Software Project Management
2
Chapter One
Overview
Content
Project Management Fundamentals
Project Life Cycle
3
Introduction
 Project Management is a complex discipline
 Multidisciplinary
 Multi-stakeholder
 Technical, but also related with human relationships
 Based on many different scientific theories, but also heavily
grounded on real world experience
The CHAOS study published in 1995 by The Standish
Group found that although the U.S spent over $250
billion on IT projects, approximately…
 31% were cancelled before completion
 53% were completed but over budget, over schedule, & did
not meet original specifications
 For mid-size companies, average cost overruns were 182%,
while average schedule overruns were 202%!
4
Summary of the Chaos Studies from 2004 to 2012
5
Tata Consultancy Services 2007 Report
Included 800 senior IT managers from the UK, US,
France, Germany, India, Japan, & Singapore:
 62% of the IT projects failed to meet their schedules
 49% experienced budget overruns
 47% experienced higher-than expected maintenance costs
 41% failed to deliver the expected business value and ROI
6
Why PM?
Results of poor Project Management
 Original objectives not met
 Project cost overruns
 Schedule overruns
 Project may not be completed
 Poor quality project outputs
 Failure to deliver anticipated business benefits, leading to
dissatisfied management and project members
 Insufficient resources
Success criteria for project management?
 deliver the software to the customer at the agreed time;
 keep overall costs within budget;
 deliver software that meets the customer’s expectations;
 maintain a coherent and well-functioning development team
7
The Triple Constraint
8
It is the project manager’s duty to
balance these three often
competing goals
Summary of CHAOS Study Factor
Rankings for Successful Projects
9
Sources: Adapted from the Standish Group. CHAOS (West
Yarmouth,MA: 1995, 2010) &
http://www.infoq.com/articles/Interview-Johnson-Standish-CHAOS
Project success factors
 1. Executive support / strong sponsorship
 2. User involvement
 3. Experienced project manager
 4. Clear business objectives
 5. Minimized scope
 6. Standard software infrastructure
 7. Firm basic requirements
 8. Formal methodology
 9. Reliable estimates
 10. Other criteria, such as small milestones, proper planning,
competent staff, and ownership
10
What is a project?
A project is a temporary endeavor undertaken to
create a unique product, service, or result.
 Temporary - project has a definite beginning and end
 The end is reached when:
 objectives have been achieved
 its objectives will not or cannot be met
 the client (customer, sponsor) wishes to terminate the project
 repetitive elements may be present in some project
deliverables and activities. E.g. building, it is unique in design,
stake holders, location, etc.
11
Project(cont’d)
Has specific objectives and a unique purpose
 Has a start and end date (temporary)
 Has a limited budget
Produces specific deliverables - is a tangible and
verifiable product of work (i.e., project plan, design
specifications, delivered system, etc.)
Can vary vastly in size, complexity and duration
 Consume human and nonhuman resources (i.e.,
money, people, equipment)
 Should have a primary customer or sponsor
12
Project(cont’d)
Examples of projects include, but are not limited to:
 Developing a new product, service, or result;
 Effecting a change in the structure, processes, staffing, or
style of an organization;
 Developing or acquiring a new or modified information system
(hardware or software);
 Constructing a building, industrial plant, or infrastructure;
 Implementing, improving, or enhancing existing business
processes and procedures.
13
Project vs. Operational Work
 Projects
 To attain its objectives and
terminate
 Create own character,
organization, and goals
 Catalyst for change
 Unique product or services
 Heterogeneous teams
 Start and end date
 Examples
 Writing and publishing a book
 Implementing a LAN
 Hiring a sales man
 Arrange for a conference
 Opening for a new shop
14
 Operations
 To sustain the business
 Semi permanent charter,
organization, and goals
 Maintain status quo
 Standard product or services
 Homogeneous teams
 Ongoing
 Examples
 Responding to customers requests
 Hooking up a Printer to a computer
 Meeting with an employee
 Attending a conference
 Writing a progress update memo
What makes software projects unique?
The product is intangible
 A manager of a shipbuilding or a civil engineering project can see
the product being developed. Software project managers cannot see
progress by looking at the artifact that is being constructed.
Large software projects are often “one-off” projects
 Lessons learned from previous projects may not be readily
transferable to new projects because:
 There is a rapid technological changes in computers and
communications. Every large software development project is unique
Software processes are variable and organization-specific
Business models and markets change too rapidly so
projects that take more than a year can be obsolete before
they are completed.
15
What is management?
Management is the process of coordinating people
and other resources to achieve the goals of the
organization.
 Planning – deciding what is to be done. This is the most
challenging
 Organizing – making arrangements
 Staffing – selecting the right people for the job
 Directing – giving instructions
 Monitoring – checking on progress
 Controlling – taking action to remedy hold-ups
 Innovating – coming up with solutions when problems emerge
 Representing – liaising with clients, users, developers and
other stakeholders
16
What is Project Management?
Project management is the application of knowledge,
skills, tools, and techniques to project activities to
meet the project requirements.
Project management involves the following activities:
 Initiating,
 Planning,
 Executing - is doing what is planned. This where the actual
project is begins,
 Monitoring and Controlling, and
 Closing
17
Software Project Management
Software Project Management is the collection of
techniques used to develop and deliver various types
of software products.
Includes technical issues such as:
 The choice of software development methodology.
 How to estimate project size and schedule.
 Which programming development environment to use.
18
Project Stakeholders
 Stakeholders are the people involved in or affected by project activities.
 1. Project Manager: is the team leader and is responsible for ensuring
that all of the project management and technical development
processes are in place and are being carried out within a set of
specific requirements, defined processes, and quality standards.
 Must have a diverse set of skills (e.g. good general skills, technical
management, conflict management, customer relationship management and
leadership skills)
 Managing a project includes:
 Identifying requirements.
 Establishing clear and achievable objectives.
 Balancing the competing demand of quality, scope, time and cost.
 Adapting the specifications, plans, and approach to the different concerns and
expectations of the various stakeholders
 97% of successful projects were led by experienced project managers.
 Project managers strive to meet the triple constraint by balancing project
scope, time, and cost goals
19
Project Stakeholders(cont’d)
20
 Project managers need both “hard” and “soft” skills.
 Hard skills include product knowledge and knowing how to use
various project management tools and techniques.
 Soft skills include being able to work with various types of people.
Effective Project Managers Ineffective Project Managers
• Leadership by example
• Visionary
• Technically competent
• Decisive
• Good communicator
• Good motivator
• Stands up to upper management
when necessary
• Supports team members
• Encourages new ideas
• Sets bad example
• Not self-assured
• Lacks technical expertise
• Poor communicator
• Poor motivator
Project Stakeholders(cont’d)
 2. Project Sponsor - the person or group who provides resources
and support for the project and is accountable for enabling
success.
 may be external or internal to the project manager’s organization.
 3. Subject Matter Expert(s) (SME) - who has specific knowledge,
expertise, or insight in a specific functional area needed to
support the project.
 4. Technical Expert(s) (TE) - include systems analysts, network
specialists, programmers, graphic artists, trainers, and so forth.
 5. Support staff - include such roles as contracting, financial
management, logistics, legal, safety, etc.
 6. Users
 7. Suppliers
21
Project Management Tools and Techniques
Project management tools and techniques assist
project managers and their teams in various aspects
of project management
Some specific ones include:
 WBS (scope)
 Gantt charts, network diagrams, critical path analysis(time)
 Cost estimates (cost)
22
Project Life Cycle(PLC)
 PLC is a collection of logical stages or phases that maps the life
of a project from its beginning to its end in order to define, build,
and deliver the product of a project
 Is a collection of project phases that defines:
 What work will be performed in each phase
 What deliverables will be produced and when
 Who is involved in each phase
 IT product life cycle – Planning -> Analysis -> Design ->
Implementation -> Maintenance -> Support 23
PLC(cont’d)
Define Project Goal
 The project goal should be focused on providing business
value to the organization
 Provides a clear focus and drives the other phases of the
project
 How will we know if this project is successful given the time,
money, and resources invested?
Plan Project
 deliverables, tasks, resources, and time to complete each task
must be defined for each phase of the project
 used as a tool to gauge the project’s performance throughout
the life cycle.
24
PLC(cont’d)
Execute Project Plan
 put the plan into action
 Progress must be documented and compared to the baseline
plan
Close Project
 Ensures that all of the work is completed as planned
 Final project report and presentation to the client
Evaluate Project
 Lessons learned to determine those things to do the same and
those things to change
 Evaluate team member performance
 May be audited by an outside third party
25
Reading Assignment
Project Vs Program Vs Portfolio
Project Management Office(PMO)
26

More Related Content

Similar to PM-1 Overview.ppt (20)

PPTX
Unit 1 spm
GomathiPrakasham
 
PPTX
Unit 1 spm
GomathiPrakasham
 
PDF
Challenging Aspects of Modern Project Management
Yamanta Raj Niroula, PMP
 
PPTX
Sessionnnnnnnnnnnnndewfcecsdddnnnnn 1.pptx
mettildauthayakumar
 
PDF
Project management lecture 1
Abeera Malik
 
PPTX
IT PROJECT MANAGEMENT COURSE for Tertiary.pptx
patriciaacquah30o
 
PPTX
PMP Training - 01 introduction to framework
ejlp12
 
PDF
1. introduction
Nuwan Kumarasinghe
 
PPT
Project project portfolio magament
DebotyamGhosh
 
PPT
Introduction.ppt
ssuser672ad6
 
PPT
Introduction to Project Management
NathanielAddoQuaye1
 
PPTX
(Fall2016)Lecture2.pptx
garkapifye
 
DOCX
Pmbok
ahsan riaz
 
PPT
1 ch1
perdogdu
 
PPTX
Introduction to Project Management
muhammadyasirsaeedqa
 
PPTX
Project Management online sample (1) (1).pptx
StanleyChabata1
 
PPT
Spm unit 1
sweetyammu
 
PPT
Chap 1 Modern Project Management
project management
 
PPTX
INTRO.pptx
Sankalp Sharma
 
PDF
01 02&03 introduction to pmp-mao
mao-osman73
 
Unit 1 spm
GomathiPrakasham
 
Unit 1 spm
GomathiPrakasham
 
Challenging Aspects of Modern Project Management
Yamanta Raj Niroula, PMP
 
Sessionnnnnnnnnnnnndewfcecsdddnnnnn 1.pptx
mettildauthayakumar
 
Project management lecture 1
Abeera Malik
 
IT PROJECT MANAGEMENT COURSE for Tertiary.pptx
patriciaacquah30o
 
PMP Training - 01 introduction to framework
ejlp12
 
1. introduction
Nuwan Kumarasinghe
 
Project project portfolio magament
DebotyamGhosh
 
Introduction.ppt
ssuser672ad6
 
Introduction to Project Management
NathanielAddoQuaye1
 
(Fall2016)Lecture2.pptx
garkapifye
 
Pmbok
ahsan riaz
 
1 ch1
perdogdu
 
Introduction to Project Management
muhammadyasirsaeedqa
 
Project Management online sample (1) (1).pptx
StanleyChabata1
 
Spm unit 1
sweetyammu
 
Chap 1 Modern Project Management
project management
 
INTRO.pptx
Sankalp Sharma
 
01 02&03 introduction to pmp-mao
mao-osman73
 

Recently uploaded (20)

PPTX
Introduction to product management –Module 1.pptx
FarheenAhmad9
 
PDF
confessions of a CMO_sxsw_panel picker.pdf
GabrielCohen28
 
PDF
Intro to Org Topologies by Rowan Bunning.pdf
Rowan Bunning
 
PDF
Branding Potentials of Keyword Search Ads The Effects of Ad Rankings on Bran...
hritikamishra2k
 
PPTX
Empowering Women Achieving Dreams Setting and Reaching Your Personal Profess...
Muhammad Musawar Ali
 
PDF
What Is Six Thinking Hats and How Does It Promote Team Problem Solving?
Writegenic AI
 
PPTX
activity overview FOR THE CONDUCT OF NEWLY ELECTED OFFICIALS BRIEFING
MPDOSanAgustinIsabel
 
PDF
250712-Role Plays for Hands on Exercise-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
PPTX
Agile Chennai 18-19 July 2025 | The Human Metrics of Agile: Building Resilien...
AgileNetwork
 
PDF
Dynamic Capabilities for a Sustainable Future
David Teece
 
PDF
250726-Individual Case Safety Reports-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
PPTX
Multicolor leadership kepemimpinan untuk organisasi
GusTri5
 
PDF
Agile Chennai 18-19 July 2025 | Unpacking OKRs: A Guide to Strategic Sophisti...
AgileNetwork
 
PPTX
sarthak nayi brain strom bca sem 3 .pptx
parekhsarthak8
 
PDF
Dubai-Tech-The-Road-to-2033-Founders-Forum-Group.pdf
PavelVeselovskiy
 
PPTX
Serving Like the Master Sermon (Jesus as the Model)
SuccessJourney2
 
PDF
SpatzAI is a self-managed micro-conflict toolkit that helps teams resolve on...
Desmond Sherlock
 
PPTX
Agile Chennai 18-19 July 2025 | Agility for Resilience - Adaptive Systems & C...
AgileNetwork
 
PDF
250621-WHO-UMC Causality Assessment-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
PPTX
Agile Chennai 18-19 July 2025 | Kanban: The Shop Floor’s Secret to Smooth Wor...
AgileNetwork
 
Introduction to product management –Module 1.pptx
FarheenAhmad9
 
confessions of a CMO_sxsw_panel picker.pdf
GabrielCohen28
 
Intro to Org Topologies by Rowan Bunning.pdf
Rowan Bunning
 
Branding Potentials of Keyword Search Ads The Effects of Ad Rankings on Bran...
hritikamishra2k
 
Empowering Women Achieving Dreams Setting and Reaching Your Personal Profess...
Muhammad Musawar Ali
 
What Is Six Thinking Hats and How Does It Promote Team Problem Solving?
Writegenic AI
 
activity overview FOR THE CONDUCT OF NEWLY ELECTED OFFICIALS BRIEFING
MPDOSanAgustinIsabel
 
250712-Role Plays for Hands on Exercise-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
Agile Chennai 18-19 July 2025 | The Human Metrics of Agile: Building Resilien...
AgileNetwork
 
Dynamic Capabilities for a Sustainable Future
David Teece
 
250726-Individual Case Safety Reports-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
Multicolor leadership kepemimpinan untuk organisasi
GusTri5
 
Agile Chennai 18-19 July 2025 | Unpacking OKRs: A Guide to Strategic Sophisti...
AgileNetwork
 
sarthak nayi brain strom bca sem 3 .pptx
parekhsarthak8
 
Dubai-Tech-The-Road-to-2033-Founders-Forum-Group.pdf
PavelVeselovskiy
 
Serving Like the Master Sermon (Jesus as the Model)
SuccessJourney2
 
SpatzAI is a self-managed micro-conflict toolkit that helps teams resolve on...
Desmond Sherlock
 
Agile Chennai 18-19 July 2025 | Agility for Resilience - Adaptive Systems & C...
AgileNetwork
 
250621-WHO-UMC Causality Assessment-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
Agile Chennai 18-19 July 2025 | Kanban: The Shop Floor’s Secret to Smooth Wor...
AgileNetwork
 
Ad

PM-1 Overview.ppt

  • 4. Introduction  Project Management is a complex discipline  Multidisciplinary  Multi-stakeholder  Technical, but also related with human relationships  Based on many different scientific theories, but also heavily grounded on real world experience The CHAOS study published in 1995 by The Standish Group found that although the U.S spent over $250 billion on IT projects, approximately…  31% were cancelled before completion  53% were completed but over budget, over schedule, & did not meet original specifications  For mid-size companies, average cost overruns were 182%, while average schedule overruns were 202%! 4
  • 5. Summary of the Chaos Studies from 2004 to 2012 5
  • 6. Tata Consultancy Services 2007 Report Included 800 senior IT managers from the UK, US, France, Germany, India, Japan, & Singapore:  62% of the IT projects failed to meet their schedules  49% experienced budget overruns  47% experienced higher-than expected maintenance costs  41% failed to deliver the expected business value and ROI 6
  • 7. Why PM? Results of poor Project Management  Original objectives not met  Project cost overruns  Schedule overruns  Project may not be completed  Poor quality project outputs  Failure to deliver anticipated business benefits, leading to dissatisfied management and project members  Insufficient resources Success criteria for project management?  deliver the software to the customer at the agreed time;  keep overall costs within budget;  deliver software that meets the customer’s expectations;  maintain a coherent and well-functioning development team 7
  • 8. The Triple Constraint 8 It is the project manager’s duty to balance these three often competing goals
  • 9. Summary of CHAOS Study Factor Rankings for Successful Projects 9 Sources: Adapted from the Standish Group. CHAOS (West Yarmouth,MA: 1995, 2010) & http://www.infoq.com/articles/Interview-Johnson-Standish-CHAOS
  • 10. Project success factors  1. Executive support / strong sponsorship  2. User involvement  3. Experienced project manager  4. Clear business objectives  5. Minimized scope  6. Standard software infrastructure  7. Firm basic requirements  8. Formal methodology  9. Reliable estimates  10. Other criteria, such as small milestones, proper planning, competent staff, and ownership 10
  • 11. What is a project? A project is a temporary endeavor undertaken to create a unique product, service, or result.  Temporary - project has a definite beginning and end  The end is reached when:  objectives have been achieved  its objectives will not or cannot be met  the client (customer, sponsor) wishes to terminate the project  repetitive elements may be present in some project deliverables and activities. E.g. building, it is unique in design, stake holders, location, etc. 11
  • 12. Project(cont’d) Has specific objectives and a unique purpose  Has a start and end date (temporary)  Has a limited budget Produces specific deliverables - is a tangible and verifiable product of work (i.e., project plan, design specifications, delivered system, etc.) Can vary vastly in size, complexity and duration  Consume human and nonhuman resources (i.e., money, people, equipment)  Should have a primary customer or sponsor 12
  • 13. Project(cont’d) Examples of projects include, but are not limited to:  Developing a new product, service, or result;  Effecting a change in the structure, processes, staffing, or style of an organization;  Developing or acquiring a new or modified information system (hardware or software);  Constructing a building, industrial plant, or infrastructure;  Implementing, improving, or enhancing existing business processes and procedures. 13
  • 14. Project vs. Operational Work  Projects  To attain its objectives and terminate  Create own character, organization, and goals  Catalyst for change  Unique product or services  Heterogeneous teams  Start and end date  Examples  Writing and publishing a book  Implementing a LAN  Hiring a sales man  Arrange for a conference  Opening for a new shop 14  Operations  To sustain the business  Semi permanent charter, organization, and goals  Maintain status quo  Standard product or services  Homogeneous teams  Ongoing  Examples  Responding to customers requests  Hooking up a Printer to a computer  Meeting with an employee  Attending a conference  Writing a progress update memo
  • 15. What makes software projects unique? The product is intangible  A manager of a shipbuilding or a civil engineering project can see the product being developed. Software project managers cannot see progress by looking at the artifact that is being constructed. Large software projects are often “one-off” projects  Lessons learned from previous projects may not be readily transferable to new projects because:  There is a rapid technological changes in computers and communications. Every large software development project is unique Software processes are variable and organization-specific Business models and markets change too rapidly so projects that take more than a year can be obsolete before they are completed. 15
  • 16. What is management? Management is the process of coordinating people and other resources to achieve the goals of the organization.  Planning – deciding what is to be done. This is the most challenging  Organizing – making arrangements  Staffing – selecting the right people for the job  Directing – giving instructions  Monitoring – checking on progress  Controlling – taking action to remedy hold-ups  Innovating – coming up with solutions when problems emerge  Representing – liaising with clients, users, developers and other stakeholders 16
  • 17. What is Project Management? Project management is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements. Project management involves the following activities:  Initiating,  Planning,  Executing - is doing what is planned. This where the actual project is begins,  Monitoring and Controlling, and  Closing 17
  • 18. Software Project Management Software Project Management is the collection of techniques used to develop and deliver various types of software products. Includes technical issues such as:  The choice of software development methodology.  How to estimate project size and schedule.  Which programming development environment to use. 18
  • 19. Project Stakeholders  Stakeholders are the people involved in or affected by project activities.  1. Project Manager: is the team leader and is responsible for ensuring that all of the project management and technical development processes are in place and are being carried out within a set of specific requirements, defined processes, and quality standards.  Must have a diverse set of skills (e.g. good general skills, technical management, conflict management, customer relationship management and leadership skills)  Managing a project includes:  Identifying requirements.  Establishing clear and achievable objectives.  Balancing the competing demand of quality, scope, time and cost.  Adapting the specifications, plans, and approach to the different concerns and expectations of the various stakeholders  97% of successful projects were led by experienced project managers.  Project managers strive to meet the triple constraint by balancing project scope, time, and cost goals 19
  • 20. Project Stakeholders(cont’d) 20  Project managers need both “hard” and “soft” skills.  Hard skills include product knowledge and knowing how to use various project management tools and techniques.  Soft skills include being able to work with various types of people. Effective Project Managers Ineffective Project Managers • Leadership by example • Visionary • Technically competent • Decisive • Good communicator • Good motivator • Stands up to upper management when necessary • Supports team members • Encourages new ideas • Sets bad example • Not self-assured • Lacks technical expertise • Poor communicator • Poor motivator
  • 21. Project Stakeholders(cont’d)  2. Project Sponsor - the person or group who provides resources and support for the project and is accountable for enabling success.  may be external or internal to the project manager’s organization.  3. Subject Matter Expert(s) (SME) - who has specific knowledge, expertise, or insight in a specific functional area needed to support the project.  4. Technical Expert(s) (TE) - include systems analysts, network specialists, programmers, graphic artists, trainers, and so forth.  5. Support staff - include such roles as contracting, financial management, logistics, legal, safety, etc.  6. Users  7. Suppliers 21
  • 22. Project Management Tools and Techniques Project management tools and techniques assist project managers and their teams in various aspects of project management Some specific ones include:  WBS (scope)  Gantt charts, network diagrams, critical path analysis(time)  Cost estimates (cost) 22
  • 23. Project Life Cycle(PLC)  PLC is a collection of logical stages or phases that maps the life of a project from its beginning to its end in order to define, build, and deliver the product of a project  Is a collection of project phases that defines:  What work will be performed in each phase  What deliverables will be produced and when  Who is involved in each phase  IT product life cycle – Planning -> Analysis -> Design -> Implementation -> Maintenance -> Support 23
  • 24. PLC(cont’d) Define Project Goal  The project goal should be focused on providing business value to the organization  Provides a clear focus and drives the other phases of the project  How will we know if this project is successful given the time, money, and resources invested? Plan Project  deliverables, tasks, resources, and time to complete each task must be defined for each phase of the project  used as a tool to gauge the project’s performance throughout the life cycle. 24
  • 25. PLC(cont’d) Execute Project Plan  put the plan into action  Progress must be documented and compared to the baseline plan Close Project  Ensures that all of the work is completed as planned  Final project report and presentation to the client Evaluate Project  Lessons learned to determine those things to do the same and those things to change  Evaluate team member performance  May be audited by an outside third party 25
  • 26. Reading Assignment Project Vs Program Vs Portfolio Project Management Office(PMO) 26