Resource Manager has changed a lot in Oracle Database 12c, especially if Oracle Multitenant is used. It can manage the available resources between the consumer groups in a single PDB as well as among all the PDBs. DBAs who are planning the upgrades or consolidations to Oracle Database 12c need to understand how the new resource manager works and how the existing resource management plans need to be changed to make them work in the new Oracle Multitenant configuration.
This paper will explain the differences between 11g and 12c resource manager, will dig into resource management features and limitations in 12c Oracle Multitenant, will provide guidelines for migrating your current resource management plan to 12c at the time of upgrade or consolidation, and will also reveal how much overhead the resource manager introduces.