Lean Six Sigma Helpful Handouts
Lean Thinking Philosophy Current State Future State Solve Problems Expose Problems Identify and eliminate all activities that are waste (Muda).  Focuses on optimal flow throughout the process.  Customer focused. “ True North ” Value Added Time = Lead Time Full of Waste, Variation, and Constraints
Lean Six Sigma   Roles Provide data and voice of customer  inputs to VSA, RIE, and Projects Apply concepts to their own jobs  and work areas Owns vision, direction, business results Leads change Allocates Resources Runs Steering  Committee Owns Value Streams Owns financial results Removes Barriers Coordinates with Steering Committee & LSS Deployment Lead Leads larger projects  Coaches Green Belts & Junior BBs Full-time or Part-time position Conducts LSS Training Develops LSS strategic plans Lead projects SME on process area Part time role Team  or Project specific support Part time Internal Deployment Leader Owns Deployment Plan Captures and Reports Metrics LSS Deployment Lead Brian Groarke Value Stream Champion Team Members Executive Champion Celia Metz Green Belts Master Black Belt Duke Sorensen Process Owners Sponsors LSS projects Responsible for execution Provides resources for project Reports ROI Removes Roadblocks All Employees Trains Black Belts / Green Belts Leads Complex Projects  Full-time position Black Belts
Future Notional View of SSC SD  LSS Hierarchical Structure SSC-SD MBB/BBs Division Black Belt Division Black Belt Division Black Belt Division Black Belt Division Black Belt Department Sr. Black Belt Branch Green Belt Branch Green Belt Branch Green Belt
LSS Green Belt Certification Requirements Nominated and selected as a Green Belt Candidate in accordance with the GB selection criteria Attend 1 week Green Belt Training Pass Green Belt written test Complete two GB DMAIC/DFLSS projects or 4 RIE’s within 2 years of training Present project completion brief to Black Belt and archive project artifacts in the LSS database
LSS Black Belt Certification Requirements Nominated and selected as a Black Belt Candidate in accordance with the BB selection criteria Attend 1 week Green Belt Training Attend 3 weeks Black Belt Training Attend leadership training (e.g. HPO) Pass Black Belt written test Complete two DMAIC/DFLSS projects and 1 RIE  Mentor 2 Green Belts through 1 project each or 3 RIE’s each Present a minimum of 10 hours of formal LSS training course instruction Present project briefing to the certification board Requirements must be completed within 2 years of BB training
DMAIC Model DEFINE IMPROVE CONTROL Define the Problem Define Scope / Boundaries Define the Case for Action Define the Sponsor Commit Resources Define Customer Value Define Expected Benefit Define the Vision Observe “As Is” Baseline Describe the Situation Measure Actual Obtain Process X’s Obtain Process Y’s Determine Process Capability Develop Process Map Determine Cause and Effect Relationships Understand ID Potential Causes ID Solutions for Improvement Summarize & Prioritize Solutions Plan the Improvements Reduce Waste Reduce Complexity Reduce Variability Conduct Pilots Run Pilots, Gather Data Design Controls Plan Implementation Deploy Improvements Implement Controls Assess and Adjust Train  personnel Update Priorities Plan Next Steps Identify Potential Follow-on Projects Publicize & Recognize Knowledge Sharing Tollgates prior to proceeding to Next Phases MEASURE ANALYZE
Step 1: DEFINE Goal Define the project’s purpose and scope and get background on the process and customer Output A clear statement of the intended improvement  and how it is to be  measured A high level map  of the process A list of what is important to the customer IMPROVE Project  Charter VOC SIPOC
Step 2: MEASURE Goal Focus the improvement effort by gathering information on the current situation Output Baseline data on current process performance Data that pinpoints problem location or occurrence A more focused problem statement IMPROVE Determine Measures based on  CTQs Measure  As-Is Patterns
Step 3: ANALYZE Goal Identify root causes and confirm them with data Output A theory that has been tested and confirmed Data Analysis IMPROVE Analyze waste and   variation Identify root causes Process  Analysis
Step 4: IMPROVE Goal Develop, try out,  and implement solutions that  address root  causes Output Planned, tested  actions that should eliminate or reduce the impact of the identified root causes Solutions FMEA Pilot Implemen - tation IMPROVE
Step 5: CONTROL Goal Use data to evaluate both the  solutions and the plans Validate that all changes  adhere to all operating  company change control,  and compliance  requirements  Maintain the gains by  standardizing processes Outline next steps for on-going improvement including opportunities  for replication Output Before and After analysis Monitoring system Completed documentation of results, learnings, and recommendations Control Standardize Document Monitor Evaluate Closure IMPROVE
Design Identify Optimize Verify Define 1-Description/ Problem Refined 2-Business Case Approved  (StartIt Page and Assumptions in Briefing) 3-Schedule Established 4-Quad 1- Customers Identified 2-Customer Needs Gathered (VOC) 3-CTQs Specified  (In Measurable Terms) 4-Stakeholder Analysis 5-Risks Quantified   (Initial Mitigation Approach Identified) 1-Design Concepts Developed  (Functional Analysis,   High Level Requirements, Mapping of these to CTQs) 2-Alternative Concepts Evaluated  (Trades)  and Optimum Solution Selected  (with rationale presented)  3-High Level Design Developed  (e.g., architecture, next level process steps, etc.) 4-High Level Design Evaluated Against CTQs/ Requirements 1-Detailed Design Developed  (Design captured How, Process Work Instruction Steps Developed, etc.) 2-End Product* implemented then piloted or simulated  (Describe this) 3-End Product Optimized  (Describe how) 4-Identify Specific  post-institutionalization control measures to be monitored  (What to Measure) 1-End product Verified that it does satisfy CTQs  (and all requirements identified during earlier phases) 2-End Product “Roll-Out” Plan Established and “Bought Into”  (By Process Owner, When? How Trained?, etc.) 3-Control Plan Defined/ Established  (What Metrics, Who, How Often, etc.) 4-Financial Validation Plan Established  (How, Who, How Often, etc.)\ 5-Replication Opportunities Identified 6-Lessons Learned Summarized DFLSS Model Tollgates prior to proceeding to Next Phases
SSC SD Balanced Scorecard
Measuring an Organization’s Lean Six Sigma Maturity In a Lean Six Sigma culture: The leadership team drives Quality Quality is embedded in our strategy Lean Six Sigma is built into project planning Targets are set in Six Sigma terms Everyone is Lean Six Sigma trained Lean Six Sigma tools are widely used Quality is a core theme in communications Everyone is engaged Lean Six Sigma defines the way we work Maturing  Lean Six Sigma Culture Key Performance Indicators (KPI): Utilization of Trained Personnel Participation of Workforce in Projects Training of Workforce Certification of Green and Black Belts Contribution to Business KPI Level 5 Utilization of Trained Personnel = 100% More than 40% Participation in Projects 80% or more of Workforce Trained >70% of Trained Belts Certified LSS Contribution to Business KPI  >  20% Level 4 Utilization of Trained Personnel = 100% 30 to 40% Participation in Projects 60 to 79% of Workforce Trained 55 to 70% of Trained Belts Certified LSS Contribution to Business KPI 16-20% Level 3 Utilization of Trained Personnel  > 75% 20 to 29% Participation in Projects 40 to 59% of Workforce Trained 40 to 54% of Trained Belts Certified LSS Contribution to Business KPI 11-15% Level 2 Utilization of Trained Personnel  >  50% 10 to 19% Participation in Projects 20 to 39% of Workforce Trained 25 to 39% of Trained Belts Certified LSS Contribution to Business KPI 5-10% Level 1 Utilization of Trained Personnel <50% < 10%   Participation in Projects Less than 19% of Workforce Trained Less than 25% of Trained Belts Certified LSS Contribution to Business KPI ≤ 5%1
LSS and CMMI are Complementary Improvement Initiatives Lean Six Sigma CMMI Lean Six Sigma focuses on designing the best processes to reach the desired end state  Integration of these two organizational improvement initiatives is powerful!  CMMI provides guidance for measuring, monitoring and managing processes Both are business strategies to deliver value to the customer and develop a sustainable competitive advantage
Examples of LSS Tools for Project Management Guide Implementation

More Related Content

PPTX
Connecting Kata with Hoshin Kanri and True North
PDF
Lean Six Sigma: DMAIC In-Depth
PDF
DMAIC for sharing
PPTX
Define phase lean six sigma tollgate template
PPT
Six sigma case study-a good approach with example
PPT
Dmaic
PPTX
Measure phase lean six sigma tollgate template
PPTX
Six sigma
Connecting Kata with Hoshin Kanri and True North
Lean Six Sigma: DMAIC In-Depth
DMAIC for sharing
Define phase lean six sigma tollgate template
Six sigma case study-a good approach with example
Dmaic
Measure phase lean six sigma tollgate template
Six sigma

What's hot (20)

PDF
Six Sigma
PPTX
Basics of Six Sigma
PPTX
Lean six sigma explained: Beginners training
PDF
WEBINAR: Introduction to DMAIC
PPTX
Six sigma
PPTX
Six Sigma Project on Distribution Efficiency
PPTX
Dmaic overview for slideshare
PPT
Basic Six Sigma Presentation
PDF
Introduction to Lean Six Sigma
PDF
PPT
Basics Six Sigma Fresher Guide
PPTX
Value stream mapping
PDF
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
PPT
Lean And Six Sigma
PDF
Gemba Walk Don'ts
PPT
Six sigma
PPT
Lean, Six Sigma, ToC using DMAIC - Measure phase
PDF
7 steps to master problem solving
PPTX
Six sigma
Six Sigma
Basics of Six Sigma
Lean six sigma explained: Beginners training
WEBINAR: Introduction to DMAIC
Six sigma
Six Sigma Project on Distribution Efficiency
Dmaic overview for slideshare
Basic Six Sigma Presentation
Introduction to Lean Six Sigma
Basics Six Sigma Fresher Guide
Value stream mapping
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
Lean And Six Sigma
Gemba Walk Don'ts
Six sigma
Lean, Six Sigma, ToC using DMAIC - Measure phase
7 steps to master problem solving
Six sigma
Ad

Viewers also liked (20)

PPTX
Lean six sigma Yellow Belt Complete training
PPTX
Six sigma ppt
PPT
Programa de certificación lean six sigma
PPT
Six sigma-presentation
PPT
Successfully Achieving And Delivering Results Through Rigorous Project Select...
PPT
Best Practices Fusion: Lean Six Sigma & CMMI
PDF
Semana Internacional para la Calidad - Study Tour en Miami Florida 2016
DOCX
Six sigma green belt training (autosaved)
PPT
Using hoshin planning for six sigma project selection
PDF
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
PPTX
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
PPTX
2013 QMOD Presentation
PPT
Ponencia ITSM2020 nuevo modelo gestión de negocios para la Era Digital
PDF
Lean Manufaturings and 7 wastings - See how Lean Manufacturings connects wit...
PPT
Session 8 - Introduction to Lean Six Sigma
PPT
Aaadissertdefesa Ppt Sgq17082007
PPTX
AgileCamp 2014 Track 5: The Seven Wastes - Can You Get Leaner
PDF
Lean 6sigma and DMAIC
PPT
DMAIC Methodology
PDF
Change management framework structure
Lean six sigma Yellow Belt Complete training
Six sigma ppt
Programa de certificación lean six sigma
Six sigma-presentation
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Best Practices Fusion: Lean Six Sigma & CMMI
Semana Internacional para la Calidad - Study Tour en Miami Florida 2016
Six sigma green belt training (autosaved)
Using hoshin planning for six sigma project selection
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
2013 QMOD Presentation
Ponencia ITSM2020 nuevo modelo gestión de negocios para la Era Digital
Lean Manufaturings and 7 wastings - See how Lean Manufacturings connects wit...
Session 8 - Introduction to Lean Six Sigma
Aaadissertdefesa Ppt Sgq17082007
AgileCamp 2014 Track 5: The Seven Wastes - Can You Get Leaner
Lean 6sigma and DMAIC
DMAIC Methodology
Change management framework structure
Ad

Similar to Lean Six Sigma Awareness Handouts (20)

PPT
Lean Six Sigma Leadership 062507
PPTX
Lean Six Sigma overview Julian Kalac
PPTX
An Introduction to Lean Six Sigma.pptx
PPTX
An introduction to lean six sigma
PPTX
An introduction to lean six sigma
PDF
B318 web
PPTX
Lean Six Sigma Naval Reserve Presentation
PPT
Lean Six Sigma Overview
PPT
Introducing Six Sigma
PPT
Integrating lssiso9ts
PPTX
Control phase lean six sigma tollgate template
PPTX
Control phase lean six sigma tollgate template
PDF
Introduction-to-Lean-Six-Sigma.pdf
PPTX
Lean Six Sigma - Introduction
PPTX
Measure phase lean six sigma tollgate template
PPT
Work Harder and Harder
Lean Six Sigma Leadership 062507
Lean Six Sigma overview Julian Kalac
An Introduction to Lean Six Sigma.pptx
An introduction to lean six sigma
An introduction to lean six sigma
B318 web
Lean Six Sigma Naval Reserve Presentation
Lean Six Sigma Overview
Introducing Six Sigma
Integrating lssiso9ts
Control phase lean six sigma tollgate template
Control phase lean six sigma tollgate template
Introduction-to-Lean-Six-Sigma.pdf
Lean Six Sigma - Introduction
Measure phase lean six sigma tollgate template
Work Harder and Harder

Recently uploaded (20)

PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PDF
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
PDF
A Brief Introduction About Julia Allison
PPTX
Buy Chaos Software – V-Ray, Enscape & Vantage Licenses in India
PDF
power sharing oneksr shot revision series-1 Copy.pdf
DOCX
Business Management - unit 1 and 2
PPT
Chapter four Project-Preparation material
PPT
Data mining for business intelligence ch04 sharda
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPTX
Amazon (Business Studies) management studies
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PPTX
Probability Distribution, binomial distribution, poisson distribution
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Lecture 3 - Risk Management and Compliance.pdf
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
PDF
COST SHEET- Tender and Quotation unit 2.pdf
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
New Microsoft PowerPoint Presentation - Copy.pptx
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
A Brief Introduction About Julia Allison
Buy Chaos Software – V-Ray, Enscape & Vantage Licenses in India
power sharing oneksr shot revision series-1 Copy.pdf
Business Management - unit 1 and 2
Chapter four Project-Preparation material
Data mining for business intelligence ch04 sharda
Reconciliation AND MEMORANDUM RECONCILATION
Amazon (Business Studies) management studies
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
Probability Distribution, binomial distribution, poisson distribution
unit 1 COST ACCOUNTING AND COST SHEET
Lecture 3 - Risk Management and Compliance.pdf
Chapter 5_Foreign Exchange Market in .pdf
Power and position in leadershipDOC-20250808-WA0011..pdf
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
COST SHEET- Tender and Quotation unit 2.pdf

Lean Six Sigma Awareness Handouts

  • 1. Lean Six Sigma Helpful Handouts
  • 2. Lean Thinking Philosophy Current State Future State Solve Problems Expose Problems Identify and eliminate all activities that are waste (Muda). Focuses on optimal flow throughout the process. Customer focused. “ True North ” Value Added Time = Lead Time Full of Waste, Variation, and Constraints
  • 3. Lean Six Sigma Roles Provide data and voice of customer inputs to VSA, RIE, and Projects Apply concepts to their own jobs and work areas Owns vision, direction, business results Leads change Allocates Resources Runs Steering Committee Owns Value Streams Owns financial results Removes Barriers Coordinates with Steering Committee & LSS Deployment Lead Leads larger projects Coaches Green Belts & Junior BBs Full-time or Part-time position Conducts LSS Training Develops LSS strategic plans Lead projects SME on process area Part time role Team or Project specific support Part time Internal Deployment Leader Owns Deployment Plan Captures and Reports Metrics LSS Deployment Lead Brian Groarke Value Stream Champion Team Members Executive Champion Celia Metz Green Belts Master Black Belt Duke Sorensen Process Owners Sponsors LSS projects Responsible for execution Provides resources for project Reports ROI Removes Roadblocks All Employees Trains Black Belts / Green Belts Leads Complex Projects Full-time position Black Belts
  • 4. Future Notional View of SSC SD LSS Hierarchical Structure SSC-SD MBB/BBs Division Black Belt Division Black Belt Division Black Belt Division Black Belt Division Black Belt Department Sr. Black Belt Branch Green Belt Branch Green Belt Branch Green Belt
  • 5. LSS Green Belt Certification Requirements Nominated and selected as a Green Belt Candidate in accordance with the GB selection criteria Attend 1 week Green Belt Training Pass Green Belt written test Complete two GB DMAIC/DFLSS projects or 4 RIE’s within 2 years of training Present project completion brief to Black Belt and archive project artifacts in the LSS database
  • 6. LSS Black Belt Certification Requirements Nominated and selected as a Black Belt Candidate in accordance with the BB selection criteria Attend 1 week Green Belt Training Attend 3 weeks Black Belt Training Attend leadership training (e.g. HPO) Pass Black Belt written test Complete two DMAIC/DFLSS projects and 1 RIE Mentor 2 Green Belts through 1 project each or 3 RIE’s each Present a minimum of 10 hours of formal LSS training course instruction Present project briefing to the certification board Requirements must be completed within 2 years of BB training
  • 7. DMAIC Model DEFINE IMPROVE CONTROL Define the Problem Define Scope / Boundaries Define the Case for Action Define the Sponsor Commit Resources Define Customer Value Define Expected Benefit Define the Vision Observe “As Is” Baseline Describe the Situation Measure Actual Obtain Process X’s Obtain Process Y’s Determine Process Capability Develop Process Map Determine Cause and Effect Relationships Understand ID Potential Causes ID Solutions for Improvement Summarize & Prioritize Solutions Plan the Improvements Reduce Waste Reduce Complexity Reduce Variability Conduct Pilots Run Pilots, Gather Data Design Controls Plan Implementation Deploy Improvements Implement Controls Assess and Adjust Train personnel Update Priorities Plan Next Steps Identify Potential Follow-on Projects Publicize & Recognize Knowledge Sharing Tollgates prior to proceeding to Next Phases MEASURE ANALYZE
  • 8. Step 1: DEFINE Goal Define the project’s purpose and scope and get background on the process and customer Output A clear statement of the intended improvement and how it is to be measured A high level map of the process A list of what is important to the customer IMPROVE Project Charter VOC SIPOC
  • 9. Step 2: MEASURE Goal Focus the improvement effort by gathering information on the current situation Output Baseline data on current process performance Data that pinpoints problem location or occurrence A more focused problem statement IMPROVE Determine Measures based on CTQs Measure As-Is Patterns
  • 10. Step 3: ANALYZE Goal Identify root causes and confirm them with data Output A theory that has been tested and confirmed Data Analysis IMPROVE Analyze waste and variation Identify root causes Process Analysis
  • 11. Step 4: IMPROVE Goal Develop, try out, and implement solutions that address root causes Output Planned, tested actions that should eliminate or reduce the impact of the identified root causes Solutions FMEA Pilot Implemen - tation IMPROVE
  • 12. Step 5: CONTROL Goal Use data to evaluate both the solutions and the plans Validate that all changes adhere to all operating company change control, and compliance requirements Maintain the gains by standardizing processes Outline next steps for on-going improvement including opportunities for replication Output Before and After analysis Monitoring system Completed documentation of results, learnings, and recommendations Control Standardize Document Monitor Evaluate Closure IMPROVE
  • 13. Design Identify Optimize Verify Define 1-Description/ Problem Refined 2-Business Case Approved (StartIt Page and Assumptions in Briefing) 3-Schedule Established 4-Quad 1- Customers Identified 2-Customer Needs Gathered (VOC) 3-CTQs Specified (In Measurable Terms) 4-Stakeholder Analysis 5-Risks Quantified (Initial Mitigation Approach Identified) 1-Design Concepts Developed (Functional Analysis, High Level Requirements, Mapping of these to CTQs) 2-Alternative Concepts Evaluated (Trades) and Optimum Solution Selected (with rationale presented) 3-High Level Design Developed (e.g., architecture, next level process steps, etc.) 4-High Level Design Evaluated Against CTQs/ Requirements 1-Detailed Design Developed (Design captured How, Process Work Instruction Steps Developed, etc.) 2-End Product* implemented then piloted or simulated (Describe this) 3-End Product Optimized (Describe how) 4-Identify Specific post-institutionalization control measures to be monitored (What to Measure) 1-End product Verified that it does satisfy CTQs (and all requirements identified during earlier phases) 2-End Product “Roll-Out” Plan Established and “Bought Into” (By Process Owner, When? How Trained?, etc.) 3-Control Plan Defined/ Established (What Metrics, Who, How Often, etc.) 4-Financial Validation Plan Established (How, Who, How Often, etc.)\ 5-Replication Opportunities Identified 6-Lessons Learned Summarized DFLSS Model Tollgates prior to proceeding to Next Phases
  • 14. SSC SD Balanced Scorecard
  • 15. Measuring an Organization’s Lean Six Sigma Maturity In a Lean Six Sigma culture: The leadership team drives Quality Quality is embedded in our strategy Lean Six Sigma is built into project planning Targets are set in Six Sigma terms Everyone is Lean Six Sigma trained Lean Six Sigma tools are widely used Quality is a core theme in communications Everyone is engaged Lean Six Sigma defines the way we work Maturing Lean Six Sigma Culture Key Performance Indicators (KPI): Utilization of Trained Personnel Participation of Workforce in Projects Training of Workforce Certification of Green and Black Belts Contribution to Business KPI Level 5 Utilization of Trained Personnel = 100% More than 40% Participation in Projects 80% or more of Workforce Trained >70% of Trained Belts Certified LSS Contribution to Business KPI > 20% Level 4 Utilization of Trained Personnel = 100% 30 to 40% Participation in Projects 60 to 79% of Workforce Trained 55 to 70% of Trained Belts Certified LSS Contribution to Business KPI 16-20% Level 3 Utilization of Trained Personnel > 75% 20 to 29% Participation in Projects 40 to 59% of Workforce Trained 40 to 54% of Trained Belts Certified LSS Contribution to Business KPI 11-15% Level 2 Utilization of Trained Personnel > 50% 10 to 19% Participation in Projects 20 to 39% of Workforce Trained 25 to 39% of Trained Belts Certified LSS Contribution to Business KPI 5-10% Level 1 Utilization of Trained Personnel <50% < 10% Participation in Projects Less than 19% of Workforce Trained Less than 25% of Trained Belts Certified LSS Contribution to Business KPI ≤ 5%1
  • 16. LSS and CMMI are Complementary Improvement Initiatives Lean Six Sigma CMMI Lean Six Sigma focuses on designing the best processes to reach the desired end state Integration of these two organizational improvement initiatives is powerful! CMMI provides guidance for measuring, monitoring and managing processes Both are business strategies to deliver value to the customer and develop a sustainable competitive advantage
  • 17. Examples of LSS Tools for Project Management Guide Implementation