This document provides instructions for disassembling and assembling the final drive of a 319D Excavator. It details 33 steps for disassembly, including removing the cover, carrier assembly, ring gears, and other components. It also outlines 13 steps for assembly, including installing bearings, determining the correct shim thickness, and reassembling components in reverse order. Required tools are listed, and notes emphasize cleanliness and replacing seals during assembly.