This document provides instructions for disassembling and assembling the final drive of a 345C excavator. The disassembly procedure involves removing over 15 parts from the final drive including the cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly procedure instructs how to install new seals, bearing cups and cones, shims, and other parts in the reverse order of disassembly while ensuring proper bearing preload. Tools and torque specifications are listed to complete the process.