This document provides instructions for disassembling and assembling a travel motor. The disassembly process involves 27 steps to remove components from the travel motor in the correct order. This includes removing the head, brake piston, barrel assembly, shoe retainer, and shaft assembly. The assembly process reverses the disassembly with 27 steps and provides notices to ensure proper installation of seals, keys, and other components.