This document provides instructions for installing a fuel injection pump gear on a 320D2 excavator. The steps include:
1. Ensuring the number one piston is at top dead center and locking the crankshaft and camshaft positions.
2. Installing the fuel pump gear on the fuel injection pump shaft and checking timing marks are aligned.
3. Installing a washer, nut and tightening to specified torques to secure the gear.
4. Unlocking the fuel injection pump and installing plugs and seals.