SlideShare a Scribd company logo
1
Featured Project:
The Wroclaw West Bypass, Poland
Trusted by the world’s largest projects
Cutting Approval Cycles
From 30 Days to Ten
With
2
Agenda
Introduction
Industry Success
Platform Demo
Q&A
Luigi Chiolini, Boston Consulting Group
Victoria Stanford, Nalcor Energy
Steve Wilson, Aconex
3
Industry landscape
• Large, geographically dispersed project teams
• Increased demand for visibility and reporting
• Efficiency to maintain competitiveness
• Time is money
4
Project complexity
Project-wide network of a major global engineering firm
• Long tail of communication
that is not often visible to key
stakeholders including the
owner or JV partner
• Dispersed teams
• Multiple project phases, each
with critical information hand-
offs
• Huge margin for error
• Significant inherent inefficiency
* Data from the Aconex system
5
Boston Consulting Group
process presentation
This was a 15-minute BCG presentation
View the complete webinar at aconex.com/Webinars
6
Victoria Stanford
Information Management
“We make a strong commitment to provide safe,
reliable and dependable electricity…”
7
Key workflow process challenges
• Cross-organization communication and visibility
• Volume of information and revisions
• Ensuring final docs and drawings move on to handover
8
The magnitude of power projects
* Data based on power projects that Aconex has been involved in globally.
616,932 mails 166 organizations 6 countries
547,118 documents 2,807 users 2,256,282 decisions
9
Improving Nalcor delivery
and business outcomes
• Company-wide approach
• Process definition and improvement
• Using technology to support Nalcor corporate initiatives
10
Design review for RFP creation in the past
• One reviewer at a time in a dedicated room
• Multiple disciplines - civil, electric and mechanical
• Mark ups on hard copy drawing
• Delayed RFP over a month
• Delayed contracting
• Delayed construction
11
Design review for RFP creation with Aconex
• Simultaneous reviews by multiple disciplines
• 2 week turnaround on design reviews
• RFPs completed and sent out on time
• Contracts in place on time
• Work starts on schedule
12
How Nalcor is using Aconex
Goal: build and improve business processes
• Speed up approval cycles: RFIs, Submittals, Changes
• Efficiently communicate with subs and suppliers
• Improve document accessibility and transmission
13
Aconex = transparency and accountability
• Transparency means having information and
data available
• Accountability is taking responsibility and
recognizing the decisions and actions taken by
the company.
• Aconex helps support transparency and
accountability
Nalcor is committed to being open, transparent
and accountable across its operations.
14
Projects like Lower Churchill need collaboration
to reduce risk and deliver long-term benefits
$6.2 billion government
infrastructure
Federal government
compliance
Over 300 internal
project team members
100+ year
asset lifetime
Significant employment
and economic benefit
Joint venture
agreement
Thousands of
document reviews
15
A project-wide solution helps to standardize
processes and embed best practice
Documents available
immediately
without delay or expense
of print and send
Real time visibility
and status reporting
Easy to set up
and automate
Smoother document
review
with process and
information tracking
Complete document
oversight
Deep collaboration
and accuracy across
multiple organizations
Manage governance
and risk
within complex business
agreements
Iron clad audit trail
Permission and
access controls
16
30
10
0
10
20
30
Without
Aconex
With
Aconex
Technical document review
process (days)
Improved workflow
turnaround
Faster document
control
Transmittal issue times
48X FASTER
Delivering measurable value and
ROI gains across the project
Without Aconex
With Aconex
Reduced IT
infrastructure costs
$
Cloud-based software
17
Aconex collaboration
Save money, increase productivity. Manage project risk.
Cloud & Mobile
Information & Process
Management
Engineering
& Construction
Project-Wide
Across the
Project Lifecycle
Plan Design Construct OperateBid
OperatorSub-contractorsContractorConsultantsOwner EPC Designer
18
One integrated collaboration platform for project
information and process
Owner EPC Designer Consultants Contractor Subcontractors
Client Service & Support
Web Mobile APIs
Information & Process Management
Platform
Document Management 3D Modeling Field Inspections
Correspondence Registers Bidding & Tenders
Workflows O&M / Deliverables Site Mobility
Network Integration API Reporting & Search
Infrastructure 2D & 3D Viewer Archiving
Operator
19
RFIs–limited accountability,visibility andtracking
TIME
Incomplete & Inefficient
information capture
Limited accountability &
visibility
Manual tracking,
Reporting & Auditing
RFI raised by initiator and
emailed to Responder
Review content, returns if
incomplete
SME Input entered
and returned
Response created and
returned. SME Input
reviewed
Action Taken
Update of RFI / TQ Log
Decides is Subject
Matter Expert input is
required
Creation of / addition to
RFI / TQ Log
20
RFIswithAconex:control,structureandvisibility
Greater process control
and structure
Team wide visibility Trusted Delivery
RFI raised by initiator
and mailed to
Responder
Review content,
returns if
incomplete
SME Input
entered and
returned
Response created
and returned. SME
input reviewed.
Action Taken
Decides is Subject
Matter Expert input is
required
TIME
Typicalcycletimereductionfrom5to2days
21
TIME
Complete
information capture
Project wide
visibility
REQUESTOR:
Creates and
issues with Mail
Forms
APPROVER:
Reviews,
responds
REQUESTOR:
Reviews
response
APPROVER:
Receives,
approves
REQUESTOR:
Proceeds
with changes
Issues
follow-up
documents
Process Tracking &
reporting
Complete audit
trail
Prepares
Impact
Assessment
ChangeRequestswithAconex:
fast,complete information capture
TIME
FUNCTIONAL
LEAD:
Reviews
Typical cycle time reduction from
7 weeks to 1 week
22
The world’s most widely-used collaboration
platform for engineering & construction
500
thousand
users worldwide
$800
billion
in projects
1.1
billion
documents
48
thousand
companies served
70
countries
around the world
40
offices
globally
RTD Chiyodo BG Group
Tanker Pacific Leighton Welspun Bilfinger
New York City Hall Reconstruction | $100M
Dubai Metro | $7.8BSydney Opera House Renovation
Panama Canal Expansion | $3.2B University of Montreal Hospital | $390M
Denver Airport | $544M
23
Aconex: reducing approval cycle time
This was a 20-minute platform demo in the live webinar
To request a personal demo: aconex.com/Demo
• Overview
• RFIs
• Submittals
• Design reviews
24
Process improvement with Aconex
Aconex Professional Services
Delivering value through
customer engagements
• Process Discovery Workshop
• Process Mapping & Assessment
• Enterprise Deployment Standards
25
Featured Project:
The Wroclaw West Bypass, Poland
Trusted by the world’s largest projects
Learn more at
aconex.com/Demo
With thanks to our participants from
&

More Related Content

PPTX
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
Aconex
 
PPTX
Optimize Process Management to Improve Business Outcomes - Webinar, September...
Aconex
 
PPTX
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
Aconex
 
PPTX
Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
Aconex
 
PPTX
Keeping your project on track - Webinar, September 2016
Aconex
 
PPTX
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
Aconex
 
PPTX
How to improve RFI management across your projects
Aconex
 
PPTX
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
Aconex
 
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
Aconex
 
Optimize Process Management to Improve Business Outcomes - Webinar, September...
Aconex
 
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
Aconex
 
Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
Aconex
 
Keeping your project on track - Webinar, September 2016
Aconex
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
Aconex
 
How to improve RFI management across your projects
Aconex
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
Aconex
 

What's hot (20)

PPTX
How Strategic Alliances and Alternative Delivery Models Drive Project Success...
Aconex
 
PPTX
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
Aconex
 
PPTX
Deliver Reliable Power Projects - Webinar June 16 2015
Aconex
 
PPTX
Keep your project moving with aconex contract administration webinar slides
Aconex
 
PPTX
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Aconex
 
PDF
ACONEX-workflow System
Jack Tan Kiah Kee
 
PPTX
Best practices to predictably meet your project budget
Aconex
 
PPTX
Five ways to drive process adoption
Aconex
 
PPTX
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Aconex
 
PPTX
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
Aconex
 
PPTX
Global Trends in Delivery Projects
Aconex
 
PPTX
Modernize project controls to ensure project success aecom
Aconex
 
PDF
Aconex connected cost webinar - drive project performance
Aconex
 
PDF
Avoid the risk and streamline your project controls
Aconex
 
PPTX
Achieve competitive advantage through innovative process management
Aconex
 
PPTX
5 methods session 2 webinar slideshare systems co
Aconex
 
PPTX
"Show me the ROI" – concrete results from process improvement
Aconex
 
PPTX
Collaborative project controls across your entire portfolio
Aconex
 
PPTX
Unlocking Engineering and Construction performance webinar apac slideshare
Aconex
 
PDF
14.15 andrew killander, aconex for distribution
Ibrahim Al-Hudhaif
 
How Strategic Alliances and Alternative Delivery Models Drive Project Success...
Aconex
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
Aconex
 
Deliver Reliable Power Projects - Webinar June 16 2015
Aconex
 
Keep your project moving with aconex contract administration webinar slides
Aconex
 
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Aconex
 
ACONEX-workflow System
Jack Tan Kiah Kee
 
Best practices to predictably meet your project budget
Aconex
 
Five ways to drive process adoption
Aconex
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Aconex
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
Aconex
 
Global Trends in Delivery Projects
Aconex
 
Modernize project controls to ensure project success aecom
Aconex
 
Aconex connected cost webinar - drive project performance
Aconex
 
Avoid the risk and streamline your project controls
Aconex
 
Achieve competitive advantage through innovative process management
Aconex
 
5 methods session 2 webinar slideshare systems co
Aconex
 
"Show me the ROI" – concrete results from process improvement
Aconex
 
Collaborative project controls across your entire portfolio
Aconex
 
Unlocking Engineering and Construction performance webinar apac slideshare
Aconex
 
14.15 andrew killander, aconex for distribution
Ibrahim Al-Hudhaif
 
Ad

Viewers also liked (10)

PPTX
Technology ap cons. ppt
apconstructiononline
 
PDF
Steven Lee 李家倫 黑帶大師
Steven Lee (李家倫)
 
PDF
FY16 Results Presentation
Pranav Rao
 
PDF
Product Managers are from Pluto and UXers are from Uranus
Product Anonymous
 
PPTX
ASG CloudFactory
DavidZou
 
PDF
CV - DOC CONT
Shirlee Ann Cabrera
 
PDF
Study: The Future of VR, AR and Self-Driving Cars
LinkedIn
 
PDF
Visual Design with Data
Seth Familian
 
PDF
3 Things Every Sales Team Needs to Be Thinking About in 2017
Drift
 
PDF
How to Become a Thought Leader in Your Niche
Leslie Samuel
 
Technology ap cons. ppt
apconstructiononline
 
Steven Lee 李家倫 黑帶大師
Steven Lee (李家倫)
 
FY16 Results Presentation
Pranav Rao
 
Product Managers are from Pluto and UXers are from Uranus
Product Anonymous
 
ASG CloudFactory
DavidZou
 
CV - DOC CONT
Shirlee Ann Cabrera
 
Study: The Future of VR, AR and Self-Driving Cars
LinkedIn
 
Visual Design with Data
Seth Familian
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
Drift
 
How to Become a Thought Leader in Your Niche
Leslie Samuel
 
Ad

Similar to Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015 (20)

PPTX
Mega project not mega problems session 2
Aconex
 
PPTX
Agile Presentation Standing Committee on Gov't Operations Oct 17
Dan Murphy, PMP, CSPO, CSM
 
PDF
Mellanox presentation for Agile Conference June 2015
Chai Forsher
 
PDF
Next Generation IT Delivery - What it means to deliver atthe speed of the Dig...
Mirco Hering
 
PPTX
August 2015 Governance Final 20150804.pptx
AdilPatel34
 
PPTX
Deep Dive Into World Of Pre Sales By Rupesh Bhatia
BLRDEVX
 
PDF
Don't drive your Race car on a dirt track!! - Athresh Krishnappa, Scrum Banga...
Scrum Bangalore
 
PPTX
“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...
India Scrum Enthusiasts Community
 
PPTX
Devops for business : Efficiency & Innovation
Satish Bhatia
 
PPTX
Mega project not mega problems session 1
Aconex
 
PPTX
Agile governance: reality or dream in the US & UK Governments? webinar on Thu...
Association for Project Management
 
PPTX
How to Play the Agile Hand You’re Dealt
jamesquinnokeeffe
 
PDF
Course Assignment: Financing and Initiating Major Engineering Projects
Fragoso Josue Muhae
 
PDF
Enzigma Casestudy
Enzigma Software Pvt. Ltd.
 
PDF
Building out a Global Data delivery platform - the business and technical use...
AWS Chicago
 
PPTX
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
Aconex
 
PPTX
The Agile PMO: Ensuring visibility and governance
Matt Holitza
 
PPTX
ANIn Gurugram Jan 2025 | Agile Reinvented: Driving Global Collaboration in GC...
AgileNetwork
 
PDF
Agile at scale resources
Glen Alleman
 
PDF
Best Practices for Oil & Gas: Rapid SAP Implementation at a Startup Independ...
Kent Landrum
 
Mega project not mega problems session 2
Aconex
 
Agile Presentation Standing Committee on Gov't Operations Oct 17
Dan Murphy, PMP, CSPO, CSM
 
Mellanox presentation for Agile Conference June 2015
Chai Forsher
 
Next Generation IT Delivery - What it means to deliver atthe speed of the Dig...
Mirco Hering
 
August 2015 Governance Final 20150804.pptx
AdilPatel34
 
Deep Dive Into World Of Pre Sales By Rupesh Bhatia
BLRDEVX
 
Don't drive your Race car on a dirt track!! - Athresh Krishnappa, Scrum Banga...
Scrum Bangalore
 
“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...
India Scrum Enthusiasts Community
 
Devops for business : Efficiency & Innovation
Satish Bhatia
 
Mega project not mega problems session 1
Aconex
 
Agile governance: reality or dream in the US & UK Governments? webinar on Thu...
Association for Project Management
 
How to Play the Agile Hand You’re Dealt
jamesquinnokeeffe
 
Course Assignment: Financing and Initiating Major Engineering Projects
Fragoso Josue Muhae
 
Enzigma Casestudy
Enzigma Software Pvt. Ltd.
 
Building out a Global Data delivery platform - the business and technical use...
AWS Chicago
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
Aconex
 
The Agile PMO: Ensuring visibility and governance
Matt Holitza
 
ANIn Gurugram Jan 2025 | Agile Reinvented: Driving Global Collaboration in GC...
AgileNetwork
 
Agile at scale resources
Glen Alleman
 
Best Practices for Oil & Gas: Rapid SAP Implementation at a Startup Independ...
Kent Landrum
 

More from Aconex (16)

PPTX
Webinar contract management aconex 6 septembre 2018
Aconex
 
PDF
Webinar contract management aconex 5 juillet 2018
Aconex
 
PDF
Atelier aconex bim_world_2018
Aconex
 
PDF
Aconex business breakfast Praesentation
Aconex
 
PPTX
Digital transformation webinar amer slideshare
Aconex
 
PPTX
Modernizando controles de proyecto
Aconex
 
PPTX
Security best ways to protect your intellectual capital
Aconex
 
PPTX
Digital Transformation 2018
Aconex
 
PPTX
The rise of the “gigaproject”
Aconex
 
PDF
How to successfully target and secure OBOR projects
Aconex
 
PPTX
Le BIM en support des études d’exécution
Aconex
 
PPTX
Tendencias actuales en la entrega de proyectos PPP/UTEs-Consorcios
Aconex
 
PPTX
Une plateforme collaborative qui met le BIM au cœur de votre gestion de proje...
Aconex
 
PDF
Atelier BIM Aconex Présentation Nodal (French)
Aconex
 
PPTX
Webinar BIM Gagnez en productivité sur vos projets BIM (French)
Aconex
 
PPTX
Atelier Aconex au BIM WORLD 2017 : « Le travail collaboratif sur un projet BI...
Aconex
 
Webinar contract management aconex 6 septembre 2018
Aconex
 
Webinar contract management aconex 5 juillet 2018
Aconex
 
Atelier aconex bim_world_2018
Aconex
 
Aconex business breakfast Praesentation
Aconex
 
Digital transformation webinar amer slideshare
Aconex
 
Modernizando controles de proyecto
Aconex
 
Security best ways to protect your intellectual capital
Aconex
 
Digital Transformation 2018
Aconex
 
The rise of the “gigaproject”
Aconex
 
How to successfully target and secure OBOR projects
Aconex
 
Le BIM en support des études d’exécution
Aconex
 
Tendencias actuales en la entrega de proyectos PPP/UTEs-Consorcios
Aconex
 
Une plateforme collaborative qui met le BIM au cœur de votre gestion de proje...
Aconex
 
Atelier BIM Aconex Présentation Nodal (French)
Aconex
 
Webinar BIM Gagnez en productivité sur vos projets BIM (French)
Aconex
 
Atelier Aconex au BIM WORLD 2017 : « Le travail collaboratif sur un projet BI...
Aconex
 

Recently uploaded (20)

PDF
solutions_manual_-_materials___processing_in_manufacturing__demargo_.pdf
AbdullahSani29
 
PPTX
How to Build a Scalable Micro-Investing Platform in 2025 - A Founder’s Guide ...
Third Rock Techkno
 
PDF
Chapter 2 Digital Image Fundamentals.pdf
Getnet Tigabie Askale -(GM)
 
PDF
NewMind AI Weekly Chronicles - July'25 - Week IV
NewMind AI
 
PPTX
ChatGPT's Deck on The Enduring Legacy of Fax Machines
Greg Swan
 
PDF
BLW VOCATIONAL TRAINING SUMMER INTERNSHIP REPORT
codernjn73
 
PDF
Unlocking the Future- AI Agents Meet Oracle Database 23ai - AIOUG Yatra 2025.pdf
Sandesh Rao
 
PDF
Automating ArcGIS Content Discovery with FME: A Real World Use Case
Safe Software
 
PDF
agentic-ai-and-the-future-of-autonomous-systems.pdf
siddharthnetsavvies
 
PDF
Accelerating Oracle Database 23ai Troubleshooting with Oracle AHF Fleet Insig...
Sandesh Rao
 
PDF
Make GenAI investments go further with the Dell AI Factory - Infographic
Principled Technologies
 
PDF
Using Anchore and DefectDojo to Stand Up Your DevSecOps Function
Anchore
 
PDF
Cloud-Migration-Best-Practices-A-Practical-Guide-to-AWS-Azure-and-Google-Clou...
Artjoker Software Development Company
 
PDF
This slide provides an overview Technology
mineshkharadi333
 
PDF
Building High-Performance Oracle Teams: Strategic Staffing for Database Manag...
SMACT Works
 
PDF
Google’s NotebookLM Unveils Video Overviews
SOFTTECHHUB
 
PDF
NewMind AI Monthly Chronicles - July 2025
NewMind AI
 
PPTX
The-Ethical-Hackers-Imperative-Safeguarding-the-Digital-Frontier.pptx
sujalchauhan1305
 
PDF
Why Your AI & Cybersecurity Hiring Still Misses the Mark in 2025
Virtual Employee Pvt. Ltd.
 
PDF
Enable Enterprise-Ready Security on IBM i Systems.pdf
Precisely
 
solutions_manual_-_materials___processing_in_manufacturing__demargo_.pdf
AbdullahSani29
 
How to Build a Scalable Micro-Investing Platform in 2025 - A Founder’s Guide ...
Third Rock Techkno
 
Chapter 2 Digital Image Fundamentals.pdf
Getnet Tigabie Askale -(GM)
 
NewMind AI Weekly Chronicles - July'25 - Week IV
NewMind AI
 
ChatGPT's Deck on The Enduring Legacy of Fax Machines
Greg Swan
 
BLW VOCATIONAL TRAINING SUMMER INTERNSHIP REPORT
codernjn73
 
Unlocking the Future- AI Agents Meet Oracle Database 23ai - AIOUG Yatra 2025.pdf
Sandesh Rao
 
Automating ArcGIS Content Discovery with FME: A Real World Use Case
Safe Software
 
agentic-ai-and-the-future-of-autonomous-systems.pdf
siddharthnetsavvies
 
Accelerating Oracle Database 23ai Troubleshooting with Oracle AHF Fleet Insig...
Sandesh Rao
 
Make GenAI investments go further with the Dell AI Factory - Infographic
Principled Technologies
 
Using Anchore and DefectDojo to Stand Up Your DevSecOps Function
Anchore
 
Cloud-Migration-Best-Practices-A-Practical-Guide-to-AWS-Azure-and-Google-Clou...
Artjoker Software Development Company
 
This slide provides an overview Technology
mineshkharadi333
 
Building High-Performance Oracle Teams: Strategic Staffing for Database Manag...
SMACT Works
 
Google’s NotebookLM Unveils Video Overviews
SOFTTECHHUB
 
NewMind AI Monthly Chronicles - July 2025
NewMind AI
 
The-Ethical-Hackers-Imperative-Safeguarding-the-Digital-Frontier.pptx
sujalchauhan1305
 
Why Your AI & Cybersecurity Hiring Still Misses the Mark in 2025
Virtual Employee Pvt. Ltd.
 
Enable Enterprise-Ready Security on IBM i Systems.pdf
Precisely
 

Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015

  • 1. 1 Featured Project: The Wroclaw West Bypass, Poland Trusted by the world’s largest projects Cutting Approval Cycles From 30 Days to Ten With
  • 2. 2 Agenda Introduction Industry Success Platform Demo Q&A Luigi Chiolini, Boston Consulting Group Victoria Stanford, Nalcor Energy Steve Wilson, Aconex
  • 3. 3 Industry landscape • Large, geographically dispersed project teams • Increased demand for visibility and reporting • Efficiency to maintain competitiveness • Time is money
  • 4. 4 Project complexity Project-wide network of a major global engineering firm • Long tail of communication that is not often visible to key stakeholders including the owner or JV partner • Dispersed teams • Multiple project phases, each with critical information hand- offs • Huge margin for error • Significant inherent inefficiency * Data from the Aconex system
  • 5. 5 Boston Consulting Group process presentation This was a 15-minute BCG presentation View the complete webinar at aconex.com/Webinars
  • 6. 6 Victoria Stanford Information Management “We make a strong commitment to provide safe, reliable and dependable electricity…”
  • 7. 7 Key workflow process challenges • Cross-organization communication and visibility • Volume of information and revisions • Ensuring final docs and drawings move on to handover
  • 8. 8 The magnitude of power projects * Data based on power projects that Aconex has been involved in globally. 616,932 mails 166 organizations 6 countries 547,118 documents 2,807 users 2,256,282 decisions
  • 9. 9 Improving Nalcor delivery and business outcomes • Company-wide approach • Process definition and improvement • Using technology to support Nalcor corporate initiatives
  • 10. 10 Design review for RFP creation in the past • One reviewer at a time in a dedicated room • Multiple disciplines - civil, electric and mechanical • Mark ups on hard copy drawing • Delayed RFP over a month • Delayed contracting • Delayed construction
  • 11. 11 Design review for RFP creation with Aconex • Simultaneous reviews by multiple disciplines • 2 week turnaround on design reviews • RFPs completed and sent out on time • Contracts in place on time • Work starts on schedule
  • 12. 12 How Nalcor is using Aconex Goal: build and improve business processes • Speed up approval cycles: RFIs, Submittals, Changes • Efficiently communicate with subs and suppliers • Improve document accessibility and transmission
  • 13. 13 Aconex = transparency and accountability • Transparency means having information and data available • Accountability is taking responsibility and recognizing the decisions and actions taken by the company. • Aconex helps support transparency and accountability Nalcor is committed to being open, transparent and accountable across its operations.
  • 14. 14 Projects like Lower Churchill need collaboration to reduce risk and deliver long-term benefits $6.2 billion government infrastructure Federal government compliance Over 300 internal project team members 100+ year asset lifetime Significant employment and economic benefit Joint venture agreement Thousands of document reviews
  • 15. 15 A project-wide solution helps to standardize processes and embed best practice Documents available immediately without delay or expense of print and send Real time visibility and status reporting Easy to set up and automate Smoother document review with process and information tracking Complete document oversight Deep collaboration and accuracy across multiple organizations Manage governance and risk within complex business agreements Iron clad audit trail Permission and access controls
  • 16. 16 30 10 0 10 20 30 Without Aconex With Aconex Technical document review process (days) Improved workflow turnaround Faster document control Transmittal issue times 48X FASTER Delivering measurable value and ROI gains across the project Without Aconex With Aconex Reduced IT infrastructure costs $ Cloud-based software
  • 17. 17 Aconex collaboration Save money, increase productivity. Manage project risk. Cloud & Mobile Information & Process Management Engineering & Construction Project-Wide Across the Project Lifecycle Plan Design Construct OperateBid OperatorSub-contractorsContractorConsultantsOwner EPC Designer
  • 18. 18 One integrated collaboration platform for project information and process Owner EPC Designer Consultants Contractor Subcontractors Client Service & Support Web Mobile APIs Information & Process Management Platform Document Management 3D Modeling Field Inspections Correspondence Registers Bidding & Tenders Workflows O&M / Deliverables Site Mobility Network Integration API Reporting & Search Infrastructure 2D & 3D Viewer Archiving Operator
  • 19. 19 RFIs–limited accountability,visibility andtracking TIME Incomplete & Inefficient information capture Limited accountability & visibility Manual tracking, Reporting & Auditing RFI raised by initiator and emailed to Responder Review content, returns if incomplete SME Input entered and returned Response created and returned. SME Input reviewed Action Taken Update of RFI / TQ Log Decides is Subject Matter Expert input is required Creation of / addition to RFI / TQ Log
  • 20. 20 RFIswithAconex:control,structureandvisibility Greater process control and structure Team wide visibility Trusted Delivery RFI raised by initiator and mailed to Responder Review content, returns if incomplete SME Input entered and returned Response created and returned. SME input reviewed. Action Taken Decides is Subject Matter Expert input is required TIME Typicalcycletimereductionfrom5to2days
  • 21. 21 TIME Complete information capture Project wide visibility REQUESTOR: Creates and issues with Mail Forms APPROVER: Reviews, responds REQUESTOR: Reviews response APPROVER: Receives, approves REQUESTOR: Proceeds with changes Issues follow-up documents Process Tracking & reporting Complete audit trail Prepares Impact Assessment ChangeRequestswithAconex: fast,complete information capture TIME FUNCTIONAL LEAD: Reviews Typical cycle time reduction from 7 weeks to 1 week
  • 22. 22 The world’s most widely-used collaboration platform for engineering & construction 500 thousand users worldwide $800 billion in projects 1.1 billion documents 48 thousand companies served 70 countries around the world 40 offices globally RTD Chiyodo BG Group Tanker Pacific Leighton Welspun Bilfinger New York City Hall Reconstruction | $100M Dubai Metro | $7.8BSydney Opera House Renovation Panama Canal Expansion | $3.2B University of Montreal Hospital | $390M Denver Airport | $544M
  • 23. 23 Aconex: reducing approval cycle time This was a 20-minute platform demo in the live webinar To request a personal demo: aconex.com/Demo • Overview • RFIs • Submittals • Design reviews
  • 24. 24 Process improvement with Aconex Aconex Professional Services Delivering value through customer engagements • Process Discovery Workshop • Process Mapping & Assessment • Enterprise Deployment Standards
  • 25. 25 Featured Project: The Wroclaw West Bypass, Poland Trusted by the world’s largest projects Learn more at aconex.com/Demo With thanks to our participants from &