ELECTRICAL SAFETY – WHY NEEDED?
ELECTROCUTION KILLS NEARLY 30 INDIANS A DAY.
 The highest number of cases is observed in the age group of
21-30 years.
 Thousand crores of rupees is spent on compensation
and maintenance due to electrical accidents in various
Power Plants in the country.
ELECTRICAL SAFETY
 Electrical is a highly versatile form of energy but only when used properly.
 Failure to take suitable precautions in its use may result in bodily injury or property
damage or both.
 Control of electrical hazards is neither difficult nor expensive, but ignoring or
neglecting them may lead to serious accidents.
HUMAN INJURIES DUE TO ELECTRICITY
Most common injuries due to electricity are:
 Electric shock - The flow of electricity through human body may lead to electric shock.
 Burning - Body parts can get burnt due to short circuit or fire caused from short circuit.
EFFECT OF CURRENT IN HUMAN BODY
> 3 mA : PAINFUL SHOCK
> 10 mA : MUSCLE CONTRACTION
> 20 mA : SEVERE SHOCK
> 30 mA : LUNG PARALYSIS –
USUALLY TEMPORARY
> 50 mA : POSSIBLE VENTRICULAR FIBRILLATION
(USUALLY FATAL)
100 mA to 4 Amps : CERTAIN VENTRICULAR FIBRILLATION (FATAL)
> 4 Amps : HEART PARALYSIS, SEVERE BURNS
MAIN CAUSES OF ELECTRICAL HAZARD
 Inadequate or substandard quality use of Personal Protective Equipment (PPEs).
 Electrocution in houses are frequent due to lack of
proper safety devices like MCB, RCCB, ELCB etc.
 Usage of substandard quality of electrical wires.
 Short Circuiting due to lack of maintenance schedule.
 Lack of proper earthing system.
 Illegal construction of buildings in proximity to existing lines.
 Unguarded distribution transformers in crowded area.
 Unauthorized digging where underground cables are buried.
 Non-compliance of safe clearances from live conductors.
VOLTAGE RANGE
LOW VOLTAGE : Upto 250 V
MEDIUM VOLTAGE : > 250 – 650 V
HIGH VOLTAGE : > 650 – 33 kV
> 10 kV (For DC)
EXTRA HIGH VOLTAGE : > 33 kV – 765 kV
ULTRA HIGH VOLTAGE : > 765 kV
CONSTITUTION OF CEA
CENTRAL ELECTRICITY AUTHORITY (CEA) is a statutory organization
constituted under section 3(1) of Electricity Supply Act 1948, which has been superseded
by section 70(1) of The Electricity Act 2003.
CEA advises the government on policy matters and formulates plans for the development
of electricity systems.
Regulate measures relating to SAFETY and ELECTRIC SUPPLY in India.
Website: cea.nic.in
IMPORTANT SAFETY RULES – IE RULES 1956
Every rule in the Indian Electricity Rules, 1956 is related either directly or indirectly to Safety.
RULE-32
 Switches on live conductor.
 Code of practice of wiring shall be followed while marking the conductors - IS 732 (1989).
SWITCH PROVIDED ON LIVE CONDUCTOR (PHASE)
IMPORTANT SAFETY RULES – IE RULES 1956
RULE-35 : DANGER NOTICES.
The owner of every medium, high and extra-high voltage installation shall affix permanently in a
conspicious position a danger notice in Hindi or English and the local language of the district, with a
sign of skull and bones of a design as per the relevant standards.
IMPORTANT SAFETY RULES – IE RULES 1956
RULE-50
Energy shall not be supplied, transformed, converted or used unless the following
provisions are observed,
 A suitable linked switch or circuit breaker is erected at the secondary side of the
transformer.
 Every circuit is protected by a suitable cut-out.
 Supply to each motor or group of motors is controlled by a linked switch or
circuit breaker.
 Adequate precautions are taken to ensure that no live parts are exposed.
PROTECTION RELAY CIRCUIT
FAULT CURRENT PATH THROUGH HUMAN BODY MOTOR PROTECTION CIRCUIT
SPECIAL PROVISIONS IN HV & EHV INSTALLATIONS
RULE-63
 Approval of Inspector is necessary before energizing any high voltage installations.
RULE-64
 All apparatus and equipment intended to be used at high or extra high voltage shall be inaccessible except to an
authorized person.
 A suitable segregation shall be provided for licensee’s equipment.
 A suitable soak pit or arrangement to drain out the leaked oil shall be made in sub-stations where the transformers
are provided.
 Cable trench shall be filled with sand or other non-flammable material and covered by bricks.
TRANSFORMER OIL SOAK PIT
CABLE TRENCH FILLED WITH SAND
SPECIAL PROVISIONS IN HV & EHV INSTALLATIONS
RULE-65
 The installation must be subjected to the prescribed testing before energizing.
RULE-66
 Conductors shall be enclosed in a metallic covering and suitable circuit breakers shall be provided to
protect the equipment from overloading.
RULE-68
 In case of outdoor type of sub-station, a metallic fencing of not less than 1.8 m height shall be erected
around the transformer.
METALLIC FENCING AROUND TRANSFORMER
SAFETY MEASURES IN CEA REGULATIONS
SAFETY PROVISIONS
HUMAN
SAFETY
EQUIPMENT
SAFETY
HUMAN SAFETY
SALIENT POINTS
 Register of designated persons to be maintained properly and kept up to date.
 Panel enclosures shall be made fire-proof.
 Switches on live conductors.
 Direct line on neutral in 1ɸ supply.
 Green wire in earthing line.
 ELCB/RCCB in each circuit.
 Display of “Danger notice” in local language/Hindi.
 Insulating floor mats before switchgear panels.
 Identification of front & rear panels.
 Placement of Fire buckets filled with sand/Fire extinguishers and First Aid boxes with proper
marking at convenient places. Also, First Aid training to be provided.
 Flexible cables to be used for portable or transportable equipment.
 Display of Shock Treatment Chart at conspicuous places.
 Minimum 100 cms clear space in front of switchboard and 75 cms space behind the board.
 Proper identification and distinguishing between live and neutral conductor.
 Trenches inside Sub-station to be filled with non-inflammable material.
 Baffle walls of 4 hours fire rating to be provided around power transformer.
 Fencing of 1.8 mtrs or more height around Sub-station. Handrails to be earthed.
 Overhead conductor clearances to be maintained.
 Earthing of guard & stay wires.
 Clearances from different regulatory bodies.
SHOCK TREATMENT CHART
EQUIPMENT SAFETY
SALIENT POINTS
 Measurement of earth resistance twice a year.
 Neutral of generator and transformers to be earthed at two different points.
 Motor and metallic coverings earthing at two different points.
 Testing of earth electrodes.
 Regular checking of all protections & interlocks.
 Periodic testing of transformer oil samples.
 Protection checking of transformers and its lightning arrestors.
 Healthiness checking of all EHV equipment at regular intervals.
 RLA (Residual Life Assessment) study of old equipment (> 20 years).
 Record maintenance of Routine & Factory tests of equipment.
 Oil soak pits for transformers with oil capacity > 2000 litres.
 Separate cable trays for AC/DC/Control/Power cables.
 Horizontal clearances to be maintained between overhead conductors
considering wind pressure.
REGULATION – 41 (RULE. 61) : CONNECTION WITH EARTH
 Earthing by minimum two separate & distinct connections with minimum two
different earth electrodes.
 Earth electrodes shall be inter connected to reduce the earth resistance.
 Neutral conductor shall also be earthed at one or more points along with
distribution system or service line.
 System supply by concentric cable, external conductor earthed by separate &
distinct connections.
Minimum two or more earth pits to be made to ensure proper grounding of the system.
EARTHING PROVISIONS AND SAFETY
EARTHING PROVISIONS AND SAFETY
REGULATION – 41 (RULE. 61) : CONNECTION WITH EARTH
Equipment Earthing: Metallic body/frame of all electrical equipment such as Generator, Transformer,
Motor (stationary & portable), Welding Transformers, etc should be earthed with two separate & distinct
connections with earth.
Neutral point of Generators & Transformers Earthing: Connecting it to earthing system by not less
than two separate & distinct connections.
EARTHING PROVISIONS AND SAFETY
REGULATION – 41 (RULE. 61) : CONNECTION WITH EARTH
Protective Frame/Conduit/Junction box Earthing: All metallic junction box, metal casing, metallic
covering throughout the length & 3rd pin of socket shall be earthed up to 250V.
Rule. 61(5)-Measurement of Earth resistance: Earthing resistance shall be measured on dry day
during dry season not less than once in two years.
CONDUIT EARTHING JUNCTION BOX EARTHING
REGULATION – 42 (RULE. 61A) : PROVISION OF ELCB
All LV installations (Up to 250 V) of 5 kW & above rating shall be controlled by earth leakage
protective device to disconnect supply instantly of earth fault or leakage.
REGULATION – 47 : EARTHING OF METAL SHEATHED ELECTRIC SUPPLY LINE
Earthing of metal sheathed electric supply line other than overhead lines voltage exceeding 650V,
outer metal sheathing shall be earthed.
EARTH LEAKAGE PROTECTIVE DEVICE
ELCB
METAL SHEATHED CABLE
APPARATUS EARTHING – STEP & TOUCH POTENTIAL
REGULATION – 48 : VOLTAGE EXCEEDING 650 V.
 All not carrying current metallic part of the associate installation of voltage exceeding 650 V shall be earthed to a
grounding system or mat,
i) Limit to touch the Step & Touch potential.
ii) Limit to ground potential rise to tolerable values
so as to prevent danger due to transfer of potential
through ground, earth wires, cable sheath, fences etc.
iii) Maintain the resistance of earth connection to such a
value as to make operation of protective device effective.
For a Fault current of level 32 kA, the typical value of
 Touch potential is 640 V.
 Step potential is 1600 V.
Gravel Resistance ≈ 20 kΏ.
 Generator & Transformer neutral shall be earthed through
suitable impedance by not less than two separate & distinct connections.
APPARATUS EARTHING
REGULATION – 48 : VOLTAGE EXCEEDING 650 V.
 For Generating Station, Sub Station and Industrial installations of more than 33 kV, neutral & frame shall be earthed
with common earthing grid/mat to rise to tolerable values for Step & Touch potential.
 Single phase system voltage more than 650V shall have effective earthing.
EARTHING GRID / MAT
EARTHING
REGULATION – 72 : METALLIC FITTINGS AND SUPPORTS OF OVERHEAD LINES.
 All metallic fittings & supports shall be earthed in 3 points in every kilometre.
 Stay wire shall be earthed.
REGULATION – 90 : EARTHING OF GUARD WIRE.
Every guard wire shall be earthed at each point at which its electrical continuity as broken & shall also be
connected with rails at intervals of not more than 5 spans.
GUARD WIRE PLACED BELOW OVERHEAD LINE
EARTHING OF STAY WIRE
EARTHING OF TRANSMISSION TOWER
IMPORTANT ELECTRICAL SAFETY PRECAUTIONS
 Never touch or try repairing any electrical equipment or circuits with wet hands. It increases the conductivity of the electric
current.
 Do not use equipment with frayed cords, damaged insulation or broken plugs.
 Always turn off the mains while working on any receptacle. Put a “Danger” sign at the point of isolation.
 Use insulated tools while working.
 Use appropriate insulated rubber gloves and goggles while working on any branch circuit or any other electrical circuit.
 Never try repairing energized equipment. Always check that it is de-energized first by using a tester or non-contact voltage
detector.
 Know the wire code of your country.
 Read and follow manufacturer’s instructions for safe use of electrical equipment.
 Leave work on energized equipment to qualified workers.
 Check electrical connections to make sure they are tight.
 Keep machines and other electrical equipment clean and well lubricated.
 Report electrical problems immediately.
 Do not use temporary wiring.
 Use proper electrical PPEs before starting any work in an electrical circuit or equipment.
 Apply for right “Permit to Work” prior to maintenance activity on an electrical system.
 Do not wear metal jewelry when working with electrical equipment.
 Do not run cords along the floor.
 Never overload motors, circuits, or outlets.
Safety Initiatives by EMD -VSTPS
NON CONTACT VOLTAGE DETECTOR
SWITCH FUSE UNIT (SFU)
It has one switch unit and one fuse unit. When we give ON
command, the contacts will get closed through switch and then
the supply will pass through the fuse unit to the output.
It is very widely used for low and medium voltages. The
ratings of switch fuse units are in the range of 30, 60, 100, 200,
400, 600 and 800 Amperes. Switch fuse units can be installed
on metal-clad switchgear.
It is specially used for high capacity tripping.
Whereas MCB & MCCBs are used for low capacity tripping.
Switch Fuse Unit can only provide overcurrent protection.
there is no separate switch and fuse unit. There is only the fuse
unit which itself acts as a switch.
SWITCH FUSE UNIT
FUSE SWITCH UNIT
COMMON ELECTRICAL PROBLEMS
 Motor not taking start.
 Motor overload.
 Motor tripping on protection.
 Breaker not racking in/out.
 MCC disturbance.
 Motor abnormal sound.
 Motor bearing and body getting hot.
 Cable heating / joint failure.
START/STOP CIRCUIT OF INDUCTION MOTOR
HT SWITCHGEAR - CONTROL SUPPLY CHECKING
REPORTED DEFECT
 MOTOR NOT TAKING START.
 MCC DISTURBANCE.
TYPE OF JOB
 CHECKING OF START PERMISSIVE
CIRCUIT.
 CHECKING OF CONTROL FUSE.
 CHECK FOR ANY OTHER PROTECTION.
PPEs TO BE USED
 ARC SUIT.
 ARC FLASH HOOD.
 NON-CONTACT VOLTAGE DETECTOR.
 INSULATED TOOL KIT.
 ELECTRICAL SAFETY SHOE.
LT SWITCHGEAR - CONTROL SUPPLY CHECKING
REPORTED DEFECT
 MOTOR NOT TAKING START.
 MOTOR TRIPPING ON PROTECTION.
 MCC DISTURBANCE.
TYPE OF JOB
 CHECKING OF START PERMISSIVE
CIRCUIT.
 CHECKING OF CONTROL FUSE.
 CHECKING OF OVERLOAD RELAY.
 CHECK FOR ANY OTHER PROTECTION.
PPEs TO BE USED
 ARC SUIT.
 ARC FLASH HOOD.
 NON-CONTACT VOLTAGE DETECTOR.
 INSULATED TOOL KIT.
 ELECTRICAL SAFETY SHOE.
LT BREAKER - MECHANISM CHECKING
REPORTED DEFECT
 MOTOR NOT TAKING START.
 BREAKER NOT RACKING IN/OUT.
TYPE OF JOB
 CHECKING OF CIRCUIT BREAKER
MECHANISM.
PPEs TO BE USED
 ARC SUIT.
 ARC FLASH HOOD.
 INSULATED TOOL KIT.
 ELECTRICAL SAFETY SHOE.
LT MODULE - CONTROL SUPPLY CHECKING
REPORTED DEFECT
 NOT TAKING COMMAND.
 TRIPPING ON OVERLOAD.
 MCC DISTURBANCE.
TYPE OF JOB
 CHECKING OF POWER FUSE.
 CHECKING OF CONTROL FUSE.
 CHECKING OF OVERLOAD RELAY.
PPEs TO BE USED
 ARC SUIT.
 ARC FLASH HOOD.
 NON-CONTACT VOLTAGE DETECTOR.
 INSULATED TOOL KIT.
 INSULATED FUSE PULLER.
 ELECTRICAL SAFETY SHOE.
HT BREAKER – ISOLATION / NORMALISATION
TYPE OF JOB
 CIRCUIT BREAKER RACK IN/OUT.
PPEs TO BE USED
 ARC SUIT.
 ARC FLASH HOOD.
 ARC FLASH GLOVE.
 ELECTRICAL SAFETY SHOE.
LT BREAKER – ISOLATION / NORMALISATION
TYPE OF JOB
 CIRCUIT BREAKER RACK IN/OUT.
PPEs TO BE USED
 ARC SUIT.
 ARC FLASH HOOD.
 ARC FLASH GLOVE.
 ELECTRICAL SAFETY SHOE.
LIGHTING MODULE - CHECKING
REPORTED DEFECT
 LIGHTS NOT GLOWING.
 PROVISION OF ADDITIONAL LIGHTING
SUPPLY.
TYPE OF JOB
 CHECKING OF LIGHTING MODULE.
 POWER CABLE CONNECTION/
DISCONNECTION.
PPEs TO BE USED
 ARC SUIT.
 ARC FLASH HOOD.
 NON-CONTACT VOLTAGE DETECTOR.
 INSULATED TOOL KIT.
 ELECTRICAL SAFETY SHOE.
LIGHTING PANEL (NLP) – CHECKING
REPORTED DEFECT
 LIGHTS NOT GLOWING.
TYPE OF JOB
 CHECKING OF CONTACTOR.
 CHECKING OF POWER SUPPLY CIRCUIT.
PPEs TO BE USED.
 NON-CONTACT VOLTAGE DETECTOR.
 INSULATED TOOL KIT.
 INSULATED GLOVE.
 ELECTRICIAN SAFETY HELMET.
 ELECTRICAL SAFETY SHOE.
HOT LINE MAINTENANCE
SUB-REGULATION (3) OF REGULATION – 19 :
IMPORTANT SAFETY PRECAUTIONS
 Only trained personnel are designated to do the work.
 Work permit to be taken from terminal stations of each end of
transmission line.
 Work shall be performed with proper planning and clarity.
 Hotline job must be carried out in sunny weather.
 All equipment and tools shall be inspected and checked for correct
operation.
 Auto re-closure shall be in 'OFF' position for the line at both ends.
 Hot sticks and other assemblies shall be kept on hotline tool rack to
avoid ground contact.
 Helmet, safety shoes and safety belt shall compulsorily be used.
 No live-line team members on the tower and conductor shall
wear any metallic chain, wristwatch or ring to avoid any circulating current.
 The team line-men will wear conductive socks, boots, helmets and hand gloves.
 Tarpaulin sheet should be laid on the work area .
 A light vehicle shall be kept nearby during entire work period.
HOT LINE WORK IN 400 KV CONDUCTOR.
ELECTRICAL SAFETY OFFICER
All suppliers of electricity including generating companies, transmission companies and
distribution companies shall designate an Electrical Safety Officer for ensuring observance
of safety measures.
QUALIFICATION
The Electrical Safety Officer shall be an Electrical Engineering degree holder with at least
five years of experience in operation and maintenance of electrical installations.
RESPONSIBILITY
The Electrical Safety Officer designated under, sub-regulation (1), shall carryout periodic
tests as per the relevant standards and inspection of such installations for ensuring
observance of safety measures specified under these regulations at intervals not exceeding
one year, and keep a record thereof in Form I or Form II or Form III, as the case may be,
of Schedule IV and test reports, and also keep a register of recommended safety
requirements duly acknowledged by the owner with date and compliances thereafter; and
such records shall be made available to the Electrical Inspector, as and when required.
FORMS FOR INSPECTION REPORT
The designated Electrical Safety Officer shall fill the following forms to
carry out the periodic tests at regular interval:
Form I – For installations up to 250 V.
Form II – For installations more than 250 V and up to 650 V.
Form III – For installations exceeding 650 V.
Thank You

More Related Content

PPT
Electrical safety training slide for .ppt
PPT
Practical Electrical Substation Safety for Engineers and Technicians
PDF
Industrial electrical safety
PPT
Electrical safety
PPTX
She training module electrical safety
PDF
Electrical safety ppt
PPT
Electrical Safety Joliet Distribution Center
PPTX
Electrical Safety and Risk Assessments
Electrical safety training slide for .ppt
Practical Electrical Substation Safety for Engineers and Technicians
Industrial electrical safety
Electrical safety
She training module electrical safety
Electrical safety ppt
Electrical Safety Joliet Distribution Center
Electrical Safety and Risk Assessments

What's hot (20)

PDF
Electrical hazards & safety training
PPSX
Electrical safety training based on osha 1910 standards sw
PPTX
Electrical safety slideshare
PPT
ELECTRICAL SAFETY PRESENTATION.ppt
PPT
Electrical safety
PPTX
Electrical safety
PPTX
Complete Guide to Electrical Safety in the Workplace
PPTX
Electrical safety
PPT
Electrical safety
PPT
Electrical Safety
PPTX
Electrical safety
PPTX
Electrical Safety Tips
PDF
Electrical safety ppt(1)
PDF
Basic electrical safety
PPSX
Electrical Hazards and their safety
PDF
Electrical safety ppt
PPTX
Electrical safety potection
PDF
Arc Flash Training
PDF
Lecture 8 -_electrical_hazard
PPT
Electrical Safety Techniques
Electrical hazards & safety training
Electrical safety training based on osha 1910 standards sw
Electrical safety slideshare
ELECTRICAL SAFETY PRESENTATION.ppt
Electrical safety
Electrical safety
Complete Guide to Electrical Safety in the Workplace
Electrical safety
Electrical safety
Electrical Safety
Electrical safety
Electrical Safety Tips
Electrical safety ppt(1)
Basic electrical safety
Electrical Hazards and their safety
Electrical safety ppt
Electrical safety potection
Arc Flash Training
Lecture 8 -_electrical_hazard
Electrical Safety Techniques
Ad

Similar to Electrical Safety - Class.ppt (20)

PPSX
Module-4-Electrical Safety in industrial safety
PDF
B Part 14 Electricity
PPT
Earthing_of_Electrical_Installations_As.ppt
PPT
4143813.ppt
PDF
73] ELECTRICAL SAFETY RULES FOR INDUSTRIES IN INDIA.pdf
PPTX
Electrical safety in construction
PPTX
Safety Electrical .pptx
PPTX
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
PPT
Electric safety related work practices ppt
PPS
Electricity on site
PPT
Indian electricity rules
PPT
Electrical safety Electrical safety Electrical safety
PPT
Tpl electrical safety230311
PPTX
1648303474275_Electrical safety & inspection of electrical installation,preve...
PPT
Elect. presentation (04).ppt
PPT
Electrical Safety.ppt
PPT
6a_ELECTRIC SAFETY.ppt
PPT
Electrical Systems maintenance-for-electrical
PPT
Basics of Electrical Engineering & Maintenance Practices
PPT
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.ppt
Module-4-Electrical Safety in industrial safety
B Part 14 Electricity
Earthing_of_Electrical_Installations_As.ppt
4143813.ppt
73] ELECTRICAL SAFETY RULES FOR INDUSTRIES IN INDIA.pdf
Electrical safety in construction
Safety Electrical .pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Electric safety related work practices ppt
Electricity on site
Indian electricity rules
Electrical safety Electrical safety Electrical safety
Tpl electrical safety230311
1648303474275_Electrical safety & inspection of electrical installation,preve...
Elect. presentation (04).ppt
Electrical Safety.ppt
6a_ELECTRIC SAFETY.ppt
Electrical Systems maintenance-for-electrical
Basics of Electrical Engineering & Maintenance Practices
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.ppt
Ad

Recently uploaded (20)

PDF
Arduino robotics embedded978-1-4302-3184-4.pdf
PPTX
web development for engineering and engineering
PDF
BRKDCN-2613.pdf Cisco AI DC NVIDIA presentation
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
ETO & MEO Certificate of Competency Questions and Answers
PPTX
436813905-LNG-Process-Overview-Short.pptx
PPTX
OOP with Java - Java Introduction (Basics)
PDF
Geotechnical Engineering, Soil mechanics- Soil Testing.pdf
PPTX
24AI201_AI_Unit_4 (1).pptx Artificial intelligence
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
The-Looming-Shadow-How-AI-Poses-Dangers-to-Humanity.pptx
PDF
Monitoring Global Terrestrial Surface Water Height using Remote Sensing - ARS...
DOCX
573137875-Attendance-Management-System-original
PPTX
Internship_Presentation_Final engineering.pptx
PPT
Drone Technology Electronics components_1
PPTX
Practice Questions on recent development part 1.pptx
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
Arduino robotics embedded978-1-4302-3184-4.pdf
web development for engineering and engineering
BRKDCN-2613.pdf Cisco AI DC NVIDIA presentation
UNIT-1 - COAL BASED THERMAL POWER PLANTS
ETO & MEO Certificate of Competency Questions and Answers
436813905-LNG-Process-Overview-Short.pptx
OOP with Java - Java Introduction (Basics)
Geotechnical Engineering, Soil mechanics- Soil Testing.pdf
24AI201_AI_Unit_4 (1).pptx Artificial intelligence
Operating System & Kernel Study Guide-1 - converted.pdf
CH1 Production IntroductoryConcepts.pptx
The-Looming-Shadow-How-AI-Poses-Dangers-to-Humanity.pptx
Monitoring Global Terrestrial Surface Water Height using Remote Sensing - ARS...
573137875-Attendance-Management-System-original
Internship_Presentation_Final engineering.pptx
Drone Technology Electronics components_1
Practice Questions on recent development part 1.pptx
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx

Electrical Safety - Class.ppt

  • 1. ELECTRICAL SAFETY By JOYDEEP BHAUMIK AGM (O&M/EMD) NTPC Vindhyachal
  • 2. ELECTRICAL SAFETY – WHY NEEDED? ELECTROCUTION KILLS NEARLY 30 INDIANS A DAY.  The highest number of cases is observed in the age group of 21-30 years.  Thousand crores of rupees is spent on compensation and maintenance due to electrical accidents in various Power Plants in the country. ELECTRICAL SAFETY  Electrical is a highly versatile form of energy but only when used properly.  Failure to take suitable precautions in its use may result in bodily injury or property damage or both.  Control of electrical hazards is neither difficult nor expensive, but ignoring or neglecting them may lead to serious accidents.
  • 3. HUMAN INJURIES DUE TO ELECTRICITY Most common injuries due to electricity are:  Electric shock - The flow of electricity through human body may lead to electric shock.  Burning - Body parts can get burnt due to short circuit or fire caused from short circuit. EFFECT OF CURRENT IN HUMAN BODY > 3 mA : PAINFUL SHOCK > 10 mA : MUSCLE CONTRACTION > 20 mA : SEVERE SHOCK > 30 mA : LUNG PARALYSIS – USUALLY TEMPORARY > 50 mA : POSSIBLE VENTRICULAR FIBRILLATION (USUALLY FATAL) 100 mA to 4 Amps : CERTAIN VENTRICULAR FIBRILLATION (FATAL) > 4 Amps : HEART PARALYSIS, SEVERE BURNS
  • 4. MAIN CAUSES OF ELECTRICAL HAZARD  Inadequate or substandard quality use of Personal Protective Equipment (PPEs).  Electrocution in houses are frequent due to lack of proper safety devices like MCB, RCCB, ELCB etc.  Usage of substandard quality of electrical wires.  Short Circuiting due to lack of maintenance schedule.  Lack of proper earthing system.  Illegal construction of buildings in proximity to existing lines.  Unguarded distribution transformers in crowded area.  Unauthorized digging where underground cables are buried.  Non-compliance of safe clearances from live conductors.
  • 5. VOLTAGE RANGE LOW VOLTAGE : Upto 250 V MEDIUM VOLTAGE : > 250 – 650 V HIGH VOLTAGE : > 650 – 33 kV > 10 kV (For DC) EXTRA HIGH VOLTAGE : > 33 kV – 765 kV ULTRA HIGH VOLTAGE : > 765 kV
  • 6. CONSTITUTION OF CEA CENTRAL ELECTRICITY AUTHORITY (CEA) is a statutory organization constituted under section 3(1) of Electricity Supply Act 1948, which has been superseded by section 70(1) of The Electricity Act 2003. CEA advises the government on policy matters and formulates plans for the development of electricity systems. Regulate measures relating to SAFETY and ELECTRIC SUPPLY in India. Website: cea.nic.in
  • 7. IMPORTANT SAFETY RULES – IE RULES 1956 Every rule in the Indian Electricity Rules, 1956 is related either directly or indirectly to Safety. RULE-32  Switches on live conductor.  Code of practice of wiring shall be followed while marking the conductors - IS 732 (1989). SWITCH PROVIDED ON LIVE CONDUCTOR (PHASE)
  • 8. IMPORTANT SAFETY RULES – IE RULES 1956 RULE-35 : DANGER NOTICES. The owner of every medium, high and extra-high voltage installation shall affix permanently in a conspicious position a danger notice in Hindi or English and the local language of the district, with a sign of skull and bones of a design as per the relevant standards.
  • 9. IMPORTANT SAFETY RULES – IE RULES 1956 RULE-50 Energy shall not be supplied, transformed, converted or used unless the following provisions are observed,  A suitable linked switch or circuit breaker is erected at the secondary side of the transformer.  Every circuit is protected by a suitable cut-out.  Supply to each motor or group of motors is controlled by a linked switch or circuit breaker.  Adequate precautions are taken to ensure that no live parts are exposed. PROTECTION RELAY CIRCUIT FAULT CURRENT PATH THROUGH HUMAN BODY MOTOR PROTECTION CIRCUIT
  • 10. SPECIAL PROVISIONS IN HV & EHV INSTALLATIONS RULE-63  Approval of Inspector is necessary before energizing any high voltage installations. RULE-64  All apparatus and equipment intended to be used at high or extra high voltage shall be inaccessible except to an authorized person.  A suitable segregation shall be provided for licensee’s equipment.  A suitable soak pit or arrangement to drain out the leaked oil shall be made in sub-stations where the transformers are provided.  Cable trench shall be filled with sand or other non-flammable material and covered by bricks. TRANSFORMER OIL SOAK PIT CABLE TRENCH FILLED WITH SAND
  • 11. SPECIAL PROVISIONS IN HV & EHV INSTALLATIONS RULE-65  The installation must be subjected to the prescribed testing before energizing. RULE-66  Conductors shall be enclosed in a metallic covering and suitable circuit breakers shall be provided to protect the equipment from overloading. RULE-68  In case of outdoor type of sub-station, a metallic fencing of not less than 1.8 m height shall be erected around the transformer. METALLIC FENCING AROUND TRANSFORMER
  • 12. SAFETY MEASURES IN CEA REGULATIONS SAFETY PROVISIONS HUMAN SAFETY EQUIPMENT SAFETY
  • 13. HUMAN SAFETY SALIENT POINTS  Register of designated persons to be maintained properly and kept up to date.  Panel enclosures shall be made fire-proof.  Switches on live conductors.  Direct line on neutral in 1ɸ supply.  Green wire in earthing line.  ELCB/RCCB in each circuit.  Display of “Danger notice” in local language/Hindi.  Insulating floor mats before switchgear panels.  Identification of front & rear panels.  Placement of Fire buckets filled with sand/Fire extinguishers and First Aid boxes with proper marking at convenient places. Also, First Aid training to be provided.  Flexible cables to be used for portable or transportable equipment.  Display of Shock Treatment Chart at conspicuous places.  Minimum 100 cms clear space in front of switchboard and 75 cms space behind the board.  Proper identification and distinguishing between live and neutral conductor.  Trenches inside Sub-station to be filled with non-inflammable material.  Baffle walls of 4 hours fire rating to be provided around power transformer.  Fencing of 1.8 mtrs or more height around Sub-station. Handrails to be earthed.  Overhead conductor clearances to be maintained.  Earthing of guard & stay wires.  Clearances from different regulatory bodies.
  • 15. EQUIPMENT SAFETY SALIENT POINTS  Measurement of earth resistance twice a year.  Neutral of generator and transformers to be earthed at two different points.  Motor and metallic coverings earthing at two different points.  Testing of earth electrodes.  Regular checking of all protections & interlocks.  Periodic testing of transformer oil samples.  Protection checking of transformers and its lightning arrestors.  Healthiness checking of all EHV equipment at regular intervals.  RLA (Residual Life Assessment) study of old equipment (> 20 years).  Record maintenance of Routine & Factory tests of equipment.  Oil soak pits for transformers with oil capacity > 2000 litres.  Separate cable trays for AC/DC/Control/Power cables.  Horizontal clearances to be maintained between overhead conductors considering wind pressure.
  • 16. REGULATION – 41 (RULE. 61) : CONNECTION WITH EARTH  Earthing by minimum two separate & distinct connections with minimum two different earth electrodes.  Earth electrodes shall be inter connected to reduce the earth resistance.  Neutral conductor shall also be earthed at one or more points along with distribution system or service line.  System supply by concentric cable, external conductor earthed by separate & distinct connections. Minimum two or more earth pits to be made to ensure proper grounding of the system. EARTHING PROVISIONS AND SAFETY
  • 17. EARTHING PROVISIONS AND SAFETY REGULATION – 41 (RULE. 61) : CONNECTION WITH EARTH Equipment Earthing: Metallic body/frame of all electrical equipment such as Generator, Transformer, Motor (stationary & portable), Welding Transformers, etc should be earthed with two separate & distinct connections with earth. Neutral point of Generators & Transformers Earthing: Connecting it to earthing system by not less than two separate & distinct connections.
  • 18. EARTHING PROVISIONS AND SAFETY REGULATION – 41 (RULE. 61) : CONNECTION WITH EARTH Protective Frame/Conduit/Junction box Earthing: All metallic junction box, metal casing, metallic covering throughout the length & 3rd pin of socket shall be earthed up to 250V. Rule. 61(5)-Measurement of Earth resistance: Earthing resistance shall be measured on dry day during dry season not less than once in two years. CONDUIT EARTHING JUNCTION BOX EARTHING
  • 19. REGULATION – 42 (RULE. 61A) : PROVISION OF ELCB All LV installations (Up to 250 V) of 5 kW & above rating shall be controlled by earth leakage protective device to disconnect supply instantly of earth fault or leakage. REGULATION – 47 : EARTHING OF METAL SHEATHED ELECTRIC SUPPLY LINE Earthing of metal sheathed electric supply line other than overhead lines voltage exceeding 650V, outer metal sheathing shall be earthed. EARTH LEAKAGE PROTECTIVE DEVICE ELCB METAL SHEATHED CABLE
  • 20. APPARATUS EARTHING – STEP & TOUCH POTENTIAL REGULATION – 48 : VOLTAGE EXCEEDING 650 V.  All not carrying current metallic part of the associate installation of voltage exceeding 650 V shall be earthed to a grounding system or mat, i) Limit to touch the Step & Touch potential. ii) Limit to ground potential rise to tolerable values so as to prevent danger due to transfer of potential through ground, earth wires, cable sheath, fences etc. iii) Maintain the resistance of earth connection to such a value as to make operation of protective device effective. For a Fault current of level 32 kA, the typical value of  Touch potential is 640 V.  Step potential is 1600 V. Gravel Resistance ≈ 20 kΏ.  Generator & Transformer neutral shall be earthed through suitable impedance by not less than two separate & distinct connections.
  • 21. APPARATUS EARTHING REGULATION – 48 : VOLTAGE EXCEEDING 650 V.  For Generating Station, Sub Station and Industrial installations of more than 33 kV, neutral & frame shall be earthed with common earthing grid/mat to rise to tolerable values for Step & Touch potential.  Single phase system voltage more than 650V shall have effective earthing. EARTHING GRID / MAT
  • 22. EARTHING REGULATION – 72 : METALLIC FITTINGS AND SUPPORTS OF OVERHEAD LINES.  All metallic fittings & supports shall be earthed in 3 points in every kilometre.  Stay wire shall be earthed. REGULATION – 90 : EARTHING OF GUARD WIRE. Every guard wire shall be earthed at each point at which its electrical continuity as broken & shall also be connected with rails at intervals of not more than 5 spans. GUARD WIRE PLACED BELOW OVERHEAD LINE EARTHING OF STAY WIRE EARTHING OF TRANSMISSION TOWER
  • 23. IMPORTANT ELECTRICAL SAFETY PRECAUTIONS  Never touch or try repairing any electrical equipment or circuits with wet hands. It increases the conductivity of the electric current.  Do not use equipment with frayed cords, damaged insulation or broken plugs.  Always turn off the mains while working on any receptacle. Put a “Danger” sign at the point of isolation.  Use insulated tools while working.  Use appropriate insulated rubber gloves and goggles while working on any branch circuit or any other electrical circuit.  Never try repairing energized equipment. Always check that it is de-energized first by using a tester or non-contact voltage detector.  Know the wire code of your country.  Read and follow manufacturer’s instructions for safe use of electrical equipment.  Leave work on energized equipment to qualified workers.  Check electrical connections to make sure they are tight.  Keep machines and other electrical equipment clean and well lubricated.  Report electrical problems immediately.  Do not use temporary wiring.  Use proper electrical PPEs before starting any work in an electrical circuit or equipment.  Apply for right “Permit to Work” prior to maintenance activity on an electrical system.  Do not wear metal jewelry when working with electrical equipment.  Do not run cords along the floor.  Never overload motors, circuits, or outlets. Safety Initiatives by EMD -VSTPS NON CONTACT VOLTAGE DETECTOR
  • 24. SWITCH FUSE UNIT (SFU) It has one switch unit and one fuse unit. When we give ON command, the contacts will get closed through switch and then the supply will pass through the fuse unit to the output. It is very widely used for low and medium voltages. The ratings of switch fuse units are in the range of 30, 60, 100, 200, 400, 600 and 800 Amperes. Switch fuse units can be installed on metal-clad switchgear. It is specially used for high capacity tripping. Whereas MCB & MCCBs are used for low capacity tripping. Switch Fuse Unit can only provide overcurrent protection. there is no separate switch and fuse unit. There is only the fuse unit which itself acts as a switch. SWITCH FUSE UNIT FUSE SWITCH UNIT
  • 25. COMMON ELECTRICAL PROBLEMS  Motor not taking start.  Motor overload.  Motor tripping on protection.  Breaker not racking in/out.  MCC disturbance.  Motor abnormal sound.  Motor bearing and body getting hot.  Cable heating / joint failure.
  • 26. START/STOP CIRCUIT OF INDUCTION MOTOR
  • 27. HT SWITCHGEAR - CONTROL SUPPLY CHECKING REPORTED DEFECT  MOTOR NOT TAKING START.  MCC DISTURBANCE. TYPE OF JOB  CHECKING OF START PERMISSIVE CIRCUIT.  CHECKING OF CONTROL FUSE.  CHECK FOR ANY OTHER PROTECTION. PPEs TO BE USED  ARC SUIT.  ARC FLASH HOOD.  NON-CONTACT VOLTAGE DETECTOR.  INSULATED TOOL KIT.  ELECTRICAL SAFETY SHOE.
  • 28. LT SWITCHGEAR - CONTROL SUPPLY CHECKING REPORTED DEFECT  MOTOR NOT TAKING START.  MOTOR TRIPPING ON PROTECTION.  MCC DISTURBANCE. TYPE OF JOB  CHECKING OF START PERMISSIVE CIRCUIT.  CHECKING OF CONTROL FUSE.  CHECKING OF OVERLOAD RELAY.  CHECK FOR ANY OTHER PROTECTION. PPEs TO BE USED  ARC SUIT.  ARC FLASH HOOD.  NON-CONTACT VOLTAGE DETECTOR.  INSULATED TOOL KIT.  ELECTRICAL SAFETY SHOE.
  • 29. LT BREAKER - MECHANISM CHECKING REPORTED DEFECT  MOTOR NOT TAKING START.  BREAKER NOT RACKING IN/OUT. TYPE OF JOB  CHECKING OF CIRCUIT BREAKER MECHANISM. PPEs TO BE USED  ARC SUIT.  ARC FLASH HOOD.  INSULATED TOOL KIT.  ELECTRICAL SAFETY SHOE.
  • 30. LT MODULE - CONTROL SUPPLY CHECKING REPORTED DEFECT  NOT TAKING COMMAND.  TRIPPING ON OVERLOAD.  MCC DISTURBANCE. TYPE OF JOB  CHECKING OF POWER FUSE.  CHECKING OF CONTROL FUSE.  CHECKING OF OVERLOAD RELAY. PPEs TO BE USED  ARC SUIT.  ARC FLASH HOOD.  NON-CONTACT VOLTAGE DETECTOR.  INSULATED TOOL KIT.  INSULATED FUSE PULLER.  ELECTRICAL SAFETY SHOE.
  • 31. HT BREAKER – ISOLATION / NORMALISATION TYPE OF JOB  CIRCUIT BREAKER RACK IN/OUT. PPEs TO BE USED  ARC SUIT.  ARC FLASH HOOD.  ARC FLASH GLOVE.  ELECTRICAL SAFETY SHOE.
  • 32. LT BREAKER – ISOLATION / NORMALISATION TYPE OF JOB  CIRCUIT BREAKER RACK IN/OUT. PPEs TO BE USED  ARC SUIT.  ARC FLASH HOOD.  ARC FLASH GLOVE.  ELECTRICAL SAFETY SHOE.
  • 33. LIGHTING MODULE - CHECKING REPORTED DEFECT  LIGHTS NOT GLOWING.  PROVISION OF ADDITIONAL LIGHTING SUPPLY. TYPE OF JOB  CHECKING OF LIGHTING MODULE.  POWER CABLE CONNECTION/ DISCONNECTION. PPEs TO BE USED  ARC SUIT.  ARC FLASH HOOD.  NON-CONTACT VOLTAGE DETECTOR.  INSULATED TOOL KIT.  ELECTRICAL SAFETY SHOE.
  • 34. LIGHTING PANEL (NLP) – CHECKING REPORTED DEFECT  LIGHTS NOT GLOWING. TYPE OF JOB  CHECKING OF CONTACTOR.  CHECKING OF POWER SUPPLY CIRCUIT. PPEs TO BE USED.  NON-CONTACT VOLTAGE DETECTOR.  INSULATED TOOL KIT.  INSULATED GLOVE.  ELECTRICIAN SAFETY HELMET.  ELECTRICAL SAFETY SHOE.
  • 35. HOT LINE MAINTENANCE SUB-REGULATION (3) OF REGULATION – 19 : IMPORTANT SAFETY PRECAUTIONS  Only trained personnel are designated to do the work.  Work permit to be taken from terminal stations of each end of transmission line.  Work shall be performed with proper planning and clarity.  Hotline job must be carried out in sunny weather.  All equipment and tools shall be inspected and checked for correct operation.  Auto re-closure shall be in 'OFF' position for the line at both ends.  Hot sticks and other assemblies shall be kept on hotline tool rack to avoid ground contact.  Helmet, safety shoes and safety belt shall compulsorily be used.  No live-line team members on the tower and conductor shall wear any metallic chain, wristwatch or ring to avoid any circulating current.  The team line-men will wear conductive socks, boots, helmets and hand gloves.  Tarpaulin sheet should be laid on the work area .  A light vehicle shall be kept nearby during entire work period. HOT LINE WORK IN 400 KV CONDUCTOR.
  • 36. ELECTRICAL SAFETY OFFICER All suppliers of electricity including generating companies, transmission companies and distribution companies shall designate an Electrical Safety Officer for ensuring observance of safety measures. QUALIFICATION The Electrical Safety Officer shall be an Electrical Engineering degree holder with at least five years of experience in operation and maintenance of electrical installations. RESPONSIBILITY The Electrical Safety Officer designated under, sub-regulation (1), shall carryout periodic tests as per the relevant standards and inspection of such installations for ensuring observance of safety measures specified under these regulations at intervals not exceeding one year, and keep a record thereof in Form I or Form II or Form III, as the case may be, of Schedule IV and test reports, and also keep a register of recommended safety requirements duly acknowledged by the owner with date and compliances thereafter; and such records shall be made available to the Electrical Inspector, as and when required.
  • 37. FORMS FOR INSPECTION REPORT The designated Electrical Safety Officer shall fill the following forms to carry out the periodic tests at regular interval: Form I – For installations up to 250 V. Form II – For installations more than 250 V and up to 650 V. Form III – For installations exceeding 650 V.