This document provides instructions for disassembling and assembling the final drive of a 319D Excavator. It details 33 steps for disassembly, removing components like the cover, carrier assembly, ring gears, and seals. It then details 13 steps for assembly, including pressing in bearings, installing seals with a special tool, and applying sealant between components. Proper cleaning and use of new parts is emphasized throughout.