SlideShare a Scribd company logo
Asphalt Conference Presentation Mar 2012
Utah Statewide Growth Trends
Strategic Goals
  Take care of what we have   Preserve Infrastructure
Make the system work better   Optimize Mobility
             Improve safety   Improve Safety
          Increase capacity   Strengthen the Economy
Preserve
  Preserve
    Infrastructure
 Infrast
Pavement Conditions
3 Maintenance Levels
to Prioritize Resources

Interstate and Level 1
 • 53% of all State Highway
   Lane Miles

 • 96% of all Vehicle Miles
   Traveled on State System

Level 2
 • Less than 2,000 vehicles
   per day
Condition of Utah State
Roads

 • Overall Condition of UDOT
   Highways are Good

 • Majority of Roads in Poor
   Condition are Low
   Volume/Rural (Level 2)
Pavement Condition
                                                               Historical – Projected
                                  (Interstate – 935 miles)                                                                                      (Level 1 – 2,185 miles)
                           Ride Quality - Projected with 60 million / year                                                            Ride Quality - Projected with 90 million / year
             100%                                                                                                      100%

             90%                                                                                                       90%

             80%                                                                                                       80%

             70%                                                                                                       70%

             60%                                                                                                       60%




                                                                                                          % of Miles
% of Miles




             50%                                                                                                       50%

             40%                                                                                                       40%

             30%                                                                                                       30%

             20%                                                                                                       20%

             10%                                                                                                       10%

              0%                                                                                                        0%
                      2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020                                          2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020


               % Good: IRI < 95   % Fair   % Poor: IRI > 170   Upper & Lower Threshold Band (95 to 98%)                  % Good: IRI < 95   % Fair   % Poor: IRI > 170   Upper & Lower Threshold Band (90 to 95%)
Pavement Condition
                                                Historical – Projected
                                                    (Level 2 – 2,735 miles)
                                                 Ride Quality – Projected at Current Funding Levels
             100%

             90%

             80%

             70%

             60%
% of Miles




             50%

             40%

             30%

             20%

             10%

              0%
                    2008     2009        2010    2011     2012      2013        2014   2015      2016      2017       2018      2019   2020
                        % Good: IRI < 95        % Fair        % Poor: IRI > 170        Upper & Lower Threshold Band (80 to 90%)


                                                                               Over 500 centerline miles in poor condition today
                                                                  At current funding levels, poor condition roads double by 2020
Pavement Condition
                                                                 Historical – Projected
                                  (Level 2 – 2,735 miles)                                                                                    (Level 2 – 2,735 miles)
                     Ride Quality – Projected at Current Funding Levels                                                            Ride Quality - Projected with an Additional 40
                                                                                                                                                   million / year *
             100%                                                                                                      100%

             90%                                                                                                       90%

             80%                                                                                                       80%

             70%                                                                                                       70%

             60%                                                                                                       60%




                                                                                                          % of Miles
% of Miles




             50%                                                                                                       50%

             40%                                                                                                       40%

             30%                                                                                                       30%

             20%                                                                                                       20%

             10%                                                                                                       10%

              0%                                                                                                        0%
                     2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020                                          2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020


               % Good: IRI < 95   % Fair   % Poor: IRI > 170   Upper & Lower Threshold Band (80 to 90%)                   % Good: IRI < 95   % Fair   % Poor: IRI > 170   Upper & Lower Threshold Band (80 to 90%)

                                                                                                                                                              * Governor’s proposed 2013 budget
Condition of UDOT Bridges
Age Distribution
Optimize
  Optimize
 Mobility
    Mobility
Delay Along the Wasatch Front
    Davis, Weber, Salt Lake & Utah Counties
Mountain View Corridor
  15 miles under construction

  All 22 bridges and structures complete or underway
Mountain View Corridor
  Sections of pavement, curb, gutter, and trails placed

  Completion date – December 2012




                                                           Midas Creek Dec. 2011




 Midas Creek at the start of construction
I-15 CORE
  24 miles, 10 interchanges, 63 bridges

  35-month schedule makes this the fastest billion-dollar project in
   U.S. history

  On schedule for Dec. 2012 completion
Construction Progress
  75% complete

  95% of traffic on new concrete

  2 million square yards of concrete placed
Southern Parkway
Southern Parkway
  I-15 to airport complete

  7 miles of new road

  Future – St. George Airport to Sand Hollow Reservoir
West Davis
 EIS began: Jan 2010

 EIS funding: $8 mil

 Aug 2010 - 46 Alt
West Davis
 Sept 2011
 8 alternatives and
 options
 9 Open houses

 5,000 public comments

 Draft EIS late
 summer 2012
Hours of use   Annual User Hours and Cost Savings
Improve
 Safety
  Improve
   Safety
Zero Fatalities




 A Goal We Can All Live With
Interstate Serious Injury and Fatal Crashes
          Engineering Solutions | Saving Lives
Interstate Serious Injury and Fatal Crashes
        Involving a Vehicle that Crossed the Median
          vs Total Miles of Cable Barrier Installed
Strength
 Strengthen
   Econom
    the Economy
Economic Impact



        Number of contractor and consultant
                                companies
                             (P rimes and S ubs )


                                 602
                  Private sector employees
                    associated with current
                       construction projects


                       13,063
Strengthen the Economy
Accelerated Techniques
Accomplishments 2012
Finishing 28 projects worth more than $3 billion
Asphalt Conference Presentation Mar 2012

More Related Content

PDF
Infrastructure and General Government Appropriations Subcommittee Jan 2012
Utah Department of Transportation
 
PDF
ITE Presentation January 2013
Utah Department of Transportation
 
PDF
#92 The Power of the Performance Metric – Getting Your Jurisdiction Back on T...
Project for Public Spaces & National Center for Biking and Walking
 
PDF
Driver's Attitudes toward Speed Limits
Basil Psarianos
 
PDF
Gridley’s mobile-ny-industy-roadmap-tips-for-successful-fundraise
Linda Gridley
 
PDF
Documents template
Alex G
 
PPTX
Rethinking Poverty and Inequality Measurement in Arab Countries
UnicefMaroc
 
PPTX
Education Equity in Asian Pacific Islander Communities in Oregon
_APANO_
 
Infrastructure and General Government Appropriations Subcommittee Jan 2012
Utah Department of Transportation
 
ITE Presentation January 2013
Utah Department of Transportation
 
#92 The Power of the Performance Metric – Getting Your Jurisdiction Back on T...
Project for Public Spaces & National Center for Biking and Walking
 
Driver's Attitudes toward Speed Limits
Basil Psarianos
 
Gridley’s mobile-ny-industy-roadmap-tips-for-successful-fundraise
Linda Gridley
 
Documents template
Alex G
 
Rethinking Poverty and Inequality Measurement in Arab Countries
UnicefMaroc
 
Education Equity in Asian Pacific Islander Communities in Oregon
_APANO_
 

Viewers also liked (9)

PDF
A State-based Model for Runtime Resource Reservation for Component-based Appl...
IDES Editor
 
PDF
Research Poster
Nick McDonold
 
PDF
Estimation of IRI from PCI in Construction Work Zones
IDES Editor
 
PDF
Multi Similarity Measure based Result Merging Strategies in Meta Search Engine
IDES Editor
 
PDF
An Efficient Search Engine for Searching Desired File
IDES Editor
 
PDF
Efficient Representation of Smart Environments using a Parallelized Approach
IDES Editor
 
PPT
Participatory Project
#Xiao Zhe#
 
PDF
Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...
Johan Granlund
 
PDF
International Roughness Index, IRI, and ISO 2631 Vibration Evaluation
Johan Granlund
 
A State-based Model for Runtime Resource Reservation for Component-based Appl...
IDES Editor
 
Research Poster
Nick McDonold
 
Estimation of IRI from PCI in Construction Work Zones
IDES Editor
 
Multi Similarity Measure based Result Merging Strategies in Meta Search Engine
IDES Editor
 
An Efficient Search Engine for Searching Desired File
IDES Editor
 
Efficient Representation of Smart Environments using a Parallelized Approach
IDES Editor
 
Participatory Project
#Xiao Zhe#
 
Roadex Iv Presentation Final Sem Inverness 2012 05 22 Vectura On Ride Vibrati...
Johan Granlund
 
International Roughness Index, IRI, and ISO 2631 Vibration Evaluation
Johan Granlund
 
Ad

Similar to Asphalt Conference Presentation Mar 2012 (20)

PDF
The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?
Marnix van Eerde
 
PPT
Workforce Statewide Presentation 2012
Minnesota Chamber of Commerce
 
PPT
Sociedade Ponto Verde by SOAP
SOAP Presentations
 
PDF
Amund Bråthen - konsumentanalytiker Norges sjømatråd - Miniseminar Laks - Ju...
Norwegian Seafood Council
 
PPTX
Session #2: Test Driven Development
Steve Lange
 
PPT
Strix Applications Case Studies
tritv
 
PPTX
Omi creds
VivekLakh
 
PPTX
Egyptian elections presidential debate may 2012
SocialEyez
 
PDF
121108 MD smart grid and renewable energy integration 1
Engineers Australia
 
PPTX
Antonio Donini - Civ-mil and the future of Humanitarian Action
Australian Civil-Military Centre
 
PDF
TV Viewership Jan - Dec 2010
noumanfazal
 
PDF
Re Insights Graphs Oct
Keller Williams Realty Professionals
 
PPTX
Direct Marketing
Irish Marketing Journal
 
PPTX
Amie Peters
Alchemy
 
PPTX
District and school board leadership for academy success
NAFCareerAcads
 
PDF
Arm2011 oliver(leininger) 6.14.11
soder145
 
PPT
Test management
Oana Feidi
 
PPSX
Mobile Devices MetaPress
Charleston Conference
 
PDF
BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...
Paul Stith
 
PDF
Audience Behaviour: Bring Back that Lovin‘ Feelin‘
AchillesMedia
 
The Waterside Convention 2011 Invesco - Volatiliteit: een anomalie?
Marnix van Eerde
 
Workforce Statewide Presentation 2012
Minnesota Chamber of Commerce
 
Sociedade Ponto Verde by SOAP
SOAP Presentations
 
Amund Bråthen - konsumentanalytiker Norges sjømatråd - Miniseminar Laks - Ju...
Norwegian Seafood Council
 
Session #2: Test Driven Development
Steve Lange
 
Strix Applications Case Studies
tritv
 
Omi creds
VivekLakh
 
Egyptian elections presidential debate may 2012
SocialEyez
 
121108 MD smart grid and renewable energy integration 1
Engineers Australia
 
Antonio Donini - Civ-mil and the future of Humanitarian Action
Australian Civil-Military Centre
 
TV Viewership Jan - Dec 2010
noumanfazal
 
Re Insights Graphs Oct
Keller Williams Realty Professionals
 
Direct Marketing
Irish Marketing Journal
 
Amie Peters
Alchemy
 
District and school board leadership for academy success
NAFCareerAcads
 
Arm2011 oliver(leininger) 6.14.11
soder145
 
Test management
Oana Feidi
 
Mobile Devices MetaPress
Charleston Conference
 
BMW – A Future Vision for Sustainable Electric Mobility (http://bit.ly/Join-E...
Paul Stith
 
Audience Behaviour: Bring Back that Lovin‘ Feelin‘
AchillesMedia
 
Ad

More from Utah Department of Transportation (20)

PDF
Comprehensive RUC Presentation
Utah Department of Transportation
 
PDF
Appropriations 2015
Utah Department of Transportation
 
PDF
Traffic Management Division Accomplishments and Needs Report
Utah Department of Transportation
 
PDF
Governor's Transportation Summit - UDOT Challenges
Utah Department of Transportation
 
PDF
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
Utah Department of Transportation
 
PDF
Governor's Transportation Summit - The Integral Relationship Between Freigh a...
Utah Department of Transportation
 
PDF
Governor's Transportation Summit - Municipal Highway Infrastructure Overview
Utah Department of Transportation
 
PDF
Governor's Transportation Summit - Ski Utah
Utah Department of Transportation
 
PDF
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Utah Department of Transportation
 
PDF
Governor's Transportation Summit - Transportation Interim Committee
Utah Department of Transportation
 
PDF
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
Utah Department of Transportation
 
PDF
Governor's Transportation Summit - Transportation Funding
Utah Department of Transportation
 
PPT
Vision for UDOT's Future
Utah Department of Transportation
 
PPTX
Utah Highway Users Fall Meeting
Utah Department of Transportation
 
PDF
UDOT Program Update
Utah Department of Transportation
 
PDF
Uintah Basin Energy and Transportation Study
Utah Department of Transportation
 
PDF
Utah Transportation Funding
Utah Department of Transportation
 
PDF
Utah's State Infrastructur Bank (Experience & Perspectives)
Utah Department of Transportation
 
Comprehensive RUC Presentation
Utah Department of Transportation
 
Traffic Management Division Accomplishments and Needs Report
Utah Department of Transportation
 
Governor's Transportation Summit - UDOT Challenges
Utah Department of Transportation
 
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
Utah Department of Transportation
 
Governor's Transportation Summit - The Integral Relationship Between Freigh a...
Utah Department of Transportation
 
Governor's Transportation Summit - Municipal Highway Infrastructure Overview
Utah Department of Transportation
 
Governor's Transportation Summit - Ski Utah
Utah Department of Transportation
 
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Utah Department of Transportation
 
Governor's Transportation Summit - Transportation Interim Committee
Utah Department of Transportation
 
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
Utah Department of Transportation
 
Governor's Transportation Summit - Transportation Funding
Utah Department of Transportation
 
Vision for UDOT's Future
Utah Department of Transportation
 
Utah Highway Users Fall Meeting
Utah Department of Transportation
 
Uintah Basin Energy and Transportation Study
Utah Department of Transportation
 
Utah Transportation Funding
Utah Department of Transportation
 
Utah's State Infrastructur Bank (Experience & Perspectives)
Utah Department of Transportation
 

Recently uploaded (20)

PDF
NewBase 29 July 2025 Energy News issue - 1807 by Khaled Al Awadi_compressed.pdf
Khaled Al Awadi
 
PDF
Minnesota’s New Lane-Sharing Law for Motorcycles.pdf
Knowyourright
 
PPTX
Helicopters in the Brazilian Oil Industry – Executive Summary
Vitor Pereira Xavier
 
PPTX
Communications Recruiter Melbourne.pptx
ReithGordon
 
PDF
William Trowell - A Construction Project Manager
William Trowell
 
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
Dr. Enrique Segura Ense Group
 
PPTX
BIS-Certification-for-CCTV-Recorders ppt.pptx
Diligence Certification
 
PPTX
Nagarajan Seyyadurai – Visionary Leadership at WS Industries.pptx
nagarajansd9
 
PDF
TriStar Gold Corporate Presentation August 2025
Adnet Communications
 
PDF
Drone Spraying in Agriculture, How It’s Enhancing Efficiency and Crop Yields
ganeshdukare428
 
PDF
A Complete Guide to Data Migration Services for Modern Businesses
Aurnex
 
PPT
How to Protect Your New York Business from the Unexpected
Sam Vohra
 
PPTX
Pakistan’s Leading Manpower Export Agencies for Qatar
Glassrooms Dubai
 
PPTX
Creating the Ultimate SOP Manual: Streamline, Standardize, and Scale
RUPAL AGARWAL
 
PDF
Tariff Surcharge and Price Increase Decision
Joshua Gao
 
PDF
FOHO: The Rental Platform Transforming Housing for Asian Renters in the U.S.
Evan Han
 
PPTX
6 Timeless Japanese Concepts to Improve Business Processes
RUPAL AGARWAL
 
PDF
askOdin - An Introduction to AI-Powered Investment Judgment
YekSoon LOK
 
DOCX
UNIT 2 BC.docx- cv - RESOLUTION -MINUTES-NOTICE - BUSINESS LETTER DRAFTING
MANJU N
 
PPTX
How to best Address your professional Training Program - August 2025.pptx
PaulYoung221210
 
NewBase 29 July 2025 Energy News issue - 1807 by Khaled Al Awadi_compressed.pdf
Khaled Al Awadi
 
Minnesota’s New Lane-Sharing Law for Motorcycles.pdf
Knowyourright
 
Helicopters in the Brazilian Oil Industry – Executive Summary
Vitor Pereira Xavier
 
Communications Recruiter Melbourne.pptx
ReithGordon
 
William Trowell - A Construction Project Manager
William Trowell
 
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
Dr. Enrique Segura Ense Group
 
BIS-Certification-for-CCTV-Recorders ppt.pptx
Diligence Certification
 
Nagarajan Seyyadurai – Visionary Leadership at WS Industries.pptx
nagarajansd9
 
TriStar Gold Corporate Presentation August 2025
Adnet Communications
 
Drone Spraying in Agriculture, How It’s Enhancing Efficiency and Crop Yields
ganeshdukare428
 
A Complete Guide to Data Migration Services for Modern Businesses
Aurnex
 
How to Protect Your New York Business from the Unexpected
Sam Vohra
 
Pakistan’s Leading Manpower Export Agencies for Qatar
Glassrooms Dubai
 
Creating the Ultimate SOP Manual: Streamline, Standardize, and Scale
RUPAL AGARWAL
 
Tariff Surcharge and Price Increase Decision
Joshua Gao
 
FOHO: The Rental Platform Transforming Housing for Asian Renters in the U.S.
Evan Han
 
6 Timeless Japanese Concepts to Improve Business Processes
RUPAL AGARWAL
 
askOdin - An Introduction to AI-Powered Investment Judgment
YekSoon LOK
 
UNIT 2 BC.docx- cv - RESOLUTION -MINUTES-NOTICE - BUSINESS LETTER DRAFTING
MANJU N
 
How to best Address your professional Training Program - August 2025.pptx
PaulYoung221210
 

Asphalt Conference Presentation Mar 2012

  • 3. Strategic Goals Take care of what we have Preserve Infrastructure Make the system work better Optimize Mobility Improve safety Improve Safety Increase capacity Strengthen the Economy
  • 4. Preserve Preserve Infrastructure Infrast
  • 6. 3 Maintenance Levels to Prioritize Resources Interstate and Level 1 • 53% of all State Highway Lane Miles • 96% of all Vehicle Miles Traveled on State System Level 2 • Less than 2,000 vehicles per day
  • 7. Condition of Utah State Roads • Overall Condition of UDOT Highways are Good • Majority of Roads in Poor Condition are Low Volume/Rural (Level 2)
  • 8. Pavement Condition Historical – Projected (Interstate – 935 miles) (Level 1 – 2,185 miles) Ride Quality - Projected with 60 million / year Ride Quality - Projected with 90 million / year 100% 100% 90% 90% 80% 80% 70% 70% 60% 60% % of Miles % of Miles 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (95 to 98%) % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (90 to 95%)
  • 9. Pavement Condition Historical – Projected (Level 2 – 2,735 miles) Ride Quality – Projected at Current Funding Levels 100% 90% 80% 70% 60% % of Miles 50% 40% 30% 20% 10% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%) Over 500 centerline miles in poor condition today At current funding levels, poor condition roads double by 2020
  • 10. Pavement Condition Historical – Projected (Level 2 – 2,735 miles) (Level 2 – 2,735 miles) Ride Quality – Projected at Current Funding Levels Ride Quality - Projected with an Additional 40 million / year * 100% 100% 90% 90% 80% 80% 70% 70% 60% 60% % of Miles % of Miles 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%) % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%) * Governor’s proposed 2013 budget
  • 11. Condition of UDOT Bridges
  • 13. Optimize Optimize Mobility Mobility
  • 14. Delay Along the Wasatch Front Davis, Weber, Salt Lake & Utah Counties
  • 15. Mountain View Corridor  15 miles under construction  All 22 bridges and structures complete or underway
  • 16. Mountain View Corridor  Sections of pavement, curb, gutter, and trails placed  Completion date – December 2012 Midas Creek Dec. 2011 Midas Creek at the start of construction
  • 17. I-15 CORE  24 miles, 10 interchanges, 63 bridges  35-month schedule makes this the fastest billion-dollar project in U.S. history  On schedule for Dec. 2012 completion
  • 18. Construction Progress  75% complete  95% of traffic on new concrete  2 million square yards of concrete placed
  • 20. Southern Parkway  I-15 to airport complete  7 miles of new road  Future – St. George Airport to Sand Hollow Reservoir
  • 21. West Davis  EIS began: Jan 2010  EIS funding: $8 mil  Aug 2010 - 46 Alt
  • 22. West Davis  Sept 2011 8 alternatives and options  9 Open houses  5,000 public comments  Draft EIS late summer 2012
  • 23. Hours of use Annual User Hours and Cost Savings
  • 24. Improve Safety Improve Safety
  • 25. Zero Fatalities A Goal We Can All Live With
  • 26. Interstate Serious Injury and Fatal Crashes Engineering Solutions | Saving Lives
  • 27. Interstate Serious Injury and Fatal Crashes Involving a Vehicle that Crossed the Median vs Total Miles of Cable Barrier Installed
  • 28. Strength Strengthen Econom the Economy
  • 29. Economic Impact Number of contractor and consultant companies (P rimes and S ubs ) 602 Private sector employees associated with current construction projects 13,063
  • 32. Accomplishments 2012 Finishing 28 projects worth more than $3 billion