The document provides disassembly and assembly instructions for the final drive of a 319D L and 319D LN excavator. The disassembly procedure involves removing 33 individual parts from the final drive assembly using various tools. The assembly procedure instructs to install parts in reverse order and provides notes on cleaning, lubrication, and use of replacement seals, gaskets and O-rings. Proper shimming of bearings during assembly is also described.