydraulic Pump Gp 1
1S-8937 Needle Valve 1
8S-7172 Double Acting Cylinder 1
5P-7269 Plate 1
1J-2921 Bolt 2
5F-9888 Coupling 1
5P-8713 Plate 1
163-9151 Pilot 1
5P-2678 Stud 5
FT-2631 Spacers 10
5P-8249 Hard Washer 5
1/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
2J-3505 Full Nut 5
C 1P-0520 Driver Gp 1
D -
Bar Stock
12.7 mm (0.50 inch) by
54.00 mm (2.125 inch) by
609.6 mm (24.00 inch) long
1
Illustration 1 g00553596
Typical example
NOTICE
Install stop assembly (13) with the large inside diameter toward the
front of the track roller frame.
2/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 2 g00553595
Typical example
NOTICE
Do not damage the threads on the inside of the front track roller frame
when the recoil spring is installed.
1. Attach a suitable lifting device to recoil spring (12) and stop assembly (13). The weight of
recoil spring (12) and stop assembly (13) is approximately 522 kg (1150 lb). Install recoil
spring (12) and stop assembly (13) in the front track roller frame.
2. Use a suitable lift truck and install the recoil spring (12) and stop assembly (13) into the
front track roller frame.
Illustration 3 g00553594
Typical example
3. Use Tooling (C) to install bearing (11) in pilot assembly (10) if the bearing was removed.
The inside diameter of the bearing must be 101.100 ± 0.116 mm (3.9803 ± .0045 inch) after
installation.
Note: The recoil spring and the stop assembly must be against the end of the front track
roller frame before pilot assembly (10) is installed.
4. Install pilot assembly (10) in the front track roller frame.
3/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 4 g00553003
Typical example
5. Attach a suitable lifting device to recoil spring retainer (9). The weight of recoil spring
retainer (9) is approximately 55 kg (120 lb). Install recoil spring retainer (9) in the front
track roller frame.
6. Tighten recoil spring retainer (9). Use Tooling (D) to tighten the recoil spring retainer (9)
enough to contact the pilot assembly. Recoil spring retainer (9) must be installed
approximately 89.0 mm ( 3.50 inch).
Illustration 5 g00553481
Typical example
Use only the tooling and cylinder listed in this procedure. Do not use
other cylinders because they can cause enough force to break the
tension rods. This can result in personal injury or death.
4/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
7. Install Tooling (B). Measure the distance between Surface (C) and 5P-7269 Plate (5) at four
locations next to 5P-2678 Studs. Use 2J-3505 Nuts (7) in order to adjust the plate. Adjust
the distance to 550.0 mm (21.65 inch). Install stops (2) on 5P-2678 Studs (6) to aid in
proper alignment for installation.
Illustration 6 g00553482
Typical example
Illustration 7 g00553483
Typical example
The recoil spring must never have more than 12.7 mm (.50 inch)
distance between the recoil spring retainer during installation of the
recoil spring.
5/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
8. Slowly extend the cylinder rod in order to compress the recoil spring while recoil spring
retainer (9) is installed. Continue this procedure until the outside of the recoil spring retainer
is 3.0 mm (0.12 inch) inside the front track roller frame.
9. Turn recoil spring retainer (9) until the slots are in alignment. Install stops (2) in the front
track roller frame.
10. Remove Tooling (B) from the front track roller frame.
Illustration 8 g00558740
Typical example
11. Put stops (2) in position, and install four bolts (1) .
12. Fasten a suitable lifting device to track adjuster (4). Install track adjuster (4) in the front
track roller frame. The weight of track adjuster (4) is approximately 177 Kg (390 lb).
13. Put cable (3) in position on track adjuster (4). Install the spacer, the washer, and the bolt that
keeps the cable in place.
End By: Install the front track roller frame.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Feb 7 22:38:27 UTC+0800 2020
6/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR JNS
Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011
i04369271
Track Roller Frame - Remove
SMCS - 4151-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
105-3351 Strap 2
105-3349 Strap 2
B 8S-6470 Forcing Bolt 1
C
8S-7620 Base As 1
8S-7650 Cylinder As 1
8S-7615 Pin 1
3S-6224 Electric Hydraulic Pump Gp 1
D
6V-3160 Double Acting Cylinder 1
9S-5564 Pin Puller Sleeve As 1
4C-9633 Puller Stud 1
1P-0543 Nut 1
3S-6224 Electric Hydraulic Pump Gp 1
E
142-8548 Bracket 1
189-0411 Shackle As 2
193-5474 Shackle As 1
1/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
9U-7536 Lift Stand 2
277-7200 Electric Hydraulic Pump Gp 2
Start By:
a. Remove the bulldozer.
b. Separate the track.
When you are using hydraulic cylinders and puller studs, always ensure
that the rated capacity of the puller stud meets or exceeds the rated
capacity of the hydraulic cylinder. If the puller stud does not meet or
exceed the rated capacity of the hydraulic cylinder, a sudden failure of
the puller stud could occur. The sudden failure of the puller stud could
result in personal injury or death.
Illustration 1 g01425311
1. Install Tooling (A) to hold the bogies in place when the machine is raised.
2/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 2 g01414487
Note: Install Tooling (F) near the outer edge of the case, forward of the ripper pin bore to
support the weight of the machine. Improper placement of Tooling (F) could result in
damage to the underside of the case.
2. Lift the rear of the machine with Tooling (F) until the track guides are above the track links.
3. Lift the front of the machine with Tooling (F) until the track guides are above the track
links.
Illustration 3 g01414894
4. Remove plug (3) and drain the oil from the pivot shaft compartment into a suitable
container for storage or disposal.
5. Fasten a suitable lifting device to trunnion (1). The weight of trunnion (1) is approximately
147 kg (325 lb). Remove bolts (2) and trunnion (1) from the track roller frame.
3/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 4 g01414954
6. Remove plug (6) from plate (5).
7. Remove spiral lock ring (4).
Illustration 5 g01414955
8. Install Tooling (B) in plate (5). Tighten Tooling (B) to remove plate (5) from the track roller
frame.
Illustration 6 g00525912
4/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
9. Position Tooling (C) under the front track roller frame, as shown. Support the weight of the
roller frame with Tooling (C).
Illustration 7 g01414960
10. Remove bolts (8) that hold retainer assembly (7) to the main frame case.
NOTICE
To prevent damage to the pivot shaft seal, make sure the bolts that
hold the pivot shaft seal retainer to the main frame case has been
removed before the equalizer bar is disconnected.
Illustration 8 g01414529
11. Remove bolts (9) and the nuts that clamp pin (10) in place in the track roller frame.
12. Remove the retaining ring and the spacer from the end of pin (10).
5/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 9 g00525919
13. Attach Tooling (D), as shown. Fasten a suitable lifting device to Tooling (D).
14. Use Tooling (D) to remove pin (10) from the track roller frame.
Illustration 10 g00525920
Personal injury or death can result from lifting a heavy assembly.
The heavy assembly can fall if using an incorrect hoist to lift the load.
Be sure the hoist has the correct capacity to lift a heavy assembly.
Approximate weight of the assembly is given below.
Pinch Point
Stay clear of this area!
6/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Serious personal injury may occur.
15. Fasten a suitable lifting device and Tooling (E) to the track roller frame. Support the weight
of the track roller frame with the suitable lifting device. The weight of the roller frame is
approximately 9979 kg (22000 lb).
16. Remove Tooling (C) from the front frame.
Illustration 11 g01414538
17. Remove bolts (11) and plate (12) that holds the track roller frame to the pivot shaft.
Remove the thrust ring.
18. Use a suitable lifting device and Tooling (E) to remove the track roller frame.
Illustration 12 g01414549
(13) Thrust plate
19. Remove O-ring seal (15).
20. Fasten a suitable lifting device to retainer assembly (7). The weight of retainer assembly (7)
is approximately 34 kg (75 lb). -Remove bolts (14) that hold retainer assembly (7) to the
track roller frame and remove retainer assembly (7).
7/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 13 g01414735
21. Remove O-ring seal (17) from retainer (16).
22. Use a hammer and a chisel to remove seal assembly (18) from retainers (16) and (19).
23. Remove plate (13) from retainer (7). Refer to Illustration 12 for the location of plate (13).
Illustration 14 g01414747
24. If necessary, remove bearings (20) from the track roller frame.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Feb 7 22:39:26 UTC+0800 2020
8/8
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR JNS
Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011
i06671320
Track Roller Frame - Disassemble
SMCS - 4151-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 105-3349 Strap 1
B
3S-6224 Electric Hydraulic Pump Gp 1
6V-3175 Hydraulic Cylinder Gp 1
4C-9634 Puller Stud 1
5P-7270 Sleeve 1
1P-1840 Bearing Puller Adapter 1
9U-6832 Nut 1
3H-0467 Puller Washer 1
C FT-1713 Wedge 1
D 2D-1201 Eyebolt 1
Start By:
a. Remove the track roller frame or the front track roller frame. Refer to Disassembly and
Assembly, "Track Roller Frame - Remove".
b. Remove the idlers. Refer to Disassembly and Assembly, "Idlers - Remove".
1/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
Note: The disassembly procedure for the track roller frame and the front track roller frame is the
same procedure. Only the front track roller frame is shown.
Illustration 1 g01425527
1. Fasten a suitable lifting device to track roller (1).
2. Remove bolts (3) and caps (2) and remove the track roller. The weight of track roller is
approximately 179 kg (394 lb).
Note: Special Spiralock threads are used on the minor bogies with caps with 2 bolts.
Spiralock threads provide improved bolt retention. Use special Spiralock taps to chase the
threads in these holes. The use of standard taps in these holes will eliminate the Spiralock
feature. This will cause the bolts to loosen.
3. Remove Tooling (A) from the track roller frame.
2/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 2 g01425931
4. Remove guides (4) and covers (5) from both sides of the track roller frame.
Illustration 3 g01425933
Note: There will be a loss of oil when the stoppers and plug (7) are removed from pin
assembly (6).
5. Use a drill and remove the stoppers and plugs (7) from both ends of pin assembly (6).
3/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 4 g01425935
6. Put Tooling (B) in position. Fasten a suitable lifting device to Tooling (B). The combined
weight of the pin assembly and Tooling (B) is approximately 45 kg (100 lb).
7. Use Tooling (B) to remove the pin assembly that holds minor bogie (8) to the major bogie.
Illustration 5 g00526056
8. Fasten a suitable lifting device to minor bogie (8). Remove minor bogie (8). The weight of
minor bogie (8) is approximately 39 kg (86 lb).
4/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 6 g01425936
9. Remove retaining ring (10).
10. Install Tooling (D) in plate (9). Remove the plate (9) from the track roller frame.
Illustration 7 g01425937
Note: There will be a loss of oil when the stoppers and plugs (11) are removed.
11. Use a suitable drill, and remove the stoppers and plugs (11) from pin assembly (12).
5/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 8 g00526071
12. Install Tooling (C) between the inside of the track roller frame and the major bogie.
13. Install Tooling (B). Fasten a suitable lifting device to Tooling (B).
14. Use Tooling (B) and remove the pin assemblies that hold the major bogie to the track roller
frame.
Illustration 9 g00526078
15. Fasten a suitable lifting device to major bogie (13). Remove major bogie (13) from the track
roller frame. The weight of major bogie (13) is approximately 435 kg (960 lb).
16. Remove pad assemblies (14) from the major bogie and the track roller frame.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Feb 7 22:40:26 UTC+0800 2020
6/6
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR JNS
Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011
i07041863
Track Roller Frame - Assemble
SMCS - 4151-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 105-3349 Strap 1
D
3S-6224 Electric Hydraulic Pump Gp 1
5P-7399 Adapter (Bearing Puller) 1
6V-3175 Cylinder Gp 1
5P-9695 Pressure Plate 1
5P-4776 Tool Stud 3
1A-1935 Nut 3
3K-5234 Hard Washer 3
E 5P-3931 Anti-Seize Compound -
F 1P-7409 Eyebolt 1
When you are using hydraulic cylinders and puller studs, always ensure
that the rated capacity of the puller stud meets or exceeds the rated
capacity of the hydraulic cylinder. If the puller stud does not meet or
1/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
exceed the rated capacity of the hydraulic cylinder, a sudden failure of
the puller stud could occur. The sudden failure of the puller stud could
result in personal injury or death.
NOTICE
Do not use threaded rods that have not been hardened as tooling with
hydraulic cylinders. The maximum rated tonnage should be stamped
on one end of the puller studs. Do not use threaded rods that have not
been stamped with the rated tonnage.
Illustration 1 g00526078
1. Put pad assemblies (14) in position on the major bogie (13) and the track roller frame.
Install the bolts that hold the pad assemblies in place.
2. Fasten a suitable lifting device to major bogie (13). Put the major bogie (13) in position in
the track roller frame. The weight of major bogie (13) is approximately 435 kg (960 lb).
2/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
Illustration 2 g01427639
Note: to reuse original pin assemblies (12), the pad assemblies must be filled with
120 ± 3 mL (4.08 ± 0.10 oz) of SAE 90W oil. The rubber stoppers must be installed
3.00 ± 1.00 mm (0.118 ± 0.039 inch) below the surface of the end of the pin assemblies.
NOTICE
The end of the pin with the Mark X or a hole must be toward the
outside of the roller frame. The Mark X or hole must be on the top or
bottom on the vertical center line of the bore.
3. Put Tooling (E) on the bores of the major bogie and the track roller frame.
4. Lower temp of pin assembly (12) and position in the bore.
5. Install Tooling (D). Use Tooling (D) and install pin assembly (12) in the major bogie.
3/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 3 g01425936
6. Install Tooling (F) into plate (9). Install plate (9). Install retaining ring (10) to hold the plate
in position.
Illustration 4 g00526056
Note: The minor bogie (8) must be installed with the part number or the words THIS SIDE
OUT toward the outside of the major bogie.
7. Put minor bogie (8) in position in the major bogie.
8. Put Tooling (E) on the bores of the minor bogie and the major bogie.
4/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
Illustration 5 g01427640
Note: to reuse original pin assemblies (12), the pin assemblies must be filled with
120 ± 3 mL (4.08 ± 0.10 oz) of SAE 90W oil. The rubber stoppers must be installed
3.00 ± 1.00 mm (0.118 ± 0.039 inch) below the surface of the end of the pin assemblies.
NOTICE
The end of the pin with the Mark X must be toward the outside of the
roller frame. The Mark X must be on the top or bottom on the vertical
centerline of the bore.
9. Lower temp of pin assembly (6), and position in the bore.
10. Install Tooling (D), as shown. Use Tooling (D) to install pin assembly (6). Install the pin
assembly to a depth of 5.0 ± 0.50 mm (0.20 ± 0.02 inch) above the surface of the major
bogie.
5/7
D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW...
2020/2/7
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...

More Related Content

PDF
Manual de serviço xr200 r nx200 cbx200s mskbb931p rodatras3
PDF
Claas Ares 507-607 Tractor repair manual
PDF
Manual de serviço cb400 ii polic.
PDF
Manual de serviço cb400 (1980) ms.001 05-80 carbura
DOC
Tablas poleas y bandas
PDF
Caterpillar cat 955 k track loader (prefix 71j) service repair manual (71j045...
PDF
Manual de serviço nx200 xr rodadian2
PDF
Catálogo NORD G1000
Manual de serviço xr200 r nx200 cbx200s mskbb931p rodatras3
Claas Ares 507-607 Tractor repair manual
Manual de serviço cb400 ii polic.
Manual de serviço cb400 (1980) ms.001 05-80 carbura
Tablas poleas y bandas
Caterpillar cat 955 k track loader (prefix 71j) service repair manual (71j045...
Manual de serviço nx200 xr rodadian2
Catálogo NORD G1000

What's hot (20)

PDF
17071 02 b13 r d13c chn 125761-132856
PDF
New holland ts90 tractor service repair manual
PDF
Case ih axial flow 2388 combine service repair manual
PDF
Manual de serviço cb450 cilindro
PPT
Caixa 9 s
PDF
Case ih case international 5140 tractor service repair manual
PDF
Combilift US8000 lb to 14000 lb C4000 pm-en-26
PDF
Manual de serviço vt600 c 00x6b-mz8-601 suplemento vt600c-05
PDF
Catalogo xlx250 r-1998
PDF
Caterpillar Cat 938F Wheel Loader (Prefix 7SN) Service Repair Manual Instant ...
PDF
Manual de serviço cb400 rodadian
PDF
http://vnx.su/ passat-b6-2006
PDF
Manual de serviço cb500 00 x6b-my5-001 sistarre
PDF
001170777PY.pdf
PDF
Tractor de cadenas
PPTX
Engranajes
PDF
PERKINS 2800 SERIES 2806C-E18 TAG2 DIESEL ENGINE Service Repair Manual
DOCX
Diseño de un tecle tipo portico para el area de Mantenimiento
PDF
Capacitacion De Mangueras Hidraulicas
17071 02 b13 r d13c chn 125761-132856
New holland ts90 tractor service repair manual
Case ih axial flow 2388 combine service repair manual
Manual de serviço cb450 cilindro
Caixa 9 s
Case ih case international 5140 tractor service repair manual
Combilift US8000 lb to 14000 lb C4000 pm-en-26
Manual de serviço vt600 c 00x6b-mz8-601 suplemento vt600c-05
Catalogo xlx250 r-1998
Caterpillar Cat 938F Wheel Loader (Prefix 7SN) Service Repair Manual Instant ...
Manual de serviço cb400 rodadian
http://vnx.su/ passat-b6-2006
Manual de serviço cb500 00 x6b-my5-001 sistarre
001170777PY.pdf
Tractor de cadenas
Engranajes
PERKINS 2800 SERIES 2806C-E18 TAG2 DIESEL ENGINE Service Repair Manual
Diseño de un tecle tipo portico para el area de Mantenimiento
Capacitacion De Mangueras Hidraulicas
Ad

Similar to Caterpillar cat d11 t carrydozer track type tractor (prefix jns) service repair manual (jns00001 and up) (20)

PDF
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
PDF
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
PDF
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
PDF
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
PDF
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
PDF
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual In...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual In...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
PDF
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
PDF
Caterpillar cat d11 r track type tractor (prefix aaf) service repair manual (...
PDF
Caterpillar cat d11 r track type tractor (prefix aaf) service repair manual (...
PDF
Caterpillar cat d11 r track type tractor (prefix aaf) service repair manual (...
PDF
Caterpillar cat d11 r track type tractor (prefix aaf) service repair manual (...
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix tpb) service...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual In...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual In...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
Caterpillar Cat D11R Track-Type Tractor (Prefix AAF) Service Repair Manual (A...
Caterpillar cat d11 r track type tractor (prefix aaf) service repair manual (...
Caterpillar cat d11 r track type tractor (prefix aaf) service repair manual (...
Caterpillar cat d11 r track type tractor (prefix aaf) service repair manual (...
Caterpillar cat d11 r track type tractor (prefix aaf) service repair manual (...
Ad

More from fjkskmmdmme (20)

PDF
John deere mechanical front wheel drive service repair manual (tm4326)
PDF
John deere fs series heads swing to tree disc saw heads service repair manual...
PDF
John deere fg18 swing to tree disk saw felling head service repair manual (tm...
PDF
John deere 7200 front fold max emerge 2 drawn conservation planters service r...
PDF
Caterpillar cat d250 d articulated truck (prefix 9mg) service repair manual (...
PDF
Caterpillar cat d250 d articulated truck (prefix 6ng) service repair manual (...
PDF
Caterpillar cat d250 b articulated dump truck (prefix 5wd) service repair man...
PDF
Caterpillar cat d44 b articulated dump truck (prefix 8sd) service repair manu...
PDF
Caterpillar cat d35 hp articulated dump truck (prefix 3fd) service repair man...
PDF
Caterpillar cat d35 c articulated dump truck (prefix 2gd) service repair manu...
PDF
Caterpillar cat d30 d articulated truck (prefix 9rf) service repair manual (9...
PDF
Caterpillar cat d30 d articulated truck (prefix 3aj) service repair manual (3...
PDF
Caterpillar cat d30 d articulated truck (prefix 1hk) service repair manual (1...
PDF
Caterpillar cat d30 d articulated truck (prefix 1hk) service repair manual (1...
PDF
Caterpillar cat d30 c articulated dump truck (prefix 7zc) service repair manu...
PDF
Caterpillar cat d25 d articulated truck (prefix 1hk) service repair manual (1...
PDF
Caterpillar cat d25 d articulated truck (prefix 1hk) service repair manual (1...
PDF
Caterpillar cat d25 c articulated dump truck (prefix 9yc) service repair manu...
PDF
Caterpillar cat d20 d articulated truck (prefix 9mg) service repair manual (9...
PDF
Caterpillar cat d20 d articulated truck (prefix 6ng) service repair manual (6...
John deere mechanical front wheel drive service repair manual (tm4326)
John deere fs series heads swing to tree disc saw heads service repair manual...
John deere fg18 swing to tree disk saw felling head service repair manual (tm...
John deere 7200 front fold max emerge 2 drawn conservation planters service r...
Caterpillar cat d250 d articulated truck (prefix 9mg) service repair manual (...
Caterpillar cat d250 d articulated truck (prefix 6ng) service repair manual (...
Caterpillar cat d250 b articulated dump truck (prefix 5wd) service repair man...
Caterpillar cat d44 b articulated dump truck (prefix 8sd) service repair manu...
Caterpillar cat d35 hp articulated dump truck (prefix 3fd) service repair man...
Caterpillar cat d35 c articulated dump truck (prefix 2gd) service repair manu...
Caterpillar cat d30 d articulated truck (prefix 9rf) service repair manual (9...
Caterpillar cat d30 d articulated truck (prefix 3aj) service repair manual (3...
Caterpillar cat d30 d articulated truck (prefix 1hk) service repair manual (1...
Caterpillar cat d30 d articulated truck (prefix 1hk) service repair manual (1...
Caterpillar cat d30 c articulated dump truck (prefix 7zc) service repair manu...
Caterpillar cat d25 d articulated truck (prefix 1hk) service repair manual (1...
Caterpillar cat d25 d articulated truck (prefix 1hk) service repair manual (1...
Caterpillar cat d25 c articulated dump truck (prefix 9yc) service repair manu...
Caterpillar cat d20 d articulated truck (prefix 9mg) service repair manual (9...
Caterpillar cat d20 d articulated truck (prefix 6ng) service repair manual (6...

Recently uploaded (20)

PDF
DAEWOO DOOSAN MEGA 400-V 400V WHEEL LOADER Service Repair Manual.pdf
PPTX
VEHICLE BODY ENGINEERING - UNIT 3 Commercial vehicle details
PPTX
THE-STORY-OF-THE-RIZAL-LAW-Critical-Analyses-of-the-Rizal-Law.pptx
PDF
2025-Teacher-I-Senior-HS-CAR-RQA-for-Verification.pdf
PDF
Lecture 10 geo_merged.pdfegrgeregrregrgeregs
PPT
SISI-GUINDY-3sdgsdgsdgsdgsdgsg-1-2006.ppt
PPTX
The-Marketing-Mix-7Ps 2.power point presentation
PDF
735 caterpillar articulated truck service repair manual AWR
PDF
John Deere Tractor 5055 5065 Technical Manual TM900019.pdf
PPTX
Electric Vehicles WPT is a very goof thing that is good in this world
PDF
ISO_9001_Quality_Induction_1720263786.ppt
PDF
Higher Engineering Mathematics ppt zipsd
PPTX
Social_Issues_Presentation.pptxjwiwiwjiwjwjiwji
PPT
Nanotechnology.pptdddddddddddddddddddddd
DOCX
MLS 221 Medical Parasitology (LABORATORY).docx
PPTX
minimum 49 characters required for Catia
PDF
2007 POLARIS Dragon RMK TWO STROKE SNOWMOBILE Service Repair Manual.pdf
PPTX
TDC-15-S-02 Road and Traffic Rules (Version 2).pptx
PPTX
EV Charging Network Requirement for Pakisan
PDF
TM400019 John deere 7430 tractors diagnostic service manual.pdf
DAEWOO DOOSAN MEGA 400-V 400V WHEEL LOADER Service Repair Manual.pdf
VEHICLE BODY ENGINEERING - UNIT 3 Commercial vehicle details
THE-STORY-OF-THE-RIZAL-LAW-Critical-Analyses-of-the-Rizal-Law.pptx
2025-Teacher-I-Senior-HS-CAR-RQA-for-Verification.pdf
Lecture 10 geo_merged.pdfegrgeregrregrgeregs
SISI-GUINDY-3sdgsdgsdgsdgsdgsg-1-2006.ppt
The-Marketing-Mix-7Ps 2.power point presentation
735 caterpillar articulated truck service repair manual AWR
John Deere Tractor 5055 5065 Technical Manual TM900019.pdf
Electric Vehicles WPT is a very goof thing that is good in this world
ISO_9001_Quality_Induction_1720263786.ppt
Higher Engineering Mathematics ppt zipsd
Social_Issues_Presentation.pptxjwiwiwjiwjwjiwji
Nanotechnology.pptdddddddddddddddddddddd
MLS 221 Medical Parasitology (LABORATORY).docx
minimum 49 characters required for Catia
2007 POLARIS Dragon RMK TWO STROKE SNOWMOBILE Service Repair Manual.pdf
TDC-15-S-02 Road and Traffic Rules (Version 2).pptx
EV Charging Network Requirement for Pakisan
TM400019 John deere 7430 tractors diagnostic service manual.pdf

Caterpillar cat d11 t carrydozer track type tractor (prefix jns) service repair manual (jns00001 and up)

  • 1. Service Repair Manual Models D11T CARRY DOZER TRACK-TYPE TRACTOR
  • 2. Shutdown SIS Previous Screen Product: TRACK-TYPE TRACTOR Model: D11T TRACK-TYPE TRACTOR JNS Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine Disassembly and Assembly D11T Track-Type Tractor Power Train Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011 i04407756 Recoil Spring - Install SMCS - 4158-012 Installation Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 8S-7640 Stand 1 8S-7611 Tube 1 8S-7615 Pin 1 8S-8048 Saddle 1 B 3S-6224 Electric Hydraulic Pump Gp 1 1S-8937 Needle Valve 1 8S-7172 Double Acting Cylinder 1 5P-7269 Plate 1 1J-2921 Bolt 2 5F-9888 Coupling 1 5P-8713 Plate 1 163-9151 Pilot 1 5P-2678 Stud 5 FT-2631 Spacers 10 5P-8249 Hard Washer 5 1/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 3. 2J-3505 Full Nut 5 C 1P-0520 Driver Gp 1 D - Bar Stock 12.7 mm (0.50 inch) by 54.00 mm (2.125 inch) by 609.6 mm (24.00 inch) long 1 Illustration 1 g00553596 Typical example NOTICE Install stop assembly (13) with the large inside diameter toward the front of the track roller frame. 2/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 4. Illustration 2 g00553595 Typical example NOTICE Do not damage the threads on the inside of the front track roller frame when the recoil spring is installed. 1. Attach a suitable lifting device to recoil spring (12) and stop assembly (13). The weight of recoil spring (12) and stop assembly (13) is approximately 522 kg (1150 lb). Install recoil spring (12) and stop assembly (13) in the front track roller frame. 2. Use a suitable lift truck and install the recoil spring (12) and stop assembly (13) into the front track roller frame. Illustration 3 g00553594 Typical example 3. Use Tooling (C) to install bearing (11) in pilot assembly (10) if the bearing was removed. The inside diameter of the bearing must be 101.100 ± 0.116 mm (3.9803 ± .0045 inch) after installation. Note: The recoil spring and the stop assembly must be against the end of the front track roller frame before pilot assembly (10) is installed. 4. Install pilot assembly (10) in the front track roller frame. 3/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 5. Illustration 4 g00553003 Typical example 5. Attach a suitable lifting device to recoil spring retainer (9). The weight of recoil spring retainer (9) is approximately 55 kg (120 lb). Install recoil spring retainer (9) in the front track roller frame. 6. Tighten recoil spring retainer (9). Use Tooling (D) to tighten the recoil spring retainer (9) enough to contact the pilot assembly. Recoil spring retainer (9) must be installed approximately 89.0 mm ( 3.50 inch). Illustration 5 g00553481 Typical example Use only the tooling and cylinder listed in this procedure. Do not use other cylinders because they can cause enough force to break the tension rods. This can result in personal injury or death. 4/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 6. 7. Install Tooling (B). Measure the distance between Surface (C) and 5P-7269 Plate (5) at four locations next to 5P-2678 Studs. Use 2J-3505 Nuts (7) in order to adjust the plate. Adjust the distance to 550.0 mm (21.65 inch). Install stops (2) on 5P-2678 Studs (6) to aid in proper alignment for installation. Illustration 6 g00553482 Typical example Illustration 7 g00553483 Typical example The recoil spring must never have more than 12.7 mm (.50 inch) distance between the recoil spring retainer during installation of the recoil spring. 5/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 7. 8. Slowly extend the cylinder rod in order to compress the recoil spring while recoil spring retainer (9) is installed. Continue this procedure until the outside of the recoil spring retainer is 3.0 mm (0.12 inch) inside the front track roller frame. 9. Turn recoil spring retainer (9) until the slots are in alignment. Install stops (2) in the front track roller frame. 10. Remove Tooling (B) from the front track roller frame. Illustration 8 g00558740 Typical example 11. Put stops (2) in position, and install four bolts (1) . 12. Fasten a suitable lifting device to track adjuster (4). Install track adjuster (4) in the front track roller frame. The weight of track adjuster (4) is approximately 177 Kg (390 lb). 13. Put cable (3) in position on track adjuster (4). Install the spacer, the washer, and the bolt that keeps the cable in place. End By: Install the front track roller frame. Copyright 1993 - 2020 Caterpillar Inc. All Rights Reserved. Private Network For SIS Licensees. Fri Feb 7 22:38:27 UTC+0800 2020 6/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 8. Shutdown SIS Previous Screen Product: TRACK-TYPE TRACTOR Model: D11T TRACK-TYPE TRACTOR JNS Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine Disassembly and Assembly D11T Track-Type Tractor Power Train Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011 i04369271 Track Roller Frame - Remove SMCS - 4151-011 Removal Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 105-3351 Strap 2 105-3349 Strap 2 B 8S-6470 Forcing Bolt 1 C 8S-7620 Base As 1 8S-7650 Cylinder As 1 8S-7615 Pin 1 3S-6224 Electric Hydraulic Pump Gp 1 D 6V-3160 Double Acting Cylinder 1 9S-5564 Pin Puller Sleeve As 1 4C-9633 Puller Stud 1 1P-0543 Nut 1 3S-6224 Electric Hydraulic Pump Gp 1 E 142-8548 Bracket 1 189-0411 Shackle As 2 193-5474 Shackle As 1 1/8 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 9. 9U-7536 Lift Stand 2 277-7200 Electric Hydraulic Pump Gp 2 Start By: a. Remove the bulldozer. b. Separate the track. When you are using hydraulic cylinders and puller studs, always ensure that the rated capacity of the puller stud meets or exceeds the rated capacity of the hydraulic cylinder. If the puller stud does not meet or exceed the rated capacity of the hydraulic cylinder, a sudden failure of the puller stud could occur. The sudden failure of the puller stud could result in personal injury or death. Illustration 1 g01425311 1. Install Tooling (A) to hold the bogies in place when the machine is raised. 2/8 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 10. Illustration 2 g01414487 Note: Install Tooling (F) near the outer edge of the case, forward of the ripper pin bore to support the weight of the machine. Improper placement of Tooling (F) could result in damage to the underside of the case. 2. Lift the rear of the machine with Tooling (F) until the track guides are above the track links. 3. Lift the front of the machine with Tooling (F) until the track guides are above the track links. Illustration 3 g01414894 4. Remove plug (3) and drain the oil from the pivot shaft compartment into a suitable container for storage or disposal. 5. Fasten a suitable lifting device to trunnion (1). The weight of trunnion (1) is approximately 147 kg (325 lb). Remove bolts (2) and trunnion (1) from the track roller frame. 3/8 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 11. Illustration 4 g01414954 6. Remove plug (6) from plate (5). 7. Remove spiral lock ring (4). Illustration 5 g01414955 8. Install Tooling (B) in plate (5). Tighten Tooling (B) to remove plate (5) from the track roller frame. Illustration 6 g00525912 4/8 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 12. 9. Position Tooling (C) under the front track roller frame, as shown. Support the weight of the roller frame with Tooling (C). Illustration 7 g01414960 10. Remove bolts (8) that hold retainer assembly (7) to the main frame case. NOTICE To prevent damage to the pivot shaft seal, make sure the bolts that hold the pivot shaft seal retainer to the main frame case has been removed before the equalizer bar is disconnected. Illustration 8 g01414529 11. Remove bolts (9) and the nuts that clamp pin (10) in place in the track roller frame. 12. Remove the retaining ring and the spacer from the end of pin (10). 5/8 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 13. Illustration 9 g00525919 13. Attach Tooling (D), as shown. Fasten a suitable lifting device to Tooling (D). 14. Use Tooling (D) to remove pin (10) from the track roller frame. Illustration 10 g00525920 Personal injury or death can result from lifting a heavy assembly. The heavy assembly can fall if using an incorrect hoist to lift the load. Be sure the hoist has the correct capacity to lift a heavy assembly. Approximate weight of the assembly is given below. Pinch Point Stay clear of this area! 6/8 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 14. Serious personal injury may occur. 15. Fasten a suitable lifting device and Tooling (E) to the track roller frame. Support the weight of the track roller frame with the suitable lifting device. The weight of the roller frame is approximately 9979 kg (22000 lb). 16. Remove Tooling (C) from the front frame. Illustration 11 g01414538 17. Remove bolts (11) and plate (12) that holds the track roller frame to the pivot shaft. Remove the thrust ring. 18. Use a suitable lifting device and Tooling (E) to remove the track roller frame. Illustration 12 g01414549 (13) Thrust plate 19. Remove O-ring seal (15). 20. Fasten a suitable lifting device to retainer assembly (7). The weight of retainer assembly (7) is approximately 34 kg (75 lb). -Remove bolts (14) that hold retainer assembly (7) to the track roller frame and remove retainer assembly (7). 7/8 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 15. Illustration 13 g01414735 21. Remove O-ring seal (17) from retainer (16). 22. Use a hammer and a chisel to remove seal assembly (18) from retainers (16) and (19). 23. Remove plate (13) from retainer (7). Refer to Illustration 12 for the location of plate (13). Illustration 14 g01414747 24. If necessary, remove bearings (20) from the track roller frame. Copyright 1993 - 2020 Caterpillar Inc. All Rights Reserved. Private Network For SIS Licensees. Fri Feb 7 22:39:26 UTC+0800 2020 8/8 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 16. Shutdown SIS Previous Screen Product: TRACK-TYPE TRACTOR Model: D11T TRACK-TYPE TRACTOR JNS Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine Disassembly and Assembly D11T Track-Type Tractor Power Train Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011 i06671320 Track Roller Frame - Disassemble SMCS - 4151-015 Disassembly Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 105-3349 Strap 1 B 3S-6224 Electric Hydraulic Pump Gp 1 6V-3175 Hydraulic Cylinder Gp 1 4C-9634 Puller Stud 1 5P-7270 Sleeve 1 1P-1840 Bearing Puller Adapter 1 9U-6832 Nut 1 3H-0467 Puller Washer 1 C FT-1713 Wedge 1 D 2D-1201 Eyebolt 1 Start By: a. Remove the track roller frame or the front track roller frame. Refer to Disassembly and Assembly, "Track Roller Frame - Remove". b. Remove the idlers. Refer to Disassembly and Assembly, "Idlers - Remove". 1/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 17. NOTICE Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates. Note: The disassembly procedure for the track roller frame and the front track roller frame is the same procedure. Only the front track roller frame is shown. Illustration 1 g01425527 1. Fasten a suitable lifting device to track roller (1). 2. Remove bolts (3) and caps (2) and remove the track roller. The weight of track roller is approximately 179 kg (394 lb). Note: Special Spiralock threads are used on the minor bogies with caps with 2 bolts. Spiralock threads provide improved bolt retention. Use special Spiralock taps to chase the threads in these holes. The use of standard taps in these holes will eliminate the Spiralock feature. This will cause the bolts to loosen. 3. Remove Tooling (A) from the track roller frame. 2/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 18. Illustration 2 g01425931 4. Remove guides (4) and covers (5) from both sides of the track roller frame. Illustration 3 g01425933 Note: There will be a loss of oil when the stoppers and plug (7) are removed from pin assembly (6). 5. Use a drill and remove the stoppers and plugs (7) from both ends of pin assembly (6). 3/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 19. Illustration 4 g01425935 6. Put Tooling (B) in position. Fasten a suitable lifting device to Tooling (B). The combined weight of the pin assembly and Tooling (B) is approximately 45 kg (100 lb). 7. Use Tooling (B) to remove the pin assembly that holds minor bogie (8) to the major bogie. Illustration 5 g00526056 8. Fasten a suitable lifting device to minor bogie (8). Remove minor bogie (8). The weight of minor bogie (8) is approximately 39 kg (86 lb). 4/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 20. Illustration 6 g01425936 9. Remove retaining ring (10). 10. Install Tooling (D) in plate (9). Remove the plate (9) from the track roller frame. Illustration 7 g01425937 Note: There will be a loss of oil when the stoppers and plugs (11) are removed. 11. Use a suitable drill, and remove the stoppers and plugs (11) from pin assembly (12). 5/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 21. Illustration 8 g00526071 12. Install Tooling (C) between the inside of the track roller frame and the major bogie. 13. Install Tooling (B). Fasten a suitable lifting device to Tooling (B). 14. Use Tooling (B) and remove the pin assemblies that hold the major bogie to the track roller frame. Illustration 9 g00526078 15. Fasten a suitable lifting device to major bogie (13). Remove major bogie (13) from the track roller frame. The weight of major bogie (13) is approximately 435 kg (960 lb). 16. Remove pad assemblies (14) from the major bogie and the track roller frame. Copyright 1993 - 2020 Caterpillar Inc. All Rights Reserved. Private Network For SIS Licensees. Fri Feb 7 22:40:26 UTC+0800 2020 6/6 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 22. Shutdown SIS Previous Screen Product: TRACK-TYPE TRACTOR Model: D11T TRACK-TYPE TRACTOR JNS Configuration: D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POWERED BY C32 Engine Disassembly and Assembly D11T Track-Type Tractor Power Train Media Number -KENR5620-00 Publication Date -01/08/2011 Date Updated -26/08/2011 i07041863 Track Roller Frame - Assemble SMCS - 4151-016 Assembly Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 105-3349 Strap 1 D 3S-6224 Electric Hydraulic Pump Gp 1 5P-7399 Adapter (Bearing Puller) 1 6V-3175 Cylinder Gp 1 5P-9695 Pressure Plate 1 5P-4776 Tool Stud 3 1A-1935 Nut 3 3K-5234 Hard Washer 3 E 5P-3931 Anti-Seize Compound - F 1P-7409 Eyebolt 1 When you are using hydraulic cylinders and puller studs, always ensure that the rated capacity of the puller stud meets or exceeds the rated capacity of the hydraulic cylinder. If the puller stud does not meet or 1/7 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 23. exceed the rated capacity of the hydraulic cylinder, a sudden failure of the puller stud could occur. The sudden failure of the puller stud could result in personal injury or death. NOTICE Do not use threaded rods that have not been hardened as tooling with hydraulic cylinders. The maximum rated tonnage should be stamped on one end of the puller studs. Do not use threaded rods that have not been stamped with the rated tonnage. Illustration 1 g00526078 1. Put pad assemblies (14) in position on the major bogie (13) and the track roller frame. Install the bolts that hold the pad assemblies in place. 2. Fasten a suitable lifting device to major bogie (13). Put the major bogie (13) in position in the track roller frame. The weight of major bogie (13) is approximately 435 kg (960 lb). 2/7 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 24. Thank you very much for your reading. Please Click Here. Then Get COMPLETE MANUAL. NO WAITING NOTE: If there is no response to click on the link above, please download the PDF document first and then click on it.
  • 25. Illustration 2 g01427639 Note: to reuse original pin assemblies (12), the pad assemblies must be filled with 120 ± 3 mL (4.08 ± 0.10 oz) of SAE 90W oil. The rubber stoppers must be installed 3.00 ± 1.00 mm (0.118 ± 0.039 inch) below the surface of the end of the pin assemblies. NOTICE The end of the pin with the Mark X or a hole must be toward the outside of the roller frame. The Mark X or hole must be on the top or bottom on the vertical center line of the bore. 3. Put Tooling (E) on the bores of the major bogie and the track roller frame. 4. Lower temp of pin assembly (12) and position in the bore. 5. Install Tooling (D). Use Tooling (D) and install pin assembly (12) in the major bogie. 3/7 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 26. Illustration 3 g01425936 6. Install Tooling (F) into plate (9). Install plate (9). Install retaining ring (10) to hold the plate in position. Illustration 4 g00526056 Note: The minor bogie (8) must be installed with the part number or the words THIS SIDE OUT toward the outside of the major bogie. 7. Put minor bogie (8) in position in the major bogie. 8. Put Tooling (E) on the bores of the minor bogie and the major bogie. 4/7 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
  • 27. Illustration 5 g01427640 Note: to reuse original pin assemblies (12), the pin assemblies must be filled with 120 ± 3 mL (4.08 ± 0.10 oz) of SAE 90W oil. The rubber stoppers must be installed 3.00 ± 1.00 mm (0.118 ± 0.039 inch) below the surface of the end of the pin assemblies. NOTICE The end of the pin with the Mark X must be toward the outside of the roller frame. The Mark X must be on the top or bottom on the vertical centerline of the bore. 9. Lower temp of pin assembly (6), and position in the bore. 10. Install Tooling (D), as shown. Use Tooling (D) to install pin assembly (6). Install the pin assembly to a depth of 5.0 ± 0.50 mm (0.20 ± 0.02 inch) above the surface of the major bogie. 5/7 D11T CARRYDOZER TRACK-TYPE TRACTOR JNS00001-UP (MACHINE) POW... 2020/2/7 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...