Transforming primary health care unit service delivery
through leadership, management and governance (LMG)
training: A field action report from Ethiopia
Bekelech Bayou*
, Tigist Hailu, Ayalew Jenberie, Yenemayehu Minalu, Tefera Tesfamichael
Abstract
Background: In order to achieve global and national health targets in Ethiopia, it is crucial that cadres of leaders
have the skills, knowledge and tools to manage and govern the primary health care reform initiative currently
underway. To support this, John Snow, Inc. (Strengthening Ethiopia’s Urban Health Program (JSI/SEUHP),the
implementing partner, collaborated with the Federal Ministry of Health (FMOH), regional health bureaus (RHBs),
and town and sub-city health offices to provide leadership, management and governance (LMG) training between
November 2016 and August 2017. The training of trainers (ToT) was undertaken by professionals from the
FMOH, RHB and universities, who cascaded it to health care workers in 12 health centers (HCs), one sub-city
health office and one town health office, in phases, followed by workplace implementation. This field action report
documents the results and lessons learned from the implementation of this LMG training.
Methods: A mixed methods approach was used to assess the impact of LMG training. Changes in leadership
competencies were assessed through pre- and post-test evaluations, and the impact of LMG training on primary
healthcare service delivery was assessed through facility records. The implementation process and impact on
providers’ perceptions were documented through a combination of coaching discussions, group work and quarterly
activity implementation reports.
Results and Discussion: Health facilities implementing the LMG project improved institutional delivery from
40% to 80% in Sodo town, and the ANC follow-up retention rate increased from 40% to 78% in Addis Ababa
Woreda10 HC. As a result of the LMG training, providers working in supported facilities noted improvements in
the workplace atmosphere, provider motivation, team work and resource management.
Conclusions: The LMG training resulted in improved manager and provider motivation, and competency to carry
out LMG practices. The training catalyzed positive competition between health facility teams to achieve facility-
level service delivery goals. Findings suggest that scaling LMG training is a promising mechanism to support
health sector transformation in Ethiopia. [Ethiop.J. Health Dev. 2020; 34(Special issue 2):33-41]
Key words: Leadership, management, governance, Ethiopia
Introduction
The World Health Organization (WHO) lists leadership
and governance as one of the six interrelated health
system building blocks, along with service delivery,
health workforce, health information systems, access to
medical products, vaccines and technologies, and
financing. Each of these building blocks is essential but
not sufficient to sustainably strengthen a health system
by itself, and strengthening leadership supports the
other five building blocks by ensuring a strategic
policy framework exists and is combined with effective
oversight, coalition building, regulation, attention to
system design and accountability (1,2).
Ethiopia is currently implementing its Health Sector
Transformation Plan (HSTP), the first phase of
‘Envisioning Ethiopia’s Path towards Universal Health
Coverage through Strengthening Primary Health Care’,
and part of the Ethiopia’s second Growth and
Transformation Plan (GTP-II). This plan emphasizes
the pivotal role that the leadership, management and
governances kills of leaders and managers play in
strengthening other health sector transformation
agendas and improving health outcomes (3).Weak
management systems can lead to frustration among
health care professionals if they feel they are not able
to make sustainable contributions to improved health
outcomes (2).Improving the ability to lead, manage
and practice good governance of those who ‘make the
health system happen’ is one identified intervention to
ensure health programs in Ethiopia are managed well,
to build leadership, management and governance
capacity to achieving the HSTP, to support the GTP-
II, and to address challenges associated with health
service delivery (4).
Ethiopia, in collaboration with development partners,
is implementing a Leadership Development Program to
provide in-service LMG training to health care
managers and health care workers. Strengthening
Ethiopia’s Urban Health Program (SEUHP),
implemented by John Snow, Inc. (JSI) and funded by
the United States Agency for International
Development (USAID), is working closely with the
Federal Ministry of Health (FMOH), regional health
bureaus (RHBs), zonal health departments (ZHDs),
woreda health offices (WorHOs), primary health care
units (PHCUs) and local partners to implement the
training program. The LMG training aimed to provide
health managers and health care workers with the skills
and knowledge needed to improve service delivery and
management. The LMG project supported sub-city
health offices (SCHOs)/town health offices (THOs)
and health facility teams in leading performance
improvement projects to address service delivery
challenges, and increase knowledge and skills in
mobilizing local resources, monitoring results and
improving workplace climates. The LMG training
initiative used two tools to guide the implementation:
the ‘challenge’ model to guide participants in working
collaboratively towards a shared vision of health
outcome goals, and the ‘leading, managing and
2. 34 Ethiop. J. Health Dev
Ethiop. J. Health Dev.2020; 34(Special issue 2)
governing for results’ model to provide insight on the
leadership and management activities that can help
health care managers and providers address challenges
and achieve results (see Annexes2 and 3) (3, 5,6).
Description of the leadership, management and
governance training
The FMOH LMG in-service training facilitator and
participant manuals guided the training sessions.
Before cascading the training, higher officials from
RHBs, SCHOs/THOs and the chief executive officers
from sub-cities and towns met to discuss trainee
selection and the implementation and sustainability of
the project. JSI/SEUHP worked with the FMOH,
universities and RHBs to implement the LMG initiative
in14 health institutions (12 PHCUs, one town health
office, and one sub-city health office) in the five
JSI/SEUHP-supported regions (Oromia; Amhara;
Southern Nations, Nationalities, and Peoples’ (SNNP);
Harari; and Tigray) and the two city administrations
(Addis Ababa and Dire Dawa) from November 2016 to
August 2017.
The LMG training included three workshops over two
or three days, with a further day for the presentation of
results. The workshops were held six to eight weeks
apart to allow time for participants to carry out their
workplace assignments. Activities conducted during
each training workshop are shown in Figure 1. The
topics were divided into three content areas:
background on the health system in Ethiopia and LMG
model; performance improvement through enhanced
LMG; and facility resource and service delivery
management.
Figure 1: Activities conducted during each training workshop
During the first training session, each team developed
their shared vision, identified their challenges using a
prioritization matrix, and set target measurable results
to ensure sustainability and work towards improved
health service delivery outcomes. JSI/SEUHP staff and
master trainers from the FMOH and universities
monitored the progress through coaching sessions
between workshops and tracking activities on a
quarterly basis. Based on the experiences of LMG
implementation in health facilities, RHBs including
Addis Ababa City Administration Health Bureau
expanded the initiative to four PHCUs/HCs. The
FMOH also customized the LMG training manuals to
include water, sanitation, and hygiene (WASH)
activities; as a result, WASH-implementing
organizations are currently putting into practice the
WASH LMG initiative.
Methods
Health facilities were selected in collaboration with
RHBs and THOs/SCHOs, based on existing human
resources, client flow and organizational performance.
The number of LMG trainees per facility was limited to
25, but representatives from all service delivery units
were included, such as the outpatient department;
maternal, neonatal and child health services; chronic
diseases (HIV, TB); and maintenance and security. To
measure the results of the LMG training, technical and
support staff (LMG team) took the baseline data from
the quarter before the trainings were initiated and the
LMG team tracked and analyzed the changes every
quarter.
Ethical considerations
This study obtained permission from the JSI/SEUHP
project funded by USAID/Ethiopia under cooperative
agreement No. AID-663-A-13-00002 and the IRB
waived the need for consent. The information that was
collected for the study was coded for the sake of
security, and anonymized. No personal identifiers were
used in the report.
Results and Discussion
Contribution of LMG training to service delivery
outcomes: Based on eHMIS quarterly reports before
and after the LMG training, selected indicators from
health facilities that participated in the training showed
improvement in service delivery outcomes. For
example, institutional delivery increased in Sodo town
from 40% to 80% through strengthening pregnant
mothers’ conferences and community-level awareness
activities. The antenatal care/follow-up retention rate
improved at Bishoftu HC from 46% to 82%, and the
health facility-level budget utilization also increased
from 60% to 99% in Addis Ababa health facilities
implementing LMG training (see Table 1). These
results imply that individuals and teams have used their
acquired knowledge and skills to work towards their
defined measurable results and the health outcome
goals of their health facilities.
3. Transforming primary health care unit service delivery through leadership 35
Ethiop. J. Health Dev.2020; 34(Special issue 2)
Table1: Results achieved by health facilities through implementing LMG projects in Ethiopia
Indicator/service
implementation
Region/HF Base
line
After nine
months of
implementation
Activities conducted for
improvement
Institutional delivery Addis Ababa
Nifas Silk Lafto
subcity-Woreda10
HC
9% 16% Providing orientation to staff
on quality counseling for
ANC follow-up
Community-level awareness-
creation activities
Improving delivery room
infrastructure
Minimizing referral from HC
to hospitals by making 24-
hour electricity back-up
available (generator)
Strengthening pregnant
mothers’ conference at health
facility level
Coffee ceremony for women
who delivered at HC
SNNP
Sodo HC
40% 80%
Retention to ANC Addis Ababa
Nifas Silk Lafto
subcity-Woreda10
HC
40% 78% Improving documentation
Makinglaboratory reagents
available for routine tests
Strengthening of defaulter
tracing activities by UHE-ps
at community level
Oromia
Bishoftu HC
46% 82%
Facility-level budget
utilization
Addis Ababa
Yeka Sub city
Woreda 6 HC
Nifas Silk Lafto
subcity-Woreda10
HC
KolfeKeranyio sub
city Woreda 9HC
60% 99% Training provided to HC staff
on drug and medical
equipment specification and
procurement procedure
Family planning (FP)
coverage
Addis Ababa
KolfeKeranyioWored
a9 HC
44% 85% FP orientation training
provided to HC staff,
including UHE-ps
Community awareness-
creation activities
FP service expanded at
schools and workplaces
through campaign
Quality counseling with full
option of FP methods to users
Oromia
Shashemene HC
39% 55%
Tigray
Selam HC (Mekelle)
16.3
%
20%
Facility-level data
quality improved
Addis Ababa
KolfeKeranyioWored
a9 HC
60% 80% Monitoring and evaluation
training provided to HC staff
Periodic internal supportive
supervision strengthened
Every month, Lots Quality
Assurance Sampling
performed before sending the
report to the next level
Create model house
hold
Addis Ababa
Arada SCHO
42% 52% Strong support provided to
UHE-ps
Community conversation
sessions
Women’s Developmental
Army (WDA) utilized
properly
Social mobilization effort by
4. 36 Ethiop. J. Health Dev
Ethiop. J. Health Dev.2020; 34(Special issue 2)
UHE-ps and WDA
Facility-level TB
detection rate
Amhara
Debre Markos HC
45% 67% Orientation for UHE-ps on
identifying suspected TB
cases, and strengthening
referral
Community-level awareness-
creation activities conducted
through health education and
distributing leaflets, including
updated TB guideline
Dire Dawa
Dechatu HC
33% 75%,
Harari
Jinela HC
20% 80%
Tigray
Semen HC (Mekelle)
1% 30%
Community Based
Health Insurance
(CBHI) beneficiaries
increased
SNNP
Sodo HC
0% 20% Community-level social
mobilization activities
Number of home
delivery-free kebeles
increased (eligible
women delivered at
the health facility
level)
SNNP
Sodo town
22% 61% Strong technical support
provided to UHE-ps
New pregnant mothers invited
to pregnant mothers’
conference
The existing pregnant
mothers’ conference
strengthened
Complete referral
improved
SNNP
Alamura HC
36% 68% Supportive Supervision and
technical support provided to
UHE-ps by LMG core team
Non-financial motivation
scheme, such as certification
and posting of photo with best
performer at the gate of the
HC
Referral focal person assigned
and quality of feedback
monitored
Orientation provided to HC-
level service providers on the
importance of referral slips
sent by UHE-ps
Weekly and monthly
meetings between UHE-ps
and HC staff were conducted
Addis Ababa
Arada sub-city
15% 93%
Home-based HIV
Testing and
Counseling initiated
Amhara
Debre Markos town
0 67% Refresher training provided to
UHE-ps on HTC
Supplies made available for
HTC
Awareness-creation activities
conducted for the community
Facility-level WASH
implementation
improved
Addis Ababa Nifas
Silk Lafto subcity-
Woreda10 HC
0 92% Sewerage line constructed
within HC compound
Hand washing facilities made
available in all service
delivery units
Separate latrines constructed
for males and females
Contribution of LMG training to work place
atmosphere: In the time between LMG workshops,
coaching visits were conducted with participants using
a structured coaching guide and tool to assess how the
LMG training impacted on an individual’s attitude
towards achieving their health facility’s goals and
working in a team environment, including
communications and relationships with managers and
team members. Based on these coaching visits, it can
be concluded that the LMG training had a positive
impact on the measurable results towards their
organizational goals. Below are participant testimonies
on the changes in the workplace atmosphere as a result
of the LMG training.
Ownership and share division: The LMG training
created a sense of shared ownership among staff on the
vision and goals of the health facility, a central
component of the workshops. Facility staff who had yet
to understand and internalize their health facility’s
5. Transforming primary health care unit service delivery through leadership 37
Ethiop. J. Health Dev.2020; 34(Special issue 2)
vision prior to the training were able to do so through
the LMG training sessions.
One of the training participants noted:
“The main thing that the training has facilitated is the
ownership of the vision and mission of the health
center. For me, I have a number of times seen the
vision and mission of the health center but never have I
internalized it as I have internalized it now.
Internalizing the vision and mission I say is the key to
our achievement and motivation.”
Motivation: The increased energy, commitment and
creativity that employees applied to their jobs was one
of the observed impacts after the training. Individuals
who participated in the training mentioned that it
motivated them, as well as their co-workers. Illustrative
examples of increased staff motivation are provided
below.
Most of the teams and individuals who were part of the
training worked extra hours without payment, on their
own initiation and without their supervisor’s request or
comment. For example, there was high demand for
family planning by night students in Kolfe keranyio
sub-city. To provide these services, Woreda9HC
committed to visiting night schools to provide on-site
services. Even though this was beyond the health
center’s working hours, this was the only way the
health center could meet these students’ family
planning needs. Woreda 9 HC staff worked, without
overtime payment, for 10 working days to provide
after-hours family planning services. One nurse said:
“…before LMG training our annual FP
coverage was low because we were waiting
for clients to come to the HC and get service.
But now, thanks to the LMG training, we are
motivated to improve HC FP coverage from
baseline 45% to 80%, and tried to minimize
unwanted pregnancy that could happen by
night school students.”
One HC in Adama had been trying to build a fence for
the center since its establishment seven years ago. Prior
to the LMG training, most participants from this center
were not involved in efforts to build the fence. After
the training, the trainees went to the city administration
to discuss the issue and convinced the administration to
provide US$26,000 to build it. Within three months of
the LMG training, the health center had the resources,
and the fence was constructed.
One individual from a sub-city health office noted that
the skills and knowledge learned from the LMG
training made activity planning and implementation
more efficient, noting:
“… the planned activities might be done even
if we didn’t take the LMG training, but what
the training provided us is the tools to getting
things done before the deadline. We learned
what real team work means, and how to do
things differently from ‘business as usual’.”
Work climate: The second round of LMG training
helped trainees understand that positive work climates
can improve an individual’s work habits. As a result of
LMG training, teams assessed their organization’s
work climate and made improvements as needed. For
example, at the Han HC in northern Ethiopia, the
health center director and head of administration and
finance experienced conflict in their working
relationship. The training was a good opportunity for
them to meet with each other to discuss
miscommunication and misunderstandings within the
team. As a result, the team addressed their challenges
and made significant organizational changes, which
resulted in improved service delivery:
“There was an unpleasant work relationship
between the administration team and the
technical medical team, which was solved as a
result of the LMG training. This is a lesson
that work climate is a foundation for
motivation, and addressing challenges which
have existed for years give the staff new
insight and new hope.”
System-based and team-based approaches: Trainees
acquired system thinking skills to address challenges
through team-based approaches rather than a program-
focused approach. To improve the health center
system, staff learned it was more effective to discuss
how to collectively address challenges as a team,
regardless of program area. For example, Woreda 10
HC in Addis Ababa planned to increase its target for
the fourth antenatal care (ANC4) visits from 40% to
78%. Before the training, each HC team (UHE-p,
MNCH, other stakeholders, laboratory and
management) worked in a silo and were not
coordinating to address the barriers to ANC4.
Following the training, the teams worked collectively
to increase ANC4 through the following mechanisms:
Urban health extension professional (UHE-
p) team: Had detailed discussions with all
UHE-ps on the importance of ANC4.
Maternal, newborn and child health
(MNCH) team:
Created appointment calendars for ANC
follow-up. UHE-ps were notified of those
who missed their follow-up appointments.
Since Woreda10 HC has no ultrasound
service for ANC mothers’ follow-up, they
have established a referral network with
Woreda5 HC, instead of referring
mothers to private health facilities. So,
the pregnant women in Woreda5 HC will
get services at a minimal cost.
Laboratory team: Identified that one cause
for ANC defaulters is the unavailability of lab
reagents. A mother who comes for ANC
follow-up and does not receive lab services
will not come to the health center the next
time for follow-up because people who live in
Woreda 10 are very poor and the majority of
6. 38 Ethiop. J. Health Dev
Ethiop. J. Health Dev.2020; 34(Special issue 2)
them are settled illegally. So, they cannot
afford the cost of laboratory tests at private
health facilities. Because of this, they thought
that they may not get the next ANC follow-up
service unless they bring the laboratory test
result requested by the ANC provider. The
laboratory team worked to obtain the
necessary stock of lab reagents through
discussions with the management team.
Management team: Purchased lab reagents
from other suppliers, instead of waiting for the
Pharmaceuticals Fund and Supply Agency
(PFSA).Additionally, to minimize the impact
of power interruptions on service delivery, the
management team purchased a
generator/power back-up for 600,000 birr
(US$22,000).
Finance and purchase team: Provided
training to the staff to streamline the
procurement process.
Improved management of resources: Human and
financial resources are more efficiently used after the
training, using the same resources that existed before
the training took place. Four health facilities identified
the need for additional staff and have hired and trained
more staff to address certain challenges identified
during the LMG training sessions. Prior to training, the
health facilities struggled to use their budgets
efficiently. Staff are now using their existing budgets in
a more efficient manner, and are working with their
management teams to increase the budget where
needed. The director of one HC in Tigray Region said:
“I was about to resign from the health center,
as I was frustrated and spent a number of
years working for the health center without
results. However, after the training, all the
health center staff know and work for the
vision of the health center. I am not more of a
manager but all the staff [now see themselves
as] a manager and leader in their respective
teams and departments. The training has
made my work very easy and interesting. The
same is true for the staff –with the same staff
the health center is achieving high results and
was first in the city in performance.”
An employee from finance & Purchase team shared:
“For several years our annual budget use did
not exceed 60%. For any purchase request,
we followed the rules and regulations of
finance and there was no way around these
rules. We did not respond to the management
committee positively, but rather we
complicated things. But after taking the LMG
training we felt more receptive, and became
risk takers without violating the finance rules
and regulations. Now, thanks to LMG
training, our budget use is 100%, which
means we used it effectively to improve our
HC activities’ performance.”
Another participant noted that:
“…one of the major problems was that
everybody, including the managers, was not
recognizing or learning about the mission and
vision of the health facility because the
mission and vision was developed somewhere
else and adopted by the health facilities. The
LMG training showed us the importance of
knowing our organization’s mission, and
individuals will work towards the mission by
developing a shared vision.”
One medical director said:
“When I come to the leading practices, the
LMG training gave me the potential to use
efforts within and out of the health facility. I
better understand how to mobilize and align
resources/activities and focus on challenges
and how to overcome them. Before the
training, I was waiting for results from each
case team but, following the training, I
engaged fully with each case team on their
day-to-day activities. By doing this, I inspired
the team instead of waiting simply for the
result/output from them. So, my motivation
has been increased, and I feel responsible and
work towards the health facility goals without
any reservation.”
Explore ways of overcoming individual and
organizational barriers: Trainees were encouraged to
think beyond the vision set for their teams. During the
training, they were asked to identify a challenge that
had not been addressed but is a concern for the facility.
Before taking the training, barriers were identified but
there was no problem-solving around removing or
working around the barriers. Now, trainees know they
can think through these challenges. One of the
participants from a sub-city health office said:
“I never knew that we had such potential to
deliver. LMG equipped us on the managerial
skills that we need in our everyday work. The
team spirit and commitment has greatly
improved.”
Another participant said that:
“… the LMG training not only helped in the
workplace, but it also helped me to improve
my social life. It helps me to plan, organize
and communicate with my colleagues.”
Another participant said:
“… before I took the LMG training, I was
waiting on team leaders and heads of the HC
to solve challenges. I didn’t feel anything
regarding the achievement of the activities,
whether it is achieved based on the plan or
not. Rather my thinking was ‘business as
usual’. But thanks to LMG training, now I can
use my potential as much as I can to achieve
the health center goals.”
7. Transforming primary health care unit service delivery through leadership 39
Ethiop. J. Health Dev.2020; 34(Special issue 2)
Key lessons learned by implementing LMG training:
LMG training motivated health care workers to
improve health facility-level service delivery
outcomes, strengthened integrated leadership to
address day-to-day challenges in health facilities,
improved management and leadership capacity at all
levels, promoted the efficient use of resources, and
empowered staff to do their jobs well. Teamwork and
coordination improved across all levels of service
delivery; individual-level commitment increased;
health facility budget use, management and
accountability improved; facilities better prioritized
activities; and stakeholder relationships were
strengthened. Overall, the LMG training resulted in
great improvements in the health system.
Our study indicates that Ethiopia proved that low-
income countries can improve health outcomes and
access to services if policies, programs and strategies
are underpinned by effective and responsive leadership
and management at all levels.
Conclusions
This paper documents that LMG training has had
positive effects on the health service delivery system
by increasing individuals’ motivation, improving
health care workers’ job satisfaction, and improving
team spirit and communication between staff. Health
care workers also gained additional knowledge and
skills to perform their day-to-day activities to achieve
the overall organization goals.
LMG training was shown to be pivotal in improving
health service delivery outcomes. The training was
appreciated by all trainees, the FMOH, RHBs and other
stakeholders. The training served as a catalyst to
improve provider motivation, provided the skills and
knowledge to improve LMG within the facilities, and
engendered positive competition between teams at
different health facilities.
The LMG training resolved conflicts of interest within
and between working units, standardized
organizational visions and objectives, and brought
about organizational changes that were based on team,
rather than individual, efforts. The authors recommend
that the government should expand and implement
LMG training in all health facilities to fully realize the
Health Sector Transformation Plan.
Conflicts of interest
The authors declare no conflicts of interest.
Acknowledgements
We are grateful to the Federal Ministry of Health,
regional health bureaus, zonal health departments,
town health offices, sub-city health offices, and
primary health care units. We would like to thank Anne
Austin, Luche Tadesse, Yibeltal Tebekaw and Shaina
Bauman for their critical review of this manuscript. We
also extend our thanks to all those who cooperated with
us in doing this work.
References
1. Federal Ministry of Health. Health Sector
Transformation Plan 2015/16-2019/20. Addis
Ababa: FMOH,
2015.www.globalfinancingfacility.org/sites/gff_ne
w/files/Ethiopia-health-system-transformation-
plan.pdf.
2. Mutale W, Vardoy-Mutale AT, Kachemba A,
Mukendi R, Clarke K, Mulenga D. Leadership and
management training as a catalyst to health system
strengthening in low-income settings: Evidence
from implementation of the Zambia Management
and Leadership course for district health managers
in Zambia. PLoS One.2017;12(7):e0174536.
3. Federal Ministry of Health.Leadership,
management and governance in-service training
facilitator manual. 2014.
4. Manyazewal T. Using the World Health
Organization health system building blocks
through survey of healthcare professionals to
determine the performance of public healthcare
facilities. Arch Public Health. 2017;75:50.
5. Vriesendorp S. Achieving results by strengthening
health systems. In: Management Sciences for
Health:Health systems in action: an ehandbook for
leaders and managers. Cambridge, MA:
Management Sciences for Health, 2010.
www.msh.org/resources/health-systems-in-action-
an-ehandbook-for-leaders-and-managers.
6. Anwari Z, Shukla M, Maseed BA, Wardak GFM,
Sardar S, Matin J, et al. Implementing people-
centred health systems governance in 3 provinces
and 11 districts of Afghanistan: A case study.
Confl Health. 2015;9(1):1-16.
8. 40 Ethiop. J. Health Dev
Ethiop. J. Health Dev.2020; 34(Special issue 2)
Annex 1: Activity tracking sheet
1
Monthly progress should be attached with separate sheet.
S. No. Key
performan
ce
indicator
(KPI)
Time for
beginning of
the LMG
intervention
(in months)
Baseline data at
the beginning of
the month (target
set in frequency/
absolute number
or percentage)
Target Data
source
for
baseline
data
Definition
of the
measuremen
t of the
target
Outline or
description
of the
methods or
activities
done to
meet the
target
Current status
[Achievement]
by _________
(Month)1
Data
source for
current
status
Remark
9. Transforming primary health care unit service delivery through leadership 41
Ethiop. J. Health Dev.2020; 34(Special issue 2)
Annex 2: Challenge model adopted from the LMG training manual – Reference No. 4
Annex 3: Leading, managing and governing for result model, adopted from LMG training
manual – Reference No. 4