The document is a project report by Ghulam M. Kanhar, detailing a case study on biomedical equipment maintenance and management at Shaheed Mohtarma Benazir Bhutto Medical University (SMBBMU). It emphasizes the importance of planned preventive maintenance strategies for improving healthcare service delivery by ensuring the functionality of medical equipment. The report includes a literature review, methodology, proposed solutions, and evaluation of the project's outcomes, highlighting the need for better maintenance practices in developing countries to overcome existing healthcare challenges.