The document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle of a M318D Wheeled Excavator. The disassembly procedure involves removing 23 parts including carrier housing, planetary gears, and brake discs. The assembly procedure instructs installing these 23 parts in reverse order and adjusting the brake clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque multipliers. Safety notices are provided to contain fluids and release spring forces carefully.