Elia Stakeholders’ Day 
21 November 2014
The development of grid 
infrastructure on both 
European & Belgian level
Federal Network 
Development Plan 
F. Dunon, Elia
AGENDA 
1. Network development: the context 
2. Infrastructure projects 
3. Consultation & approval process
1. NETWORK 
DEVELOPMENT 
The context 
5 
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / 
FIRSTNAME LASTNAME
TSOs play a key role in the energy revolution 
3 ACTIVITIES 3 CHALLENGES 
Infrastructure 
management 
System operation + 
strategic reserves 
Market facilitation
Belgian electricity network: history and future 
developments 
Industrial development 
Electricity Companies 
Economic Expansion Nuclear development Gas power plants 
integration 
EU Electricity 
Directives & packages 
2200’’ss –– 4400’’ss 5500’’ss –– 7700’’ss 7700’’ss late 80’s – 
eraly 90’s 
late 90’s - 
2013
EU leaders agreed on 23 October 2014 the 
domestic 2030 greenhouse gas reduction target 
of at least 40% compared to 1990 
COMMISIONER GÜNTHER OETTINGER
Increasing uncertainties 
today 2020 2030 
Uncertainties 
From today to 2020 From 2020 to 2030 
Essentially, the following uncertainties 
 Nuclear power plants 
 EU 2020 targets 
 New thermal plants 
 Additional decommissioning 
 Load growth 
Key drivers shaping the future energy landscape 
 No nuclear power plants after 2025 
 Pace of RES integration 
 Security of supply : autonomy or dependency 
 CO2 market reforms 
 Additional decommissioning 
 Load growth and Energy efficiency 
 Storage developments 
 Off-grid solutions
Scenarios for framing uncertainty: 2030 
Construction of 4 scenarios 2030: 
• Legal obligation: in line with the 
prospective study on generation 
resources (federal authorities) 
• Legal obligation: being compatible 
with TYNDP scenarios 
• Elia does not assume that one 
scenario is more likely or more 
desirable than another 
• The actual situation should tally in 
these extreme scenarios 
Reality 2030 
?
Total electricity demand (TWh) 
110 
100 
90 
80 
70 
60 
+23% 
V4 
V0 
+3% 
2005 2010 2015 2020 2025 2030 
Year 
EU 2020 
V3 
4 ENTSO-E based scenarios used by Elia to 
evaluate federal development plan 
4 scenarios defined to test robustness of development plan All visions assume a demand increase vs. 2013 (3-23%) 
Low (imports) High (autonomy) 
National autonomy 
High 
RES 
growth 
Low 
Vision 4: "Green 
Revolution" 
Vision 3: "Green 
Transition" 
Vision 0: "No 
progress" 
Vision 1: "Slow 
progress" 
Historical consumption 
Scenarios 
V1
% RES 
-20% 
-62% 3 
CO2 reduction 
(% - compared to 1990) 
40% 50% 60% 
2 
-78% 
14% 
-7% 
2005 
-39% 
35% 
1 
-42% 
4 
RES Targets EU = total scope energy 
% RES graph = part within electricity generation mix 
On track energy 
roadmap 2050 
2020
Definition of scenarios : test for the resiliance of 
infrastructure projects 
Scheme 
Description 
Application of the 4 visions (V0, 
V1, V3 and V4) 
Moderate transition of the power 
market 
• Moderate to strong demand 
increase 
• Further RES penetration 
• Different national autonomy 
levels 
Decentral 
Strong decentral production (30% 
of power demand), no longer 
passing through grids 
• High adoption of intermittent 
RES 
• Breakthrough of 'prosumption', 
combining local generation & 
storage 
• Adequacy and balancing on 
unit or microgrid level 
Pan-European mgmt of demand and 
generation fluctuations in context of 
high intermittent production 
• High adoption of intermittent 
RES 
• High capacity interconnections 
• Adequacy on pan-European 
level: pooling variability & 
capacity 
• Likely by European ISO 
4 ENTSO-E 
0 trajectories 1 Islands 
2 Supergrid
“380kV backbone and 
interconnection projects are 
effective and robust against 
uncertainties” 
ENTSO-E SYSTEM DEVELOPMENT 
COMMITTEE
“ Regarding lower voltage levels, it is wise 
to maintain a careful approach towards grid 
extensions, based on techno-economic 
optimizations, flexible operational 
measures, projects phasing and striving 
for a rationalization of the portfolio” 
ELIA GRID DEVELOPMENT
2. INFRASTRUCTURE 
PROJECTS 
16 
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / 
FIRSTNAME LASTNAME
Developing or reinforcing interconnections on 
each border 
1 
4 
3 2 
5 
1 NEMO [2019]: GB-BE subsea 
HVDC interconnection 
2 ALEGrO [2019]: DE-BE 
underground HVDC 
interconnection 
3 Avelin-Avelgem-Horta [2021- 
23]: new HTLS conductors 
4 Brabo I [ 2016 ]: PST 4 
Zandvliet 
5 PST Schiffelange [CREOS- 
2015] 
2 220 kV Aubange- 
Bascharage 
(*)HTLS : High Temperature Low Sag – High performance conductors
Reinforcing the 380 KV backbone 
1 
2 3 
4 
6 
5 
6 
1 STEVIN [2018]: Corridor 
Zomergem-Zeebrugge 380 kV 
2 Mercator-Horta [2019-2021]: new 
HTLS conductors 
3 
Brabo II [2019]: Zandvliet-Lillo- 
Liefkenshoek 380 kV 
Brabo III [2023]: Liefkenshoek- 
Mercator 380 kV 
(*)HTLS : High Temperature Low Sag – High performance conductors
Reinforcing the 380 KV backbone 
1 
2 3 
4 
6 
5 
6 
4 Gramme-Van Eyck[2015] : 2nd 
circuit 380 kV and substation 
Van Eyck 
5 Lixhe-Herderen [2017] : 2nd 
circuit 380 kV and substation 
Lixhe 
6 Longer run - indicative: 
 2nd circuit Van Eyck- 
Massenhoven 
 New HTLS conductors on 
Gramme-Van Eyck corridor 380 
kV 
 2nd corridor 380 kV Lixhe- 
Herderen 
(*)HTLS : High Temperature Low Sag – High performance conductors
Local grids: 220 – 150 – 110 KV 
(*)HTLS : High Temperature Low Sag – High performance conductors 
Refurbish 
Reinforce 
Mixed 
RES
3. CONSULTATION & 
APPROVAL PROCESS 
21 
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / 
FIRSTNAME LASTNAME
Plan de Développement fédéral 2015 - 2025 
Juin 2014 Août 2014 Oct. 2014 Nov. 2014 Jan. 2015 Mars 2015 Mai 2015 Juil. 2015 Sept. 2015 Nov. 2015 
DDrraaffttiinngg PPDDFF 22001155--22002255 
Processus 
approbation 
PDF 
approuvé 
5 Jan, 2015 
Draft PDP 
Publié 
FFiinnaalliissaattiioonn 
Consult, 
CREG + 
comité SEA 
Etude 
SEA 
Update 
PDF 
Consultation 
Publique 
TYNDP final 
publié 
Meetings 
SPF-BFP (4x) 
PDF 2015-2025: approbation par le Ministre de l’Energie pour novembre 2015 (date cible) 
SEA = Strategic Environmental Assessment 
PDF = Plan de Développement Fédéral 
TYNDP = Ten-Year Network Development Plan d’ENTSO-E 
BFP = Bureau Fédéral du Plan 
SPF = Service Public Fédéral (Direction énergie)
Many thanks for your attention! 
FRÉDÉRIC DUNON
EU Energy 
Infrastructure package 
Implications for Belgium 
L. Meeus, Vlerick Energy Centre
“200 billion needs to be invested in energy 
infrastructure projects in the EU by 2020” 
“Risk that almost half of this investment will 
arrive too late or not at all” 
EUROPEAN COMMISSION, 2011
ALREADY MAKING A 
POSITIVE DIFFERENCE 
EU Energy Infrastructure Package
Common CBA method: 
new instrument to select EU priorities 
Cost Benefit Analysis now enables right project selection
Projects of common interest: several belgian 
projects made the selection 
Infrastructure Projects Nemo and Alegro have PCI label
Permits: FIRST one stop shops ARE 
coming online
EU Funding for projects rather than paper
IF National Regulation Authorities 
CANNOT AGREE ON COST SHARING…. 
..THEN ACER WILL TAKE AN IMPORTANT ROLE
INVESTMENT INCENTIVES? 
EU Energy Infrastructure Package
Risk versus Return… 
Incentives to invest: TSO rate of return 
Cost efficiency incentives: 
TSO Risk 
… diverging 
practices 
across Europe
Towards a harmonization of national 
regulatory frameworks? 
Incentives to invest: TSO rate of return 
Cost efficiency incentives: 
TSO Risk
Or towards exceptional regulatory frames for 
priority projects? 
Context 
• Lack of stragicalligy improtant investment, 2003 blackout 
Solution 
• Eligible projects: interconnection and 
congestion reducing domestic lines 
• Incentives: 12 years (risk) and +2% 
WACC premium (return) 
Experience 
• 8 billion invested since 2008 
• 28 ongoing strategic projects
THIS IS ONLY THE FIRST PACKAGE 
FOR INFRASTRUCTURE 
EU Energy Infrastructure Package
Key messages for Belgium 
• Advanced regulatory treatment that has to be put in 
place anyway for PCIs, could also be applied to 
important national investments 
• Look at the state of the art one stop shops that are 
being implemented for permit granting 
• Revisit the regulatory framework for electricity 
networks
Elia stakeholders day 21 nov 2014
Market functioning, strategic 
reserve & planned outages 
E. Spire, Elia 
D. Zenner, Elia 
D. Aelbrecht, Elia
Q1 à Emeline Spire 
Le jugement de Leonardo Meeus sur le fonctionnement 
du marché interne est du moins « mitigé ». 
Quelle est ton opinion a ce sujet ? 
Comment vois-tu évoluer les choses ?.... 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 40 NOVEMBER 21, 2014
Q2 à Emeline Spire 
Quels ont été les principaux développements en 2014 
concernant le marché de l’énergie ? 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 41 NOVEMBER 21, 2014
Q3 à Emeline Spire 
Mais le fonctionnement du marché à plus long terme, 
pour les signaux d’investissements laisse quand-même 
beaucoup à désirer ? 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 42 NOVEMBER 21, 2014
Q4 à Emeline Spire 
On entend beaucoup parler de l’incitant de 4500 
Euro/MWh, on parle même de temps en temps d’une 
amende. 
Peux-tu nous expliquer de quoi il s’agit exactement et 
comment cet incitant a été déterminé. 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 43 NOVEMBER 21, 2014
44
Q5 aan David Zenner 
Heeft een dergelijke incentive toch voor enige reacties 
gezorgd heeft bij de marktpartijen ? 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 45 NOVEMBER 21, 2014
Q6 aan David Zenner 
Hoe staan we ervoor? Wat is de laatste stand van zaken 
ivm het risico op stroomschaarste voor deze winter? 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 46 NOVEMBER 21, 2014
SITUATIE WINTER 2014-2015 
Context
Q7 aan David Zenner 
Quels moyens de communication Elia met en place pour 
ses stakeholders afin de les avertir au mieux de la 
situation? 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 48 NOVEMBER 21, 2014
Which channel, content and targeted audience? 
Communicate on the risk evolution of … 
•Towards the energy market professionals 
•Towards the Community 
49 
… Strategic Reserve activation … load-shedding 
www.elia.be/en/grid-data www.readyforwinter.be 
An app will also be available 
with notification push! 
Also for subscription to RSS 
feed 
COMMUNICATION
Q8 à David Zenner 
Le plan de délestage connaît un grand impact. 
Pour être clair, les utilisateurs du réseau d’Elia ne seront pas affectés ? 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 50 NOVEMBER 21, 2014
Q9 aan Dirk Aelbrecht 
Gezien de situatie, welke operationele acties en middelen heeft het National Control 
Center genomen om de situatie meester te blijven? 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 51 NOVEMBER 21, 2014
Q10 aan Dirk Aelbrecht 
Om het hoofd te bieden aan de situatie wordt rekening gehouden met een 
beschikbare interconnectiecapaciteit. 
Hoe zit dit exact in elkaar en hoe wordt deze capaciteit berekend? 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 52 NOVEMBER 21, 2014
53 
Import – inter-TSO coördinatie 
Voorbeeld van een invoer van 3500 MW 
vanuit Noord-Europa 
Acties
Q11 aan Dirk Aelbrecht 
De regulator CREG, alsook de markt, challenged Elia of we wel voldoende 
inspanningen leveren om een maximale capaciteit ter beschikking te stellen. 
Hoe staan wij hier tegenover en wat is ons antwoord? 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 54 NOVEMBER 21, 2014
Elia stakeholders day 21 nov 2014
Risk for Electricity Shortfall 
Winter 2014-2015 
What is the role of the 
government? 
N. Mahieu, FOD/SPF Economie
Procedure shortfall of electricity (iterative process) 
Notification Preparation 
Detection Crisis consultation Decision Execution 
Crisis consultation 
Elia Elia/Ministers/FPS 
Economy/FPS of 
the Interior 
Departmental 
crisis cell. 
Consultation 
Regions 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 57 NOVEMBER 21, 2014 
Minister(s)/ELIA/DG 
Energy and DG NCC 
Ministers of 
Economy 
and Energy 
ARP/ Elia Involved actors* 
When situation 
confirmed, 
Elia sends out 
a notification 
Weather 
factors of the 
RMI, 
production 
forecasts, etc 
D-7 D-7 
Technical 
briefing 
D-7 D-7/D-6 
Discussion of the 
measures and the 
related impact (based 
on the analysis of the 
evaluation cell) 
D-6 D-6 
Information partners 
/Communication 
population / Technical 
implementation 
Control and monitoring 
D-6/D-5  J 
Package of measures 
(Awareness and 
Prohibition) 
Activation load 
shedding plan 
* Involved actors: Ministers/ Administrations of FPS Economy and of the Interior/ 
Elia/ distribution network provider/other involved actors
MEASURES TO REDUCE ELECTRICITY 
CONSUMPTION 
• Two types of measures : 
• Awareness measures 
• Prohibition measures 
• Prohibition of the use of electrical devices and consumption sources (i.e. via decrees) 
• Decision taken by Energy and Economy Ministers 
• 4 main clusters : 
1. Residential clients 
• Awareness via OFF/ON campaign 
• Prohibition measures 
2. Buildings (Private buildings and government buildings) 
• Awareness via OFF/ON campaign 
• Reducing consumption procedure for all buildings 
(written by Energy DG) 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 58 NOVEMBER 21, 2014 
3. Lighting 
• Awareness via OFF/ON campaign 
• Prohibition measures for public (streets, 
highways, etc.) and private non-functional lighting 
4. Public transport 
• Awareness of all actors (trains, metro, etc) 
• Consumption reduction measures on electrical 
railways
Capacity remuneration schemes 
Two planned mechanisms 
Part of an overarching generation adequacy 
plan. 
• Strategic reserve: 850 MW, including 
100 MW of DSM, for winter 2014-2015 
can be called upon in case of a 
generation adequacy crisis; 
• Public tender: Mechanism to trigger 
investments in gas-fired power 
plants. Three offers being analyzed. 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 59 NOVEMBER 21, 2014 
Vision of the new government 
Aim to radically improve the investment 
climate, including an evaluation of the 
planned nuclear phase-out. 
• Strategic reserve: Will be maintained 
for winter 2014-2015, but necessity for 
following years analyzed in light of the 
new context; 
• Public tender: Opportunity of current 
tender will be re-evaluated, in close 
collaboration with neighboring countries.
Thank you 
for your attention! 
NANCY MAHIEU, ACTING DIRECTOR GENERAL FOR ENERGY
Energy shortage & load 
shedding 
The role of the DSOs 
B. Crabs, Synergrid
1. Wie is Synergrid? 
• Synergrid verenigt de beheerders van de aardgas- en elektriciteitsnetten in België: 
– Elia: transmissie van elektriciteit (hoogspanningslijnen) 
– Fluxys: vervoer van aardgas (hogedrukleidingen) 
– Distributienetbeheerders: distributie van elektriciteit en aardgas (midden en lage druk/spanning) 
• Missie: 
Bevorderen van de efficiëntie van de netinfrastructuur 
Verhogen van de dienstverlening aan de netgebruikers
2. De elektriciteitsnetbeheerders 
Transportnetbeheerder 
Distributienetbeheerders 
Vlaanderen 
Eandis 
Infrax 
Brussel 
Sibelga 
Wallonië 
Ores 
Resa 
REW 
AIEG 
AIESH
3. Het elektriciteitsnet in enkele cijfers 
• Lengte transportnet: 8.370 km 
• Lengte distributienet: 210.072 km 
• Aantal leveringsposten TNB/DNB: 567 
– Vlaanderen: 300 
– Brussel: 49 
– Wallonië: 218 
• Aantal klantcabines: 73.810 
• Aantal actieve leveringspunten: 5.714.503
4. Wie doet wat? 
Beslissing afschakeling: Minister Economie + Energie 
Crisisbeheer: Federale + provinciale + gemeentelijke crisiscellen 
Uitvoering afschakeling: TNB Elia 
Hervoeding ziekenhuizen en zorgcentra: DNB 
Hervoeding alle klanten na herbevoorrading door Elia: DNB
5. Hoe verloopt een afschakeling?
6. Hervoeding van de netten 
• De volgende leveringspunten zullen zo snel mogelijk hervoed worden: 
– Hulpdiensten van de netinfrastructuur 
– Ziekenhuizen en zorgcentra: volgens de lijst opgesteld door de FOD Volksgezondheid
7. Decentrale productie-eenheden 
• Windmolens, fotovoltaïsche zonnepanelen en wkk’s zullen zich automatisch afkoppelen 
van net conform de geldende reglementering 
• Productie-eenheden aangesloten op hoogspanningspost: terug onder spanning 
gebracht om bij te dragen tot beperken schaarste 
• Productie-eenheden op laag- en middenspanningsnet: niet terug onder spanning 
gebracht 
=> Verbruik > productie => Schaarsteprobleem verergeren!
Bedankt! 
BÉRÉNICE CRABS - SYNERGRID
Energy shortage planning 
P. De Leener, Coreso 
F. Vandenberghe, Elia
Coreso 
• Independent company (SA); 100% TSO owned 
• Created in Dec 2008; in operation since Feb 2009 
• Today over 20 operators in 24/7 shift role 
• Centralized model; experts coming from the TSOs (“rotational model”) 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 71 NOVEMBER 21, 2014
Coreso’s Mission 
• The mission of Coreso is to assist TSOs pro actively to ensure Security of Supply on a 
European regional basis. 
• Being a centralized RSCI, the highest added value and so the operational focus is 
from a few days before until close to real time. 
• Coreso develops and performs operational coordination services in cooperation with 
TSOs and RSCIs; the operational responsibilities remain at TSO level. 
• Based on its regional expertise, Coreso supports the TSO community in identifying 
and undertaking actions and initiatives on medium and longer term to ensure Security 
of Supply. 
• By its centralized model with rotational staffing from TSOs, Coreso spreads the culture 
and practice of international cooperation amongst the TSOs. 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 72 NOVEMBER 21, 2014
Coreso’s role in the Winter Action Plan 
In order to support the TSOs in case of scarcity situation during next winter in 
a coordinated way, an ad hoc action plan has been put forward: 
1. ex ante operational winter study together with CWE partners 
2. Set up of a coordinated process to enable adequate import capacities 
in a secure way on Day Ahead and Intraday Markets 
3. Coordination support to interTSO actions (after the markets; close to 
real time) 
ELIA STAKEHOLDERS’ DAY | FRIDAY, 73 NOVEMBER 21, 2014
European energy policy and 
internal markets 
P. Bornard, RTE, Chairman of ENTSO-E 
P. Fonck, Elia 
O. Koch, European Commission
QUESTIONS FROM THE 
AUDIENCE? 
75 
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / 
FIRSTNAME LASTNAME
LUNCH 
76 
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / 
FIRSTNAME LASTNAME
Elia’s broadening 
international scope 
M. Maes, Chairwoman of the Board
The role of the regulator 
MP Fauconnier, CREG
De CREG, 
een blik in de keuken 
ELIA Stakeholders Day 2014 
Marie-Pierre Fauconnier 
Voorzitster van het directiecomité van de CREG 
Brussel, 21 november 2014
Agenda 
I. Regulatoir kader 
II. Rol van de regulator bij de bevordering van een stabiel regulatoir kader 
III. Rol van de regulator als marktfacilitator 
IV. Rol van de regulator bij de bevordering van degelijke informatie 
V. Rol van de regulator bij de bevordering van een open, eerlijke en constructieve 
dialoog 
80
I. Regulatoir kader 
 Veel wetswijzigingen de laatste jaren 
 Als gevolg van omzetting & uitvoering 3e Energiepakket: splitsing en certificering van 
DNB’s, tariefmethodologie, Europese netwerkcodes, bescherming van de verbruikers ... 
 ... maar ook andere nationale en Europese wetgevingsinitiatieven: strategische 
reserve, steunregeling voor offshore productie, verlenging van Tihange 1, de Europese REMIT-verordening, 
investeringsprojecten van gemeenschappelijk belang (PCI - infrastructure package) ... 
 => Uitbreiding van de bevoegdheden van de regulator naar gebieden die, 
direct of indirect, verband houden met de netactiviteiten. 
81
II. Rol van de regulator bij de bevordering van een 
stabiel regulatoir kader (1) 
 Stabiliteit van het regulatoir kader = ook het streven van de regulator 
− gunstig investeringsklimaat (productie, netinfrastructuren ...) 
− bevoorradingszekerheid 
− harmonieuze ontwikkeling van de energiemarkten 
− ... 
 Maar er zijn 'exogene' beperkingen: 
− toenemende complexiteit van energiesector in transitie 
− veel en uiteenlopende besluitvormingscentra 
− Integratieproces van nationale markten in de EU: speelt zich voortaan af in het kader 
van een Europees energiebeleid dat ook de klimaatproblematiek wil aanpakken 
82
II. Rol van de regulator bij de bevordering van een 
stabiel regulatoir kader (2) 
Groeiend aantal beslissingen/initiatieven van invloed op de binnenlandse markten 
worden op Europees niveau genomen/goedgekeurd 
 Europese Raad van 23 & 24 oktober 2014 
 40 – 27 – 27 
 interne energiemarkt (interconnecties - projecten van gemeenschappelijk belang) 
 bevordering van de energiezekerheid van de EU 
 ontwikkeling van een governancesysteem 
 “A Bridge to 2025” – ACER: prioriteitenpakket 
 volledige uitvoering van de Europese energiewetgeving 
 totstandbrenging van een interne energiemarkt 
 flexibiliteit van het energiestelsel 
83
II. Rol van de regulator bij de bevordering van een 
stabiel regulatoir kader (3) 
Conclusies 
 Een interne energiemarkt: meer interconnecties maar wel tegen een achtergrond van transitie naar 
een koolstofarme Europese economie én met voldoende concurrentiekracht; 
 Aangepaste, gemoderniseerde en/of sterkere netten met een groeiend percentage variabele 
hernieuwbare energie en een grotere flexibiliteit aan vraag- en aanbodzijde; 
 Noodzaak om vakgebieden aan te passen en de energietransitie zo goed mogelijk te begeleiden in 
het algemeen belang van het land en van alle Belgische verbruikers; 
 De CREG zal ertoe bijdragen dat ELIA, zo efficiënt en zo goed mogelijk, een niet-discriminerend, 
veilig, betrouwbaar en performant net ontwikkelt ten voordele van alle verbruikers. 
84
III. Rol van de regulator als marktfacilitator (1) 
 Doel: zorgen voor een goede marktwerking, van alle activiteitensegmenten, 
en de transparantie ervan ten behoeve van de verbruikers en in overleg met 
de marktspelers 
 Voorbeelden 
1. Tariefmethodologie 
2. Strategische reserves 
3. Capaciteit op de grenzen 
85
III. Rol van de regulator als marktfacilitator (2) 
Tariefmethologie - chronologie 
 Ontwerp van tariefmethodologie in overleg met ELIA (06/2014) 
 Openbare raadpleging (09/2014 en NEMO 11/2014) 
 12 reacties (geen op NEMO) 
 60 verschillende vragen => 60 antwoorden 
 Verslag van de raadpleging (27/11) 
 Verzending van de documenten naar de Kamer van Volksvertegenwoordigers 
(30/11) 
 Publicatie tekst tariefmethodologie : vóór 31/12/2014 
86
III. Rol van de regulator als marktfacilitator (3) 
Tariefmethologie – grote consultatiethema’s 
 Allocatie van de kosten aan de gebruikers 
− CREG: legt het kader voor de allocatie van de kosten vast 
− ELIA: stelt de allocatie van de kosten voor 
 Beslissing CREG 
 Peak Load Pricing 
− Efficiëntie, Eenvoud, Transparantie, Harmonisatie, Kostenreflectiviteit, Evoluties van de 
markt en het netwerk 
 Tariefperiodes 
− Tarief voor de jaarlijkse piek berekend op basis van tarifaire piekperiode 
87
III. Rol van de regulator als marktfacilitator (4) 
Tariefmethologie – stimulansen 
 Kostenefficiëntie 
 Beheersbare kosten en beïnvloedbare kosten 
 Marktintegratie 
 Financiële participaties 
 Interconnecties en welfare 
 Investeringen 
 Efficiëntie 
 Respect van de termijnen 
 R&D 
 Bevoorradingszekerheid 
 Strategische reserve 
 Rendabiliteit en Kwaliteit 
88
III. Rol van de regulator als marktfacilitator (5) 
Strategische reserve 
 Behoud van een bepaald veiligheidsniveau voor levering in de winter 
 Overlegprocedure betreffende modaliteiten voor samenstelling van de reserve 
 Procedure, op voorstel van Elia en na overleg, voor goedkeuring door de CREG van 
werkingsregels voor de strategische reserve - definitieve beslissing CREG: 5 juni 2014 
 Standpunt van de CREG betreffende de redelijkheid van de prijsoffertes die bij Elia 
binnengekomen zijn 
 Wil om in samenwerking met Elia, toezicht te houden op het mechanisme van de strategische 
reserve 
 Open vraag: andere CRM-types nodig? Te bepalen in een regionaal / Europees kader. 
89
III. Rol van de regulator als marktfacilitator (6) 
Capaciteit op de grenzen 
 Realiseren van studies om beter zicht te krijgen op de commerciële capaciteit die 
beschikbaar is op de bestaande interconnecties 
 Tot op vandaag heeft de CREG geen enkele investering verworpen 
 Initiatieven om de realisatie van bepaalde projecten te faciliteren 
 NEMO (BE-UK): ontwikkeling van een specifiek regulatoir kader (genaamd “cap & floor”) 
met de Britse regulator OFGEM, in samenwerking met Elia en National Grid, en 
ondersteund door verschillende publieke consultaties 
90
IV. Rol van de regulator in het verspreiden 
van kwaliteitsvolle informatie 
 Ter bevordering van de transparantie van de markt en voor een beter inzicht in de 
mechanismen van de marktwerking, voor alle activiteitensegmenten 
 Informatie 'op maat' of aangepast aan de doelgroepen (industrie, huishoudens, kmo's ...) 
 Informatie over evoluties op Europees niveau en in de Belgische gewesten 
 Publicatie door de CREG van goedgekeurde ‘akten’ gelinkt met de uitvoering van haar 
opdrachten, met respect voor vertrouwelijkheid van gegevens: www.creg.be 
 Verbeterde communicatie-instrumenten 
91
V. Rol van de regulator in het bevorderen van een 
open, eerlijke en constructieve dialoog 
In een energiewereld die voortdurend in beweging is, zal de CREG, in een geest van 
openheid en constructief overleg, zich blijven inspannen om: 
 de contacten tussen de marktspelers te bevorderen 
 aandacht te hebben voor de bekommernissen van de verschillende stakeholders en hen regelmatig te raadplegen 
 hen antwoorden te geven inspelend op hun behoeften, met respect voor haar onafhankelijkheid en met naleving 
van haar bevoegdheden 
 haar verantwoordelijkheid te nemen op regionaal niveau (FORBEG), nationaal en Europees niveau (CEER, 
ACER, Europese Commissie…) en de bestaande samenwerkingsverbanden te versterken 
 haar van de overheden en hen regelmatig te informeren expertise ter beschikking te stellen 
92
 Traditionele rol van « waakhond » van de markt 
 Maar deze « métier » dient mee te evolueren met een steeds complexere 
energiewereld 
 Alleen zo kunnen we blijven beantwoorden aan de behoeften van de 
marktspelers, steeds rekening houdend met de verbruikers 
 Met als noodzakelijke sleutel tot succes: een cultuur van open en 
constructieve dialoog, op permanente basis 
93 
Besluit
Dank voor uw aandacht 
94
Federal Minister of Energy 
M-C Marghem
J. Vandermeiren 
F. Vandenberghe
Main highlights of the day 
I. Tant, Elia
Thank you for your attention!

More Related Content

PDF
Rianne t Hoen - DNV GL
PDF
Piet Nienhuis - Gasunie & Gert van der Lee - Tennet
PDF
Stefan Olsthoorn - Energy Storage NL
PDF
Sertkan Kabul - TenneT
PDF
Lars Meindert - Ministerie van Economische Zaken en Klimaat
PDF
4. Maike Akkers - Havenbedrijf Rotterdam
PDF
Frank wiersma - Tennet
PDF
3. Edward Coster - Session 4: Distributed Energy Resources and active demand ...
Rianne t Hoen - DNV GL
Piet Nienhuis - Gasunie & Gert van der Lee - Tennet
Stefan Olsthoorn - Energy Storage NL
Sertkan Kabul - TenneT
Lars Meindert - Ministerie van Economische Zaken en Klimaat
4. Maike Akkers - Havenbedrijf Rotterdam
Frank wiersma - Tennet
3. Edward Coster - Session 4: Distributed Energy Resources and active demand ...

What's hot (20)

PDF
7. Ernst Menten - Rijkswaterstaat
PPTX
Bert den Ouden - Voorzitter FAN - Flexibiliteit in de markt
PPT
Tony Vynckier - Nuon
PDF
Anne van der molen - Stedin
PDF
Ton van Cuijk - Enexis Netbeheer
PDF
3. Maarten Noom- Enexis
PDF
Workshop agentschap nl pro vada 6juni13
PDF
1. Henk Fidder - Stedin
PPT
Alternatief voor WK en elektrische warmtepompen
PPTX
Werelddag van de Stedenbouw 2017 | Klimaatnetwerk Vlaams-Brabant
PDF
Presentatie Sint Lambertusinstituut
PDF
Presentatie VTS Sint Niklaas
PDF
De ware kosten en baten van conventionele en hernieuwbare energie
PPTX
Werelddag van de Stedenbouw 2017 | Transitie bestaande wijken/Limburg renoveert
PPT
Werelddag van de Stedenbouw 2017 | Eeklo Energieneutraal
PDF
Presentatie%20 agentschapnl smit_21mrt13
PPTX
Het derde natuurlijke moment
PDF
Jan Declercq, Royal Smit Transformatoren
PDF
SF6 Alternatieven in Middenspanning
PPTX
Energielabel c verplichting kantoren in 2023
7. Ernst Menten - Rijkswaterstaat
Bert den Ouden - Voorzitter FAN - Flexibiliteit in de markt
Tony Vynckier - Nuon
Anne van der molen - Stedin
Ton van Cuijk - Enexis Netbeheer
3. Maarten Noom- Enexis
Workshop agentschap nl pro vada 6juni13
1. Henk Fidder - Stedin
Alternatief voor WK en elektrische warmtepompen
Werelddag van de Stedenbouw 2017 | Klimaatnetwerk Vlaams-Brabant
Presentatie Sint Lambertusinstituut
Presentatie VTS Sint Niklaas
De ware kosten en baten van conventionele en hernieuwbare energie
Werelddag van de Stedenbouw 2017 | Transitie bestaande wijken/Limburg renoveert
Werelddag van de Stedenbouw 2017 | Eeklo Energieneutraal
Presentatie%20 agentschapnl smit_21mrt13
Het derde natuurlijke moment
Jan Declercq, Royal Smit Transformatoren
SF6 Alternatieven in Middenspanning
Energielabel c verplichting kantoren in 2023
Ad

Viewers also liked (9)

PPTX
Elia Stakeholders' Day 2015
PDF
20140630_Crucial Energy Choices For Belgium
PDF
The European long term vision and the Elia Group challenges
PDF
Strategy performance management hierarchy of objectives
PDF
Results based performance management system rpms- for dep ed
PDF
How to Write Clickass Presentations that Convert
PPT
Performance Management System
PPT
Strategic Planning For Managers
PPT
Performance Management
Elia Stakeholders' Day 2015
20140630_Crucial Energy Choices For Belgium
The European long term vision and the Elia Group challenges
Strategy performance management hierarchy of objectives
Results based performance management system rpms- for dep ed
How to Write Clickass Presentations that Convert
Performance Management System
Strategic Planning For Managers
Performance Management
Ad

More from Elia (13)

PPT
Panel sd 16.06.2014
PDF
Elia group full year results 2013
PPTX
Windturbines en storm: project Twenties
PDF
Elia's Stakeholders' day 2013 afternoon
PDF
Elia's Stakeholders' day 2013 morning-part2
PDF
Elia's Stakeholders' day 2013 morning-part1
PPTX
Elia vision utility week 2013
PDF
Infosessie rechtgezette tarieven
PDF
2013 05 22 session d'information tarifs rectifiés grd-ur - fr
PDF
Elia en chiffres/Elia in cijfers
PDF
Presentation Jacques Vandermeiren at Trends Lunch
PDF
Elia : lien essentiel dans le marché de l'électricité
PDF
Elia: essentiële link in de elektriciteitsmarkt
Panel sd 16.06.2014
Elia group full year results 2013
Windturbines en storm: project Twenties
Elia's Stakeholders' day 2013 afternoon
Elia's Stakeholders' day 2013 morning-part2
Elia's Stakeholders' day 2013 morning-part1
Elia vision utility week 2013
Infosessie rechtgezette tarieven
2013 05 22 session d'information tarifs rectifiés grd-ur - fr
Elia en chiffres/Elia in cijfers
Presentation Jacques Vandermeiren at Trends Lunch
Elia : lien essentiel dans le marché de l'électricité
Elia: essentiële link in de elektriciteitsmarkt

Elia stakeholders day 21 nov 2014

  • 1. Elia Stakeholders’ Day 21 November 2014
  • 2. The development of grid infrastructure on both European & Belgian level
  • 3. Federal Network Development Plan F. Dunon, Elia
  • 4. AGENDA 1. Network development: the context 2. Infrastructure projects 3. Consultation & approval process
  • 5. 1. NETWORK DEVELOPMENT The context 5 ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / FIRSTNAME LASTNAME
  • 6. TSOs play a key role in the energy revolution 3 ACTIVITIES 3 CHALLENGES Infrastructure management System operation + strategic reserves Market facilitation
  • 7. Belgian electricity network: history and future developments Industrial development Electricity Companies Economic Expansion Nuclear development Gas power plants integration EU Electricity Directives & packages 2200’’ss –– 4400’’ss 5500’’ss –– 7700’’ss 7700’’ss late 80’s – eraly 90’s late 90’s - 2013
  • 8. EU leaders agreed on 23 October 2014 the domestic 2030 greenhouse gas reduction target of at least 40% compared to 1990 COMMISIONER GÜNTHER OETTINGER
  • 9. Increasing uncertainties today 2020 2030 Uncertainties From today to 2020 From 2020 to 2030 Essentially, the following uncertainties  Nuclear power plants  EU 2020 targets  New thermal plants  Additional decommissioning  Load growth Key drivers shaping the future energy landscape  No nuclear power plants after 2025  Pace of RES integration  Security of supply : autonomy or dependency  CO2 market reforms  Additional decommissioning  Load growth and Energy efficiency  Storage developments  Off-grid solutions
  • 10. Scenarios for framing uncertainty: 2030 Construction of 4 scenarios 2030: • Legal obligation: in line with the prospective study on generation resources (federal authorities) • Legal obligation: being compatible with TYNDP scenarios • Elia does not assume that one scenario is more likely or more desirable than another • The actual situation should tally in these extreme scenarios Reality 2030 ?
  • 11. Total electricity demand (TWh) 110 100 90 80 70 60 +23% V4 V0 +3% 2005 2010 2015 2020 2025 2030 Year EU 2020 V3 4 ENTSO-E based scenarios used by Elia to evaluate federal development plan 4 scenarios defined to test robustness of development plan All visions assume a demand increase vs. 2013 (3-23%) Low (imports) High (autonomy) National autonomy High RES growth Low Vision 4: "Green Revolution" Vision 3: "Green Transition" Vision 0: "No progress" Vision 1: "Slow progress" Historical consumption Scenarios V1
  • 12. % RES -20% -62% 3 CO2 reduction (% - compared to 1990) 40% 50% 60% 2 -78% 14% -7% 2005 -39% 35% 1 -42% 4 RES Targets EU = total scope energy % RES graph = part within electricity generation mix On track energy roadmap 2050 2020
  • 13. Definition of scenarios : test for the resiliance of infrastructure projects Scheme Description Application of the 4 visions (V0, V1, V3 and V4) Moderate transition of the power market • Moderate to strong demand increase • Further RES penetration • Different national autonomy levels Decentral Strong decentral production (30% of power demand), no longer passing through grids • High adoption of intermittent RES • Breakthrough of 'prosumption', combining local generation & storage • Adequacy and balancing on unit or microgrid level Pan-European mgmt of demand and generation fluctuations in context of high intermittent production • High adoption of intermittent RES • High capacity interconnections • Adequacy on pan-European level: pooling variability & capacity • Likely by European ISO 4 ENTSO-E 0 trajectories 1 Islands 2 Supergrid
  • 14. “380kV backbone and interconnection projects are effective and robust against uncertainties” ENTSO-E SYSTEM DEVELOPMENT COMMITTEE
  • 15. “ Regarding lower voltage levels, it is wise to maintain a careful approach towards grid extensions, based on techno-economic optimizations, flexible operational measures, projects phasing and striving for a rationalization of the portfolio” ELIA GRID DEVELOPMENT
  • 16. 2. INFRASTRUCTURE PROJECTS 16 ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / FIRSTNAME LASTNAME
  • 17. Developing or reinforcing interconnections on each border 1 4 3 2 5 1 NEMO [2019]: GB-BE subsea HVDC interconnection 2 ALEGrO [2019]: DE-BE underground HVDC interconnection 3 Avelin-Avelgem-Horta [2021- 23]: new HTLS conductors 4 Brabo I [ 2016 ]: PST 4 Zandvliet 5 PST Schiffelange [CREOS- 2015] 2 220 kV Aubange- Bascharage (*)HTLS : High Temperature Low Sag – High performance conductors
  • 18. Reinforcing the 380 KV backbone 1 2 3 4 6 5 6 1 STEVIN [2018]: Corridor Zomergem-Zeebrugge 380 kV 2 Mercator-Horta [2019-2021]: new HTLS conductors 3 Brabo II [2019]: Zandvliet-Lillo- Liefkenshoek 380 kV Brabo III [2023]: Liefkenshoek- Mercator 380 kV (*)HTLS : High Temperature Low Sag – High performance conductors
  • 19. Reinforcing the 380 KV backbone 1 2 3 4 6 5 6 4 Gramme-Van Eyck[2015] : 2nd circuit 380 kV and substation Van Eyck 5 Lixhe-Herderen [2017] : 2nd circuit 380 kV and substation Lixhe 6 Longer run - indicative:  2nd circuit Van Eyck- Massenhoven  New HTLS conductors on Gramme-Van Eyck corridor 380 kV  2nd corridor 380 kV Lixhe- Herderen (*)HTLS : High Temperature Low Sag – High performance conductors
  • 20. Local grids: 220 – 150 – 110 KV (*)HTLS : High Temperature Low Sag – High performance conductors Refurbish Reinforce Mixed RES
  • 21. 3. CONSULTATION & APPROVAL PROCESS 21 ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / FIRSTNAME LASTNAME
  • 22. Plan de Développement fédéral 2015 - 2025 Juin 2014 Août 2014 Oct. 2014 Nov. 2014 Jan. 2015 Mars 2015 Mai 2015 Juil. 2015 Sept. 2015 Nov. 2015 DDrraaffttiinngg PPDDFF 22001155--22002255 Processus approbation PDF approuvé 5 Jan, 2015 Draft PDP Publié FFiinnaalliissaattiioonn Consult, CREG + comité SEA Etude SEA Update PDF Consultation Publique TYNDP final publié Meetings SPF-BFP (4x) PDF 2015-2025: approbation par le Ministre de l’Energie pour novembre 2015 (date cible) SEA = Strategic Environmental Assessment PDF = Plan de Développement Fédéral TYNDP = Ten-Year Network Development Plan d’ENTSO-E BFP = Bureau Fédéral du Plan SPF = Service Public Fédéral (Direction énergie)
  • 23. Many thanks for your attention! FRÉDÉRIC DUNON
  • 24. EU Energy Infrastructure package Implications for Belgium L. Meeus, Vlerick Energy Centre
  • 25. “200 billion needs to be invested in energy infrastructure projects in the EU by 2020” “Risk that almost half of this investment will arrive too late or not at all” EUROPEAN COMMISSION, 2011
  • 26. ALREADY MAKING A POSITIVE DIFFERENCE EU Energy Infrastructure Package
  • 27. Common CBA method: new instrument to select EU priorities Cost Benefit Analysis now enables right project selection
  • 28. Projects of common interest: several belgian projects made the selection Infrastructure Projects Nemo and Alegro have PCI label
  • 29. Permits: FIRST one stop shops ARE coming online
  • 30. EU Funding for projects rather than paper
  • 31. IF National Regulation Authorities CANNOT AGREE ON COST SHARING…. ..THEN ACER WILL TAKE AN IMPORTANT ROLE
  • 32. INVESTMENT INCENTIVES? EU Energy Infrastructure Package
  • 33. Risk versus Return… Incentives to invest: TSO rate of return Cost efficiency incentives: TSO Risk … diverging practices across Europe
  • 34. Towards a harmonization of national regulatory frameworks? Incentives to invest: TSO rate of return Cost efficiency incentives: TSO Risk
  • 35. Or towards exceptional regulatory frames for priority projects? Context • Lack of stragicalligy improtant investment, 2003 blackout Solution • Eligible projects: interconnection and congestion reducing domestic lines • Incentives: 12 years (risk) and +2% WACC premium (return) Experience • 8 billion invested since 2008 • 28 ongoing strategic projects
  • 36. THIS IS ONLY THE FIRST PACKAGE FOR INFRASTRUCTURE EU Energy Infrastructure Package
  • 37. Key messages for Belgium • Advanced regulatory treatment that has to be put in place anyway for PCIs, could also be applied to important national investments • Look at the state of the art one stop shops that are being implemented for permit granting • Revisit the regulatory framework for electricity networks
  • 39. Market functioning, strategic reserve & planned outages E. Spire, Elia D. Zenner, Elia D. Aelbrecht, Elia
  • 40. Q1 à Emeline Spire Le jugement de Leonardo Meeus sur le fonctionnement du marché interne est du moins « mitigé ». Quelle est ton opinion a ce sujet ? Comment vois-tu évoluer les choses ?.... ELIA STAKEHOLDERS’ DAY | FRIDAY, 40 NOVEMBER 21, 2014
  • 41. Q2 à Emeline Spire Quels ont été les principaux développements en 2014 concernant le marché de l’énergie ? ELIA STAKEHOLDERS’ DAY | FRIDAY, 41 NOVEMBER 21, 2014
  • 42. Q3 à Emeline Spire Mais le fonctionnement du marché à plus long terme, pour les signaux d’investissements laisse quand-même beaucoup à désirer ? ELIA STAKEHOLDERS’ DAY | FRIDAY, 42 NOVEMBER 21, 2014
  • 43. Q4 à Emeline Spire On entend beaucoup parler de l’incitant de 4500 Euro/MWh, on parle même de temps en temps d’une amende. Peux-tu nous expliquer de quoi il s’agit exactement et comment cet incitant a été déterminé. ELIA STAKEHOLDERS’ DAY | FRIDAY, 43 NOVEMBER 21, 2014
  • 44. 44
  • 45. Q5 aan David Zenner Heeft een dergelijke incentive toch voor enige reacties gezorgd heeft bij de marktpartijen ? ELIA STAKEHOLDERS’ DAY | FRIDAY, 45 NOVEMBER 21, 2014
  • 46. Q6 aan David Zenner Hoe staan we ervoor? Wat is de laatste stand van zaken ivm het risico op stroomschaarste voor deze winter? ELIA STAKEHOLDERS’ DAY | FRIDAY, 46 NOVEMBER 21, 2014
  • 48. Q7 aan David Zenner Quels moyens de communication Elia met en place pour ses stakeholders afin de les avertir au mieux de la situation? ELIA STAKEHOLDERS’ DAY | FRIDAY, 48 NOVEMBER 21, 2014
  • 49. Which channel, content and targeted audience? Communicate on the risk evolution of … •Towards the energy market professionals •Towards the Community 49 … Strategic Reserve activation … load-shedding www.elia.be/en/grid-data www.readyforwinter.be An app will also be available with notification push! Also for subscription to RSS feed COMMUNICATION
  • 50. Q8 à David Zenner Le plan de délestage connaît un grand impact. Pour être clair, les utilisateurs du réseau d’Elia ne seront pas affectés ? ELIA STAKEHOLDERS’ DAY | FRIDAY, 50 NOVEMBER 21, 2014
  • 51. Q9 aan Dirk Aelbrecht Gezien de situatie, welke operationele acties en middelen heeft het National Control Center genomen om de situatie meester te blijven? ELIA STAKEHOLDERS’ DAY | FRIDAY, 51 NOVEMBER 21, 2014
  • 52. Q10 aan Dirk Aelbrecht Om het hoofd te bieden aan de situatie wordt rekening gehouden met een beschikbare interconnectiecapaciteit. Hoe zit dit exact in elkaar en hoe wordt deze capaciteit berekend? ELIA STAKEHOLDERS’ DAY | FRIDAY, 52 NOVEMBER 21, 2014
  • 53. 53 Import – inter-TSO coördinatie Voorbeeld van een invoer van 3500 MW vanuit Noord-Europa Acties
  • 54. Q11 aan Dirk Aelbrecht De regulator CREG, alsook de markt, challenged Elia of we wel voldoende inspanningen leveren om een maximale capaciteit ter beschikking te stellen. Hoe staan wij hier tegenover en wat is ons antwoord? ELIA STAKEHOLDERS’ DAY | FRIDAY, 54 NOVEMBER 21, 2014
  • 56. Risk for Electricity Shortfall Winter 2014-2015 What is the role of the government? N. Mahieu, FOD/SPF Economie
  • 57. Procedure shortfall of electricity (iterative process) Notification Preparation Detection Crisis consultation Decision Execution Crisis consultation Elia Elia/Ministers/FPS Economy/FPS of the Interior Departmental crisis cell. Consultation Regions ELIA STAKEHOLDERS’ DAY | FRIDAY, 57 NOVEMBER 21, 2014 Minister(s)/ELIA/DG Energy and DG NCC Ministers of Economy and Energy ARP/ Elia Involved actors* When situation confirmed, Elia sends out a notification Weather factors of the RMI, production forecasts, etc D-7 D-7 Technical briefing D-7 D-7/D-6 Discussion of the measures and the related impact (based on the analysis of the evaluation cell) D-6 D-6 Information partners /Communication population / Technical implementation Control and monitoring D-6/D-5  J Package of measures (Awareness and Prohibition) Activation load shedding plan * Involved actors: Ministers/ Administrations of FPS Economy and of the Interior/ Elia/ distribution network provider/other involved actors
  • 58. MEASURES TO REDUCE ELECTRICITY CONSUMPTION • Two types of measures : • Awareness measures • Prohibition measures • Prohibition of the use of electrical devices and consumption sources (i.e. via decrees) • Decision taken by Energy and Economy Ministers • 4 main clusters : 1. Residential clients • Awareness via OFF/ON campaign • Prohibition measures 2. Buildings (Private buildings and government buildings) • Awareness via OFF/ON campaign • Reducing consumption procedure for all buildings (written by Energy DG) ELIA STAKEHOLDERS’ DAY | FRIDAY, 58 NOVEMBER 21, 2014 3. Lighting • Awareness via OFF/ON campaign • Prohibition measures for public (streets, highways, etc.) and private non-functional lighting 4. Public transport • Awareness of all actors (trains, metro, etc) • Consumption reduction measures on electrical railways
  • 59. Capacity remuneration schemes Two planned mechanisms Part of an overarching generation adequacy plan. • Strategic reserve: 850 MW, including 100 MW of DSM, for winter 2014-2015 can be called upon in case of a generation adequacy crisis; • Public tender: Mechanism to trigger investments in gas-fired power plants. Three offers being analyzed. ELIA STAKEHOLDERS’ DAY | FRIDAY, 59 NOVEMBER 21, 2014 Vision of the new government Aim to radically improve the investment climate, including an evaluation of the planned nuclear phase-out. • Strategic reserve: Will be maintained for winter 2014-2015, but necessity for following years analyzed in light of the new context; • Public tender: Opportunity of current tender will be re-evaluated, in close collaboration with neighboring countries.
  • 60. Thank you for your attention! NANCY MAHIEU, ACTING DIRECTOR GENERAL FOR ENERGY
  • 61. Energy shortage & load shedding The role of the DSOs B. Crabs, Synergrid
  • 62. 1. Wie is Synergrid? • Synergrid verenigt de beheerders van de aardgas- en elektriciteitsnetten in België: – Elia: transmissie van elektriciteit (hoogspanningslijnen) – Fluxys: vervoer van aardgas (hogedrukleidingen) – Distributienetbeheerders: distributie van elektriciteit en aardgas (midden en lage druk/spanning) • Missie: Bevorderen van de efficiëntie van de netinfrastructuur Verhogen van de dienstverlening aan de netgebruikers
  • 63. 2. De elektriciteitsnetbeheerders Transportnetbeheerder Distributienetbeheerders Vlaanderen Eandis Infrax Brussel Sibelga Wallonië Ores Resa REW AIEG AIESH
  • 64. 3. Het elektriciteitsnet in enkele cijfers • Lengte transportnet: 8.370 km • Lengte distributienet: 210.072 km • Aantal leveringsposten TNB/DNB: 567 – Vlaanderen: 300 – Brussel: 49 – Wallonië: 218 • Aantal klantcabines: 73.810 • Aantal actieve leveringspunten: 5.714.503
  • 65. 4. Wie doet wat? Beslissing afschakeling: Minister Economie + Energie Crisisbeheer: Federale + provinciale + gemeentelijke crisiscellen Uitvoering afschakeling: TNB Elia Hervoeding ziekenhuizen en zorgcentra: DNB Hervoeding alle klanten na herbevoorrading door Elia: DNB
  • 66. 5. Hoe verloopt een afschakeling?
  • 67. 6. Hervoeding van de netten • De volgende leveringspunten zullen zo snel mogelijk hervoed worden: – Hulpdiensten van de netinfrastructuur – Ziekenhuizen en zorgcentra: volgens de lijst opgesteld door de FOD Volksgezondheid
  • 68. 7. Decentrale productie-eenheden • Windmolens, fotovoltaïsche zonnepanelen en wkk’s zullen zich automatisch afkoppelen van net conform de geldende reglementering • Productie-eenheden aangesloten op hoogspanningspost: terug onder spanning gebracht om bij te dragen tot beperken schaarste • Productie-eenheden op laag- en middenspanningsnet: niet terug onder spanning gebracht => Verbruik > productie => Schaarsteprobleem verergeren!
  • 70. Energy shortage planning P. De Leener, Coreso F. Vandenberghe, Elia
  • 71. Coreso • Independent company (SA); 100% TSO owned • Created in Dec 2008; in operation since Feb 2009 • Today over 20 operators in 24/7 shift role • Centralized model; experts coming from the TSOs (“rotational model”) ELIA STAKEHOLDERS’ DAY | FRIDAY, 71 NOVEMBER 21, 2014
  • 72. Coreso’s Mission • The mission of Coreso is to assist TSOs pro actively to ensure Security of Supply on a European regional basis. • Being a centralized RSCI, the highest added value and so the operational focus is from a few days before until close to real time. • Coreso develops and performs operational coordination services in cooperation with TSOs and RSCIs; the operational responsibilities remain at TSO level. • Based on its regional expertise, Coreso supports the TSO community in identifying and undertaking actions and initiatives on medium and longer term to ensure Security of Supply. • By its centralized model with rotational staffing from TSOs, Coreso spreads the culture and practice of international cooperation amongst the TSOs. ELIA STAKEHOLDERS’ DAY | FRIDAY, 72 NOVEMBER 21, 2014
  • 73. Coreso’s role in the Winter Action Plan In order to support the TSOs in case of scarcity situation during next winter in a coordinated way, an ad hoc action plan has been put forward: 1. ex ante operational winter study together with CWE partners 2. Set up of a coordinated process to enable adequate import capacities in a secure way on Day Ahead and Intraday Markets 3. Coordination support to interTSO actions (after the markets; close to real time) ELIA STAKEHOLDERS’ DAY | FRIDAY, 73 NOVEMBER 21, 2014
  • 74. European energy policy and internal markets P. Bornard, RTE, Chairman of ENTSO-E P. Fonck, Elia O. Koch, European Commission
  • 75. QUESTIONS FROM THE AUDIENCE? 75 ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / FIRSTNAME LASTNAME
  • 76. LUNCH 76 ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 / FIRSTNAME LASTNAME
  • 77. Elia’s broadening international scope M. Maes, Chairwoman of the Board
  • 78. The role of the regulator MP Fauconnier, CREG
  • 79. De CREG, een blik in de keuken ELIA Stakeholders Day 2014 Marie-Pierre Fauconnier Voorzitster van het directiecomité van de CREG Brussel, 21 november 2014
  • 80. Agenda I. Regulatoir kader II. Rol van de regulator bij de bevordering van een stabiel regulatoir kader III. Rol van de regulator als marktfacilitator IV. Rol van de regulator bij de bevordering van degelijke informatie V. Rol van de regulator bij de bevordering van een open, eerlijke en constructieve dialoog 80
  • 81. I. Regulatoir kader  Veel wetswijzigingen de laatste jaren  Als gevolg van omzetting & uitvoering 3e Energiepakket: splitsing en certificering van DNB’s, tariefmethodologie, Europese netwerkcodes, bescherming van de verbruikers ...  ... maar ook andere nationale en Europese wetgevingsinitiatieven: strategische reserve, steunregeling voor offshore productie, verlenging van Tihange 1, de Europese REMIT-verordening, investeringsprojecten van gemeenschappelijk belang (PCI - infrastructure package) ...  => Uitbreiding van de bevoegdheden van de regulator naar gebieden die, direct of indirect, verband houden met de netactiviteiten. 81
  • 82. II. Rol van de regulator bij de bevordering van een stabiel regulatoir kader (1)  Stabiliteit van het regulatoir kader = ook het streven van de regulator − gunstig investeringsklimaat (productie, netinfrastructuren ...) − bevoorradingszekerheid − harmonieuze ontwikkeling van de energiemarkten − ...  Maar er zijn 'exogene' beperkingen: − toenemende complexiteit van energiesector in transitie − veel en uiteenlopende besluitvormingscentra − Integratieproces van nationale markten in de EU: speelt zich voortaan af in het kader van een Europees energiebeleid dat ook de klimaatproblematiek wil aanpakken 82
  • 83. II. Rol van de regulator bij de bevordering van een stabiel regulatoir kader (2) Groeiend aantal beslissingen/initiatieven van invloed op de binnenlandse markten worden op Europees niveau genomen/goedgekeurd  Europese Raad van 23 & 24 oktober 2014  40 – 27 – 27  interne energiemarkt (interconnecties - projecten van gemeenschappelijk belang)  bevordering van de energiezekerheid van de EU  ontwikkeling van een governancesysteem  “A Bridge to 2025” – ACER: prioriteitenpakket  volledige uitvoering van de Europese energiewetgeving  totstandbrenging van een interne energiemarkt  flexibiliteit van het energiestelsel 83
  • 84. II. Rol van de regulator bij de bevordering van een stabiel regulatoir kader (3) Conclusies  Een interne energiemarkt: meer interconnecties maar wel tegen een achtergrond van transitie naar een koolstofarme Europese economie én met voldoende concurrentiekracht;  Aangepaste, gemoderniseerde en/of sterkere netten met een groeiend percentage variabele hernieuwbare energie en een grotere flexibiliteit aan vraag- en aanbodzijde;  Noodzaak om vakgebieden aan te passen en de energietransitie zo goed mogelijk te begeleiden in het algemeen belang van het land en van alle Belgische verbruikers;  De CREG zal ertoe bijdragen dat ELIA, zo efficiënt en zo goed mogelijk, een niet-discriminerend, veilig, betrouwbaar en performant net ontwikkelt ten voordele van alle verbruikers. 84
  • 85. III. Rol van de regulator als marktfacilitator (1)  Doel: zorgen voor een goede marktwerking, van alle activiteitensegmenten, en de transparantie ervan ten behoeve van de verbruikers en in overleg met de marktspelers  Voorbeelden 1. Tariefmethodologie 2. Strategische reserves 3. Capaciteit op de grenzen 85
  • 86. III. Rol van de regulator als marktfacilitator (2) Tariefmethologie - chronologie  Ontwerp van tariefmethodologie in overleg met ELIA (06/2014)  Openbare raadpleging (09/2014 en NEMO 11/2014)  12 reacties (geen op NEMO)  60 verschillende vragen => 60 antwoorden  Verslag van de raadpleging (27/11)  Verzending van de documenten naar de Kamer van Volksvertegenwoordigers (30/11)  Publicatie tekst tariefmethodologie : vóór 31/12/2014 86
  • 87. III. Rol van de regulator als marktfacilitator (3) Tariefmethologie – grote consultatiethema’s  Allocatie van de kosten aan de gebruikers − CREG: legt het kader voor de allocatie van de kosten vast − ELIA: stelt de allocatie van de kosten voor  Beslissing CREG  Peak Load Pricing − Efficiëntie, Eenvoud, Transparantie, Harmonisatie, Kostenreflectiviteit, Evoluties van de markt en het netwerk  Tariefperiodes − Tarief voor de jaarlijkse piek berekend op basis van tarifaire piekperiode 87
  • 88. III. Rol van de regulator als marktfacilitator (4) Tariefmethologie – stimulansen  Kostenefficiëntie  Beheersbare kosten en beïnvloedbare kosten  Marktintegratie  Financiële participaties  Interconnecties en welfare  Investeringen  Efficiëntie  Respect van de termijnen  R&D  Bevoorradingszekerheid  Strategische reserve  Rendabiliteit en Kwaliteit 88
  • 89. III. Rol van de regulator als marktfacilitator (5) Strategische reserve  Behoud van een bepaald veiligheidsniveau voor levering in de winter  Overlegprocedure betreffende modaliteiten voor samenstelling van de reserve  Procedure, op voorstel van Elia en na overleg, voor goedkeuring door de CREG van werkingsregels voor de strategische reserve - definitieve beslissing CREG: 5 juni 2014  Standpunt van de CREG betreffende de redelijkheid van de prijsoffertes die bij Elia binnengekomen zijn  Wil om in samenwerking met Elia, toezicht te houden op het mechanisme van de strategische reserve  Open vraag: andere CRM-types nodig? Te bepalen in een regionaal / Europees kader. 89
  • 90. III. Rol van de regulator als marktfacilitator (6) Capaciteit op de grenzen  Realiseren van studies om beter zicht te krijgen op de commerciële capaciteit die beschikbaar is op de bestaande interconnecties  Tot op vandaag heeft de CREG geen enkele investering verworpen  Initiatieven om de realisatie van bepaalde projecten te faciliteren  NEMO (BE-UK): ontwikkeling van een specifiek regulatoir kader (genaamd “cap & floor”) met de Britse regulator OFGEM, in samenwerking met Elia en National Grid, en ondersteund door verschillende publieke consultaties 90
  • 91. IV. Rol van de regulator in het verspreiden van kwaliteitsvolle informatie  Ter bevordering van de transparantie van de markt en voor een beter inzicht in de mechanismen van de marktwerking, voor alle activiteitensegmenten  Informatie 'op maat' of aangepast aan de doelgroepen (industrie, huishoudens, kmo's ...)  Informatie over evoluties op Europees niveau en in de Belgische gewesten  Publicatie door de CREG van goedgekeurde ‘akten’ gelinkt met de uitvoering van haar opdrachten, met respect voor vertrouwelijkheid van gegevens: www.creg.be  Verbeterde communicatie-instrumenten 91
  • 92. V. Rol van de regulator in het bevorderen van een open, eerlijke en constructieve dialoog In een energiewereld die voortdurend in beweging is, zal de CREG, in een geest van openheid en constructief overleg, zich blijven inspannen om:  de contacten tussen de marktspelers te bevorderen  aandacht te hebben voor de bekommernissen van de verschillende stakeholders en hen regelmatig te raadplegen  hen antwoorden te geven inspelend op hun behoeften, met respect voor haar onafhankelijkheid en met naleving van haar bevoegdheden  haar verantwoordelijkheid te nemen op regionaal niveau (FORBEG), nationaal en Europees niveau (CEER, ACER, Europese Commissie…) en de bestaande samenwerkingsverbanden te versterken  haar van de overheden en hen regelmatig te informeren expertise ter beschikking te stellen 92
  • 93.  Traditionele rol van « waakhond » van de markt  Maar deze « métier » dient mee te evolueren met een steeds complexere energiewereld  Alleen zo kunnen we blijven beantwoorden aan de behoeften van de marktspelers, steeds rekening houdend met de verbruikers  Met als noodzakelijke sleutel tot succes: een cultuur van open en constructieve dialoog, op permanente basis 93 Besluit
  • 94. Dank voor uw aandacht 94
  • 95. Federal Minister of Energy M-C Marghem
  • 96. J. Vandermeiren F. Vandenberghe
  • 97. Main highlights of the day I. Tant, Elia
  • 98. Thank you for your attention!