This document provides the installation procedure for a swing motor on excavator models 320D2 and 320D2 L in 30 steps. It details cleaning and preparing the mating surfaces, lifting and attaching the swing motor, connecting multiple hose and harness assemblies using new O-rings, and ensuring the drain valve is closed at the end of installation. Proper torque specifications are provided for installing bolts. Safety notices warn of spring hazards and containing fluids.