Construction phases
Construction phases
PLANING/PRE-PLANING PHASE
DESIGN PHASE
PRE-CONSTRUCTUCTION
CONSTRUCTION PHASE
POST CONSTRUCTION/CLOSE OUT
PHASE
 CLIENT
 CONSULTANT
 CONTRUCTOR
 CLIENT IS AN IMPORTANT PERSON IN
CONSTRUCTION
 CLIENT IS THE ONE WHO INVEST MONEY
 CLIENT IS THE ONE WHO OWN THE PROJECT
 CLIENT LOOK AFTER PROJECT FROM STARTING TO
END
 CONSULTANT IS A PROFESSIONAL WHO PROVIDE
PROFESSIONAL OR EXPERT ADVICE
 CLIENT CONTACT WITH CONSULTANT DIRECTLY FOR
HIS/HER PROJECT.
 CONSULTANT IS A CONNECTING ROPE BETWEEN
CLIENT AND CONTRACTOR.
 CONSULTANT PREPARE DRAWINGS, DOCUMENTS AND
SPECIFICATIONS
 CONTRACTOR IS AN EXPERT OR PROFESSIONAL IN
CONSTRUCTION PROCESS WHO PLAY A LEADING ROLE
DURING CONSTRUCTION.
 CONTRACTOR IS IN DIRECT CONTACT WITH
CONSULTANT.
 CONTRACTOR COME INTO PLAY FROM THE INTIAL
STAGE UPTO THE LAST STAGE.
 CONTRACTOR CAN BE SOMETIMES CONSULTANT ALSO.
CLIENT
• IDEA
CONSULTANT
• DOCUMENTS
• DRAWINGS
• TENDER
NOTICE
CONTRACTOR
• PRIME
CONTRACTOR
• SUB
CONTRACTOR
PLANNING
 ANY CONSTRUCTION PROJECT STARTS WITH THE
DESIRE OF CLIENT/OWNER.
 MASTER PLAN CREATE AND SIGNED OFF BY
OWNER.
 MASTER PLAN INCLUDE FUNCTION, SIZE,
ECONOMIC REQUIREMENT OF PROJECT, ALSO
INCLUDE TIME DURATION AND ECONOMIC
FEASIBILITY (PROJECT BUDGET AND FINANCING).
 SITE SELECTION.
Construction phases
 CLIENT CONTACT CONSULTANT FOR DESIGNING
OF THE PROJECT.
 ARCHITECT/ENGINEER TAKES THE LEAD IN
DESIGN.
 ARCHITECT DESIGN 2D AND 3D DRAWINGS AND
SPECIFICATIONS OF THE PROJECT.
 HERE ARCHITECT PREPARES BILL OF QUANTITY.
 CONSTRUCTION PROCESS INITIATE WITH THE
AWARDING OF PROJECT TO THE CONTRACTOR.
 CONTRACTOR IN THIS PHASE IS A KEY PLAYER.
 CONSTRUCTION PROCESS CARRY ON UNLESS
THE HANDLING OF PROJECT TO OWNER.
 BIM is essentially "the process of generating and managing
information about a building during its entire life cycle".
Construction phases
“BIDDING IS AN OFFER (OFTEN COMPETITIVE) OF
SETTING A PRICE ONE IS WILLING TO PAY FOR
SOMETHING OR A DEMAND THAT SOMETHING BE
DONE. A PRICE OFFER IS CALLED A BID.”
 BOND
A TYPE OF SURETY BOND USED BY
INVESTORS IN CONSTRUCTION PROJECTS TO
PROTECT AGAINST AN ADVERSE EVENT THAT
CAUSES DISRUPTIONS, FAILURE TO
COMPLETE THE PROJECT DUE TO
INSOLVENCY OF THE BUILDER(S), OR THE
JOB'S FAILURE TO MEET CONTRACT
SPECIFICATIONS.
BID-BOND
SECURITY BOND
EARNEST MONEY
 BOQ
A BILL OF QUANTITIES (BOQ) IS A DOCUMENT USED
IN TENDERING IN THE CONSTRUCTION INDUSTRY IN
WHICH MATERIALS, PARTS, AND LABOR (AND THEIR
COSTS) ARE ITEMIZED.
 QUALITY ASSURANCE
ASSURANCE OF QUALITY OF MATERIAL ETC BY
SUPPLIER.
 CONTRACT
CONSTRUCTION CONTRACT IS SIMPLY MUTUAL
OR LEGALLY BINDING AGREEMENT BETWEEN
TWO PARTIES BASED ON CERTAIN POLICIES AND
CONDITIONS GENERALLY RECORDED IN
DOCUMENTATION FORM. THE TWO PARTIES
INVOLVED ARE OWNER AND CONTRACTOR.
Construction phases
Construction phases
 AN INVITATION IS BEING SEND TO THE BIDDERS IN
THE FORM OF TENDER NOTICE EITHER BY THE
SENDING AN INVITATION LETTER OR BY GIVING AN
ADVERTISEMENT IN THE NEWS PAPER OR ON THE
WEBSITE.
 THE INTERESTED BIDDERS MUST NEED TO DEPOSIT
SOME MONEY IN ORDER TO TAKE THE VOLUMES
FROM THE CLIENT OR CONSULTANT. THIS MONEY IS
USUALLY 25000 Rupees.
 NORMALLY PEC HAS 3 VOLUMES FOR BOQ.
 VOLUME 1
 VOLUME 2
 VOLUME 3
 BUT SOME FIRM USES VOLUME 4 AS WELL.
 VOLUME 4
 CONDITION OF CONTRACT
 INVITATION LETTER
 INSTRUCTION TO BIDDER
 BIDDING DATA
 IT HAS DIFFERENT APPENDIX'S AND APPENDIX D
IS OF BOQ.
 GCC IS ALSO THE PART OF V₁.
 TECHNICAL SPECIFICATIONS
 MATERIAL
 SOIL REPORT
 SECTION DETAIL
 DRAWINGS
 ARCHITECTURAL DRAWINGS
 STRUCTURAL DRAWINGS
 IT HAS EHS (ENVIRONMENTAL HEALTH SAFETY)
GUIDELINES
 WORK PERMIT SYSTEM
 PI (PROJECT INSTRUCTION)
 USUALLY THE LOWEST RESPONSIBLE BIDDER IS
AWARDED THE PROJECT.
NOC: NOC MEANS NO OBJECTION
CERTIFICATE. AN NOC DATE IS GIVEN TO THE
CONTRACTOR WHICH MEANS HE HAVE TO
START HIS WORK UPON THE NOC DATE.
Construction phases
 ACTING AS THE OWNER'S
REPRESENTATIVE OR AGENT
 PROJECT PLANNING AND
RECOMMENDATIONS ON PROJECT
DELIVERY
 CONSTRUCTABILITY REVIEWS
 VALUE ENGINEERING
 DEVELOPING SCHEDULES
Construction phases
 ESTABLISHING WORKING BUDGETS
 CONSULTING ON DESIGN, UTILITY AND
BUILDING COSTS
 REVIEWING CONTRACTOR
QUALIFICATIONS
 MONITORING CONTRACTOR AND
DESIGN TEAM PERFORMANCE
 CONSTRUCTION PHASE SERVICES
 QUALITY CONTROL
 LITIGATION SUPPORT
Construction phases
 CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL OF THE MATERIAL, LABOR,
EQUIPMENT (SUCH AS ENGINEERING
VEHICLES AND TOOLS) AND SERVICES
NECESSARY FOR THE CONSTRUCTION OF THE
PROJECT.
 GENERAL CONTRACTOR HIRES
SPECIALIZED SUBCONTRACTORS TO PERFORM ALL
OR PORTIONS OF THE CONSTRUCTION WORK.
 HEALTH AND SAFETY
 RESPONSIBILITIES MAY INCLUDE APPLYING
FOR
 BUILDING PERMITS.
 SECURING THE PROPERTY.
 PROVIDING TEMPORARY UTILITIES ON SITE.
 MANAGING PERSONNEL ON SITE.
 PROVIDING SITE SURVEYING AND ENGINEERING.
 DISPOSING OR RECYCLING OF CONSTRUCTION
WASTE.
 MONITORING SCHEDULES AND CASH FLOWS.
 MAINTAINING ACCURATE RECORDS.
 A joint venture (JV) is a business agreement in which
the parties agree to develop, for a finite time, a new entity
and new assets by contributing equity.
 They exercise control over the enterprise and consequently
share revenues, expenses and assets.
 when two or more persons come together to form
a temporary partnership for the purpose of carrying out
a particular project, such partnership can also be called a
joint venture where the parties are "co-venturers".
Topographic survey:
It helps to locate the NSL with the MSL reference
Clearing and grubbing:
Clearing and grubbing process occur on the Natural Surface Level
(NSL) then to achieve NGL(Natural Ground Level) the compaction
of NSL is carried out.
FDT:
Field density test of the soil is then took place which is the
compaction of embankment layers and this test is done for each layer
separately.
Problems face by the contractor
during construction:
There might be a number of problems e.g.
•Strikes
•Shortage of fuel
•Equipment’s failure
•Weather conditions
•Any mishap on field
The contractor must need to report the consultant in case of any
work delay.
Project Inspector:
Meanwhile, member of the consultant always remain on site for the
quality assurance and monitoring of safety factors. The QA/QC and
EHS are also the contractor’s responsibility .Before the starting of
any new work the contractor is bound to have a consultant’s sign on
the check request. Without his permission no work can be started
on the field. He only signs the check request after all the test results
comes positive and when he is completely satisfied by the
contractor’s work.
The IPC Reports:
There might be a number of IPC reports. IPC stands for In-
term Payment Certificate. It’s the demand of money by the
contractor to the client after the completion of the amount of
work mentioned in the contract.
• Substantial completion
• Once the project is sufficiently complete, the contractor will ask
the architect to conduct a substantial completion inspection to
confirm that the work is complete in most respects.
• Contractor implies that the work is complete enough for the owner
to occupy the facility and start using it, even though there might be
cosmetic and minor work yet to be completed.
• Punch list
• List of incomplete portions of the work (to be completed)
• The punch list, which is prepared by the contractor, is used by the
engineer as a checklist to review all work, not merely the incomplete
portions of the work.
Post-Construction (Project
Closeout) Phase:
• Certificate of final completion:
• After the contractor carries out all the corrective work
identified during the substantial completion inspection and so
informs the architect, the architect (with the assistance of the
consultants) carries out the final inspection of the project.
• If the final inspection passes, certification for final payment is
issued by the architect, which entitles the contractor to receive
the final payment from the owner.
Record documents (As‐built documents)):
• Minor changes are often made during the construction of a
project.
• Changes must be recorded for the benefit of the owner should
the owner wish to alter or expand the building in the future.
Construction phases
Construction phases

More Related Content

PPT
Construction process
PPTX
Process of Building Construction
PDF
construction project planing
PPTX
Stages In Construction
PPTX
Construction Project Management
PPT
Chapter 3 - Statistics and Probability-1.ppt
PDF
Introduction-construction management_Construction Management (2180611) (Semes...
PDF
EOT Related Cost Compensation Determination
Construction process
Process of Building Construction
construction project planing
Stages In Construction
Construction Project Management
Chapter 3 - Statistics and Probability-1.ppt
Introduction-construction management_Construction Management (2180611) (Semes...
EOT Related Cost Compensation Determination

What's hot (20)

PPTX
Construction Planning
PPTX
QUANTITY SURVEYING
PDF
Tendering documentation
PDF
Quality control IN CONSTRUCTION
PPTX
Types of contract
PPTX
Construction Project Management
PPT
contract procedure
PPTX
CONTRACTS AND ITS TYPES
PPTX
Construction Cost Control
PPTX
Construction project management
PPTX
Contracts and-tenders
PPTX
Construction planning - Construction Technology and Project Management
DOCX
Bills of quantities
PPTX
Types of Contract in Construction Management
PPTX
Analysis of rates
PPTX
Insepction and quality control
PPTX
Schedule of Rates
PDF
Construction Project Management
PDF
Project management in construction.
PPT
Quality in Construction
Construction Planning
QUANTITY SURVEYING
Tendering documentation
Quality control IN CONSTRUCTION
Types of contract
Construction Project Management
contract procedure
CONTRACTS AND ITS TYPES
Construction Cost Control
Construction project management
Contracts and-tenders
Construction planning - Construction Technology and Project Management
Bills of quantities
Types of Contract in Construction Management
Analysis of rates
Insepction and quality control
Schedule of Rates
Construction Project Management
Project management in construction.
Quality in Construction
Ad

Viewers also liked (19)

PDF
Construction Phase Mgmt Srvcs (2)
PPT
Construction Management Services
PPTX
Adb procurement guidelines icb-b1
DOC
Ankur Sood-Instrument engineer
DOCX
CV of Viswanathan KK
DOCX
Mouneer ALjebn CV
PPTX
5 phases of project management
PPT
Procurment Management
PDF
Epc presentation robert foxpresentation
PPTX
5 phases of project management
PPTX
Project Procurment Management
PDF
Class 42 control valves - valve positioners, cavitation and flashing
PDF
Class 37 inferential control, gain scheduling
PPTX
Phases of a Project
PPTX
Types of contracts
DOCX
Bill Of Quantities
PPT
Structure engineers and green building
PDF
SMM7 Bill of Quantities
PDF
80 instrumentation interview questions with answers
Construction Phase Mgmt Srvcs (2)
Construction Management Services
Adb procurement guidelines icb-b1
Ankur Sood-Instrument engineer
CV of Viswanathan KK
Mouneer ALjebn CV
5 phases of project management
Procurment Management
Epc presentation robert foxpresentation
5 phases of project management
Project Procurment Management
Class 42 control valves - valve positioners, cavitation and flashing
Class 37 inferential control, gain scheduling
Phases of a Project
Types of contracts
Bill Of Quantities
Structure engineers and green building
SMM7 Bill of Quantities
80 instrumentation interview questions with answers
Ad

Similar to Construction phases (20)

PDF
MODULE 1 professional practice contracts
PDF
estimate procurement and contract in const.pdf
PPTX
MODULE 5.pptx
PDF
Rev207 matrixexcelfile
PPT
Sxsw 2011 construction enviroment
PDF
EPC (Engineering, Procurement and Construction) Contract.pdf
PDF
Engineering, Procurement & Contracts CONTRACT Handbook
PPT
The Architecture Profession
DOCX
Construction Management Jump StartChapter 5Project Sta.docx
PPTX
4. offer tendering - site
PPTX
TURNKEY PROJECT.pptx
PDF
Matrix207
PDF
Project Phase, Project Teams & Construction Phase.pdf
PPTX
landscape
PDF
introduction to estimating in construction.pdf
PDF
ESTIMATING.pdf
PPT
Chapter 3 Detail Cost Estimation (1).ppt
PPTX
PPTX
Qs(ici&itd)
PDF
Royce_Brown Resume-82115
MODULE 1 professional practice contracts
estimate procurement and contract in const.pdf
MODULE 5.pptx
Rev207 matrixexcelfile
Sxsw 2011 construction enviroment
EPC (Engineering, Procurement and Construction) Contract.pdf
Engineering, Procurement & Contracts CONTRACT Handbook
The Architecture Profession
Construction Management Jump StartChapter 5Project Sta.docx
4. offer tendering - site
TURNKEY PROJECT.pptx
Matrix207
Project Phase, Project Teams & Construction Phase.pdf
landscape
introduction to estimating in construction.pdf
ESTIMATING.pdf
Chapter 3 Detail Cost Estimation (1).ppt
Qs(ici&itd)
Royce_Brown Resume-82115

More from Meesum Zaidi (10)

PDF
Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...
PDF
Soil Classification
PDF
Physics 10th(freebooks.pk)
DOC
Aci reinforcement limits
DOCX
Stream flow
DOCX
SEAPAGE
DOCX
Air pollution in lahore slideshare
DOCX
Built operate transfer case studies in local construction Sector in Pakistan
PPTX
Surfer
PPTX
Concrete
Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...
Soil Classification
Physics 10th(freebooks.pk)
Aci reinforcement limits
Stream flow
SEAPAGE
Air pollution in lahore slideshare
Built operate transfer case studies in local construction Sector in Pakistan
Surfer
Concrete

Recently uploaded (20)

PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPTX
additive manufacturing of ss316l using mig welding
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
Welding lecture in detail for understanding
PDF
Digital Logic Computer Design lecture notes
PPTX
web development for engineering and engineering
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
Internet of Things (IOT) - A guide to understanding
PDF
Well-logging-methods_new................
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
Embodied AI: Ushering in the Next Era of Intelligent Systems
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
additive manufacturing of ss316l using mig welding
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
CH1 Production IntroductoryConcepts.pptx
Welding lecture in detail for understanding
Digital Logic Computer Design lecture notes
web development for engineering and engineering
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Foundation to blockchain - A guide to Blockchain Tech
CYBER-CRIMES AND SECURITY A guide to understanding
Internet of Things (IOT) - A guide to understanding
Well-logging-methods_new................
bas. eng. economics group 4 presentation 1.pptx
Automation-in-Manufacturing-Chapter-Introduction.pdf
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...

Construction phases

  • 1. NED UNIVERSITY OF ENGINEERING AND TECHNOLOGY
  • 6.  CLIENT IS AN IMPORTANT PERSON IN CONSTRUCTION  CLIENT IS THE ONE WHO INVEST MONEY  CLIENT IS THE ONE WHO OWN THE PROJECT  CLIENT LOOK AFTER PROJECT FROM STARTING TO END
  • 7.  CONSULTANT IS A PROFESSIONAL WHO PROVIDE PROFESSIONAL OR EXPERT ADVICE  CLIENT CONTACT WITH CONSULTANT DIRECTLY FOR HIS/HER PROJECT.  CONSULTANT IS A CONNECTING ROPE BETWEEN CLIENT AND CONTRACTOR.  CONSULTANT PREPARE DRAWINGS, DOCUMENTS AND SPECIFICATIONS
  • 8.  CONTRACTOR IS AN EXPERT OR PROFESSIONAL IN CONSTRUCTION PROCESS WHO PLAY A LEADING ROLE DURING CONSTRUCTION.  CONTRACTOR IS IN DIRECT CONTACT WITH CONSULTANT.  CONTRACTOR COME INTO PLAY FROM THE INTIAL STAGE UPTO THE LAST STAGE.  CONTRACTOR CAN BE SOMETIMES CONSULTANT ALSO.
  • 9. CLIENT • IDEA CONSULTANT • DOCUMENTS • DRAWINGS • TENDER NOTICE CONTRACTOR • PRIME CONTRACTOR • SUB CONTRACTOR
  • 10. PLANNING  ANY CONSTRUCTION PROJECT STARTS WITH THE DESIRE OF CLIENT/OWNER.  MASTER PLAN CREATE AND SIGNED OFF BY OWNER.
  • 11.  MASTER PLAN INCLUDE FUNCTION, SIZE, ECONOMIC REQUIREMENT OF PROJECT, ALSO INCLUDE TIME DURATION AND ECONOMIC FEASIBILITY (PROJECT BUDGET AND FINANCING).  SITE SELECTION.
  • 13.  CLIENT CONTACT CONSULTANT FOR DESIGNING OF THE PROJECT.  ARCHITECT/ENGINEER TAKES THE LEAD IN DESIGN.  ARCHITECT DESIGN 2D AND 3D DRAWINGS AND SPECIFICATIONS OF THE PROJECT.  HERE ARCHITECT PREPARES BILL OF QUANTITY.
  • 14.  CONSTRUCTION PROCESS INITIATE WITH THE AWARDING OF PROJECT TO THE CONTRACTOR.  CONTRACTOR IN THIS PHASE IS A KEY PLAYER.  CONSTRUCTION PROCESS CARRY ON UNLESS THE HANDLING OF PROJECT TO OWNER.
  • 15.  BIM is essentially "the process of generating and managing information about a building during its entire life cycle".
  • 17. “BIDDING IS AN OFFER (OFTEN COMPETITIVE) OF SETTING A PRICE ONE IS WILLING TO PAY FOR SOMETHING OR A DEMAND THAT SOMETHING BE DONE. A PRICE OFFER IS CALLED A BID.”
  • 18.  BOND A TYPE OF SURETY BOND USED BY INVESTORS IN CONSTRUCTION PROJECTS TO PROTECT AGAINST AN ADVERSE EVENT THAT CAUSES DISRUPTIONS, FAILURE TO COMPLETE THE PROJECT DUE TO INSOLVENCY OF THE BUILDER(S), OR THE JOB'S FAILURE TO MEET CONTRACT SPECIFICATIONS.
  • 20.  BOQ A BILL OF QUANTITIES (BOQ) IS A DOCUMENT USED IN TENDERING IN THE CONSTRUCTION INDUSTRY IN WHICH MATERIALS, PARTS, AND LABOR (AND THEIR COSTS) ARE ITEMIZED.
  • 21.  QUALITY ASSURANCE ASSURANCE OF QUALITY OF MATERIAL ETC BY SUPPLIER.  CONTRACT CONSTRUCTION CONTRACT IS SIMPLY MUTUAL OR LEGALLY BINDING AGREEMENT BETWEEN TWO PARTIES BASED ON CERTAIN POLICIES AND CONDITIONS GENERALLY RECORDED IN DOCUMENTATION FORM. THE TWO PARTIES INVOLVED ARE OWNER AND CONTRACTOR.
  • 24.  AN INVITATION IS BEING SEND TO THE BIDDERS IN THE FORM OF TENDER NOTICE EITHER BY THE SENDING AN INVITATION LETTER OR BY GIVING AN ADVERTISEMENT IN THE NEWS PAPER OR ON THE WEBSITE.  THE INTERESTED BIDDERS MUST NEED TO DEPOSIT SOME MONEY IN ORDER TO TAKE THE VOLUMES FROM THE CLIENT OR CONSULTANT. THIS MONEY IS USUALLY 25000 Rupees.
  • 25.  NORMALLY PEC HAS 3 VOLUMES FOR BOQ.  VOLUME 1  VOLUME 2  VOLUME 3  BUT SOME FIRM USES VOLUME 4 AS WELL.  VOLUME 4
  • 26.  CONDITION OF CONTRACT  INVITATION LETTER  INSTRUCTION TO BIDDER  BIDDING DATA  IT HAS DIFFERENT APPENDIX'S AND APPENDIX D IS OF BOQ.  GCC IS ALSO THE PART OF V₁.
  • 27.  TECHNICAL SPECIFICATIONS  MATERIAL  SOIL REPORT  SECTION DETAIL
  • 28.  DRAWINGS  ARCHITECTURAL DRAWINGS  STRUCTURAL DRAWINGS
  • 29.  IT HAS EHS (ENVIRONMENTAL HEALTH SAFETY) GUIDELINES  WORK PERMIT SYSTEM  PI (PROJECT INSTRUCTION)
  • 30.  USUALLY THE LOWEST RESPONSIBLE BIDDER IS AWARDED THE PROJECT. NOC: NOC MEANS NO OBJECTION CERTIFICATE. AN NOC DATE IS GIVEN TO THE CONTRACTOR WHICH MEANS HE HAVE TO START HIS WORK UPON THE NOC DATE.
  • 32.  ACTING AS THE OWNER'S REPRESENTATIVE OR AGENT  PROJECT PLANNING AND RECOMMENDATIONS ON PROJECT DELIVERY  CONSTRUCTABILITY REVIEWS  VALUE ENGINEERING  DEVELOPING SCHEDULES
  • 34.  ESTABLISHING WORKING BUDGETS  CONSULTING ON DESIGN, UTILITY AND BUILDING COSTS  REVIEWING CONTRACTOR QUALIFICATIONS  MONITORING CONTRACTOR AND DESIGN TEAM PERFORMANCE  CONSTRUCTION PHASE SERVICES  QUALITY CONTROL  LITIGATION SUPPORT
  • 36.  CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL OF THE MATERIAL, LABOR, EQUIPMENT (SUCH AS ENGINEERING VEHICLES AND TOOLS) AND SERVICES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT.
  • 37.  GENERAL CONTRACTOR HIRES SPECIALIZED SUBCONTRACTORS TO PERFORM ALL OR PORTIONS OF THE CONSTRUCTION WORK.  HEALTH AND SAFETY
  • 38.  RESPONSIBILITIES MAY INCLUDE APPLYING FOR  BUILDING PERMITS.  SECURING THE PROPERTY.  PROVIDING TEMPORARY UTILITIES ON SITE.  MANAGING PERSONNEL ON SITE.
  • 39.  PROVIDING SITE SURVEYING AND ENGINEERING.  DISPOSING OR RECYCLING OF CONSTRUCTION WASTE.  MONITORING SCHEDULES AND CASH FLOWS.  MAINTAINING ACCURATE RECORDS.
  • 40.  A joint venture (JV) is a business agreement in which the parties agree to develop, for a finite time, a new entity and new assets by contributing equity.  They exercise control over the enterprise and consequently share revenues, expenses and assets.  when two or more persons come together to form a temporary partnership for the purpose of carrying out a particular project, such partnership can also be called a joint venture where the parties are "co-venturers".
  • 41. Topographic survey: It helps to locate the NSL with the MSL reference Clearing and grubbing: Clearing and grubbing process occur on the Natural Surface Level (NSL) then to achieve NGL(Natural Ground Level) the compaction of NSL is carried out. FDT: Field density test of the soil is then took place which is the compaction of embankment layers and this test is done for each layer separately.
  • 42. Problems face by the contractor during construction: There might be a number of problems e.g. •Strikes •Shortage of fuel •Equipment’s failure •Weather conditions •Any mishap on field The contractor must need to report the consultant in case of any work delay.
  • 43. Project Inspector: Meanwhile, member of the consultant always remain on site for the quality assurance and monitoring of safety factors. The QA/QC and EHS are also the contractor’s responsibility .Before the starting of any new work the contractor is bound to have a consultant’s sign on the check request. Without his permission no work can be started on the field. He only signs the check request after all the test results comes positive and when he is completely satisfied by the contractor’s work. The IPC Reports: There might be a number of IPC reports. IPC stands for In- term Payment Certificate. It’s the demand of money by the contractor to the client after the completion of the amount of work mentioned in the contract.
  • 44. • Substantial completion • Once the project is sufficiently complete, the contractor will ask the architect to conduct a substantial completion inspection to confirm that the work is complete in most respects. • Contractor implies that the work is complete enough for the owner to occupy the facility and start using it, even though there might be cosmetic and minor work yet to be completed. • Punch list • List of incomplete portions of the work (to be completed) • The punch list, which is prepared by the contractor, is used by the engineer as a checklist to review all work, not merely the incomplete portions of the work.
  • 45. Post-Construction (Project Closeout) Phase: • Certificate of final completion: • After the contractor carries out all the corrective work identified during the substantial completion inspection and so informs the architect, the architect (with the assistance of the consultants) carries out the final inspection of the project. • If the final inspection passes, certification for final payment is issued by the architect, which entitles the contractor to receive the final payment from the owner.
  • 46. Record documents (As‐built documents)): • Minor changes are often made during the construction of a project. • Changes must be recorded for the benefit of the owner should the owner wish to alter or expand the building in the future.

Editor's Notes

  • #27: GCC is also the part of V₁ but is not provided to bidder because every 1 has its own GCC copy… no one can change or overwrite it. In order to customize the GCC, PCC forms on the same format as GCC.