 Occupational Standard: Natural Resources
Conservation and Development Level III
 Unit Title:- Undertake Environmental Impact
Assessment
 Unit Code AGR NCD3 03 0715
12/28/2022 1
This competence covers:
 understanding the detail process of the proposed
project and its interaction with environment locally
 analyzing the impacts (positive and negative) of each
activities of the proposed project to the environment,
 identifying of the mitigation measures (avoid, reduce,
replace, restore and compensate) and their
implementation procedures and system of auditing
the compliance/fulfillment.
To do these; It requires knowledge of
 environmental law,
 policies and regulation;
 environmental management techniques,
 environmental valuation,
 sustainable development,
 system thinking,
 carrying out cost benefit analysis.
12/28/2022 2
 (EIA) – The systematic, reproducible and
interdisciplinary identification, prediction and
evaluation, mitigation and management of
impacts from a proposed development and
its reasonable alternatives
-Is a formal process for identifying:- likely
effects of activities or projects on the
environment, and on human health and
welfare
-The process concerned with all types of
impacts
direct & indirect,
short term & long term,
adverse & beneficial and
Cumulative
12/28/2022 3
Objectives of EIA
 Short term
 To improve the environmental design of the
proposal;
 To Ensure the appropriate and efficient use of
resources
 To identify appropriate measures for
mitigating the potential impacts of the
proposal; and
 To inform the process of decision-making by
identifying the potentially significant
environmental effects and risks of
development proposals.
12/28/2022 4
Long term
 To promote sustainable development
◦ Economic benefit
◦ Social benefit Sustainable development
◦ Environmental benefit
 To protect human health and safety;
 To avoid irreversible changes and serious
damage to the environment;
 To safeguard valued resources, natural areas and
ecosystem components; and
 To enhance the social aspects of the proposal.
12/28/2022 5
Current
Benefits
Sustainab
ly
develope
d
Future
Benefits
 Purposive- EIA should
meet its aim
 Certainty: The process
and timing of the
assessment adjust by
all participants.
 Integrated (social,
economic and
biophysical aspects)
 Adaptive- focuses on
the realities
 Rigorous- best
practicable
methodologies to
address the impacts
 Credibility/Interdiscipli
nary : Assessment is
undertaken with
professionalism and
objectivity.
 Cost-
effectiveness/Efficient
 Accountability
 Practical
 Participative
 Transparency
 Relevant
 Focused -
12/28/2022 6
Acquisition of project proposal and
EIA report
EIA Report
 The EIA report should
contain a brief introduction
explaining the need for and
context of the project.
 Contents:-
 Executive Summary
 Policy, Legal and
Administrative Framework
 Description of the
environment
 Description of the Proposed
Project in detail
 Significant Environmental
Impacts
 Socio-economic analysis of
Project Impacts
 Identification and Analysis
of Alternatives
 Mitigation
Action/Mitigation
Management Plan
 Environmental
Management and Training
 Monitoring Program
 Public Involvement
 List of References
 Terms of Reference
 Consulting team
composition
 Notes of Public
Consultation sessions
12/28/2022 7
 We will get the information that will be carried out
during the project implementation from the EIS.
Environmental Impact Statement (EIS).
 -Is a comprehensive document that reports the findings
of the EIA and
 required by law before a new project can proceed.
 usually prepared by the project on behalf of the proponent (usually
by consultants),
 focuses on the issues most relevant to decision-making
Types •
 Volume 1 - a comprehensive and concise document
drawing together all relevant information regarding the
development project;
 Non-Technical Summary (NTS) - a brief report of
volume 1 in non-technical language that can easily be
understood by the public;
 Volume 2 - a volume that contains a detailed
assessment of the significant environmental effects.
(Not necessary when there are no significant effects
either before or after mitigation).
12/28/2022 8
The positive and negative interaction of activities
with the environment
 To identify the interaction of activity
Interdisciplinary team is important.
Beneficial Impact
 Employment opportunity to local people
 Increase in income and
 Improve living standard for individual
 increase in agricultural products
 Impact on agro-based local economy
 Impact on landless farmers and small
landholders
 Appreciation of Land Value
 Enhancement of technical skill
 Other
12/28/2022 9
Negative/
adverse impacts
 Land use
 Geology, topography
and soils
 Hydrology and water
quality
 Air quality
 Climate change
 Ecology: terrestrial
and aquatic
 Noise and vibration
 Socio-economics
 Transport
 Landscape, visual
quality
 Historic environment
 Recreation and
amenity
12/28/2022 10
Initial Environmental Examination or Evaluation (IEE)
 is a report containing brief, preliminary evaluation of the
types of impacts (direct & indirect, short term & long term,
adverse & beneficial and Cumulative) that would result
from an action.
 It often used as a screening process to assess whether or
not proposals should undergo full scale EIA.
 It determine whether potentially adverse environmental
effects are identified or whether mitigation measures can be
adopted to reduce or eliminate these adverse effects.
 contains a brief statement of key environmental issues,
 used in the early (pre-feasibility) phase of project planning.
 It suggests whether or not depth studies are needed.
 The general objectives of IEE study should at least cover
the following
12/28/2022 11
 To provide information on
 the general environmental settings of the project
area as baseline data;
 potential impacts of the project and the
characteristic of the impacts, magnitude,
distribution, who will be the affected group, and
their duration;
 potential mitigation measures including
mitigation costs;
 the best alternative project at most benefits and
least costs in terms of financial, social, and
environment.
 formulating management and monitoring plan
12/28/2022 12
 water scarcity
 land degradation
 tropical forest clearance
 species loss and
 climate warming
12/28/2022 13
are global issues,
they affect all
countries
are concentrated
regionally and thus
affect only certain
countries
Major environmental issues in developing regions
Developing
Countries
Major Environmental Issues
Africa desertification and soil degradation, declining food
security, and increasing water scarcity
Eastern Europe and
Central Asia
industrial pollution and contaminated land
Latin America and
the Caribbean
the destruction of tropical forests and loss of biodiversity
Middle East Desertification, nutrient deposition,air and water pollution
 Another way of subdividing environmental issues
is to group them under green and brown agendas.
 The green agenda focuses on natural resource
management and environmental protection issues,
such as rural land and water use, forestry and
fisheries and habitat and species conservation.
 The brown agenda is concerned with issues of
industrial pollution, waste management and urban
development.
12/28/2022 14
 Stakeholders – those who may be potentially
affected benefited by a proposal.
local people
 the proponent
 government agencies
 NGOs
 donors
 Decision makers
 experts
12/28/2022 15
Identification and determination of mitigation
measures
 Mitigation:- Mitigation is the activity done to
avoid, minimize or offset predicted adverse
impacts.
 For each potential adverse impact the plan for
its mitigation at each stage of the project
should be documented and costed
 to be successful Mitigation measures must be
translated into action in the correct way and at
the right time
 A written plan should be prepared for this
purpose, and includes a schedule of agreed
actions
12/28/2022 16
 Avoid, Replace, Reduce, Restore and
Compensate
Carrying out feasibility studies
 Cost benefit analysis (CBA)-A method of
comparing alternative actions according to the
relative costs incurred (technical,
environmental and economic) and the relative
benefits gained
12/28/2022 17
Develop Environmental Action Plan or
Environmental Management Plan
 Environmental Management Plan (EMP) -is a
detailed plan and schedule of measures
necessary to minimize, mitigate, etc. any
potential environmental impacts identified by
the EIA.
 Should consist of a set of mitigation,
monitoring, cost needed and institutional
measures to be taken during the
implementation and operation of the
proposed project to eliminate adverse
environmental impacts
12/28/2022 18
Impact management plan – A structured
management plan that outlines the
mitigation, monitoring and management
requirements arising from an environmental
impact assessment.
 For each potential adverse impact the plan
for its mitigation at each stage of the project
should be documented and its cost assessed.
It is essential that these costs of mitigation
be adequately assessed and be fully
documented.
12/28/2022 19
 Environmental monitoring is the systematic measurement
of key environmental indicators over time within a
particular geographic area (World Bank, 1999).
 Monitoring should focus on the most significant impacts
identified in the EIA.
 Monitoring should be regular and performed
over a long period of duration
 The main aim of EIA monitoring is
 providing information required to ensure the project
implementation has to be the least possible negative
impacts on the people and environment
12/28/2022 20
What to avoid in monitoring:
 Overestimation of data needed as this can lead to
drowning in data without information.
 Under-estimation of time and cost for data
analysis
 Weak coordination between the data collection
with project time table and seasonal factors
 Ignoring requirements for baselines
 Types of monitoring.
 Baseline Monitoring: A survey should be conducted on
basic environmental parameters in the area surrounding
the proposed project before construction begins.
Subsequent monitoring can assess the changes in those
parameters over time against the baseline.
12/28/2022 21
 Impact Monitoring: The biophysical and socio-
economical (including public health) parameters within
the project area, must be measured during the project
construction and operational phases in order to detect
environmental changes, which may have occurred as a
result of project implementation e.g. air emission, dust,
noise, water pollution etc (European Commission, 1999
 Compliance Monitoring: This form of monitoring
employs a periodic sampling method, or continuous
recording of specific environmental quality indicators or
pollution levels to ensure project compliance with
recommended environmental protection standards
12/28/2022 22
The monitoring program should clearly state
the:
 Institutional arrangements for carrying out
the work
 Parameters to be monitored
 Methods to be employed
 Standards or guidelines to be used
 Evaluation of the results
 Schedule and duration of monitoring
 Initiation of action necessary to limit adverse
impacts disclosed by monitoring
 Format and frequency of reporting
12/28/2022 23
 Is a management tool comprising a
systematic, documented, periodic and
objective evaluation of the performance of
the organization, management system and
processes designed to protect the
environment.
 Is the systematic examination of the
interaction between any business operation
and its surrounding; this includes all
emissions to air, land and water legal
constraints; the effects on the neighboring
community, landscape and ecology; and the
public's perception of the operating company
in the local area.
12/28/2022 24
Goals of environmental auditing :
 Identify and document facility compliance
status
 Improve overall environmental performance
at facilities
 Assist facility management
 Increase environmental awareness
throughout the company
 Identify and assess environmental risks
 Optimize Resources
 Provide assurance to senior management.
12/28/2022 25
 compliance audit - the most common type of
audit consisting of checks against environmental
legislation and company policy;
 issues audit - an evaluation of how a company's
activities relate to an environmental issue or (e.g.
global pollution, energy use) or an evaluation of
a specific issue (e.g. buildings, supplies);
 health and safety audit - an assessment of risks
and contingency planning (sometimes merged
with environmental auditing because of the
interconnected impacts of industrial processes
and hazards);
 site audit - an audit of a particular site to
examine actual or potential environmental
problems;
 corporate audit - an audit of the whole company
and its polices, structures, procedures and
practices;
12/28/2022 26
 due diligence audit - an assessment of
potential environmental and financial risks
and liabilities carried out before a company
merger or site acquisition or divestiture (e.g.
contaminated land remediation costs);
 activity or operational audit - an assessment
of activities that may cross company
departments or units (e.g. energy or waste
management) and
 Product or life cycle audit - an analysis of
environmental impacts of a product
throughout all stages of its design,
production, use and disposal, including its
reuse and recycling (cradle to grave).
12/28/2022 27
 External audit - 'An assessment of the
condition of the local environment, usually
resulting in a State of the Environment Report
 Internal audit - consisting of two areas:
 'Policy Impact Assessment - a review of the activities
(objectives, services, practices and policies) of the
authority' and
 'Management Audit - a review of the procedures and
structures by which environmental policies are
managed by the authority'.
12/28/2022 28
Pre-audit stage
 full management commitment;
 setting overall goals, objectives, scope and priorities;
 selecting a team to ensure objectivity and
professional competence;
Audit stage
 on-site audit, well defined and systematic using
protocols or checklists;
 review of documents and records;
 review of policies;
 interviews;
 site inspection;
Post- audit stage
 evaluation of findings;
 reporting with recommendations;
 preparation of an action plan; and
 Follow-up.
 12/28/2022 29
END

More Related Content

PDF
environmentalimpactassessmenteia-210826024951.pdf
PPT
Environmental impact assessment (eia)
PPTX
Environmental impact assessment 2020
PPTX
Environmental-awareness Training-pptx.pptx
PPTX
FUNCTIONS OF EPA
PPTX
Environmental impact assessment in oil & gas industry
PPTX
37363981311111112212-EIA-in-Oil-Gas.pptx
PPTX
INTRODUCTION TO ENVIRONMENTAL IMPACT ASSESSMENT 2.pptx
environmentalimpactassessmenteia-210826024951.pdf
Environmental impact assessment (eia)
Environmental impact assessment 2020
Environmental-awareness Training-pptx.pptx
FUNCTIONS OF EPA
Environmental impact assessment in oil & gas industry
37363981311111112212-EIA-in-Oil-Gas.pptx
INTRODUCTION TO ENVIRONMENTAL IMPACT ASSESSMENT 2.pptx

Similar to EIA 2013.pptx (20)

PPTX
Introduction to Environmental Impact Assessment.pptx
PPT
Chapter-1.ppt
PDF
Environment impact assessment in environment impact assessment
PPTX
EIA Report Preparation and its Challenges.pptx
PPT
Environmental Impact Assessment, chapter-5.ppt
DOCX
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
PPTX
Environmental management
DOCX
Question
PPTX
EIA PPT.pptx
PDF
EIA PPT.pdf
PPTX
environmental impact assesment
PPTX
Environmental impact assessment m5
PDF
Lec environmental impacts of projects 3.pdf
PDF
What is an Environmental Clearance Certificate and How to Obtain It.pdf
PPTX
PPTX
PRESENTATION ON ENIVERONMENTAL IMPACT ASSESSMENT (EIA).pptx
PPT
Contemporary issues in environmental impact assessment
PPTX
Strategic Environmental Assessment Methodology
PDF
IISC 3-4
Introduction to Environmental Impact Assessment.pptx
Chapter-1.ppt
Environment impact assessment in environment impact assessment
EIA Report Preparation and its Challenges.pptx
Environmental Impact Assessment, chapter-5.ppt
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
Environmental management
Question
EIA PPT.pptx
EIA PPT.pdf
environmental impact assesment
Environmental impact assessment m5
Lec environmental impacts of projects 3.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdf
PRESENTATION ON ENIVERONMENTAL IMPACT ASSESSMENT (EIA).pptx
Contemporary issues in environmental impact assessment
Strategic Environmental Assessment Methodology
IISC 3-4
Ad

Recently uploaded (20)

PPTX
Targeted drug delivery system 1_44299_BP704T_03-12-2024.pptx
PPTX
Spectroscopic Techniques for M Tech Civil Engineerin .pptx
PDF
cell_morphology_organelles_Physiology_ 07_02_2019.pdf
PDF
Exploring PCR Techniques and Applications
PDF
Cosmology using numerical relativity - what hapenned before big bang?
PPTX
LIPID & AMINO ACID METABOLISM UNIT-III, B PHARM II SEMESTER
PPTX
The Female Reproductive System - Grade 10 ppt
PPTX
Chapter 1 Introductory course Biology Camp
PPTX
Thyroid disorders presentation for MBBS.pptx
PPTX
ELISA(Enzyme linked immunosorbent assay)
PPTX
BPharm_Hospital_Organization_Complete_PPT.pptx
PDF
No dilute core produced in simulations of giant impacts on to Jupiter
PPTX
limit test definition and all limit tests
PPTX
02_OpenStax_Chemistry_Slides_20180406 copy.pptx
PPTX
Preformulation.pptx Preformulation studies-Including all parameter
PDF
Science Form five needed shit SCIENEce so
PDF
Geothermal Energy: Unlocking the Earth’s Heat for Power (www.kiu.ac.ug)
PPTX
EPILEPSY UPDATE in kkm malaysia today new
PDF
Chapter 3 - Human Development Poweroint presentation
PPTX
Arterial Blood Pressure_Blood Flow_Hemodynamics.pptx
Targeted drug delivery system 1_44299_BP704T_03-12-2024.pptx
Spectroscopic Techniques for M Tech Civil Engineerin .pptx
cell_morphology_organelles_Physiology_ 07_02_2019.pdf
Exploring PCR Techniques and Applications
Cosmology using numerical relativity - what hapenned before big bang?
LIPID & AMINO ACID METABOLISM UNIT-III, B PHARM II SEMESTER
The Female Reproductive System - Grade 10 ppt
Chapter 1 Introductory course Biology Camp
Thyroid disorders presentation for MBBS.pptx
ELISA(Enzyme linked immunosorbent assay)
BPharm_Hospital_Organization_Complete_PPT.pptx
No dilute core produced in simulations of giant impacts on to Jupiter
limit test definition and all limit tests
02_OpenStax_Chemistry_Slides_20180406 copy.pptx
Preformulation.pptx Preformulation studies-Including all parameter
Science Form five needed shit SCIENEce so
Geothermal Energy: Unlocking the Earth’s Heat for Power (www.kiu.ac.ug)
EPILEPSY UPDATE in kkm malaysia today new
Chapter 3 - Human Development Poweroint presentation
Arterial Blood Pressure_Blood Flow_Hemodynamics.pptx
Ad

EIA 2013.pptx

  • 1.  Occupational Standard: Natural Resources Conservation and Development Level III  Unit Title:- Undertake Environmental Impact Assessment  Unit Code AGR NCD3 03 0715 12/28/2022 1
  • 2. This competence covers:  understanding the detail process of the proposed project and its interaction with environment locally  analyzing the impacts (positive and negative) of each activities of the proposed project to the environment,  identifying of the mitigation measures (avoid, reduce, replace, restore and compensate) and their implementation procedures and system of auditing the compliance/fulfillment. To do these; It requires knowledge of  environmental law,  policies and regulation;  environmental management techniques,  environmental valuation,  sustainable development,  system thinking,  carrying out cost benefit analysis. 12/28/2022 2
  • 3.  (EIA) – The systematic, reproducible and interdisciplinary identification, prediction and evaluation, mitigation and management of impacts from a proposed development and its reasonable alternatives -Is a formal process for identifying:- likely effects of activities or projects on the environment, and on human health and welfare -The process concerned with all types of impacts direct & indirect, short term & long term, adverse & beneficial and Cumulative 12/28/2022 3
  • 4. Objectives of EIA  Short term  To improve the environmental design of the proposal;  To Ensure the appropriate and efficient use of resources  To identify appropriate measures for mitigating the potential impacts of the proposal; and  To inform the process of decision-making by identifying the potentially significant environmental effects and risks of development proposals. 12/28/2022 4
  • 5. Long term  To promote sustainable development ◦ Economic benefit ◦ Social benefit Sustainable development ◦ Environmental benefit  To protect human health and safety;  To avoid irreversible changes and serious damage to the environment;  To safeguard valued resources, natural areas and ecosystem components; and  To enhance the social aspects of the proposal. 12/28/2022 5 Current Benefits Sustainab ly develope d Future Benefits
  • 6.  Purposive- EIA should meet its aim  Certainty: The process and timing of the assessment adjust by all participants.  Integrated (social, economic and biophysical aspects)  Adaptive- focuses on the realities  Rigorous- best practicable methodologies to address the impacts  Credibility/Interdiscipli nary : Assessment is undertaken with professionalism and objectivity.  Cost- effectiveness/Efficient  Accountability  Practical  Participative  Transparency  Relevant  Focused - 12/28/2022 6
  • 7. Acquisition of project proposal and EIA report EIA Report  The EIA report should contain a brief introduction explaining the need for and context of the project.  Contents:-  Executive Summary  Policy, Legal and Administrative Framework  Description of the environment  Description of the Proposed Project in detail  Significant Environmental Impacts  Socio-economic analysis of Project Impacts  Identification and Analysis of Alternatives  Mitigation Action/Mitigation Management Plan  Environmental Management and Training  Monitoring Program  Public Involvement  List of References  Terms of Reference  Consulting team composition  Notes of Public Consultation sessions 12/28/2022 7
  • 8.  We will get the information that will be carried out during the project implementation from the EIS. Environmental Impact Statement (EIS).  -Is a comprehensive document that reports the findings of the EIA and  required by law before a new project can proceed.  usually prepared by the project on behalf of the proponent (usually by consultants),  focuses on the issues most relevant to decision-making Types •  Volume 1 - a comprehensive and concise document drawing together all relevant information regarding the development project;  Non-Technical Summary (NTS) - a brief report of volume 1 in non-technical language that can easily be understood by the public;  Volume 2 - a volume that contains a detailed assessment of the significant environmental effects. (Not necessary when there are no significant effects either before or after mitigation). 12/28/2022 8
  • 9. The positive and negative interaction of activities with the environment  To identify the interaction of activity Interdisciplinary team is important. Beneficial Impact  Employment opportunity to local people  Increase in income and  Improve living standard for individual  increase in agricultural products  Impact on agro-based local economy  Impact on landless farmers and small landholders  Appreciation of Land Value  Enhancement of technical skill  Other 12/28/2022 9
  • 10. Negative/ adverse impacts  Land use  Geology, topography and soils  Hydrology and water quality  Air quality  Climate change  Ecology: terrestrial and aquatic  Noise and vibration  Socio-economics  Transport  Landscape, visual quality  Historic environment  Recreation and amenity 12/28/2022 10
  • 11. Initial Environmental Examination or Evaluation (IEE)  is a report containing brief, preliminary evaluation of the types of impacts (direct & indirect, short term & long term, adverse & beneficial and Cumulative) that would result from an action.  It often used as a screening process to assess whether or not proposals should undergo full scale EIA.  It determine whether potentially adverse environmental effects are identified or whether mitigation measures can be adopted to reduce or eliminate these adverse effects.  contains a brief statement of key environmental issues,  used in the early (pre-feasibility) phase of project planning.  It suggests whether or not depth studies are needed.  The general objectives of IEE study should at least cover the following 12/28/2022 11
  • 12.  To provide information on  the general environmental settings of the project area as baseline data;  potential impacts of the project and the characteristic of the impacts, magnitude, distribution, who will be the affected group, and their duration;  potential mitigation measures including mitigation costs;  the best alternative project at most benefits and least costs in terms of financial, social, and environment.  formulating management and monitoring plan 12/28/2022 12
  • 13.  water scarcity  land degradation  tropical forest clearance  species loss and  climate warming 12/28/2022 13 are global issues, they affect all countries are concentrated regionally and thus affect only certain countries Major environmental issues in developing regions Developing Countries Major Environmental Issues Africa desertification and soil degradation, declining food security, and increasing water scarcity Eastern Europe and Central Asia industrial pollution and contaminated land Latin America and the Caribbean the destruction of tropical forests and loss of biodiversity Middle East Desertification, nutrient deposition,air and water pollution
  • 14.  Another way of subdividing environmental issues is to group them under green and brown agendas.  The green agenda focuses on natural resource management and environmental protection issues, such as rural land and water use, forestry and fisheries and habitat and species conservation.  The brown agenda is concerned with issues of industrial pollution, waste management and urban development. 12/28/2022 14
  • 15.  Stakeholders – those who may be potentially affected benefited by a proposal. local people  the proponent  government agencies  NGOs  donors  Decision makers  experts 12/28/2022 15
  • 16. Identification and determination of mitigation measures  Mitigation:- Mitigation is the activity done to avoid, minimize or offset predicted adverse impacts.  For each potential adverse impact the plan for its mitigation at each stage of the project should be documented and costed  to be successful Mitigation measures must be translated into action in the correct way and at the right time  A written plan should be prepared for this purpose, and includes a schedule of agreed actions 12/28/2022 16
  • 17.  Avoid, Replace, Reduce, Restore and Compensate Carrying out feasibility studies  Cost benefit analysis (CBA)-A method of comparing alternative actions according to the relative costs incurred (technical, environmental and economic) and the relative benefits gained 12/28/2022 17
  • 18. Develop Environmental Action Plan or Environmental Management Plan  Environmental Management Plan (EMP) -is a detailed plan and schedule of measures necessary to minimize, mitigate, etc. any potential environmental impacts identified by the EIA.  Should consist of a set of mitigation, monitoring, cost needed and institutional measures to be taken during the implementation and operation of the proposed project to eliminate adverse environmental impacts 12/28/2022 18
  • 19. Impact management plan – A structured management plan that outlines the mitigation, monitoring and management requirements arising from an environmental impact assessment.  For each potential adverse impact the plan for its mitigation at each stage of the project should be documented and its cost assessed. It is essential that these costs of mitigation be adequately assessed and be fully documented. 12/28/2022 19
  • 20.  Environmental monitoring is the systematic measurement of key environmental indicators over time within a particular geographic area (World Bank, 1999).  Monitoring should focus on the most significant impacts identified in the EIA.  Monitoring should be regular and performed over a long period of duration  The main aim of EIA monitoring is  providing information required to ensure the project implementation has to be the least possible negative impacts on the people and environment 12/28/2022 20
  • 21. What to avoid in monitoring:  Overestimation of data needed as this can lead to drowning in data without information.  Under-estimation of time and cost for data analysis  Weak coordination between the data collection with project time table and seasonal factors  Ignoring requirements for baselines  Types of monitoring.  Baseline Monitoring: A survey should be conducted on basic environmental parameters in the area surrounding the proposed project before construction begins. Subsequent monitoring can assess the changes in those parameters over time against the baseline. 12/28/2022 21
  • 22.  Impact Monitoring: The biophysical and socio- economical (including public health) parameters within the project area, must be measured during the project construction and operational phases in order to detect environmental changes, which may have occurred as a result of project implementation e.g. air emission, dust, noise, water pollution etc (European Commission, 1999  Compliance Monitoring: This form of monitoring employs a periodic sampling method, or continuous recording of specific environmental quality indicators or pollution levels to ensure project compliance with recommended environmental protection standards 12/28/2022 22
  • 23. The monitoring program should clearly state the:  Institutional arrangements for carrying out the work  Parameters to be monitored  Methods to be employed  Standards or guidelines to be used  Evaluation of the results  Schedule and duration of monitoring  Initiation of action necessary to limit adverse impacts disclosed by monitoring  Format and frequency of reporting 12/28/2022 23
  • 24.  Is a management tool comprising a systematic, documented, periodic and objective evaluation of the performance of the organization, management system and processes designed to protect the environment.  Is the systematic examination of the interaction between any business operation and its surrounding; this includes all emissions to air, land and water legal constraints; the effects on the neighboring community, landscape and ecology; and the public's perception of the operating company in the local area. 12/28/2022 24
  • 25. Goals of environmental auditing :  Identify and document facility compliance status  Improve overall environmental performance at facilities  Assist facility management  Increase environmental awareness throughout the company  Identify and assess environmental risks  Optimize Resources  Provide assurance to senior management. 12/28/2022 25
  • 26.  compliance audit - the most common type of audit consisting of checks against environmental legislation and company policy;  issues audit - an evaluation of how a company's activities relate to an environmental issue or (e.g. global pollution, energy use) or an evaluation of a specific issue (e.g. buildings, supplies);  health and safety audit - an assessment of risks and contingency planning (sometimes merged with environmental auditing because of the interconnected impacts of industrial processes and hazards);  site audit - an audit of a particular site to examine actual or potential environmental problems;  corporate audit - an audit of the whole company and its polices, structures, procedures and practices; 12/28/2022 26
  • 27.  due diligence audit - an assessment of potential environmental and financial risks and liabilities carried out before a company merger or site acquisition or divestiture (e.g. contaminated land remediation costs);  activity or operational audit - an assessment of activities that may cross company departments or units (e.g. energy or waste management) and  Product or life cycle audit - an analysis of environmental impacts of a product throughout all stages of its design, production, use and disposal, including its reuse and recycling (cradle to grave). 12/28/2022 27
  • 28.  External audit - 'An assessment of the condition of the local environment, usually resulting in a State of the Environment Report  Internal audit - consisting of two areas:  'Policy Impact Assessment - a review of the activities (objectives, services, practices and policies) of the authority' and  'Management Audit - a review of the procedures and structures by which environmental policies are managed by the authority'. 12/28/2022 28
  • 29. Pre-audit stage  full management commitment;  setting overall goals, objectives, scope and priorities;  selecting a team to ensure objectivity and professional competence; Audit stage  on-site audit, well defined and systematic using protocols or checklists;  review of documents and records;  review of policies;  interviews;  site inspection; Post- audit stage  evaluation of findings;  reporting with recommendations;  preparation of an action plan; and  Follow-up.  12/28/2022 29 END