1© Life Cycle Engineering 2015 1
Connecting Reliability &
Business + ISO 55000
© Life Cycle Engineering
2© Life Cycle Engineering 2015
Connecting Reliability & Business + ISO 55000 Framework
Outline:
• State of the Industry – Pharma & Biotech Manufacturing Disruptions
• Asset Management vs. Reliability vs. Maintenance
• Understand the Corporate Business Strategy
• The Value Stream and Monetizing Downtime
• Strategic Implementation Value
• Tactical Implementation Value - Availability
• The A3 Tool
3© Life Cycle Engineering 2015
Impact of Manufacturing Disruptions
Graphic Source: Strategic Plan for Preventing and Mitigating Drug Shortages, Food and Drug Administration, October 2013
66% of disruptions resulted from:
• Facility remediation efforts (35%)
• Manufacturing issues (31%)
Drug Shortages by Primary Reason for Disruption in Supply (2012)
Note:
Regulatory agencies are
asking companies about
asset management
programs during audits
4© Life Cycle Engineering 2015 4
• ISO 55000 (2014): Asset Management Standards
• BSI PAS 55 (2004, 2008): Optimized Management of
Physical Assets Standards
• ASTM E2500: Pharma-specific Guidance (Create or
Acquire Phase of Asset Life Cycle)
Recent focus on Asset Management
5© Life Cycle Engineering 2015 5
Graphic Source: Life Cycle Engineering, Copyright 2015
Leadership,
Policy & Strategy
Asset Management
Strategy
Physical Asset Portfolio
Business
Case
Procure &
Construct
Commission
Operate &
Maintain
Asset Management System
Asset Management
Capability
(Processes, Procedures
& Knowledge)
Asset Management
Objectives
Value Delivery
ISO 55000 Compliance
Reliability Excellence
Process Safety Management
Mechanical Integrity
ISO 31000 Risk Management
Asset Management Plans
Asset Criticality
ASSET
LIFECYCLE
Asset Management System Implementation Framework
Areas where companies
commonly focus
6© Life Cycle Engineering 2015 6
Asset Management Implementation Broken-Down Further…
1. Understand the corporate (and/or site) business strategy &
objectives
2. Create asset management strategy & objectives that align
with the business strategy & objectives
3. Implement asset management capabilities, across the asset
lifecycle, to deliver value
Asset Management
Capability
(Processes, Procedures
& Knowledge)
Value Delivery
ISO 55000 Compliance
Reliability Excellence
Process Safety Management
Mechanical Integrity
ISO 31000 Risk Management
Asset Management Plans
Asset Criticality
7© Life Cycle Engineering 2015 7
FAQ: What’s the difference between Reliability, Maintenance
and Asset Management?
• Reliability Processes:
o Asset criticality, root cause analysis, etc.
• Maintenance Processes:
o Planning & scheduling, work execution, etc.
These are Asset Management Capabilities
• Other asset management capabilities include: capital delivery, MRO
materials management, etc.
Asset Management
Capability
(Processes, Procedures
& Knowledge)
Value Delivery
ISO 55000 Compliance
Reliability Excellence
Process Safety Management
Mechanical Integrity
ISO 31000 Risk Management
Asset Management Plans
Asset Criticality
8© Life Cycle Engineering 2015 8
Understanding the Value Stream
How does your business create value?
• Producing medicines, vaccines, devices, etc.
• Selling products – increasing prices &/or volume over time
• Reducing cost of goods sold (COGS) over time
 Waste = Cost
TIM WOOD
T: Transportation
I: Inventory
M: Motion
W: Waiting
O: Over-processing
O: Over-production
D: Defects
9© Life Cycle Engineering 2015 9
Understanding the Value Stream
• What are your high-profit products?
• Do you have capacity-constrained products (everything made is
immediately sold)?
• Where in your production is COGS absorbed?
• What is the cost of downtime?
• Get to know your
corporate & site
finance teams! They
can answer most of
the questions above.
• Great partnership
opportunity with your
Operational
Excellence groups!
10© Life Cycle Engineering 2015 10
Highest-Level Value Delivery Concepts
Fixed Capital
• Optimize lifecycle costs
• Defer asset replacement
through increased asset life
Working Capital
• Leaner manufacturing
• Reduce work in process
• Reduce spare parts
inventory
Revenue or Output
• Increase asset availability
• Increase throughput
• Improve quality
Operating Costs
• Reduce unscheduled
downtime
• Reduce maintenance cost
• Reduce operations Cost
Note: Site-to-site and/or company-to-company benchmarking key to quantifying
opportunities for strategic implementations
11© Life Cycle Engineering 2015 11
Tactical Value - Availability & Opportunity Case for Improvement
Availability as defined by SMRP Best Practices & Metrics Guide (download at
SMRP.org – free for members):
12© Life Cycle Engineering 2015 12
Availability & Opportunity Case for Improvement
Reliability Engineers should focus on improving unscheduled downtime
Unscheduled
Downtime due to
Equipment Issues:
90 hrs/month
(1 hr/shift, 3 shifts/day)
13© Life Cycle Engineering 2015 13
Availability & Opportunity Case for Improvement
 Goal: Reduce unscheduled equipment downtime from 90 hrs/month to 45
hrs/month (Improve availability from 44% to 50%)
• 45 hrs/month of additional production time now available
• Average production rate for data collection period: 382 vials/hr
• Average Profit/vial: $10
• Monthly profit gain: $171,900
Annual profit gain: $2.1MM
14© Life Cycle Engineering 2015 14
Availability & Opportunity Case for Improvement
What can we do to reduce unscheduled equipment downtime?
• Pareto analysis of equipment issues/failures
• FMEA for bad actors on the line (typically filler, inspection
machine)
• PM optimization/improvements across line unit ops
• Implement PdM for common failure modes & causes
• If large line or operation, start with asset criticality analysis
Graphics Source: Life Cycle Engineering, Copyright 2015
15© Life Cycle Engineering 2015 15
Presenting & Tracking Improvements
Utilize the A3 Business Case Template
Graphics Source: Life Cycle Engineering, Copyright 2015
The A3 template is named after the ISO 216 ‘A3’ paper size, and incorporates all
information on a single 11”x17” sheet of paper. The format was developed in the
1960s as part of Toyota’s Quality Circle problem-solving program.
Example Goal:
Reduce unscheduled
equipment downtime from
90 hrs/month to 45
hrs/month (Improve
availability from 44% to
50%)
Present to Engineering
Leadership Team monthly
to update on:
Implementation Plan,
Schedule, Metrics
including unscheduled
downtime, availability, ROI
16© Life Cycle Engineering 2015 16
Summary of Reliability Improvement Approaches & Impact
on the Business
Graphics Source: Life Cycle Engineering, Copyright 2015
Strategic Approach:
• Establish an Asset Management Program with a
policy, strategy and objectives aligned with corporate
and/or site business objectives
• Multi-year effort: 1 year to see results in a pilot area of
company, 3-5 year full transformation – 1st year
benefits often ‘pay for’ the entire program
• Implementation of all asset management capabilities
(50+)
• Largest value opportunity: Hundreds of millions of
dollars for most pharma & biotech companies
Tactical Approach:
• Targeted improvements of one area or production line
• Smaller scope, faster return on investment: Average
3-6 month implementation
• Can still provide significant business benefit
• Implementation of several (3-5) asset management
capabilities
• Does require other functioning asset management
capabilities such as maintenance work execution,
spare parts management, etc.
17© Life Cycle Engineering 2015 17
Questions &
Discussion
Connecting Reliability & Business + ISO 55000 Framework
David J. Mierau, PE, CMRP
Director, Reliability Solutions
Life Cycle Engineering
(954) 547-5854
dmierau@lce.com
www.LCE.com

More Related Content

PDF
Operational Excellence model
(Dawn) Holly Crabtree
 
PPTX
ISO 55000 for Leaders: Developing an Asset Management Policy
Life Cycle Engineering
 
PPTX
ISO 55000 Overview
Life Cycle Engineering
 
PPTX
The Keys to Unlocking Safety Culture
Medgate Inc.
 
PPTX
APM Best Practices - Reliability Added Value
Stork
 
PDF
Asset Integrity Management approach to achieve excellence in Process Safety
Chandrashekhar Kulkarni
 
PDF
Operational Excellence
Kamraan
 
PDF
Developing asset management plans
OntarioEast
 
Operational Excellence model
(Dawn) Holly Crabtree
 
ISO 55000 for Leaders: Developing an Asset Management Policy
Life Cycle Engineering
 
ISO 55000 Overview
Life Cycle Engineering
 
The Keys to Unlocking Safety Culture
Medgate Inc.
 
APM Best Practices - Reliability Added Value
Stork
 
Asset Integrity Management approach to achieve excellence in Process Safety
Chandrashekhar Kulkarni
 
Operational Excellence
Kamraan
 
Developing asset management plans
OntarioEast
 

What's hot (20)

PDF
ISO 9001 2015 Quality Management System (Implementation)
Rozil Anwar
 
PDF
Flowchart
Steve Barfoot
 
PPTX
ISO 55000: Asset Management System Workshop
Life Cycle Engineering
 
PDF
Smrp ontario chapter mtg ISO 55000 overview by David Armstrong, Bentley Systems
SandraDiMatteo
 
PPSX
ISO Implementation Roadmap- By Motaharul Islam
Motaharul Islam
 
PDF
Introduction to ISO 55000 Training
Richard Uytdewilligen
 
PDF
Asset management iso 55001: Getting more value from your assets
Alain D'Hoe
 
PPTX
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Stork
 
PPTX
Integrated management systems
Archil Nasrashvili
 
PPT
IMS .ppt
AHMED Hegab
 
PPT
An Integrated Management System Standard
Ralph Reid
 
PDF
Operational Excellence
Steve Mitchinson
 
PDF
IMS Training Presentation
Global Manager Group
 
PDF
Iso 9001:2015 Documented Information Guidance
Mohammad Elshahat
 
PPSX
Basic of Integrated Management System
jamaluddin ma'ruf
 
PPT
KPI SMRP Presentation
Ricky Smith CMRP, CMRT
 
PPTX
Qms & iatf presentation1
Krishna Kant Pandey
 
PPSX
Measurement System Analysis
Qualimation Technologies
 
PDF
IATF 16949:2016 Clause Modification & Add
Neerav Poothia (Urgently need a Change)
 
PPTX
Webinar decision-making - Part 3: KPI Management
Stork
 
ISO 9001 2015 Quality Management System (Implementation)
Rozil Anwar
 
Flowchart
Steve Barfoot
 
ISO 55000: Asset Management System Workshop
Life Cycle Engineering
 
Smrp ontario chapter mtg ISO 55000 overview by David Armstrong, Bentley Systems
SandraDiMatteo
 
ISO Implementation Roadmap- By Motaharul Islam
Motaharul Islam
 
Introduction to ISO 55000 Training
Richard Uytdewilligen
 
Asset management iso 55001: Getting more value from your assets
Alain D'Hoe
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Stork
 
Integrated management systems
Archil Nasrashvili
 
IMS .ppt
AHMED Hegab
 
An Integrated Management System Standard
Ralph Reid
 
Operational Excellence
Steve Mitchinson
 
IMS Training Presentation
Global Manager Group
 
Iso 9001:2015 Documented Information Guidance
Mohammad Elshahat
 
Basic of Integrated Management System
jamaluddin ma'ruf
 
KPI SMRP Presentation
Ricky Smith CMRP, CMRT
 
Qms & iatf presentation1
Krishna Kant Pandey
 
Measurement System Analysis
Qualimation Technologies
 
IATF 16949:2016 Clause Modification & Add
Neerav Poothia (Urgently need a Change)
 
Webinar decision-making - Part 3: KPI Management
Stork
 
Ad

Similar to Connecting Reliability & Business + ISO 55000 Framework (20)

PPTX
Chapter-7-Making Operations Strategy (1).pptx
MuhammadTariq711065
 
DOC
GVK- Resume
Geoffrey Keith
 
PPTX
Production and Operations Management Slides.pptx
SaadFarooq74
 
PPTX
Leading a Lean Implementation
Life Cycle Engineering
 
PDF
0-vcc-maturity-guide-v2.pdf
TummaRamarao1
 
PPT
Process
meenakshi sv
 
PPTX
603941183-Unit-1-Introduction-to-Product-Life-Cycle-Management.pptx
vinothkumarphd24
 
PDF
TPS vs Lean Manufacturing A Comparative Analysis
Dr.Eng.Siripong Jungthawan, PhD, MBA, ACPE, CAP, CSCP, EPPM
 
PPTX
Module1_Strategic_Maintenance_Slides.pptx
rkanna2006
 
PPTX
qp (1).pptx 1
Muhammad Tasleem
 
PDF
Practical experiences of portfolio management
Association for Project Management
 
PPTX
Om ibs-2
videoaakash15
 
PDF
1 Operations Managementjncsickhbfijofcndw.pdf
AbhishekYadav241439
 
PPTX
13._Lean_6_Sigma_Toolkit_-_Overview_and_Approach.pptx
MudassarIqbal853374
 
PDF
Measuring Business Success: Lean Metrics
Willie Carter
 
PDF
Intro to Six Sigma.pdf use of six segma in management
mahmoudgaber100425
 
PDF
Basics of six sigma public information on the inter
AjayDharmavaram2
 
PDF
Complete Guide To Input Output Business Process Model PowerPoint Presentatio...
SlideTeam
 
DOCX
Lean Six Sigma for Jewellery
Prem Anand
 
PDF
Kaizen and Continuous Improvement...pdf
Abdullah Al Seam
 
Chapter-7-Making Operations Strategy (1).pptx
MuhammadTariq711065
 
GVK- Resume
Geoffrey Keith
 
Production and Operations Management Slides.pptx
SaadFarooq74
 
Leading a Lean Implementation
Life Cycle Engineering
 
0-vcc-maturity-guide-v2.pdf
TummaRamarao1
 
Process
meenakshi sv
 
603941183-Unit-1-Introduction-to-Product-Life-Cycle-Management.pptx
vinothkumarphd24
 
TPS vs Lean Manufacturing A Comparative Analysis
Dr.Eng.Siripong Jungthawan, PhD, MBA, ACPE, CAP, CSCP, EPPM
 
Module1_Strategic_Maintenance_Slides.pptx
rkanna2006
 
qp (1).pptx 1
Muhammad Tasleem
 
Practical experiences of portfolio management
Association for Project Management
 
Om ibs-2
videoaakash15
 
1 Operations Managementjncsickhbfijofcndw.pdf
AbhishekYadav241439
 
13._Lean_6_Sigma_Toolkit_-_Overview_and_Approach.pptx
MudassarIqbal853374
 
Measuring Business Success: Lean Metrics
Willie Carter
 
Intro to Six Sigma.pdf use of six segma in management
mahmoudgaber100425
 
Basics of six sigma public information on the inter
AjayDharmavaram2
 
Complete Guide To Input Output Business Process Model PowerPoint Presentatio...
SlideTeam
 
Lean Six Sigma for Jewellery
Prem Anand
 
Kaizen and Continuous Improvement...pdf
Abdullah Al Seam
 
Ad

More from Life Cycle Engineering (19)

PPTX
LCE Corporate Capabilities Brief-Life Cycle Talent
Life Cycle Engineering
 
PPTX
Introduction to Reliability Excellence
Life Cycle Engineering
 
PPTX
SMRP Body of Knowledge Guided Study Slide Share
Life Cycle Engineering
 
PPTX
Maintenance Management Certification
Life Cycle Engineering
 
PPTX
Stakeholder Risk Management
Life Cycle Engineering
 
PPTX
Institute of Asset Management Certificate Workshop
Life Cycle Engineering
 
PPTX
10 Factors that May Affect the Future of Subsea Production
Life Cycle Engineering
 
PPTX
Competency Based Learning
Life Cycle Engineering
 
PPTX
Hack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Life Cycle Engineering
 
PPTX
Reliability Engineering Certification Program
Life Cycle Engineering
 
PPTX
Planning for Shutdowns, Turnarounds and Outages Workshop
Life Cycle Engineering
 
PPTX
Shutdown Turnaround and Outage Competency Improvement Program
Life Cycle Engineering
 
PPTX
Leadership for Shutdowns, Turnarounds and Outages Workshop
Life Cycle Engineering
 
PPTX
Leading high performance teams
Life Cycle Engineering
 
PPTX
Cybersecurity Risk Management Framework Strategy Workshop
Life Cycle Engineering
 
PPTX
8 Factors to Fix a Dysfunctional Storeroom
Life Cycle Engineering
 
PPTX
5 Biggest Risks to Effective Asset Management
Life Cycle Engineering
 
PPTX
Introduction to Agile Software Development
Life Cycle Engineering
 
PPTX
Lean Maintenance Training
Life Cycle Engineering
 
LCE Corporate Capabilities Brief-Life Cycle Talent
Life Cycle Engineering
 
Introduction to Reliability Excellence
Life Cycle Engineering
 
SMRP Body of Knowledge Guided Study Slide Share
Life Cycle Engineering
 
Maintenance Management Certification
Life Cycle Engineering
 
Stakeholder Risk Management
Life Cycle Engineering
 
Institute of Asset Management Certificate Workshop
Life Cycle Engineering
 
10 Factors that May Affect the Future of Subsea Production
Life Cycle Engineering
 
Competency Based Learning
Life Cycle Engineering
 
Hack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Life Cycle Engineering
 
Reliability Engineering Certification Program
Life Cycle Engineering
 
Planning for Shutdowns, Turnarounds and Outages Workshop
Life Cycle Engineering
 
Shutdown Turnaround and Outage Competency Improvement Program
Life Cycle Engineering
 
Leadership for Shutdowns, Turnarounds and Outages Workshop
Life Cycle Engineering
 
Leading high performance teams
Life Cycle Engineering
 
Cybersecurity Risk Management Framework Strategy Workshop
Life Cycle Engineering
 
8 Factors to Fix a Dysfunctional Storeroom
Life Cycle Engineering
 
5 Biggest Risks to Effective Asset Management
Life Cycle Engineering
 
Introduction to Agile Software Development
Life Cycle Engineering
 
Lean Maintenance Training
Life Cycle Engineering
 

Recently uploaded (20)

PPTX
Online Cab Booking and Management System.pptx
diptipaneri80
 
PDF
FLEX-LNG-Company-Presentation-Nov-2017.pdf
jbloggzs
 
PPTX
22PCOAM21 Session 2 Understanding Data Source.pptx
Guru Nanak Technical Institutions
 
PPTX
22PCOAM21 Session 1 Data Management.pptx
Guru Nanak Technical Institutions
 
PDF
settlement FOR FOUNDATION ENGINEERS.pdf
Endalkazene
 
PDF
Natural_Language_processing_Unit_I_notes.pdf
sanguleumeshit
 
PPTX
Module2 Data Base Design- ER and NF.pptx
gomathisankariv2
 
PDF
top-5-use-cases-for-splunk-security-analytics.pdf
yaghutialireza
 
PDF
Zero Carbon Building Performance standard
BassemOsman1
 
PDF
Chad Ayach - A Versatile Aerospace Professional
Chad Ayach
 
PDF
Machine Learning All topics Covers In This Single Slides
AmritTiwari19
 
PDF
Introduction to Ship Engine Room Systems.pdf
Mahmoud Moghtaderi
 
PDF
Zero carbon Building Design Guidelines V4
BassemOsman1
 
PDF
CAD-CAM U-1 Combined Notes_57761226_2025_04_22_14_40.pdf
shailendrapratap2002
 
PPTX
sunil mishra pptmmmmmmmmmmmmmmmmmmmmmmmmm
singhamit111
 
PPT
Understanding the Key Components and Parts of a Drone System.ppt
Siva Reddy
 
PDF
Packaging Tips for Stainless Steel Tubes and Pipes
heavymetalsandtubes
 
PDF
STUDY OF NOVEL CHANNEL MATERIALS USING III-V COMPOUNDS WITH VARIOUS GATE DIEL...
ijoejnl
 
PDF
AI-Driven IoT-Enabled UAV Inspection Framework for Predictive Maintenance and...
ijcncjournal019
 
PPTX
Information Retrieval and Extraction - Module 7
premSankar19
 
Online Cab Booking and Management System.pptx
diptipaneri80
 
FLEX-LNG-Company-Presentation-Nov-2017.pdf
jbloggzs
 
22PCOAM21 Session 2 Understanding Data Source.pptx
Guru Nanak Technical Institutions
 
22PCOAM21 Session 1 Data Management.pptx
Guru Nanak Technical Institutions
 
settlement FOR FOUNDATION ENGINEERS.pdf
Endalkazene
 
Natural_Language_processing_Unit_I_notes.pdf
sanguleumeshit
 
Module2 Data Base Design- ER and NF.pptx
gomathisankariv2
 
top-5-use-cases-for-splunk-security-analytics.pdf
yaghutialireza
 
Zero Carbon Building Performance standard
BassemOsman1
 
Chad Ayach - A Versatile Aerospace Professional
Chad Ayach
 
Machine Learning All topics Covers In This Single Slides
AmritTiwari19
 
Introduction to Ship Engine Room Systems.pdf
Mahmoud Moghtaderi
 
Zero carbon Building Design Guidelines V4
BassemOsman1
 
CAD-CAM U-1 Combined Notes_57761226_2025_04_22_14_40.pdf
shailendrapratap2002
 
sunil mishra pptmmmmmmmmmmmmmmmmmmmmmmmmm
singhamit111
 
Understanding the Key Components and Parts of a Drone System.ppt
Siva Reddy
 
Packaging Tips for Stainless Steel Tubes and Pipes
heavymetalsandtubes
 
STUDY OF NOVEL CHANNEL MATERIALS USING III-V COMPOUNDS WITH VARIOUS GATE DIEL...
ijoejnl
 
AI-Driven IoT-Enabled UAV Inspection Framework for Predictive Maintenance and...
ijcncjournal019
 
Information Retrieval and Extraction - Module 7
premSankar19
 

Connecting Reliability & Business + ISO 55000 Framework

  • 1. 1© Life Cycle Engineering 2015 1 Connecting Reliability & Business + ISO 55000 © Life Cycle Engineering
  • 2. 2© Life Cycle Engineering 2015 Connecting Reliability & Business + ISO 55000 Framework Outline: • State of the Industry – Pharma & Biotech Manufacturing Disruptions • Asset Management vs. Reliability vs. Maintenance • Understand the Corporate Business Strategy • The Value Stream and Monetizing Downtime • Strategic Implementation Value • Tactical Implementation Value - Availability • The A3 Tool
  • 3. 3© Life Cycle Engineering 2015 Impact of Manufacturing Disruptions Graphic Source: Strategic Plan for Preventing and Mitigating Drug Shortages, Food and Drug Administration, October 2013 66% of disruptions resulted from: • Facility remediation efforts (35%) • Manufacturing issues (31%) Drug Shortages by Primary Reason for Disruption in Supply (2012) Note: Regulatory agencies are asking companies about asset management programs during audits
  • 4. 4© Life Cycle Engineering 2015 4 • ISO 55000 (2014): Asset Management Standards • BSI PAS 55 (2004, 2008): Optimized Management of Physical Assets Standards • ASTM E2500: Pharma-specific Guidance (Create or Acquire Phase of Asset Life Cycle) Recent focus on Asset Management
  • 5. 5© Life Cycle Engineering 2015 5 Graphic Source: Life Cycle Engineering, Copyright 2015 Leadership, Policy & Strategy Asset Management Strategy Physical Asset Portfolio Business Case Procure & Construct Commission Operate & Maintain Asset Management System Asset Management Capability (Processes, Procedures & Knowledge) Asset Management Objectives Value Delivery ISO 55000 Compliance Reliability Excellence Process Safety Management Mechanical Integrity ISO 31000 Risk Management Asset Management Plans Asset Criticality ASSET LIFECYCLE Asset Management System Implementation Framework Areas where companies commonly focus
  • 6. 6© Life Cycle Engineering 2015 6 Asset Management Implementation Broken-Down Further… 1. Understand the corporate (and/or site) business strategy & objectives 2. Create asset management strategy & objectives that align with the business strategy & objectives 3. Implement asset management capabilities, across the asset lifecycle, to deliver value Asset Management Capability (Processes, Procedures & Knowledge) Value Delivery ISO 55000 Compliance Reliability Excellence Process Safety Management Mechanical Integrity ISO 31000 Risk Management Asset Management Plans Asset Criticality
  • 7. 7© Life Cycle Engineering 2015 7 FAQ: What’s the difference between Reliability, Maintenance and Asset Management? • Reliability Processes: o Asset criticality, root cause analysis, etc. • Maintenance Processes: o Planning & scheduling, work execution, etc. These are Asset Management Capabilities • Other asset management capabilities include: capital delivery, MRO materials management, etc. Asset Management Capability (Processes, Procedures & Knowledge) Value Delivery ISO 55000 Compliance Reliability Excellence Process Safety Management Mechanical Integrity ISO 31000 Risk Management Asset Management Plans Asset Criticality
  • 8. 8© Life Cycle Engineering 2015 8 Understanding the Value Stream How does your business create value? • Producing medicines, vaccines, devices, etc. • Selling products – increasing prices &/or volume over time • Reducing cost of goods sold (COGS) over time  Waste = Cost TIM WOOD T: Transportation I: Inventory M: Motion W: Waiting O: Over-processing O: Over-production D: Defects
  • 9. 9© Life Cycle Engineering 2015 9 Understanding the Value Stream • What are your high-profit products? • Do you have capacity-constrained products (everything made is immediately sold)? • Where in your production is COGS absorbed? • What is the cost of downtime? • Get to know your corporate & site finance teams! They can answer most of the questions above. • Great partnership opportunity with your Operational Excellence groups!
  • 10. 10© Life Cycle Engineering 2015 10 Highest-Level Value Delivery Concepts Fixed Capital • Optimize lifecycle costs • Defer asset replacement through increased asset life Working Capital • Leaner manufacturing • Reduce work in process • Reduce spare parts inventory Revenue or Output • Increase asset availability • Increase throughput • Improve quality Operating Costs • Reduce unscheduled downtime • Reduce maintenance cost • Reduce operations Cost Note: Site-to-site and/or company-to-company benchmarking key to quantifying opportunities for strategic implementations
  • 11. 11© Life Cycle Engineering 2015 11 Tactical Value - Availability & Opportunity Case for Improvement Availability as defined by SMRP Best Practices & Metrics Guide (download at SMRP.org – free for members):
  • 12. 12© Life Cycle Engineering 2015 12 Availability & Opportunity Case for Improvement Reliability Engineers should focus on improving unscheduled downtime Unscheduled Downtime due to Equipment Issues: 90 hrs/month (1 hr/shift, 3 shifts/day)
  • 13. 13© Life Cycle Engineering 2015 13 Availability & Opportunity Case for Improvement  Goal: Reduce unscheduled equipment downtime from 90 hrs/month to 45 hrs/month (Improve availability from 44% to 50%) • 45 hrs/month of additional production time now available • Average production rate for data collection period: 382 vials/hr • Average Profit/vial: $10 • Monthly profit gain: $171,900 Annual profit gain: $2.1MM
  • 14. 14© Life Cycle Engineering 2015 14 Availability & Opportunity Case for Improvement What can we do to reduce unscheduled equipment downtime? • Pareto analysis of equipment issues/failures • FMEA for bad actors on the line (typically filler, inspection machine) • PM optimization/improvements across line unit ops • Implement PdM for common failure modes & causes • If large line or operation, start with asset criticality analysis Graphics Source: Life Cycle Engineering, Copyright 2015
  • 15. 15© Life Cycle Engineering 2015 15 Presenting & Tracking Improvements Utilize the A3 Business Case Template Graphics Source: Life Cycle Engineering, Copyright 2015 The A3 template is named after the ISO 216 ‘A3’ paper size, and incorporates all information on a single 11”x17” sheet of paper. The format was developed in the 1960s as part of Toyota’s Quality Circle problem-solving program. Example Goal: Reduce unscheduled equipment downtime from 90 hrs/month to 45 hrs/month (Improve availability from 44% to 50%) Present to Engineering Leadership Team monthly to update on: Implementation Plan, Schedule, Metrics including unscheduled downtime, availability, ROI
  • 16. 16© Life Cycle Engineering 2015 16 Summary of Reliability Improvement Approaches & Impact on the Business Graphics Source: Life Cycle Engineering, Copyright 2015 Strategic Approach: • Establish an Asset Management Program with a policy, strategy and objectives aligned with corporate and/or site business objectives • Multi-year effort: 1 year to see results in a pilot area of company, 3-5 year full transformation – 1st year benefits often ‘pay for’ the entire program • Implementation of all asset management capabilities (50+) • Largest value opportunity: Hundreds of millions of dollars for most pharma & biotech companies Tactical Approach: • Targeted improvements of one area or production line • Smaller scope, faster return on investment: Average 3-6 month implementation • Can still provide significant business benefit • Implementation of several (3-5) asset management capabilities • Does require other functioning asset management capabilities such as maintenance work execution, spare parts management, etc.
  • 17. 17© Life Cycle Engineering 2015 17 Questions & Discussion Connecting Reliability & Business + ISO 55000 Framework David J. Mierau, PE, CMRP Director, Reliability Solutions Life Cycle Engineering (954) 547-5854 [email protected] www.LCE.com

Editor's Notes

  • #3: Today, LCE is a privately held company with headquarters in Charleston, South Carolina. Our more than 600 employees, working out of 10 offices around the United States, provide engineering solutions for private industry, public entities, government organizations and the military, in North America and around the world.   LCE is a strengths-based organization focused on turning individual talents into strengths and then turning individual strengths into organizational performance that supports our clients’ success. Our corporate culture encourages personal and professional growth because LCE’s success depends on the talent, professionalism and commitment of our employees. Ranked in the top 10 Best Places to Work in South Carolina for six consecutive years, in 2012 we were honored to be selected as the Best Place to Work in South Carolina among large employers in the state.     Since 1976, Life Cycle Engineering has grown to include three groups:     LCE’s Applied Technology Group provides expertise in software testing, Service Oriented Architecture, cyber security, agile development, virtualization, and systems administration and monitoring.   The Engineering Services Group provides engineering and professional services to U.S. and foreign Navies, commercial marine operators and industrial companies. These services include electrical and environmental engineering, mechanical and marine engineering, materials and metallurgical engineering, energy management, integrated logistics support, and program and financial management.   Our Reliability Consulting Group provides consulting, services and education that help organizations reduce risk, improve operating performance and engage their employees. Let’s take a closer look at what makes LCE’s Reliability Consulting Group a leading provider of reliability solutions worldwide.
  • #5: Referenced standards provide the elements of a holistic asset management program and should be referenced when creating a corporate or site asset management policy and program.