The design of the new, decentralised heating and hot water system allowed for
the calculation of efficient energy demands for individual buildings on this large
business park. This allowed accurate energy supply negotiations with the gas
utility company. Installation of the new system was complex, but was undertaken
without any disruption of supply to the business park tenants. Workshop and
industrial buildings were fitted with gas-fired radiant heaters to heat occupants.
New
Heating
System
Heating system upgrades save £180,000 of energy annually...
A Carbon Trust funded energy
audit revealed major savings
from the renewal of aging
plant and controls...
Bretby Business Park in Derbyshire
hosts over 70 companies who employ
around 1,000 people. A Carbon Trust
funded assessment revealed the
potential for huge energy savings. The
aging and inefficient centralised steam-
based heating plant was replaced with
10 decentralised gas fired boiler houses.
The existing steam system was old
and in a poor state of repair - it was kept
fully energised all year round, which
created steam and condensate losses
continuously. Barrie Waring was
commissioned to design the new system
and also undertook the project
management of the installation.
This large project shows how major
energy savings are realised through the
replacement of old, inefficient boilers
and heating distribution systems. It was
also encouraging to note that the scale
of initial savings and cost estimates
were reasonably accurately achieved in
practice.
The total energy savings, including
some maintenance savings, amounted
to £180,000 per year, for an installation
cost of £520,000, which equates to a
simple payback period of 2.9 years.
This project aptly reiterates the
importance of upgrading aging
plant and controls to ensure
energy efficiency.
Bretby Business Park
Site Plan

More Related Content

PDF
Kerry County Council Submission on Proposal for a Sustainable Energy Community
PDF
Passive House and Renewables
PPT
community retrofit
PPTX
Alternative Heat - Technical Insights
PPSX
Broan nutone canada green initiatives 2006 2010
PDF
Superhomes 2.0 ierc conference 300317 final
PPTX
Presentation
PDF
Terry Plaisted, Automatic Heating
Kerry County Council Submission on Proposal for a Sustainable Energy Community
Passive House and Renewables
community retrofit
Alternative Heat - Technical Insights
Broan nutone canada green initiatives 2006 2010
Superhomes 2.0 ierc conference 300317 final
Presentation
Terry Plaisted, Automatic Heating

What's hot (20)

PDF
Dave Redden, Refrigeration Innovations
PDF
Butler Manufacturing - Annville Plant Profile
PDF
Ormonde Hotel case study
PPTX
Condensing Boilers: Are they cost effective?
PDF
REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)
PDF
PPTX
RaCBio concept and how can it work
PPT
SEAM Centre seminar - Sept 2010 (Part 2)
PDF
CADES_KelvinKBB_Case Study
PPT
SEAM Centre Seminar - July 2010
PPT
SEAM Centre seminar - Sept 2010 (part 1)
PPT
Tony Cotton, Johnson Tiles - Cost Effective Use of Heat Recovery
PDF
152 project book jan15
PDF
Passive House: A Primer on High Performance Buildings
PDF
Bmw manufacturing chp-project_profile1
PDF
Utility Scale to Domestic Energy Storage
PDF
Haven Energy Bridge – Electrolysing Renewable Generation to Inject Hydrogen i...
PDF
Michael Thompson, RARE Technologies
DOCX
Carnegie BPObjective-Energy
PDF
Colin Steel, Weltec Biopower
Dave Redden, Refrigeration Innovations
Butler Manufacturing - Annville Plant Profile
Ormonde Hotel case study
Condensing Boilers: Are they cost effective?
REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)
RaCBio concept and how can it work
SEAM Centre seminar - Sept 2010 (Part 2)
CADES_KelvinKBB_Case Study
SEAM Centre Seminar - July 2010
SEAM Centre seminar - Sept 2010 (part 1)
Tony Cotton, Johnson Tiles - Cost Effective Use of Heat Recovery
152 project book jan15
Passive House: A Primer on High Performance Buildings
Bmw manufacturing chp-project_profile1
Utility Scale to Domestic Energy Storage
Haven Energy Bridge – Electrolysing Renewable Generation to Inject Hydrogen i...
Michael Thompson, RARE Technologies
Carnegie BPObjective-Energy
Colin Steel, Weltec Biopower
Ad

Viewers also liked (16)

PPTX
Lukman ryan zaen
PPS
Te Adoro Aunque No Te Vea
PDF
Npc force weekly 16 july 2010
PPTX
presenter's service
PPTX
Trabajo de slideshare Derecho Romano
PPTX
Tugas ict kelompok 5
DOCX
Silabus ganjil
DOCX
Uh suhu dan kalor
DOC
1112 p2-p psp-teknik distribusi tenaga listrik (1)
PPTX
Evaluation
PDF
Uan 2003
PDF
eNew Oct 17 2012
DOCX
Alejandro javier ramirez villatoro segunda parte slideshare
PPTX
Pendahuluan
PPTX
DandC 84 p2
PDF
25 h besimcha nehalelecha
Lukman ryan zaen
Te Adoro Aunque No Te Vea
Npc force weekly 16 july 2010
presenter's service
Trabajo de slideshare Derecho Romano
Tugas ict kelompok 5
Silabus ganjil
Uh suhu dan kalor
1112 p2-p psp-teknik distribusi tenaga listrik (1)
Evaluation
Uan 2003
eNew Oct 17 2012
Alejandro javier ramirez villatoro segunda parte slideshare
Pendahuluan
DandC 84 p2
25 h besimcha nehalelecha
Ad

Similar to Dqm bretby business park.pdf copy (20)

PPT
Energy Saver Presentation
PDF
Heat Pump case studies Aspiration Energy
PDF
EnergySaver - Energy saving heating additive
DOCX
Derek Hendry WEC Biography
PDF
Leading Water Utilities Reducing Water-Energy Nexus Pressures
PDF
Schiedel Commercial Brochure
PDF
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
PDF
BCE SUPERCIRC Heater
PDF
Nutech - Killeagh
PDF
Energy Capital - Tyseley Energy Park - Prospectus
PDF
Thames_Beckton_Crossness_THPs_2014
PDF
Optimising Woodfuel Project Returns through Heat and Power Generation
PDF
Gni case study solar enhanced units2 (1) final - sep15
PDF
Donald MacBrayne, Scottish Water Horizons – Commercial Renewable and Energy S...
PDF
Exciting self build
PDF
Renewable Energy Systems For Building Professionals Great Lakes Brewing Com...
PPTX
LEED_NC and LEED_EB
PPTX
Innovative thermal energy storage technologies (Vincent O'Brien)
DOC
Appsolu
PDF
Blake Lapthorn Green Breakfast, 12 December 2012, with guest speaker Alex Fla...
Energy Saver Presentation
Heat Pump case studies Aspiration Energy
EnergySaver - Energy saving heating additive
Derek Hendry WEC Biography
Leading Water Utilities Reducing Water-Energy Nexus Pressures
Schiedel Commercial Brochure
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
BCE SUPERCIRC Heater
Nutech - Killeagh
Energy Capital - Tyseley Energy Park - Prospectus
Thames_Beckton_Crossness_THPs_2014
Optimising Woodfuel Project Returns through Heat and Power Generation
Gni case study solar enhanced units2 (1) final - sep15
Donald MacBrayne, Scottish Water Horizons – Commercial Renewable and Energy S...
Exciting self build
Renewable Energy Systems For Building Professionals Great Lakes Brewing Com...
LEED_NC and LEED_EB
Innovative thermal energy storage technologies (Vincent O'Brien)
Appsolu
Blake Lapthorn Green Breakfast, 12 December 2012, with guest speaker Alex Fla...

More from DQM Solutions Ltd (7)

PDF
DQM Review 2016
PDF
Dqm ® 2013 brochure
PDF
Dqm scottish prisons
PDF
Dqm shrewsbury school
PDF
Dqm scottish local authorities
PDF
Dqm r a irwin factory
PDF
Dqm bristol university
DQM Review 2016
Dqm ® 2013 brochure
Dqm scottish prisons
Dqm shrewsbury school
Dqm scottish local authorities
Dqm r a irwin factory
Dqm bristol university

Dqm bretby business park.pdf copy

  • 1. The design of the new, decentralised heating and hot water system allowed for the calculation of efficient energy demands for individual buildings on this large business park. This allowed accurate energy supply negotiations with the gas utility company. Installation of the new system was complex, but was undertaken without any disruption of supply to the business park tenants. Workshop and industrial buildings were fitted with gas-fired radiant heaters to heat occupants. New Heating System Heating system upgrades save £180,000 of energy annually... A Carbon Trust funded energy audit revealed major savings from the renewal of aging plant and controls... Bretby Business Park in Derbyshire hosts over 70 companies who employ around 1,000 people. A Carbon Trust funded assessment revealed the potential for huge energy savings. The aging and inefficient centralised steam- based heating plant was replaced with 10 decentralised gas fired boiler houses. The existing steam system was old and in a poor state of repair - it was kept fully energised all year round, which created steam and condensate losses continuously. Barrie Waring was commissioned to design the new system and also undertook the project management of the installation. This large project shows how major energy savings are realised through the replacement of old, inefficient boilers and heating distribution systems. It was also encouraging to note that the scale of initial savings and cost estimates were reasonably accurately achieved in practice. The total energy savings, including some maintenance savings, amounted to £180,000 per year, for an installation cost of £520,000, which equates to a simple payback period of 2.9 years. This project aptly reiterates the importance of upgrading aging plant and controls to ensure energy efficiency. Bretby Business Park Site Plan