SlideShare a Scribd company logo
  • Upload
  • Login
  • Download free for 30 days
SlideShare a Scribd company logo
  • Upload
  • Download free for 30 days
  • Login
×
×
×
×
×
×
Iftikhar Hussain

Iftikhar Hussain

30 Followers
1 SlideShare 30 Followers 52 Followings
  • Unblock User Block User
1 SlideShare 30 Followers 52 Followings

Personal Information
Organization / Workplace
Federal Capial &AJK, Pakistan Pakistan
Occupation
Civil engineer Expertise in building construction.
Industry
Real Estate/ Construction / Architecture
About
Graduated Civil engineer with 3 years construction industry experience. Expertise in site supervision, site management, quality control and quality assurance, preparation of BOQ and BBS, understanding of architectural, structural and working drawings, good knowledge of code and engineering specifications. Having good knowledge and understanding of laboratory testing of concrete, soil and transportation. Previously involved in a construction of multi story commercial building having covered area 5400s.ft. It consists B+G+5 Upper Stories with a modern reinforced technique POST TENSION CABLE has been adopted. PT Cable reduced structural load up to 100 tons compared with normal steel reinforc...
Contact Details
  • Activity
  • About

Documents

(1)

Iftikhar Hussain CV

9 years ago • 902 Views

Likes

(53)
See all

Bloom's Taxonomy Presentation

Heather Higgins • 13 years ago

Importance of Ductility in Structural Performance Analysis

AIT Solutions • 6 years ago

CE 72.32 (January 2016 Semester) Lecture 8 - Structural Analysis for Lateral Loads

Fawad Najam • 9 years ago

CE 72.32 (January 2016 Semester): Lecture 1a - Overview of Tall Buildings

Fawad Najam • 9 years ago

ETABS Modelling

Eur Ing Valentinos Neophytou BEng (Hons), MSc, CEng MICE • 12 years ago

Performance Based Design Presentation By Deepak Bashetty

Deepak Bashetty • 10 years ago

Fibre Reinforced Concrete

Mustafa Sonasath • 10 years ago

fiber reinforced polymers

Korrapati Pratyusha • 8 years ago

Etabs tutorial

Asaye Dilbo • 8 years ago

Cable Layout, Continuous Beam & Load Balancing Method

Md Tanvir Alam • 11 years ago

Proportioning of concrete mix

Dr V Kannan B.E., M.E., PhD • 7 years ago

Design of Precast Elements

Rahul Biswas • 10 years ago

Stress ribbon bridge

Shreya Thusoo • 11 years ago

PRECAST BUILDING SYSTEM

Sagar Shah • 9 years ago

Total precase concrete structure for multi storey

Broad Homes Intl. • 10 years ago

seismic retrofitting using precast elements

discorajan • 11 years ago

Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally Abu-Hamd)

Hossam Shafiq II • 7 years ago

Some basics of Strength Of Materials..

Mohammed Mubeen • 10 years ago

Heat of Hydration in Mass Concrete

Khaldoon Slaiai • 8 years ago

Creep and shrinkage

Asad Rehman • 9 years ago

Hardened concrete

sayang 181 • 10 years ago

DEEP FOUNDATION

aframawal • 8 years ago

Concrete

Mitali V. Gondaliya • 10 years ago

CE 72.52 - Lecture 7 - Strut and Tie Models

Fawad Najam • 9 years ago

253283568 stm

Ramil Artates • 9 years ago

Introduction to finite element analysis

Tarun Gehlot • 11 years ago

RESTORATION OF EXISTING MAJOR BRIDGE ACROSS RIVER BHADAR ON NATIONAL HIGHWAY N0. 8E BETWEEN PORBANDAR AND SOMNATH- CASE STUDY

IEI GSC • 9 years ago

Structural Health Monitoring

JNTU • 13 years ago

Structural Analysis of a Bungalow Report

douglasloon • 8 years ago

Design project

Kabilan Kabi • 10 years ago
Personal Information
Organization / Workplace
Federal Capial &AJK, Pakistan Pakistan
Occupation
Civil engineer Expertise in building construction.
Industry
Real Estate/ Construction / Architecture
About
Graduated Civil engineer with 3 years construction industry experience. Expertise in site supervision, site management, quality control and quality assurance, preparation of BOQ and BBS, understanding of architectural, structural and working drawings, good knowledge of code and engineering specifications. Having good knowledge and understanding of laboratory testing of concrete, soil and transportation. Previously involved in a construction of multi story commercial building having covered area 5400s.ft. It consists B+G+5 Upper Stories with a modern reinforced technique POST TENSION CABLE has been adopted. PT Cable reduced structural load up to 100 tons compared with normal steel reinforc...

Modal header

  • About
  • Support
  • Terms
  • Privacy
  • Copyright
  • Cookie Preferences
  • Do not sell or share my personal information
English
Current Language: English
Español
Português
Français
Deutsch

© 2025 SlideShare from Scribd