SlideShare a Scribd company logo
Dr f Dejahang (BSc CEng, BSc (Hons) Construction Mgmt, MSc,MCIOB,PhD)
 
017
PRECAST
BRIDGES
http://www.cpi-team.com
Science Art Religion Politics Scholarly Articles For
Mathematics and Productivity
http://www.twitlonger.com/show/n_1sp9pjo?new_post=true
MICROSOFT OneDrive PPT’s PDF’s BOOK LESSONS
Dr f Dejahang BSc CEng, BSc (Hons) Construction Mgmt,
MSc, PhD
PRECAST BRIDGES
ABC Precast Concrete County Bridge Construction - YouTube.htm
construction of bridge - YouTube.htm
Bridge-arch installation 02.VOB - YouTube.htm
Bridge-Construction - Macrete FlexiArch Bridge System - YouTube.htm
PRECAST CONCERTE BRIDGES
Low Initial Cost
Precast prestressed concrete
bridges are usually lower in first
cost than other types of bridges.
Savings in maintenance, precast
bridges offer maximum economy.
PRECAST CONCERTE BRIDGES
Minimum Maintenance
The overall economy of a structure is
measured in terms of life-cycle costs.
These include the initial cost of the
structure plus the total expected
maintenance costs.
The lifetime cost of repainting steel bridges
can amount to 10 to 20% of the original
cost of the original cost of the bridge.
PRECAST CONCRETE
BRIDGES
PRECAST CONCERTE BRIDGES
PRECAST CONCERTE BRIDGES
Precast prestressed concrete bridges built in
accordance with provincial government
requirements should require very little if any
maintenance.
They are constructed using high quality materials
to exacting manufacturing tolerances.
Fatigue problems are minimal because traffic
loads induce only minor stresses.
PRECAST CONCERTE BRIDGES
Fast Easy Construction
Precast prestressed bridge girders require
minimal lead times because they are locally
manufactured in standard shapes and sizes.
The precast components are easy to erect
in any weather.
Simple connections join the deck girders to
the substructure.
PRECAST CONCERTE BRIDGES
Formwork for the
superstructure can be
eliminated when the tops of
girders are placed together to
form the entire deck slab.
PRECAST CONCERTE BRIDGES
Ties between adjacent units
often consist of a grouted
keyway and welded or
transverse post-tensioned
connections.
PRECAST CONCERTE BRIDGES
For logging or low
volume secondary roads,
traffic can run directly on
the girder deck.
PRECAST CONCERTE BRIDGES
Carefully planned details will speed the construction
process and save money.
Minimum Traffic Interruption
Maintaining traffic and eliminating detours are difficult
problems for bridge owners.
Precast prestressed concrete integral deck bridges can
minimize traffic interruption
This is because of the availability of long span, plant-
produced sections and the speed of erecting a bridge
PRECAST CONCERTE BRIDGES
In emergencies, precast girders
can be rush ordered and a bridge
reopened in a matter of days or
weeks using standard
components.
PRECAST CONCERTE BRIDGES
PRECAST CONCERTE BRIDGES
Simple span precast bridge deck girders can be
pinned to the abutments to resist horizontal earth
pressures
Or designed as integral abutments to eliminate
troublesome expansion joints
Multi-span bridges can be made continuous for a
smoother ride and to reduce the number of
expansion joints
Minimum Span/Depth Ratio
PRECAST CONCERTE BRIDGES
Assured Plant Quality
Assured Plant Quality
Assured Plant Quality
Durable
Durable
Durable
PRECAST BRIDGES
PRECAST BRIDGES
PRECAST BRIDGES
PRECAST BRIDGES
Bridges precast
Bridges precast
PRECAST CONCERTE BRIDGES
Precast concrete structural elements
Factory site
PRECAST CONCERTE BRIDGES
PRECAST CONCERTE BRIDGES
Stockpiled in Advance
PRECAST BRIDGES
PRECAST BRIDGES
Supply and Chain- Just-In-Time
PRECAST BRIDGES
PRECAST BRIDGES
PRECAST BRIDGES
PRECAST CONCERTE BRIDGES
PRECAST CONCERTE BRIDGES
PRECAST CONCERTE BRIDGES
PRECAST CONCERTE BRIDGES
PRECAST BRIDGES
PRECAST BRIDGES
Piers can be made of precast concrete pieces
quickly assembled in the field.
PRECAST CONCERTE BRIDGES
Attractive
Precast prestressed concrete bridges can be designed to
elegantly blend harmoniously with their surroundings
It can offer an attractive view from above, beside and below.
Strong
Tough
Durable
Can be constructed using the low depth/span ratios possible
using high strength precast prestressed concrete and the
simple clean shapes of locally available sections.
Bridge deck erection gantries for
pre-cast concrete viaducts
Bridge deck erection gantries for
pre-cast concrete viaducts
Concrete bridge deck erection gantry
Picture shows one of the self launching bridge
deck erection gantry for erection of precast
concrete segments on the 75m approach spans
Used for Sutong cable stayed bridge
The gantry was designed to handle precast
concrete segments weighing up to 160 tonnes
each
Bridge deck erection gantries for
pre-cast concrete viaducts
which were erected by the balanced cantilever
method
and to suspend a half span of segments adjacent
to deck movement joints weighing up to 1100
tonnes.
The gantry was designed to handle deck
longitudinal gradients of +/- 3%, deck plan
minimum curvature of 950m and to skid
sideways to erect adjacent box girders.

More Related Content

PPT
Precast Bridges slides
Waqas Javaid
 
PPTX
Diaphragm wall
Thananchayan Theivendra
 
PPTX
Earth retaining structures
JNTUK
 
PPTX
Ppt bridges & types
pratik vanam
 
PPTX
STRESS RIBBON BRIDGE
Shivananda Roy
 
PPTX
Suspension bridges
Dheerendra Prasad
 
PPTX
suspension bridge
Gaurav Rawat
 
Precast Bridges slides
Waqas Javaid
 
Diaphragm wall
Thananchayan Theivendra
 
Earth retaining structures
JNTUK
 
Ppt bridges & types
pratik vanam
 
STRESS RIBBON BRIDGE
Shivananda Roy
 
Suspension bridges
Dheerendra Prasad
 
suspension bridge
Gaurav Rawat
 

What's hot (20)

PPT
Pre-stressed Concrete
Katrina Mabini
 
PPT
Chapter 3 shallow foundations
KHUSHBU SHAH
 
DOCX
Light weight concrete
chandrakanthkadadas
 
PPTX
Earthquake tip no.22
ketan Abhani
 
PPTX
Fibre reinforced concrete
MOHIT PANCHAL
 
PPTX
Moment Distribution Method SA-2
Kaizer Dave
 
PPTX
Bridge foundation
SHUBHAM DABHADE
 
PPTX
Pile foundation
Aamir Farhan Sheikh
 
PDF
Shear wall ppt
Akash Pandey
 
PPTX
BALANCED CANTILEVER BRIDGE
srinivas cnu
 
PPTX
UNIT-1 PSC.pptx
jairam131
 
PPTX
Stress ribbon bridge
Shreya Thusoo
 
PPTX
Light weight concrete
devesha y jog
 
PPTX
PPT On Bridge Construction
Robin Nirwal
 
PPTX
19021 d2004 well foundation design ppt
Bala Balaji
 
PPTX
Brick Masonry
Joynul Abadin Rasel
 
PPTX
Admixtures in concrete/Types of admixtures
kavithamegha
 
PPTX
Bridge pier
Pritesh Parmar
 
PPTX
About Bridge pier.
Tajul Islam
 
Pre-stressed Concrete
Katrina Mabini
 
Chapter 3 shallow foundations
KHUSHBU SHAH
 
Light weight concrete
chandrakanthkadadas
 
Earthquake tip no.22
ketan Abhani
 
Fibre reinforced concrete
MOHIT PANCHAL
 
Moment Distribution Method SA-2
Kaizer Dave
 
Bridge foundation
SHUBHAM DABHADE
 
Pile foundation
Aamir Farhan Sheikh
 
Shear wall ppt
Akash Pandey
 
BALANCED CANTILEVER BRIDGE
srinivas cnu
 
UNIT-1 PSC.pptx
jairam131
 
Stress ribbon bridge
Shreya Thusoo
 
Light weight concrete
devesha y jog
 
PPT On Bridge Construction
Robin Nirwal
 
19021 d2004 well foundation design ppt
Bala Balaji
 
Brick Masonry
Joynul Abadin Rasel
 
Admixtures in concrete/Types of admixtures
kavithamegha
 
Bridge pier
Pritesh Parmar
 
About Bridge pier.
Tajul Islam
 
Ad

Viewers also liked (20)

DOC
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Mohit Shukla
 
PPTX
Corrugated Steel Bridge and Tunnel Solutions
Communications Branding
 
PPTX
Structural design of tunnel lining
Mahesh Raj Bhatt
 
PPT
tunnelling scope, construction techniques and necessity
Shashank Gaurav
 
PPTX
NEW AUSTRIAN TUNNELING METHOD
ADIL BIN AYOUB
 
PPTX
Tunnel engg.2
SHUBHAM DABHADE
 
PPTX
Innovative Precast Bridge System
AltosMarketing
 
PDF
Ecg533 rock-tunnel-engineering
Junaida Wally
 
PPTX
Bridge
karapeshivraj
 
PDF
Guidelines
Šumadin Šumić
 
PPTX
Strukturas General Presentation (200ppi)
Strukturas
 
PDF
My publication Tunnels and Tunnelling magazine
Filipe Mello
 
PDF
Precast segmental concrete bridges a
Palmer Consulting Services, LLC
 
PDF
Diaphragm Wall Presentation By Gagan
HERITAGE INFRASPACE INDIA PRIVATE LIMITED
 
PPTX
Diaphragm wall: Construction and Design
Umer Farooq
 
PDF
Top down construction presentation
HERITAGE INFRASPACE INDIA PRIVATE LIMITED
 
PPTX
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Let's Tute
 
PPTX
Tunneling by tunnel boring machine
VISHAL KUMAR SINGH
 
PPTX
tunnel boring machine
Naquiakhter
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Mohit Shukla
 
Corrugated Steel Bridge and Tunnel Solutions
Communications Branding
 
Structural design of tunnel lining
Mahesh Raj Bhatt
 
tunnelling scope, construction techniques and necessity
Shashank Gaurav
 
NEW AUSTRIAN TUNNELING METHOD
ADIL BIN AYOUB
 
Tunnel engg.2
SHUBHAM DABHADE
 
Innovative Precast Bridge System
AltosMarketing
 
Ecg533 rock-tunnel-engineering
Junaida Wally
 
Guidelines
Šumadin Šumić
 
Strukturas General Presentation (200ppi)
Strukturas
 
My publication Tunnels and Tunnelling magazine
Filipe Mello
 
Precast segmental concrete bridges a
Palmer Consulting Services, LLC
 
Diaphragm Wall Presentation By Gagan
HERITAGE INFRASPACE INDIA PRIVATE LIMITED
 
Diaphragm wall: Construction and Design
Umer Farooq
 
Top down construction presentation
HERITAGE INFRASPACE INDIA PRIVATE LIMITED
 
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Let's Tute
 
Tunneling by tunnel boring machine
VISHAL KUMAR SINGH
 
tunnel boring machine
Naquiakhter
 
Ad

Similar to Bridges precast (20)

PPTX
Precast Concrete Structure: Architectural examples
SayedaAmrin
 
PPT
Advance Prestress Bridge
University of Tikrit
 
PPTX
fastrack technologies in bridges ppt
Srinivasulu Srinu
 
PPTX
PRE-CAST-CONSTRUCTION.pptx
Vinayak247538
 
PPTX
Construction of prestressed concrete structures
sanmilan
 
PPTX
METHODS OF CONSTRUCTION OF BRIDGES. different types application importance an...
joicegeorge13
 
PPTX
segmental bridge and different types.pptx
joicegeorge13
 
PPTX
Bridge-SIT-01.pptx
PranotiHunungare
 
PDF
Ralls ncc meeting-san_antonio_04-01-09
zaff69
 
PPTX
stress ribbon bridge.pptx
SauravShahane
 
PPT
PRE STRESSED CONCRETE
524001
 
PPTX
Precast concrete
SnehaKothari13
 
PDF
Bridge-SGI-01_Pranoti.pdf
PranotiHunungare
 
PPTX
Prestressed Concrete Bridge.pptx
RajeshKumar25548
 
PPTX
PRE-CAST-CONSTRUCTION-Expertcivil.pptx
atiulla001
 
PPTX
495763976-Structural-Design_495763976-Structural-Design.pptx
gunjanatulbansal
 
PPTX
Gandhi Setu Bridge Patna that is the Longest fully prestressed concrete bridg...
AkankshaRawat75
 
PDF
IRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET Journal
 
PPT
3544134000000000000000000000000000000.ppt
k70000000
 
PDF
Precast Concrete is the most prominent structure
NisshantSinghSaud
 
Precast Concrete Structure: Architectural examples
SayedaAmrin
 
Advance Prestress Bridge
University of Tikrit
 
fastrack technologies in bridges ppt
Srinivasulu Srinu
 
PRE-CAST-CONSTRUCTION.pptx
Vinayak247538
 
Construction of prestressed concrete structures
sanmilan
 
METHODS OF CONSTRUCTION OF BRIDGES. different types application importance an...
joicegeorge13
 
segmental bridge and different types.pptx
joicegeorge13
 
Bridge-SIT-01.pptx
PranotiHunungare
 
Ralls ncc meeting-san_antonio_04-01-09
zaff69
 
stress ribbon bridge.pptx
SauravShahane
 
PRE STRESSED CONCRETE
524001
 
Precast concrete
SnehaKothari13
 
Bridge-SGI-01_Pranoti.pdf
PranotiHunungare
 
Prestressed Concrete Bridge.pptx
RajeshKumar25548
 
PRE-CAST-CONSTRUCTION-Expertcivil.pptx
atiulla001
 
495763976-Structural-Design_495763976-Structural-Design.pptx
gunjanatulbansal
 
Gandhi Setu Bridge Patna that is the Longest fully prestressed concrete bridg...
AkankshaRawat75
 
IRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET Journal
 
3544134000000000000000000000000000000.ppt
k70000000
 
Precast Concrete is the most prominent structure
NisshantSinghSaud
 

More from Dr Fereidoun Dejahang (20)

DOCX
27 j20 my news punch -dr f dejahang 27-01-2020
Dr Fereidoun Dejahang
 
DOCX
28 dej my news punch rev 28-12-2019
Dr Fereidoun Dejahang
 
DOCX
16 fd my news punch rev 16-12-2019
Dr Fereidoun Dejahang
 
PPT
029 fast-tracking projects
Dr Fereidoun Dejahang
 
PPT
028 fast-tracking projects & cost overrun
Dr Fereidoun Dejahang
 
PPT
027 fast-tracked projects-materials
Dr Fereidoun Dejahang
 
PPT
026 fast react-productivity improvement
Dr Fereidoun Dejahang
 
PPT
025 enterprise resources management
Dr Fereidoun Dejahang
 
PPT
022 b construction productivity-write
Dr Fereidoun Dejahang
 
PPT
022 a construction productivity (2)
Dr Fereidoun Dejahang
 
PPT
021 construction productivity (1)
Dr Fereidoun Dejahang
 
PPTX
019 competencies-managers
Dr Fereidoun Dejahang
 
PPT
018 company productivity
Dr Fereidoun Dejahang
 
PPT
017 communication
Dr Fereidoun Dejahang
 
PPT
016 communication in construction sector
Dr Fereidoun Dejahang
 
PPTX
015 changes-process model
Dr Fereidoun Dejahang
 
PPTX
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
 
PPTX
013 changes in construction projects
Dr Fereidoun Dejahang
 
PPT
012 bussiness planning process
Dr Fereidoun Dejahang
 
PPT
011 business performance management
Dr Fereidoun Dejahang
 
27 j20 my news punch -dr f dejahang 27-01-2020
Dr Fereidoun Dejahang
 
28 dej my news punch rev 28-12-2019
Dr Fereidoun Dejahang
 
16 fd my news punch rev 16-12-2019
Dr Fereidoun Dejahang
 
029 fast-tracking projects
Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
Dr Fereidoun Dejahang
 
027 fast-tracked projects-materials
Dr Fereidoun Dejahang
 
026 fast react-productivity improvement
Dr Fereidoun Dejahang
 
025 enterprise resources management
Dr Fereidoun Dejahang
 
022 b construction productivity-write
Dr Fereidoun Dejahang
 
022 a construction productivity (2)
Dr Fereidoun Dejahang
 
021 construction productivity (1)
Dr Fereidoun Dejahang
 
019 competencies-managers
Dr Fereidoun Dejahang
 
018 company productivity
Dr Fereidoun Dejahang
 
017 communication
Dr Fereidoun Dejahang
 
016 communication in construction sector
Dr Fereidoun Dejahang
 
015 changes-process model
Dr Fereidoun Dejahang
 
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
 
013 changes in construction projects
Dr Fereidoun Dejahang
 
012 bussiness planning process
Dr Fereidoun Dejahang
 
011 business performance management
Dr Fereidoun Dejahang
 

Recently uploaded (20)

PDF
algorithms-16-00088-v2hghjjnjnhhhnnjhj.pdf
Ajaykumar966781
 
PPTX
Fluid Mechanics, Module 3: Basics of Fluid Mechanics
Dr. Rahul Kumar
 
PPTX
ANIMAL INTERVENTION WARNING SYSTEM (4).pptx
dodultrongaming
 
PDF
2010_Book_EnvironmentalBioengineering (1).pdf
EmilianoRodriguezTll
 
PPTX
Lesson 3_Tessellation.pptx finite Mathematics
quakeplayz54
 
PPTX
MET 305 MODULE 1 KTU 2019 SCHEME 25.pptx
VinayB68
 
PDF
Introduction to Data Science: data science process
ShivarkarSandip
 
PPTX
Module_II_Data_Science_Project_Management.pptx
anshitanarain
 
PDF
A Framework for Securing Personal Data Shared by Users on the Digital Platforms
ijcncjournal019
 
PPTX
AgentX UiPath Community Webinar series - Delhi
RohitRadhakrishnan8
 
PDF
Traditional Exams vs Continuous Assessment in Boarding Schools.pdf
The Asian School
 
PPTX
Practice Questions on recent development part 1.pptx
JaspalSingh402
 
PPTX
EE3303-EM-I 25.7.25 electrical machines.pptx
Nagen87
 
PDF
Chad Ayach - A Versatile Aerospace Professional
Chad Ayach
 
PPT
High Data Link Control Protocol in Data Link Layer
shailajacse
 
PDF
Cryptography and Information :Security Fundamentals
Dr. Madhuri Jawale
 
PPT
SCOPE_~1- technology of green house and poyhouse
bala464780
 
PPTX
Chapter----five---Resource Recovery.pptx
078bce110prashant
 
PDF
Top 10 read articles In Managing Information Technology.pdf
IJMIT JOURNAL
 
algorithms-16-00088-v2hghjjnjnhhhnnjhj.pdf
Ajaykumar966781
 
Fluid Mechanics, Module 3: Basics of Fluid Mechanics
Dr. Rahul Kumar
 
ANIMAL INTERVENTION WARNING SYSTEM (4).pptx
dodultrongaming
 
2010_Book_EnvironmentalBioengineering (1).pdf
EmilianoRodriguezTll
 
Lesson 3_Tessellation.pptx finite Mathematics
quakeplayz54
 
MET 305 MODULE 1 KTU 2019 SCHEME 25.pptx
VinayB68
 
Introduction to Data Science: data science process
ShivarkarSandip
 
Module_II_Data_Science_Project_Management.pptx
anshitanarain
 
A Framework for Securing Personal Data Shared by Users on the Digital Platforms
ijcncjournal019
 
AgentX UiPath Community Webinar series - Delhi
RohitRadhakrishnan8
 
Traditional Exams vs Continuous Assessment in Boarding Schools.pdf
The Asian School
 
Practice Questions on recent development part 1.pptx
JaspalSingh402
 
EE3303-EM-I 25.7.25 electrical machines.pptx
Nagen87
 
Chad Ayach - A Versatile Aerospace Professional
Chad Ayach
 
High Data Link Control Protocol in Data Link Layer
shailajacse
 
Cryptography and Information :Security Fundamentals
Dr. Madhuri Jawale
 
SCOPE_~1- technology of green house and poyhouse
bala464780
 
Chapter----five---Resource Recovery.pptx
078bce110prashant
 
Top 10 read articles In Managing Information Technology.pdf
IJMIT JOURNAL
 

Bridges precast