EminentPanelConference,Accra,August7th -9th,2020
PRELIMINARY FINDINGS:
Rural Transport in Ghana
Michael Graham, Head of Development Finance Programmes at the
University of Stellenbosch Business School, Cape Town
Infrastructure and Economic Growth
The current state of road infrastructure
 Total network of 78,402 km with only 49% either maintained or rehabilitated.
Poverty levels and state of road infrastructure
0
10
20
30
40
50
60
70
80
90
100
Upper East Upper West Northern Brong Ahafo Ashanti Volta Eastern Greater Accra Central Western
Percentage
Region
% Living below Poverty Line (1999) % of roads in poor condition
Infrastructure and Economic Growth contd.
The current state of rail tracks
 Total track network length is 1300km, with the rail industry operating a route length of 947km.
 60% of the rail network is not used on a regular basis due to infrastructure decay.
 Limits the country’s potential in harnessing its resources.
 International competitiveness and market access
 Stimulate industrial and labour productivity growth rates,
Intervention 1
Development of Rural Roads
Rural Roads: Overview
Construction of 1888km of roads
 Link several identified high agricultural production areas to the nearest commercial centers
 Link several tourism areas to the nearest commercial centers
The expected net present values of the cost of the project is
GHS5.3 billion at 8 percent discount rate.
Costs across the project life
0
200
400
600
800
1000
1200
1400
1600
1800
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048
Costs
(GHS,
million)
Year
Contruction Cost (with overrun) (GHS, millions) Routine O&M Cost (GHS, millions) Periodic O&M Cost (GHS, millions)
The expected total net present value of the benefit for the road
intervention is estimated to be GHS6.5 billion at 8% discount rate.
Benefits(GHS,Millions) Costs(GHS,Millions) BCR
WithoutCostOverruns
5% 10,237 6,220 1.65
8% 6,494 4,650 1.40
14% 3,092 2,990 1.03
WithCostOverruns
5% 10,237 6,973 1.47
8% 6,494 5,297 1.23
14% 3,092 3,481 0.89
0 1E+10 2E+10
Carbon emission savings
Generalised cost savings
Travel cost savings
PHL savings
Road Benefits
Intervention 2
Rehabilitation and expansion of Railway tracks in Ghana
Rail: Overview
 The rail intervention project
 Rehabilitation of 668 km of existing narrow gauge tacks by converting them into single-tracks
standard gauge
 The expansion of rail networks to the northern region of Ghana by constructing new standard
gauge tracks with a total length of 3340km.
Cost
The expected total net present value of the cost for the rail intervention is
estimated to be GHS 72.9 million per kilometer
Benefits
 The estimated NPV of benefits is GHS109 million/km,
comprising;
 Time savings
 Pax GHS/km 575
 Freight GHS/km 19,500
 Avoided VOC
 Pax GHS/km 38,000
 Freight GHS/km 3.9 million
 Accident Savings
 1,394 lives saved amounting to GHS/km 118,000
 PHL savings
 Estimated savings of PHL at base year GHS/km 20160
 Residual Value
 Pax GHS 5 million
 Freight 4 million
Times savings for passengers and freight
Total Benefits and Cost-Benefit Ratio
Discount rate Benefits per km
(GHS, Millions)
Costs per km
(GHS, Millions) BCR
5% 175 76 2.3
8% 109 72 1.5
14% 52 69 0.8
Summary of Benefits and Costs for Rail Intervention
SUMMARY BCR TABLE
INTERVENTION
BENEFITS
(GHS M)
COSTS
(GHS M)
BCR
Development of Rural
Roads 6.5 billion 5.3 billion 1.2
Rehabilitation and
expansion of Railway
tracks in Ghana
109 72 1.5

More Related Content

PPTX
Ghana Priorities: Urban Transportation
PDF
UDOT Presentation to 2019 Legislature
PPTX
[Transportation] Action Learning - Manjula sri lanka
PDF
Charging for use of infrastructure by road freight
PPTX
International Experience with Electric and Zero Emission Buses
PDF
"A big data approach for investigating the performance of road infrastructure...
PDF
"Using truck sensors for road pavement performance investigation" presented a...
PPTX
Stirling Regional Centre Introduction - DOT
Ghana Priorities: Urban Transportation
UDOT Presentation to 2019 Legislature
[Transportation] Action Learning - Manjula sri lanka
Charging for use of infrastructure by road freight
International Experience with Electric and Zero Emission Buses
"A big data approach for investigating the performance of road infrastructure...
"Using truck sensors for road pavement performance investigation" presented a...
Stirling Regional Centre Introduction - DOT

What's hot (20)

PDF
Rochelle Newsleader Sunday June 26th 2016
PPTX
Greater Brisbane transport demand model
PPT
Dynamic Fleet Sizing Problem for an E-Scooter Valet Service
PDF
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
PDF
Routes to Clean Air 2015 - Poppy Lyle
PPTX
Stirling Regional Centre Modelling
PDF
Public-sector capital expenditure shrinks for the first time since 2010
PPT
All Aboard! Getting America Back on Rail
PDF
Modelling Urban Transports in a City Energy System Model
PPTX
Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...
PDF
Challenging urban sprawl: public transit access point optimization
PPTX
STEP Conference 2016 - Brian Robinson, Low Carbon Vehicle Partnership - From ...
PDF
Trimble Advanced Route Optimization Technology - QUANTM
PPTX
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
PPT
Changing Course: Building a Low Carbon Transport Sector in Asia
PDF
Pioneer Innovation Showcase - EY
PPTX
STEP Conference 2016 - James Tate, ITS - The Real Fleet & Their Real Driving ...
PDF
Routes to Clean Air 2016 - Liz Bates, City of York Council and Bradford MDC
PPTX
Developing a methodology to quantify emissions associated with excess capacit...
PDF
Gauteng Freeway Improvement Plan (GFIP) Costs
Rochelle Newsleader Sunday June 26th 2016
Greater Brisbane transport demand model
Dynamic Fleet Sizing Problem for an E-Scooter Valet Service
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
Routes to Clean Air 2015 - Poppy Lyle
Stirling Regional Centre Modelling
Public-sector capital expenditure shrinks for the first time since 2010
All Aboard! Getting America Back on Rail
Modelling Urban Transports in a City Energy System Model
Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...
Challenging urban sprawl: public transit access point optimization
STEP Conference 2016 - Brian Robinson, Low Carbon Vehicle Partnership - From ...
Trimble Advanced Route Optimization Technology - QUANTM
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
Changing Course: Building a Low Carbon Transport Sector in Asia
Pioneer Innovation Showcase - EY
STEP Conference 2016 - James Tate, ITS - The Real Fleet & Their Real Driving ...
Routes to Clean Air 2016 - Liz Bates, City of York Council and Bradford MDC
Developing a methodology to quantify emissions associated with excess capacit...
Gauteng Freeway Improvement Plan (GFIP) Costs
Ad

Similar to Ghana Priorities: Rural Transportation (20)

PPTX
New Initiatives - Budget FY 22-23 INDIAN RAILWAYS.pptx
PPT
Transport and communications
PPT
HIGHWAYS
PDF
PDF
Mena Infrastructure Growing Sectors - 2013
PPT
Upgrading and Extending Passenger Services
PPTX
Adani Transmission Ltd_Equity presentation_June 2023.pptx
PPTX
Presentations_2025 Group Assignment.pptx
PDF
Clean Energy Transition for transportation Decarbonization
PPTX
Department of Works NIP - NIPA
PPTX
24th Oct NRP updating knowledge of users
PPTX
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
PDF
Transport Infrastructure Planning development and Non Motorised Transport
PPTX
Opportunities in infra
PDF
The Future of Gauteng's Traffic and How We Can Change It
PDF
What PRASA is doing to improve the passenger rail service in the Western Cape
PPTX
Towards an effective transitioning of public transport system in Ghana
PPT
India Logistics Infrastructure
New Initiatives - Budget FY 22-23 INDIAN RAILWAYS.pptx
Transport and communications
HIGHWAYS
Mena Infrastructure Growing Sectors - 2013
Upgrading and Extending Passenger Services
Adani Transmission Ltd_Equity presentation_June 2023.pptx
Presentations_2025 Group Assignment.pptx
Clean Energy Transition for transportation Decarbonization
Department of Works NIP - NIPA
24th Oct NRP updating knowledge of users
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
Transport Infrastructure Planning development and Non Motorised Transport
Opportunities in infra
The Future of Gauteng's Traffic and How We Can Change It
What PRASA is doing to improve the passenger rail service in the Western Cape
Towards an effective transitioning of public transport system in Ghana
India Logistics Infrastructure
Ad

More from Copenhagen_Consensus (20)

PPTX
Ghana Priorities: Fecal Treatment and Reuse
PPTX
Ghana Priorities: Urban Sanitation
PPTX
Ghana Priorities: Urbanisation
PPTX
Ghana Priorities: Poverty
PPTX
Ghana Priorities: Nutrition
PPTX
Ghana Priorities: Land Titles
PPTX
Ghana Priorities: Youth Unemployment
PPTX
Ghana Priorities: Rural Electrification
PPTX
Ghana Priorities: LPG Cooking
PPT
Ghana Priorities: Industrialization
PPTX
Ghana Priorities: Industrial Policy
PPTX
Ghana Priorities: Fisheries
PPTX
Ghana Priorities: Education (SHS)
PPTX
Ghana Priorities: Education Quality
PPTX
Ghana Priorities: Tuberculosis
PPTX
Ghana Priorities: Rural Sanitation
PPTX
Ghana Priorities: Mental Health
PPTX
Ghana Priorities: Maternal and Child Health
PPTX
Ghana Priorities: Malaria
PPTX
Ghana Priorities: Health Access
Ghana Priorities: Fecal Treatment and Reuse
Ghana Priorities: Urban Sanitation
Ghana Priorities: Urbanisation
Ghana Priorities: Poverty
Ghana Priorities: Nutrition
Ghana Priorities: Land Titles
Ghana Priorities: Youth Unemployment
Ghana Priorities: Rural Electrification
Ghana Priorities: LPG Cooking
Ghana Priorities: Industrialization
Ghana Priorities: Industrial Policy
Ghana Priorities: Fisheries
Ghana Priorities: Education (SHS)
Ghana Priorities: Education Quality
Ghana Priorities: Tuberculosis
Ghana Priorities: Rural Sanitation
Ghana Priorities: Mental Health
Ghana Priorities: Maternal and Child Health
Ghana Priorities: Malaria
Ghana Priorities: Health Access

Recently uploaded (20)

PDF
GVCParticipation_Automation_Climate_India
PDF
Private Equity in Action: Sector-Specific Investments for High Growth”
PDF
Modern Advanced Accounting in Canada, 9th Edition by Darrell Herauf, Murray H...
PPTX
DOC-20250604-WA0001.pbbgjjghhyt gg fromptx
PPTX
Lesson Environment and Economic Growth.pptx
PPTX
ratio analysis presentation for graduate
PDF
Fintech as a Gateway for Rural Investment in Bangladesh
PDF
Income processes in Poland: An analysis based on GRID data
PPTX
RISK MANAGEMENT IN MEDICAL LABORATORIES 2.pptx
PPT
Chapter 3-elasacity and its applications
PPTX
Machine Learning (ML) is a branch of Artificial Intelligence (AI)
PPTX
Corporate Governance and Financial Decision-Making in Consumer Goods.pptx
PPTX
BU22CSEN0300556_PPT.pptx presentation about
PPT
CompanionAsset_9780128146378_Chapter04.ppt
PDF
2018_Simulating Hedge Fund Strategies Generalising Fund Performance Presentat...
PPTX
ANALYZE MARKET DEMAND, MARKET SUPPLY AND MARKET.pptx
PDF
epic-retirement-criteria-for-funds (1).pdf
PDF
NewBase 22 August 2025 Energy News issue - 1818 by Khaled Al Awadi_compresse...
PDF
Pension Trustee Training (1).pdf From Salih Shah
DOCX
Final. 150 minutes exercise agrumentative Essay
GVCParticipation_Automation_Climate_India
Private Equity in Action: Sector-Specific Investments for High Growth”
Modern Advanced Accounting in Canada, 9th Edition by Darrell Herauf, Murray H...
DOC-20250604-WA0001.pbbgjjghhyt gg fromptx
Lesson Environment and Economic Growth.pptx
ratio analysis presentation for graduate
Fintech as a Gateway for Rural Investment in Bangladesh
Income processes in Poland: An analysis based on GRID data
RISK MANAGEMENT IN MEDICAL LABORATORIES 2.pptx
Chapter 3-elasacity and its applications
Machine Learning (ML) is a branch of Artificial Intelligence (AI)
Corporate Governance and Financial Decision-Making in Consumer Goods.pptx
BU22CSEN0300556_PPT.pptx presentation about
CompanionAsset_9780128146378_Chapter04.ppt
2018_Simulating Hedge Fund Strategies Generalising Fund Performance Presentat...
ANALYZE MARKET DEMAND, MARKET SUPPLY AND MARKET.pptx
epic-retirement-criteria-for-funds (1).pdf
NewBase 22 August 2025 Energy News issue - 1818 by Khaled Al Awadi_compresse...
Pension Trustee Training (1).pdf From Salih Shah
Final. 150 minutes exercise agrumentative Essay

Ghana Priorities: Rural Transportation

  • 1. EminentPanelConference,Accra,August7th -9th,2020 PRELIMINARY FINDINGS: Rural Transport in Ghana Michael Graham, Head of Development Finance Programmes at the University of Stellenbosch Business School, Cape Town
  • 2. Infrastructure and Economic Growth The current state of road infrastructure  Total network of 78,402 km with only 49% either maintained or rehabilitated. Poverty levels and state of road infrastructure 0 10 20 30 40 50 60 70 80 90 100 Upper East Upper West Northern Brong Ahafo Ashanti Volta Eastern Greater Accra Central Western Percentage Region % Living below Poverty Line (1999) % of roads in poor condition
  • 3. Infrastructure and Economic Growth contd. The current state of rail tracks  Total track network length is 1300km, with the rail industry operating a route length of 947km.  60% of the rail network is not used on a regular basis due to infrastructure decay.  Limits the country’s potential in harnessing its resources.  International competitiveness and market access  Stimulate industrial and labour productivity growth rates,
  • 5. Rural Roads: Overview Construction of 1888km of roads  Link several identified high agricultural production areas to the nearest commercial centers  Link several tourism areas to the nearest commercial centers
  • 6. The expected net present values of the cost of the project is GHS5.3 billion at 8 percent discount rate. Costs across the project life 0 200 400 600 800 1000 1200 1400 1600 1800 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 Costs (GHS, million) Year Contruction Cost (with overrun) (GHS, millions) Routine O&M Cost (GHS, millions) Periodic O&M Cost (GHS, millions)
  • 7. The expected total net present value of the benefit for the road intervention is estimated to be GHS6.5 billion at 8% discount rate. Benefits(GHS,Millions) Costs(GHS,Millions) BCR WithoutCostOverruns 5% 10,237 6,220 1.65 8% 6,494 4,650 1.40 14% 3,092 2,990 1.03 WithCostOverruns 5% 10,237 6,973 1.47 8% 6,494 5,297 1.23 14% 3,092 3,481 0.89 0 1E+10 2E+10 Carbon emission savings Generalised cost savings Travel cost savings PHL savings Road Benefits
  • 8. Intervention 2 Rehabilitation and expansion of Railway tracks in Ghana
  • 9. Rail: Overview  The rail intervention project  Rehabilitation of 668 km of existing narrow gauge tacks by converting them into single-tracks standard gauge  The expansion of rail networks to the northern region of Ghana by constructing new standard gauge tracks with a total length of 3340km.
  • 10. Cost The expected total net present value of the cost for the rail intervention is estimated to be GHS 72.9 million per kilometer
  • 11. Benefits  The estimated NPV of benefits is GHS109 million/km, comprising;  Time savings  Pax GHS/km 575  Freight GHS/km 19,500  Avoided VOC  Pax GHS/km 38,000  Freight GHS/km 3.9 million  Accident Savings  1,394 lives saved amounting to GHS/km 118,000  PHL savings  Estimated savings of PHL at base year GHS/km 20160  Residual Value  Pax GHS 5 million  Freight 4 million Times savings for passengers and freight
  • 12. Total Benefits and Cost-Benefit Ratio Discount rate Benefits per km (GHS, Millions) Costs per km (GHS, Millions) BCR 5% 175 76 2.3 8% 109 72 1.5 14% 52 69 0.8 Summary of Benefits and Costs for Rail Intervention
  • 13. SUMMARY BCR TABLE INTERVENTION BENEFITS (GHS M) COSTS (GHS M) BCR Development of Rural Roads 6.5 billion 5.3 billion 1.2 Rehabilitation and expansion of Railway tracks in Ghana 109 72 1.5