This document discusses the use of Building Information Modeling (BIM) software for planning and scheduling multi-story building projects. BIM allows architects, engineers, and contractors to visualize a building design in a 3D virtual environment and identify potential problems before physical construction begins. It integrates key project information, such as converting the 3D model to 4D by linking it to a schedule with time, or 5D by including cost information. Using BIM for 5D modeling can save time and reduce costs compared to traditional scheduling methods. The paper explores how BIM tools can help with design, visualization, cost analysis, scheduling, and monitoring building projects more efficiently.