 Activity diagrams represent the dynamic (behavioral) view of a system.
 Activity diagrams are typically used for business (transaction) process
modeling and modeling the logic captured by a single use-case or usage
scenario.
 Activity diagram is used to represent the flow across use cases or to
represent flow within a particular use case.
 UML activity diagrams are the object oriented equivalent of flow chart and
data flow diagrams in function-oriented design approach.
 Activity diagram contains activities, transitions between activities, decision
points, synchronization bars, swim lanes and many more…
 Describes how activities are coordinated.
 Is particularly useful when you know that an operation has to achievea
number of different things, and you want to model what the essential
dependencies between them are, before you decide in what order to do
them.
 Records the dependencies between activities, such as which things can
happen in parallel and what must be finished before something else can
start.
 Represents the workflow of the process.
LokendraPrajapati(MCA)Acropolis
Institute of Technology&Research
3
2/19/2015
LokendraPrajapati(MCA)Acropolis
Institute of Technology&Research
4
2/19/2015
1. Activity
 The Core symbol is used forActivities.
Activity
 An activity is some task which needs to be done.
 Each activity can be followed by another activity (sequencing).
 An activity may be a manual thing, so that it’s not necessarily in a program.
2. Transmission (Flow)
 When the action or activity of a state completes, flow of control passes
immediately to the next action or activity state
 The flow of control is shown by arrow symbol.
LokendraPrajapati(MCA)Acropolis
Institute of Technology&Research
5
2/19/2015
3. Starting and Ending Nodes
 The source of flow of control is known as ‘Initial Node orStarting
Node’.
Starting Node(Mark)
 Destination of flow of control is called ‘Ending Node or FinalNode’.
Ending Node
LokendraPrajapati(MCA)Acropolis
Institute of Technology&Research
6
2/19/2015
4. Join and Fork
 Join
A block bar with several flows entering in it and one leaving from it. thisdenotes
the end of parallel activities
LokendraPrajapati(MCA)Acropolis
Institute of Technology&Research
7
2/19/2015
4.1 Synch.Bar (Join)
 Fork
A black bar ( horizontal/vertical ) with one flow going into it and several leavingit.
This denotes the beginning of parallel activities
4.2 SplittingBar(Fork)
5. Decision and Merge
 Decision
– A diamond with one flow enteringand
several leaving. The flow leaving
includes conditions as yes/ no state.
 Merge
– A diamond with several flows entering
and one leaving. The implication is that
all incoming flow to reach this point until
processing continues
LokendraPrajapati(MCA)Acropolis
Institute of Technology&Research
8
2/19/2015
Acti
Acti
 Activity diagrams tell you what is happening, but not who doeswhat.
 In domain modelling, this diagram type does not convey which people or
departments are responsible for each activity.
 In programming, it does not convey which class is responsible foreach
activity
LokendraPrajapati(MCA)Acropolis
Institute of Technology&Research
11
2/19/2015

More Related Content

PPTX
Activity diagram
LOKENDRA PRAJAPATI
 
PPT
Uml Activity Diagram
Niloy Rocker
 
PPTX
Activity diagram model
ahmed zewita
 
PPTX
Uml and enterprise architect
Md Touhidul Alam Shuvo
 
PPTX
ppt of flowchart
140120109032
 
PPT
Activity diagrams
Jalaxy Jahury
 
PDF
Lecture6 activity diagrams
Shahid Riaz
 
PPT
Fundamentals of Software Engineering
Madhar Khan Pathan
 
Activity diagram
LOKENDRA PRAJAPATI
 
Uml Activity Diagram
Niloy Rocker
 
Activity diagram model
ahmed zewita
 
Uml and enterprise architect
Md Touhidul Alam Shuvo
 
ppt of flowchart
140120109032
 
Activity diagrams
Jalaxy Jahury
 
Lecture6 activity diagrams
Shahid Riaz
 
Fundamentals of Software Engineering
Madhar Khan Pathan
 

Similar to Acti (20)

PPT
Slide 6 Activity Diagram
Niloy Rocker
 
PDF
week07a.pdf
umidxjy
 
PPTX
Use Case Descriptions Collabration .pptx
royalchaulagain321
 
PPTX
Lecture 19...unit 3.....se
Praveen Nelapati
 
PPTX
UML - Activity Diagrams (1) for cs.pptx
ms4715485
 
PPT
4 Activity & Statechart diagram.ppt4 Activity & Statechart diagram.ppt4 Activ...
MuhammadAbubakar114879
 
PPTX
ACTIVITY DIAGRAM.pptx
devboris1
 
PPTX
SAD09 - Activity Diagrams
Michael Heron
 
PPT
Software designe and constractionLec 4B.ppt
adnanshaheen425
 
PPTX
ACTIVITY DIAGRAMS IN OBJECT ORIENTED ANALYSIS AND DESIGN
UmmuAhmed3
 
PDF
software engineering with uml- activity diagram
rahmantoyuri
 
PPT
08 state diagram and activity diagram
Baskarkncet
 
PDF
Activity Diagram part8
DrMohammed Qassim
 
PPTX
Unit III Dynamic and Implementation UML Diagrams.pptx
anguraju1
 
PPTX
Activity diagram
Kaushik Ghosh
 
PPTX
Activity diagrams show the flow of one activity to another within a system or...
NALESVPMEngg
 
PPTX
3150711_SE_GTU_Study_Material_Presentations_Unit-4_11082020081044AM (1).pptx
shyambk4
 
PDF
Activity diag
Preeti Mishra
 
PPTX
Use case model
Ashwani Kumar
 
Slide 6 Activity Diagram
Niloy Rocker
 
week07a.pdf
umidxjy
 
Use Case Descriptions Collabration .pptx
royalchaulagain321
 
Lecture 19...unit 3.....se
Praveen Nelapati
 
UML - Activity Diagrams (1) for cs.pptx
ms4715485
 
4 Activity & Statechart diagram.ppt4 Activity & Statechart diagram.ppt4 Activ...
MuhammadAbubakar114879
 
ACTIVITY DIAGRAM.pptx
devboris1
 
SAD09 - Activity Diagrams
Michael Heron
 
Software designe and constractionLec 4B.ppt
adnanshaheen425
 
ACTIVITY DIAGRAMS IN OBJECT ORIENTED ANALYSIS AND DESIGN
UmmuAhmed3
 
software engineering with uml- activity diagram
rahmantoyuri
 
08 state diagram and activity diagram
Baskarkncet
 
Activity Diagram part8
DrMohammed Qassim
 
Unit III Dynamic and Implementation UML Diagrams.pptx
anguraju1
 
Activity diagram
Kaushik Ghosh
 
Activity diagrams show the flow of one activity to another within a system or...
NALESVPMEngg
 
3150711_SE_GTU_Study_Material_Presentations_Unit-4_11082020081044AM (1).pptx
shyambk4
 
Activity diag
Preeti Mishra
 
Use case model
Ashwani Kumar
 
Ad

Recently uploaded (20)

PDF
Arihant Class 10 All in One Maths full pdf
sajal kumar
 
PPTX
Nursing Management of Patients with Disorders of Ear, Nose, and Throat (ENT) ...
RAKESH SAJJAN
 
PDF
What is CFA?? Complete Guide to the Chartered Financial Analyst Program
sp4989653
 
PPTX
Dakar Framework Education For All- 2000(Act)
santoshmohalik1
 
PDF
Types of Literary Text: Poetry and Prose
kaelandreabibit
 
DOCX
Action Plan_ARAL PROGRAM_ STAND ALONE SHS.docx
Levenmartlacuna1
 
PPTX
Five Point Someone – Chetan Bhagat | Book Summary & Analysis by Bhupesh Kushwaha
Bhupesh Kushwaha
 
PDF
UTS Health Student Promotional Representative_Position Description.pdf
Faculty of Health, University of Technology Sydney
 
PPTX
TEF & EA Bsc Nursing 5th sem.....BBBpptx
AneetaSharma15
 
PPTX
vedic maths in python:unleasing ancient wisdom with modern code
mistrymuskan14
 
DOCX
SAROCES Action-Plan FOR ARAL PROGRAM IN DEPED
Levenmartlacuna1
 
PPTX
ACUTE NASOPHARYNGITIS. pptx
AneetaSharma15
 
PDF
Sunset Boulevard Student Revision Booklet
jpinnuck
 
PPT
Python Programming Unit II Control Statements.ppt
CUO VEERANAN VEERANAN
 
PDF
7.Particulate-Nature-of-Matter.ppt/8th class science curiosity/by k sandeep s...
Sandeep Swamy
 
PPTX
family health care settings home visit - unit 6 - chn 1 - gnm 1st year.pptx
Priyanshu Anand
 
PDF
Exploring-Forces 5.pdf/8th science curiosity/by sandeep swamy notes/ppt
Sandeep Swamy
 
PPTX
Care of patients with elImination deviation.pptx
AneetaSharma15
 
PDF
The Picture of Dorian Gray summary and depiction
opaliyahemel
 
PDF
1.Natural-Resources-and-Their-Use.ppt pdf /8th class social science Exploring...
Sandeep Swamy
 
Arihant Class 10 All in One Maths full pdf
sajal kumar
 
Nursing Management of Patients with Disorders of Ear, Nose, and Throat (ENT) ...
RAKESH SAJJAN
 
What is CFA?? Complete Guide to the Chartered Financial Analyst Program
sp4989653
 
Dakar Framework Education For All- 2000(Act)
santoshmohalik1
 
Types of Literary Text: Poetry and Prose
kaelandreabibit
 
Action Plan_ARAL PROGRAM_ STAND ALONE SHS.docx
Levenmartlacuna1
 
Five Point Someone – Chetan Bhagat | Book Summary & Analysis by Bhupesh Kushwaha
Bhupesh Kushwaha
 
UTS Health Student Promotional Representative_Position Description.pdf
Faculty of Health, University of Technology Sydney
 
TEF & EA Bsc Nursing 5th sem.....BBBpptx
AneetaSharma15
 
vedic maths in python:unleasing ancient wisdom with modern code
mistrymuskan14
 
SAROCES Action-Plan FOR ARAL PROGRAM IN DEPED
Levenmartlacuna1
 
ACUTE NASOPHARYNGITIS. pptx
AneetaSharma15
 
Sunset Boulevard Student Revision Booklet
jpinnuck
 
Python Programming Unit II Control Statements.ppt
CUO VEERANAN VEERANAN
 
7.Particulate-Nature-of-Matter.ppt/8th class science curiosity/by k sandeep s...
Sandeep Swamy
 
family health care settings home visit - unit 6 - chn 1 - gnm 1st year.pptx
Priyanshu Anand
 
Exploring-Forces 5.pdf/8th science curiosity/by sandeep swamy notes/ppt
Sandeep Swamy
 
Care of patients with elImination deviation.pptx
AneetaSharma15
 
The Picture of Dorian Gray summary and depiction
opaliyahemel
 
1.Natural-Resources-and-Their-Use.ppt pdf /8th class social science Exploring...
Sandeep Swamy
 
Ad

Acti

  • 1. LokendraPrajapati(MCA)Acropolis Institute of Technology&Research 1 2/19/2015 Name umair ilyas 2017-ag-5217 University of Agriculture Faisalabad
  • 2. LokendraPrajapati(MCA)Acropolis Institute of Technology&Research 2 2/19/2015  Activity diagrams represent the dynamic (behavioral) view of a system.  Activity diagrams are typically used for business (transaction) process modeling and modeling the logic captured by a single use-case or usage scenario.  Activity diagram is used to represent the flow across use cases or to represent flow within a particular use case.  UML activity diagrams are the object oriented equivalent of flow chart and data flow diagrams in function-oriented design approach.  Activity diagram contains activities, transitions between activities, decision points, synchronization bars, swim lanes and many more…
  • 3.  Describes how activities are coordinated.  Is particularly useful when you know that an operation has to achievea number of different things, and you want to model what the essential dependencies between them are, before you decide in what order to do them.  Records the dependencies between activities, such as which things can happen in parallel and what must be finished before something else can start.  Represents the workflow of the process. LokendraPrajapati(MCA)Acropolis Institute of Technology&Research 3 2/19/2015
  • 4. LokendraPrajapati(MCA)Acropolis Institute of Technology&Research 4 2/19/2015 1. Activity  The Core symbol is used forActivities. Activity  An activity is some task which needs to be done.  Each activity can be followed by another activity (sequencing).  An activity may be a manual thing, so that it’s not necessarily in a program.
  • 5. 2. Transmission (Flow)  When the action or activity of a state completes, flow of control passes immediately to the next action or activity state  The flow of control is shown by arrow symbol. LokendraPrajapati(MCA)Acropolis Institute of Technology&Research 5 2/19/2015
  • 6. 3. Starting and Ending Nodes  The source of flow of control is known as ‘Initial Node orStarting Node’. Starting Node(Mark)  Destination of flow of control is called ‘Ending Node or FinalNode’. Ending Node LokendraPrajapati(MCA)Acropolis Institute of Technology&Research 6 2/19/2015
  • 7. 4. Join and Fork  Join A block bar with several flows entering in it and one leaving from it. thisdenotes the end of parallel activities LokendraPrajapati(MCA)Acropolis Institute of Technology&Research 7 2/19/2015 4.1 Synch.Bar (Join)  Fork A black bar ( horizontal/vertical ) with one flow going into it and several leavingit. This denotes the beginning of parallel activities 4.2 SplittingBar(Fork)
  • 8. 5. Decision and Merge  Decision – A diamond with one flow enteringand several leaving. The flow leaving includes conditions as yes/ no state.  Merge – A diamond with several flows entering and one leaving. The implication is that all incoming flow to reach this point until processing continues LokendraPrajapati(MCA)Acropolis Institute of Technology&Research 8 2/19/2015
  • 11.  Activity diagrams tell you what is happening, but not who doeswhat.  In domain modelling, this diagram type does not convey which people or departments are responsible for each activity.  In programming, it does not convey which class is responsible foreach activity LokendraPrajapati(MCA)Acropolis Institute of Technology&Research 11 2/19/2015