This document provides instructions for disassembling and assembling the final drive of a 374D L excavator. It lists over 30 detailed steps for removing components like the ring gear, carrier assemblies, gears, shafts and seals. Bearing preload is determined by applying specific pressures and measuring clearances with a micrometer. All components must be thoroughly cleaned before precise reassembly in their original locations using torque wrenches and lifting devices, with seals and threaded surfaces coated in locking compound or adhesive.