Context
No

Program

Areas that
Revenue Duration needed
Attention

Sustenance Engineering - Test the
Compatibility of 2000 selected
1
50 Million 3 years
Application suit on Pre-released
and Released Operating systems

Development and Maintenance of
Telecom Apps (DNS and DHCP
2
4.5 Million 3 years
services for IPv4 and IPv6
networks)

3 Evangelize pre-released products
Yukon (SQL Server 2005) –
Whidbey (Visual Studio 2005) and
Long Horn server (Business Layer) 1 Million

1.5 Years

Lean Tenants Applied

- Value Stream Mapping Method
- Dependency Structure Matrix
- Work Load Levelling (through Complexity
Analysis, Resource Profiling
Work Load Levelling)
- 5S (Sort, Straighten, Shine, Standardize and
Sustain)
- Single Minute Exchange of Dies (Test
Automation)
- Time To Market is - Value Stream Mapping Method
more
- Visual Control Boards
- Low Quality
- Work Allocation
- Customer
- Dependency Matrix Structure
Involvement
- 5 Why
- Long Cycle Service
Requests with AS-is
Process
(Clarifications,
Scope Increase, low - Value Stream Mapping Methods
end user touch
- Visual Control Boards
time)
- Concurrent Engineering
- Long Cycle
Regression Window
- Less productivity
- Ineffective Work
Allocation Process
- Long Setup
Stabilization Time

Lean
Benefits

20%

16%

13%
Context…
No

Program

Areas that
Revenue Duration needed
Attention

Sustenance Engineering - Support a
47.5
4 Pharmaceutical Company's IT
Million
Division

3 years

Development of Scan, Sync and
Setup tools that replaces CD based
5 software updating procedure and 0.5 Million 1 Year
testing the same on Localized
languages

Lean Tenants Applied

-Value Stream Mapping Methods of top 20%
Incident generation Modules
-Team unable To
Work Load Levelling (through Complexity
meet Service Levels
Analysis, Resource Profiling
during Transition
Work Load Levelling)
Visual Boards

'-Ineffective
Collaboration
- Respond To
Change was Poor

Concurrent Engineering
Visual Control Boards

Lean
Benefits

11%

12%
Business Levers…

Value Driven Development - Establish common understanding about the
value we create for customer across the performing team
Continuous Stakeholder involvement - Enable Early Feedback through
continuous integration and short cycle iterations
Rolling Waving Planning – A Framework that helps us address requirement
ambiguities
“Right Person for the Right Task” – Establish an efficient work allocation
process.
Business Levers…

“No Compromise on Quality” through set of handy standards and guidelines
Empowering individuals at the front-line, thereby motivating them
Incorporating continuous improvement mindset. Looking at the ways to
decrease the possible Waste in this process.
Visual Controls – Establish framework to help detect early warnings
Practical Insights….
Goal – “Sustainable shortest lead time, best quality and value (to people and
society), most customer delight, lowest cost, high morale, safety”.

Respect For
the People

Create process flow to surface problems
Use pull systems to avoid overproduction
Level out the workload
Stop when there is a quality problem
Standardize tasks for continuous
improvement
Use visual control so no problems are hidden
Use only reliable, thoroughly tested
technology

Continuous
Improvement

Go-See
Kaizen
5 Whys

Learn to see the “whole” – Adapt “Kaizen” mindset
(each individual employee is given the opportunity to find problems in his own way
of working, to solve them and to make improvements.)
Experiments with Lean
Tenants
No

Focus Area

1

Understand Customer definition of
Value &
Connect Customer Value to single
piece flow

2

3

4

5

Lean Tenants
A) Value Stream Mapping Method
B) Takt Time

A) Design Structure Matrix
Work Allocation Process
B) Work Load Leveling
C) Value Stream Mapping Method
Optimize Test Setup
A) 5S
Media Management
B) Pull
App Library Issues
C) SMED
D) Visual Controls
E) Concurrent Engineering
F) 5 WHY
A) Visual Controls
B) 5 WHY
C) Visual Controls
Continuous Improvements/Efficiencies
D) Automation
E) Concurrent Engineering
F) Value Stream Mapping Method
Capacity Utilization
A) Work Load Levelling
1. Value Stream Mapping

Flow – Value Stream Mapping methods
helps us optimize as a whole
Everybody understands what customer
expects and corresponding acceptance
criteria
Expose hidden Bottlenecks in the flow Brings good information as to what is
really going on in the field
Team will arrive at common point of
thinking
Team Bonding because of transparent
communication and collocation
Productivity Improvement and cycle Time
Reduction
Team is now open for new ideas.
2. Design Structure Matrix
R1

R3

R4

Benefits
Lets you analyze the dependencies among
the requirements

R2

Helps you identify Cyclic Dependencies
Take preventive actions

Requirement

R3 R1 R2 R4

Independent

R3

X

Coupled

R1

1

X

1

Coupled

R2

1

1

X

Dependent

R4

1

1

X
3. Level the workload
Establish efficient Work Allocation process through
application of lean tenants
“Takt Time” [ No. of Features/ Unit Time]
“Design Structure Matrix”,
“Work load levelling”.
DSM Analysis

Complexity
Analysis

Work Allocation
Resource
Profiling
4. Concurrent Engineering
5 Core Principles of Concurrent Engineering
 High value features first
 Multiple phases with smaller release cycles
 Detailed planning (DSM)

 Early Feedback through continuous
integration and short cycle iterations

 Elaborative approach – set based thinking
 Design alternatives
 Rapid Prototyping

 Implement quickly
 Reuse of prototypes
 Early completion with additional headcount

 Integrated Review with Coding – pair
programming
 Delay decisions as late as possible
 Phase concurrency between development &
 Push features requiring clarity to later
test
releases

When Requirements keep changing, Concurrent Engineering
helps planning iterative releases taking Customer, Team into
confidence.
5.Continous Improvement

Single Minute
Exchange of Die
Automation
Usage of Out of Box
Tools like Medusa etc.
5S

ID

Task

1

Select configuration

1.1

Chassis options

1.2

Modem options

1.3

Traffic generator options

1.4

Optional components

2

Schedule resources

3

Shelf assembly

3.1

Collect components

3.2

Seat cards

3.3

Interconnect

4

Download package

5

Initialize setup

ON

OFF
6. Improve Quality Through

“Go and See Yourself”,
“5 whys”
“Standardize the procedures”
7. Visual Controls
Bug Trend (Bug Created Vs Bug Resolved)
Bug Count

20
18
16
14
12
10
8
6
4
2
0

14- 15- 16- 17- 18- 21- 22- 23- 24- 25- 28- 29- 30- 3114511/6/ 11/7/ 11/8/
Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Nov- Nov- Nov2013 2013 2013
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
Created #

0

6

3

3

2

4

9

6

6

9

9

11

1

13

3

5

6

4

4

11

Resolved #

0

8

5

3

2

3

7

13

18

5

2

10

1

0

5

4

18

6

3

6

#QA Verified + Closed

0

2

6

11

0

12

12

4

16

1

13

3

0

3

1

2

1

2

8

5
Lean – Accelerator our business:

It helped us focus on creating value to
customers – Thus, we achieved high
customer satisfaction
It helped us establish Handy and Flexible
practices
It empowered individuals at front line and
thus achieved high motivation levels
Team inculcated “Continuous mind-set”
Financial benefits we are able to power up
ATH2013-Krishnamurty Pammi- Power your business through implementing Lean

More Related Content

What's hot (20)

PPTX
Designing a to be process
Ihor Malytskyi
 
ODP
Software Rollout
colmbennett
 
PPT
The Power of Business Process Improvement
Business Book Summaries
 
PPTX
Business process mapping
DAVIS THOMAS
 
PDF
Dell Server Ordering Six Sigma Case Study
Steven Bonacorsi
 
PPTX
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
PPT
Introduction to Six Sigma
Vijay Rasam
 
PDF
Erp Implementation Project Planning
Darshan Ambhaikar
 
PDF
Overview of Rational Services Offerings
IBM Rational software
 
PPT
Business process modelling
Kiito25
 
PDF
Enterprise system implementation strategies and phases
John Cachat
 
PDF
Agile Project Management for PMP's
VersionOne
 
PDF
White Belt DMAIC Project Line G MTTR
Irfan Rasheed Rana
 
PDF
Business process management case studies
Steven Bonacorsi
 
PPTX
The Quality Standard: ISO 9000 , CMM and Six Sigma
Deep Dalsania
 
PDF
Architecture Series 5-4 Solution Architecture Draft
Frankie Hsiang
 
PPTX
Lean six sigma - Waste elimination (Yellow Belt)
Abhay Yadav
 
PPTX
Protorative Methodology
Yashpal Jain
 
PPT
6 Sigma
alexjoseph813
 
PPT
BPR OR Business Process Re-engineering
Ubaid Rahman
 
Designing a to be process
Ihor Malytskyi
 
Software Rollout
colmbennett
 
The Power of Business Process Improvement
Business Book Summaries
 
Business process mapping
DAVIS THOMAS
 
Dell Server Ordering Six Sigma Case Study
Steven Bonacorsi
 
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
Introduction to Six Sigma
Vijay Rasam
 
Erp Implementation Project Planning
Darshan Ambhaikar
 
Overview of Rational Services Offerings
IBM Rational software
 
Business process modelling
Kiito25
 
Enterprise system implementation strategies and phases
John Cachat
 
Agile Project Management for PMP's
VersionOne
 
White Belt DMAIC Project Line G MTTR
Irfan Rasheed Rana
 
Business process management case studies
Steven Bonacorsi
 
The Quality Standard: ISO 9000 , CMM and Six Sigma
Deep Dalsania
 
Architecture Series 5-4 Solution Architecture Draft
Frankie Hsiang
 
Lean six sigma - Waste elimination (Yellow Belt)
Abhay Yadav
 
Protorative Methodology
Yashpal Jain
 
6 Sigma
alexjoseph813
 
BPR OR Business Process Re-engineering
Ubaid Rahman
 

Similar to ATH2013-Krishnamurty Pammi- Power your business through implementing Lean (20)

PPT
Better Faster Cheaper
nnorthrup
 
PPTX
Lean strategies for it support1.9 presented
Roger Brown
 
PPTX
LKIN2019: Lean transformation journey of infra briefing for business agility...
Ravi Tadwalkar
 
PPT
Alternate Hourly Lean Introduction
Harold Philbrick
 
PPT
Eg Lean Case Studies
guestc3f47e
 
PPTX
Revised lean
Chris Norris
 
PPT
Hourly Lean Introduction
Harold Philbrick
 
PPTX
Lean Concepts In The Service Industry
RNHolley01
 
PPT
Lci la chapter lean intro 071410 no pics
haganone
 
PDF
Lean Transformation in Office, Service, and Knowledge Work Enviroments
TKMG, Inc.
 
PDF
Lean practitioner transactional_pune
LeanIndiaConsulting
 
PPTX
Lean in a Lean Economy
Darren Dolcemascolo
 
PDF
Using lean to reduce prototype lead time 2006
Chris Baichoo
 
PDF
Delivering Lean the IT Way PE Summit Apr 08
Phil Falato
 
PPTX
Lean Thinking
Miles Weaver
 
PDF
Lean Event 2013
SAIGlobalAssurance
 
PPTX
How to Build a Strategic Transformation Practice
James Woolwine
 
PPT
Lean introduction
Martin Burns
 
PPT
Operational Excellence & Cost Reduction Sept09
Ramesh Victor
 
PPT
Make green go green by going lean
bwu.nl
 
Better Faster Cheaper
nnorthrup
 
Lean strategies for it support1.9 presented
Roger Brown
 
LKIN2019: Lean transformation journey of infra briefing for business agility...
Ravi Tadwalkar
 
Alternate Hourly Lean Introduction
Harold Philbrick
 
Eg Lean Case Studies
guestc3f47e
 
Revised lean
Chris Norris
 
Hourly Lean Introduction
Harold Philbrick
 
Lean Concepts In The Service Industry
RNHolley01
 
Lci la chapter lean intro 071410 no pics
haganone
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
TKMG, Inc.
 
Lean practitioner transactional_pune
LeanIndiaConsulting
 
Lean in a Lean Economy
Darren Dolcemascolo
 
Using lean to reduce prototype lead time 2006
Chris Baichoo
 
Delivering Lean the IT Way PE Summit Apr 08
Phil Falato
 
Lean Thinking
Miles Weaver
 
Lean Event 2013
SAIGlobalAssurance
 
How to Build a Strategic Transformation Practice
James Woolwine
 
Lean introduction
Martin Burns
 
Operational Excellence & Cost Reduction Sept09
Ramesh Victor
 
Make green go green by going lean
bwu.nl
 
Ad

More from India Scrum Enthusiasts Community (20)

PPTX
Deciphering Agile Big Data
India Scrum Enthusiasts Community
 
PPTX
“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...
India Scrum Enthusiasts Community
 
PPTX
Rubber Meets the Road
India Scrum Enthusiasts Community
 
PPTX
Can Agile Enthusiasm See The Organization Through?
India Scrum Enthusiasts Community
 
PPTX
Agile​ ​HR​ ​From​ ​the​ ​trenches
India Scrum Enthusiasts Community
 
PDF
Evolutionary Change
India Scrum Enthusiasts Community
 
PPTX
Software 4.0 : “How” of Building Software Driven Business
India Scrum Enthusiasts Community
 
PPTX
Agile Digital Architecture
India Scrum Enthusiasts Community
 
PPTX
Governance mechanism to further business agility
India Scrum Enthusiasts Community
 
PDF
Opening the Mainframe world to Mobile Ecosystem in a seamless and beneficial ...
India Scrum Enthusiasts Community
 
PDF
Workplace Happiness - Is Business Agility Taking us Towards Happy Workplaces?
India Scrum Enthusiasts Community
 
PDF
Wave 2 of Agile: Agile Leadership Redefined
India Scrum Enthusiasts Community
 
PDF
Agile Engineering Environment – 2017
India Scrum Enthusiasts Community
 
PPTX
Management for Agility and Outcomes
India Scrum Enthusiasts Community
 
PPTX
Agile Mindset Shifting: Agile For All
India Scrum Enthusiasts Community
 
PDF
Agile Engineering Environment – 2017
India Scrum Enthusiasts Community
 
PDF
Wave 2 of Agile: Agile Leadership Redefined
India Scrum Enthusiasts Community
 
PDF
Five (Oops!) Six Mistakes You are Making as a Leader
India Scrum Enthusiasts Community
 
PPTX
Empower the Forbidden Power Players
India Scrum Enthusiasts Community
 
PPTX
Agility in Education System for Digital India
India Scrum Enthusiasts Community
 
Deciphering Agile Big Data
India Scrum Enthusiasts Community
 
“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...
India Scrum Enthusiasts Community
 
Rubber Meets the Road
India Scrum Enthusiasts Community
 
Can Agile Enthusiasm See The Organization Through?
India Scrum Enthusiasts Community
 
Agile​ ​HR​ ​From​ ​the​ ​trenches
India Scrum Enthusiasts Community
 
Software 4.0 : “How” of Building Software Driven Business
India Scrum Enthusiasts Community
 
Agile Digital Architecture
India Scrum Enthusiasts Community
 
Governance mechanism to further business agility
India Scrum Enthusiasts Community
 
Opening the Mainframe world to Mobile Ecosystem in a seamless and beneficial ...
India Scrum Enthusiasts Community
 
Workplace Happiness - Is Business Agility Taking us Towards Happy Workplaces?
India Scrum Enthusiasts Community
 
Wave 2 of Agile: Agile Leadership Redefined
India Scrum Enthusiasts Community
 
Agile Engineering Environment – 2017
India Scrum Enthusiasts Community
 
Management for Agility and Outcomes
India Scrum Enthusiasts Community
 
Agile Mindset Shifting: Agile For All
India Scrum Enthusiasts Community
 
Agile Engineering Environment – 2017
India Scrum Enthusiasts Community
 
Wave 2 of Agile: Agile Leadership Redefined
India Scrum Enthusiasts Community
 
Five (Oops!) Six Mistakes You are Making as a Leader
India Scrum Enthusiasts Community
 
Empower the Forbidden Power Players
India Scrum Enthusiasts Community
 
Agility in Education System for Digital India
India Scrum Enthusiasts Community
 
Ad

Recently uploaded (20)

PPTX
UI5Con 2025 - Get to Know Your UI5 Tooling
Wouter Lemaire
 
PPTX
UI5Con 2025 - Beyond UI5 Controls with the Rise of Web Components
Wouter Lemaire
 
PDF
Lecture A - AI Workflows for Banking.pdf
Dr. LAM Yat-fai (林日辉)
 
PDF
HR agent at Mediq: Lessons learned on Agent Builder & Maestro by Tacstone Tec...
UiPathCommunity
 
PDF
How Current Advanced Cyber Threats Transform Business Operation
Eryk Budi Pratama
 
PDF
Sustainable and comertially viable mining process.pdf
Avijit Kumar Roy
 
PDF
2025-07-15 EMEA Volledig Inzicht Dutch Webinar
ThousandEyes
 
PPTX
✨Unleashing Collaboration: Salesforce Channels & Community Power in Patna!✨
SanjeetMishra29
 
PDF
Novus Safe Lite- What is Novus Safe Lite.pdf
Novus Hi-Tech
 
PDF
Bitcoin+ Escalando sin concesiones - Parte 1
Fernando Paredes García
 
PPTX
Earn Agentblazer Status with Slack Community Patna.pptx
SanjeetMishra29
 
PDF
Novus-Safe Pro: Brochure-What is Novus Safe Pro?.pdf
Novus Hi-Tech
 
PPTX
Extensions Framework (XaaS) - Enabling Orchestrate Anything
ShapeBlue
 
PPTX
Lecture 5 - Agentic AI and model context protocol.pptx
Dr. LAM Yat-fai (林日辉)
 
PDF
CIFDAQ'S Token Spotlight for 16th July 2025 - ALGORAND
CIFDAQ
 
PDF
TrustArc Webinar - Data Privacy Trends 2025: Mid-Year Insights & Program Stra...
TrustArc
 
PDF
Arcee AI - building and working with small language models (06/25)
Julien SIMON
 
PPTX
Building a Production-Ready Barts Health Secure Data Environment Tooling, Acc...
Barts Health
 
PDF
Shuen Mei Parth Sharma Boost Productivity, Innovation and Efficiency wit...
AWS Chicago
 
PDF
OpenInfra ID 2025 - Are Containers Dying? Rethinking Isolation with MicroVMs.pdf
Muhammad Yuga Nugraha
 
UI5Con 2025 - Get to Know Your UI5 Tooling
Wouter Lemaire
 
UI5Con 2025 - Beyond UI5 Controls with the Rise of Web Components
Wouter Lemaire
 
Lecture A - AI Workflows for Banking.pdf
Dr. LAM Yat-fai (林日辉)
 
HR agent at Mediq: Lessons learned on Agent Builder & Maestro by Tacstone Tec...
UiPathCommunity
 
How Current Advanced Cyber Threats Transform Business Operation
Eryk Budi Pratama
 
Sustainable and comertially viable mining process.pdf
Avijit Kumar Roy
 
2025-07-15 EMEA Volledig Inzicht Dutch Webinar
ThousandEyes
 
✨Unleashing Collaboration: Salesforce Channels & Community Power in Patna!✨
SanjeetMishra29
 
Novus Safe Lite- What is Novus Safe Lite.pdf
Novus Hi-Tech
 
Bitcoin+ Escalando sin concesiones - Parte 1
Fernando Paredes García
 
Earn Agentblazer Status with Slack Community Patna.pptx
SanjeetMishra29
 
Novus-Safe Pro: Brochure-What is Novus Safe Pro?.pdf
Novus Hi-Tech
 
Extensions Framework (XaaS) - Enabling Orchestrate Anything
ShapeBlue
 
Lecture 5 - Agentic AI and model context protocol.pptx
Dr. LAM Yat-fai (林日辉)
 
CIFDAQ'S Token Spotlight for 16th July 2025 - ALGORAND
CIFDAQ
 
TrustArc Webinar - Data Privacy Trends 2025: Mid-Year Insights & Program Stra...
TrustArc
 
Arcee AI - building and working with small language models (06/25)
Julien SIMON
 
Building a Production-Ready Barts Health Secure Data Environment Tooling, Acc...
Barts Health
 
Shuen Mei Parth Sharma Boost Productivity, Innovation and Efficiency wit...
AWS Chicago
 
OpenInfra ID 2025 - Are Containers Dying? Rethinking Isolation with MicroVMs.pdf
Muhammad Yuga Nugraha
 

ATH2013-Krishnamurty Pammi- Power your business through implementing Lean

  • 1. “Power Your Business through implementing lean Tenants” Krishnamurty VG Pammi IVY Comp etch Private Limited Hyderabad India
  • 2. Context No Program Areas that Revenue Duration needed Attention Sustenance Engineering - Test the Compatibility of 2000 selected 1 50 Million 3 years Application suit on Pre-released and Released Operating systems Development and Maintenance of Telecom Apps (DNS and DHCP 2 4.5 Million 3 years services for IPv4 and IPv6 networks) 3 Evangelize pre-released products Yukon (SQL Server 2005) – Whidbey (Visual Studio 2005) and Long Horn server (Business Layer) 1 Million 1.5 Years Lean Tenants Applied - Value Stream Mapping Method - Dependency Structure Matrix - Work Load Levelling (through Complexity Analysis, Resource Profiling Work Load Levelling) - 5S (Sort, Straighten, Shine, Standardize and Sustain) - Single Minute Exchange of Dies (Test Automation) - Time To Market is - Value Stream Mapping Method more - Visual Control Boards - Low Quality - Work Allocation - Customer - Dependency Matrix Structure Involvement - 5 Why - Long Cycle Service Requests with AS-is Process (Clarifications, Scope Increase, low - Value Stream Mapping Methods end user touch - Visual Control Boards time) - Concurrent Engineering - Long Cycle Regression Window - Less productivity - Ineffective Work Allocation Process - Long Setup Stabilization Time Lean Benefits 20% 16% 13%
  • 3. Context… No Program Areas that Revenue Duration needed Attention Sustenance Engineering - Support a 47.5 4 Pharmaceutical Company's IT Million Division 3 years Development of Scan, Sync and Setup tools that replaces CD based 5 software updating procedure and 0.5 Million 1 Year testing the same on Localized languages Lean Tenants Applied -Value Stream Mapping Methods of top 20% Incident generation Modules -Team unable To Work Load Levelling (through Complexity meet Service Levels Analysis, Resource Profiling during Transition Work Load Levelling) Visual Boards '-Ineffective Collaboration - Respond To Change was Poor Concurrent Engineering Visual Control Boards Lean Benefits 11% 12%
  • 4. Business Levers… Value Driven Development - Establish common understanding about the value we create for customer across the performing team Continuous Stakeholder involvement - Enable Early Feedback through continuous integration and short cycle iterations Rolling Waving Planning – A Framework that helps us address requirement ambiguities “Right Person for the Right Task” – Establish an efficient work allocation process.
  • 5. Business Levers… “No Compromise on Quality” through set of handy standards and guidelines Empowering individuals at the front-line, thereby motivating them Incorporating continuous improvement mindset. Looking at the ways to decrease the possible Waste in this process. Visual Controls – Establish framework to help detect early warnings
  • 6. Practical Insights…. Goal – “Sustainable shortest lead time, best quality and value (to people and society), most customer delight, lowest cost, high morale, safety”. Respect For the People Create process flow to surface problems Use pull systems to avoid overproduction Level out the workload Stop when there is a quality problem Standardize tasks for continuous improvement Use visual control so no problems are hidden Use only reliable, thoroughly tested technology Continuous Improvement Go-See Kaizen 5 Whys Learn to see the “whole” – Adapt “Kaizen” mindset (each individual employee is given the opportunity to find problems in his own way of working, to solve them and to make improvements.)
  • 7. Experiments with Lean Tenants No Focus Area 1 Understand Customer definition of Value & Connect Customer Value to single piece flow 2 3 4 5 Lean Tenants A) Value Stream Mapping Method B) Takt Time A) Design Structure Matrix Work Allocation Process B) Work Load Leveling C) Value Stream Mapping Method Optimize Test Setup A) 5S Media Management B) Pull App Library Issues C) SMED D) Visual Controls E) Concurrent Engineering F) 5 WHY A) Visual Controls B) 5 WHY C) Visual Controls Continuous Improvements/Efficiencies D) Automation E) Concurrent Engineering F) Value Stream Mapping Method Capacity Utilization A) Work Load Levelling
  • 8. 1. Value Stream Mapping Flow – Value Stream Mapping methods helps us optimize as a whole Everybody understands what customer expects and corresponding acceptance criteria Expose hidden Bottlenecks in the flow Brings good information as to what is really going on in the field Team will arrive at common point of thinking Team Bonding because of transparent communication and collocation Productivity Improvement and cycle Time Reduction Team is now open for new ideas.
  • 9. 2. Design Structure Matrix R1 R3 R4 Benefits Lets you analyze the dependencies among the requirements R2 Helps you identify Cyclic Dependencies Take preventive actions Requirement R3 R1 R2 R4 Independent R3 X Coupled R1 1 X 1 Coupled R2 1 1 X Dependent R4 1 1 X
  • 10. 3. Level the workload Establish efficient Work Allocation process through application of lean tenants “Takt Time” [ No. of Features/ Unit Time] “Design Structure Matrix”, “Work load levelling”. DSM Analysis Complexity Analysis Work Allocation Resource Profiling
  • 11. 4. Concurrent Engineering 5 Core Principles of Concurrent Engineering  High value features first  Multiple phases with smaller release cycles  Detailed planning (DSM)  Early Feedback through continuous integration and short cycle iterations  Elaborative approach – set based thinking  Design alternatives  Rapid Prototyping  Implement quickly  Reuse of prototypes  Early completion with additional headcount  Integrated Review with Coding – pair programming  Delay decisions as late as possible  Phase concurrency between development &  Push features requiring clarity to later test releases When Requirements keep changing, Concurrent Engineering helps planning iterative releases taking Customer, Team into confidence.
  • 12. 5.Continous Improvement Single Minute Exchange of Die Automation Usage of Out of Box Tools like Medusa etc. 5S ID Task 1 Select configuration 1.1 Chassis options 1.2 Modem options 1.3 Traffic generator options 1.4 Optional components 2 Schedule resources 3 Shelf assembly 3.1 Collect components 3.2 Seat cards 3.3 Interconnect 4 Download package 5 Initialize setup ON OFF
  • 13. 6. Improve Quality Through “Go and See Yourself”, “5 whys” “Standardize the procedures”
  • 14. 7. Visual Controls Bug Trend (Bug Created Vs Bug Resolved) Bug Count 20 18 16 14 12 10 8 6 4 2 0 14- 15- 16- 17- 18- 21- 22- 23- 24- 25- 28- 29- 30- 3114511/6/ 11/7/ 11/8/ Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Nov- Nov- Nov2013 2013 2013 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 Created # 0 6 3 3 2 4 9 6 6 9 9 11 1 13 3 5 6 4 4 11 Resolved # 0 8 5 3 2 3 7 13 18 5 2 10 1 0 5 4 18 6 3 6 #QA Verified + Closed 0 2 6 11 0 12 12 4 16 1 13 3 0 3 1 2 1 2 8 5
  • 15. Lean – Accelerator our business: It helped us focus on creating value to customers – Thus, we achieved high customer satisfaction It helped us establish Handy and Flexible practices It empowered individuals at front line and thus achieved high motivation levels Team inculcated “Continuous mind-set” Financial benefits we are able to power up

Editor's Notes

  • #9: Value and WasteValue— The moments of action or thought creating the product that the customer is willing to pay for. In other words, value is defined in the eyes of the external customer. Imagine a customer was observing the work in your office. At what moments would they be willing to reach into their pocket, pull out money, and give it to you?…Waste— All other moments or actions that do not add value but consume resources. Wastes come from overburdened workers, bottlenecks, waiting, handoff, wishful thinking, and information scatter, among many others