How the West was One Gold Rush Survival Kit
 
 
Project  Overview 
HISTORY REPEATS ITSELF
 
 
IN MAY of 2013, the City of Ferndale will embark upon a $1,896,236 three-prong infrastructure project
consisting of water main and road resurfacing between Planavon and Pinecrest, coupled with a streetscape
enhancement between Livernois and Pinecrest. West Nine Mile Streetscape Improvement Project Phase IV: Livernois
to Pinecrest will change the overall dynamics of the most western section of Nine Mile between Livernois and
Pinecrest and at long last connect the west side of Nine Mile through consistent streetscape design, resolve
accessibility issues, provide for multiple modes of transportation or „getting there‰, significantly improve the
appearance and environment, and set the platform to spur on economic development. The road resurfacing and
water main replacement will take care of much needed infrastructure upgrades to improve service to this area. This
multi-faceted streetscape project is more cohesive and cost-effective by implementing it in unison with each other.
The City of Ferndale with the leadership, planning and execution by the Ferndale Downtown Development
Authority received a $590,133.60 Transportation Alternatives Program (TAP) grant from Southeast Michigan
Council of Governments*, an MDOT administered program, making Ferndale one of the first year recipients in the
new TAP program. The city matched the TAP funding for a total West Nine Mile Phase IV Streetscape Project cost of
$1,062,132 encompassing a 4-block area (1/4 mile). This coincides with a 3R Project spearheaded by the City of
Ferndale DPW funded by the Federal Highway SAFETEA-LU grant of $320,240 for road resurfacing. Since the
water main in that section is one of the oldest, the City will also be replacing the existing 6 inch water main with a
new 12" water main to improve water reliability and complete the replacement of 1.5 mile of water main along
Nine Mile from Paxton to the western City limits.
*The City & DDA first applied for and received a Michigan Department of Transportation Transportation
Enhancement Grant. MDOTÊs TE program was transitioned into SEMCOGÊs TAP progam in late January 2013.
Nine Mile Road is one of the most important assets for commerce in our downtown, and we have learned
from experience that physical improvements to our infrastructure and streetscape environment are critical in
stimulating economic growth. This section of West Nine Mile, as currently configured, is an impediment to economic
growth and does not foster a cohesive atmosphere or a strong quality of life in our downtown. It is located at the
west end of downtown, within the Downtown Development Authority boundaries, with five lanes of traffic and
directly abuts residential neighborhoods on the north and south sides.
Over the last five years, residents and businesses alike have urged the City and DDA to improve this section
of Nine Mile by increasing walkability, ADA accessibility, biking, safety, parking, visual presence, landscaping and
streetscape amenities. The streetscape severely lacks adequate facilities for disabled persons, is visually
unappealing, pedestrian unfriendly and doesn't support business needs, services and growth. Because of this, some
property owners are not able to fill vacancies and maintain their properties as hoped or expected, decreasing the
property value and livability in this area. Because of the close proximity to residential neighborhoods, residents are
impacted by the declining commercial property values, debris, and inaccessible sidewalks. Birchler Arroyo, traffic
engineering and planning consultants, specifically noted the following challenges within the area as part of the DDA
Downtown Development Plan:
WHAT WEÊRE FIXINÊ!
 Not ADA Accessible
 Pedestrian Unfriendly & Unsafe
 No On-street Parking
 Uninviting Environment
 Inadequate Pedestrian Crossings & Ramps
 Lacks Continuity with Downtown and Amenities in CBD
 Traffic Misaligned at Pinecrest
 Traffic Signals & Flow at Livernois Lacking, causing vehicular/pedestrian confusion
 Too Many Curb Cuts Disrupting Pedestrian Flow
 Poor Sight Lines at Corners where Residential Streets Intersect
Therefore, as part of the DDA's and City's master and downtown development plans of 2007 and
2008, we included goals of increasing economic growth to this area, creating unison with other areas of the
downtown by providing continuity of streetscape design, walkability, materials and economic development
initiatives. By 2012, The Ferndale DDDA and volunteers held numerous focus groups and information sessions with
the public to discuss the needs of this area and incorporated these desires into the streetscape design. The design
will emulate many of the visual standards and materials used in the Nine Mile Streetscape Improvement Project
Phases I-III from Paxton to Livernois immediately east of the area now defined, which were completed in 2001 and
funded by a TEA-21 grant. Since this project in 2001, we have had over $57 million in reinvestment in the area
and reduced our vacancy rate in this section from 30% to 2%.
We know from experience how a good streetscape improvement project can positively impact the local economy
and quality of life. We also know from experience how to implement, manage and complete streetscape
improvement projects to fulfill State and Federal grants both the City and DDA have obtained.
Streetscape design to be implemented:
 5-to-3 Lane Conversion
 On-street Parking on South side
 Widen Sidewalks to Avg. 7ft. - ADA Compliant
 Bike Friendly - Integration of Sharrows
 Mid-block Crossing
 Remove Cobra Head Lights for Lower Height Ornamental Streetpoles
 Parking lot screenings
 Streetscape Amenities
o 9+benches
o trash/recyclable containers
o 60 trees & perennial beds
o on-street bike corrals & on-sidewalks racks
How the West was One, ultimately, will prove that Change is Good with a unified and attractive
streetscape, producing an environment where businesses will thrive and grow and consumers, residents and guests
will enjoy. The economic return will hopefully be like striking gold!
TheFerndaleDDAispreparedtovisitwithyouandyourstafftoprovidealltheinformationyouneedtorun
yourbusinessandhelpyourcustomersgettoyouthroughouttheproject.
Throughouttheproject,theDDAwillbeofferingspecialsforWestNinebusinesses--co-opadvertising,
facebookpagealerts,eblastsfeaturingthebusinessesintheaffectedcorridor.
Haveanideayouthinkwouldhelp--we’relistening.
youtube.com/downtownferndale
twitter.com/ferndaledda
linkedin.com/groups/Downtown-Ferndale-DDA-
pinterest.com/dwntwnferndale/how-the-west-was-one/
Updatesanddetails
@downtownferndale.com
(available24/7)
Pickupthephone
SocialMedia
communication
ScanCOdetoSignup
forEBLASTorsignup
@downtownferdal.ecom
(Sebtoutweekly)
WEBSITE
FerndaleDDA-248-546-1632,ext.400
FerndaleDPW -248-546-2514
CONTACTTHEFERNDALEDDA
CristinaSheppard-Decius,DDAExecutiveDirector,Cristina@DowntownFerndale.com
ChrisHughes,DDACommunications&Mktg.Mgr.,Chughes@DowntownFerndale.com
CindyWillcock,OperationsMgr.,Cindy@DowntownFerndale.com
MarthaPotere,ProgramMgr.,Martha@DowntownFerndale.com
General:Info@DowntownFerndale.com
InHouseStaffTraining&W.NineSpecials
Wheretofindinfo,howtoshareinfo!
OptInforTextMessageTrafficAlerts:
Ifyousmellgas/havealife-threateningemergencyCALL911.
Likeustoconnect.
ShareYourNews
&We'llShare,too!
INYOUREMAILBOX
How the West was One Gold Rush Survival Kit
PROJECT TIMELINE
How the West was One is a three stage project, each stage approximately eight weeks long.
There will also be some Pre & Post construction activity. Of course, the timeline will change according to
potential delays from unpredictable circumstances, i.e. weather. Timeline changes will be noted at the
weekly open-to-the-public Construction Briefings, 11 am, every Thursday at the DDA office. Stop by to get
the latest.
Pre-Construction
May 5th 7 am. Water Main Big Flush. Expect some disruption in water service this morning, as well as
some discoloration and sediment.
May 6th 9 am Noon. Open House with plan details at DDA Office, 149 W. Nine Mile.
May 9th Lights Out/Light Up. Lights between Livernois and Pinecrest removed, weather depending.
May 13th Site prep including delivery of traffic barrels, construction equipment, project materials.
BIG DIG begins.
Construction
May – July
Stage 1 The Big Dig Water Main Replacement. Main runs along the north side of West Nine,
Planavon to Pinecrest. Crews will dig, replace and fill in daily. EXPECT some interruption of water service,
at least twice, up to 4 hours each, during this phase. Businesses will be notified a day in advance and we
will work around business needs as best as possible. Sidewalks on both sides will be disrupted and
replaced as businesses are disconnected from the old main and reconnected to the new.
July-September
Stage II Gussy Up 1. Streetscape improvements. North side of West Nine. New and wider
sidewalks, hardscape and conduit installation, curb and gutter, drive accesses.
September-November
Stage III Gussy Up 2. Streetscape improvements. South side of West Nine. Painting & prepping of
parking bays. New and wider sidewalks, hardscape and conduit installation, curb and gutter, drive
accesses. Iinstallation of streetscape amenities - seating, trash cans, street lights, trees, plants, etc.
POST-Construction
November Hoe Down! A Celebration of a West Nine ThatÊs One! Read the Pony Express
for future details!
 
GETTING AROUND/TRAFFIC INFO
How the West was One will disrupt the daily flow of traffic throughout the length of the project.
Specific information on weekly changes will be available at the weekly Construction Briefings, every
Thursday at 11 am at the DDA office. You are always welcome to attend.
Businesses have been categorized as Gold or Silver, depending on location within the project. Please refer
to the list below to know whether you are a Gold or Silver zone business. This will help you better
understand how and when you will be affected.
Here are some specific need-to-knows to help you and your customers get around town.
 Sign up for urgent construction text messages. Once you opt in, you will receive text alerts.
 West Nine Mile will be reduced to two lanes of traffic during construction.
o During Stage I & II, traffic will flow both ways in the south two lanes.
o During Stage III, traffic will be adjusted to the north two lanes.
 Drive access for businesses will be maintained, with periodic, partial closings.
 Southside alley between Livernois and Beaufield will become one way, west bound, to access
parking. Deliveries should be directed to parking lots OR ask us what might be best. NO
PARKING in alley.
 Free public parking is available at the American Legion Hall.
 Sidewalk access will be interrupted. Please follow the signs.
 Prepare to provide alternative -- side or back door - access to your business.
 Dover, Beaufield & Kenton will be closed to thru traffic at Nine Mile.
Gold Businesses
#1 Nails Ferndale Foods Physical Therapy & Rehab
8 Degrees Plato Hong Kong #1 Salon on IX
Claddagh Chiropractic I Heart Hair Crush Shear Heaven
Courtesy Cleaners Intrinsic Boutique State of the Art
CVS Pharmacy Jameel Permanent Make Up Studio 925 Photography
DÊs Treasure Chest JoeÊs Party Store Thomas Chweirut, DO
DTE Substation Papa RomanoÊs Pizza West Woodward Animal Clinic
Evolution Skin Care Studio PC Michigan Food & Ankle Zenru The Salon
Silver Businesses
Affirmations Huntington Bank Painting With A Twist Standard Building Maintenance
Assaggi Bistro Jackson Hewitt Retro Barber Shop Sullivan Cleaners
Bangkok Café Le Bling Said Shoe Repair Thru LunaÊs Eyes
Bella Vita Boutique Le Host Salon 501 Western Market
Buffalo Wild Wings Local Kitchen & Bar Save-A-Lot
Cupcake Station LynnÊs Nails SchrammÊs Mead
Driven Solutions ME Wells Supply Secreto Cigar Bar
Hungry HowieÊs Nine Lives Tattoo Spaulding & Curtin Funeral Home
How the West was One Gold Rush Survival Kit
BENEFITS TO TALK ABOUT
Road construction is messy business but THIS road construction is going to do more than produce just another pretty
surface. How the West was One goes deep and while road crews are busy „fixin‰ West Nine, here are
some of the pluses that will keep you talking.
PARTNERS & FUNDING
 $1.9 million project is an investment by federal, state & city government in your part of town. Massive
improvement projects such as this are proven to spur more private investment in the project area and thus,
spur economic redevelopment and improve quality of life.
 Partners in the project are the City of Ferndale, Southeast Michigan Council of Governments, Michigan
Department of Transportation, Ferndale Downtown Development Authority & the U.S. Government Federal
Highway Administration.
 Funding for the project comes via a $590,000+ Transportation Alternative Program (TAP) Grant from
SEMCOG/MDOT, a $320,000+ Federal Highway Grant and matching funds from the City of Ferndale.
The Ferndale DDA also contributed $120,000+ in financial and in-kind support to provide design &
engineering.
ULTIMATE BENEFITS 
 Everyone -- cyclists, pedestrians, motorists, neighbors -- will appreciate improvements including:
o Wider sidewalks for baby strollers, wheelchairs, street furniture & people, in general.
o Road bike sharrows for cyclists & cars to know they „Share The Road.‰
o Mid-block crossing at Beaufield with push button rapid beacon to alert drivers.
o Energy-efficient & attractive LED decorative street lights that donÊt impede accessibility.
o On-street car & bike parking for customers.
o Landscaping including trees, perennials & the opportunity for flower baskets.
o Full connectivity along West Nine from Pinecrest to the center of Downtown.
o Improved water service for your business.
o Sustainable, permeable paving & recycling trash receptacles that help our environment.
 West Nine will go on a road diet from five lanes of traffic to three.
 Better signaling and signage will produce smoother flow of traffic in fewer lanes.
 West Nine Mile Road will be one with the rest of Downtown!
ON THE JOB
 Giffels Webster Engineers are Construction Project Coordinators.
 GWE Full-Time Construction Inspector will be on site DAILY.
 The City of Ferndale DPW Director Loyd Cureton is the Lead Project Manager.
 Ferndale DDA Executive Director Cristina Sheppard-Decius is the Chief Information Officer.

SILVERMININGAREA
WATERMAIN
&RESURFACINGONLY
GOLDRUSHAREA
STREETSCAPE,
WATERMAIN
&RESURFACING
W9ConstructionProjectSpring-Fall2013!
StageI:BigDig(May-July)
StageII:GussyUpPartINorthsideof9(July-September)
StageIII:GussyUpPartIISouthsideof9(Sept.-November)
Driveaccessesforbusinesseswillbe
maintainedwithperiodicpartialclosings.
SidewalkaccessduringeachStagewill
beinterrupted,pleasefollowconstructionsigns.
Beaufield,Dover&Kentonwillbeclosedto
thrutrafficatNineMile.
SouthsidealleybetweenLivernoisand
Beaufieldwillbechangedtoaone-way
alleyduringconstructiontoaccommodate
deliveriesandparking.Pleasefollow
constructionsigns.(Seealleyreroutemap)
FreePublicParkingavailableat
AmericanLegionHall.(Seealleyreroutemap)
SIDESTREETSCLOSED
TOTHRUTRAFFIC
ATNINEMILE
**USEALLEYTOACCESSBUSINESSES
NORTHBOUNDLIVERNOIS
ANDPARKINGLOTENTRANCE
CLOSEDTOTHRUTRAFFIC
ATNINEMILE
NINEMILELANEREDUCTION:
TWOLANESOFTRAFFIC(WEST&EASTBOUND)
WILLREMAINOPENTHROUGHOUTCONSTRUCTION
FORMOREINFO:
WWW.DOWNTOWNFERNDALE.COM
FOLLOWUPDATESON:
facebook.com/HowTheWestWasOne
twitter.com/ferndaledda
linkedin.com/groups/Downtown-Ferndale-DDA-
PinYourPhotos@dwntwnferndale/how-the-west-was-one
UploadVideos@youtube.com/downtownferndale
JoinOur“Urgent”
TextMessageAlerts
emailorcalluswithyour
cellphonenumber
info@downtownferndale.com
248-546-1632x400
FREE
PublicParking
AlleyRerouteMap
NoParkingor
UnloadinginAlley
How the West was One Gold Rush Survival Kit
 
May 1, 2013 
 
 
To Our Vendors and Suppliers, 
 
This summer, the City of Ferndale and the Ferndale Downtown Development Authority will be 
resurfacing, replacing the water main and implementing a streetscape project along West Nine Mile 
Road. The project duration is from May 13th
, 2013 through November, during which time travel will be 
reduced to two lanes along West Nine Mile Road from Livernois to Pinecrest.  
 
Please note that travel times will be impacted by factors such as congestion and other construction‐
related delays. There will be absolutely no parking along Nine Mile Road in any construction zone, and 
unloading will be prohibited. Please also keep in mind that alleys will also be off‐limits for parking and 
unloading, so that traffic can flow as efficiently as possible. 
 
As an option, we encourage you to use private lots in association with the business to which you are 
delivering. Alternatively, you may utilize existing parking on Livernois and/or the American Legion Hall’s 
public parking lot. Otherwise, please contact the Ferndale Downtown Development Authority and your 
business clients for individual needs regarding pick‐ups and deliveries during construction. 
 
The DDA office number is: 248‐546‐1632, ex. 400. You are also welcome to email their staff at: 
info@downtownferndale.com. 
 
We thank you for your patience as this project progresses. 
 
Sincerely, 
 

More Related Content

PDF
City of Salina-9th Street Curb & Gutter Project
City of Salina
 
PDF
e Circuit: Building Trails that Connect Cities, Suburbs, and Everywhere In Be...
Project for Public Spaces & National Center for Biking and Walking
 
PDF
Emmp community presentations_anc oct 15 presentation final rev1
RamaChilamkurthy
 
DOC
Frank Del 0215
Frank Deldjoui
 
PDF
PCW_Community_Report_2016-web
Mary Murphy
 
PDF
South Main Revitalization Plan
Max Herzog
 
PDF
NJ Future Forum 2012 Creating a Redevelopment Agenda Fisher
New Jersey Future
 
City of Salina-9th Street Curb & Gutter Project
City of Salina
 
e Circuit: Building Trails that Connect Cities, Suburbs, and Everywhere In Be...
Project for Public Spaces & National Center for Biking and Walking
 
Emmp community presentations_anc oct 15 presentation final rev1
RamaChilamkurthy
 
Frank Del 0215
Frank Deldjoui
 
PCW_Community_Report_2016-web
Mary Murphy
 
South Main Revitalization Plan
Max Herzog
 
NJ Future Forum 2012 Creating a Redevelopment Agenda Fisher
New Jersey Future
 

What's hot (20)

PDF
Tying it all together meeting materials
Darin Dinsmore
 
PDF
Pic 2 panels june 23 2015
Toronto Public Consultation Unit
 
PDF
Public Meeting #2 Information Materials
Toronto Public Consultation Unit
 
PPT
Brookleigh Community Meeting 2-7-12
Kathleen Boettcher
 
PDF
Eastern market community meeting presentation 012202020
RamaChilamkurthy
 
PDF
Fulton Market Taskforce Meeting 10-04-2017
West Central Association
 
PDF
900 S Reconstruction and 9-Line Trail Update (April 2018)
ELPCO East Liberty Park Comm. Organization
 
PDF
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...
Maureen Kenney
 
PDF
AH City Council Meeting 12.14.15 - Item #10 - 6116 Broadway & 213 Henderson
Marian Vargas Mendoza
 
PDF
Emmp community meeting#5 12-12-2019_presentation
RamaChilamkurthy
 
PDF
Lynée Russell - Previous DUDC Projects
Lynee Russell
 
PPT
JAN 2010 Community Improvement Update
Washington, DC
 
PPTX
Burke Road Corridor Community Meeting : June 18, 2018
Fairfax County
 
PDF
Titusville FL Talking Points January 2017
Edyie McCall
 
DOC
Rodney Hibbard CV_Construction Manager
Rodney Hibbard
 
PPTX
May 2018 Service Change Public Info Meeting
COTA BUS
 
PDF
Fort lincoln park community mtg presentation 2019 09 24 final
RamaChilamkurthy
 
PDF
Hills Road Cycle Lanes revisited
Christie Marrian
 
PDF
JMP Development Planning
Alan Bain
 
PDF
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Phil Gray
 
Tying it all together meeting materials
Darin Dinsmore
 
Pic 2 panels june 23 2015
Toronto Public Consultation Unit
 
Public Meeting #2 Information Materials
Toronto Public Consultation Unit
 
Brookleigh Community Meeting 2-7-12
Kathleen Boettcher
 
Eastern market community meeting presentation 012202020
RamaChilamkurthy
 
Fulton Market Taskforce Meeting 10-04-2017
West Central Association
 
900 S Reconstruction and 9-Line Trail Update (April 2018)
ELPCO East Liberty Park Comm. Organization
 
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...
Maureen Kenney
 
AH City Council Meeting 12.14.15 - Item #10 - 6116 Broadway & 213 Henderson
Marian Vargas Mendoza
 
Emmp community meeting#5 12-12-2019_presentation
RamaChilamkurthy
 
Lynée Russell - Previous DUDC Projects
Lynee Russell
 
JAN 2010 Community Improvement Update
Washington, DC
 
Burke Road Corridor Community Meeting : June 18, 2018
Fairfax County
 
Titusville FL Talking Points January 2017
Edyie McCall
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard
 
May 2018 Service Change Public Info Meeting
COTA BUS
 
Fort lincoln park community mtg presentation 2019 09 24 final
RamaChilamkurthy
 
Hills Road Cycle Lanes revisited
Christie Marrian
 
JMP Development Planning
Alan Bain
 
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Phil Gray
 
Ad

Viewers also liked (20)

PPT
Luis Veas Powerpoint Tennis
Luis9
 
PPTX
Age introduction ppt
rsusami
 
PDF
Lindner Products Eng
lindnervietnam
 
PPTX
Halloween Party
ginaferguson
 
PPS
Fotosincreibles
guest5c1f73
 
PPT
Understanding Fractures
guest4334a9
 
DOC
Agenda grupo(1) 2013-2014
Escuela primaria
 
PDF
Lenox Advisors
RickVanBenschoten
 
PPT
Debt Dr Introduction
drazza65
 
PDF
NEDMAInno14: Innovations in Tracking Your Mail- Kerry Hannify
New England Direct Marketing Association
 
PDF
Türkiyede Eğitim Sitemi
Yunus Emre
 
PDF
Catalogo Mobiliário
Lumatek
 
PPTX
Technology In Early Childhood Pw Poin
djmcrh
 
PDF
Bdf report finale compresso
Conetica
 
PPTX
Bloque cierre tfa
Teresa Freire
 
PDF
009 from concept to product, judy chambers
FLAR - Fondo Latinoamericano para Arroz de Riego
 
PDF
Илья Бирман – Ангстрем
404fest
 
PPTX
ShareCafé: Office365 - Efficiënt samenwerken met minimum aan kosten en comple...
Orbit One - We create coherence
 
PPT
Pmp Certification
turnerwife
 
Luis Veas Powerpoint Tennis
Luis9
 
Age introduction ppt
rsusami
 
Lindner Products Eng
lindnervietnam
 
Halloween Party
ginaferguson
 
Fotosincreibles
guest5c1f73
 
Understanding Fractures
guest4334a9
 
Agenda grupo(1) 2013-2014
Escuela primaria
 
Lenox Advisors
RickVanBenschoten
 
Debt Dr Introduction
drazza65
 
NEDMAInno14: Innovations in Tracking Your Mail- Kerry Hannify
New England Direct Marketing Association
 
Türkiyede Eğitim Sitemi
Yunus Emre
 
Catalogo Mobiliário
Lumatek
 
Technology In Early Childhood Pw Poin
djmcrh
 
Bdf report finale compresso
Conetica
 
Bloque cierre tfa
Teresa Freire
 
009 from concept to product, judy chambers
FLAR - Fondo Latinoamericano para Arroz de Riego
 
Илья Бирман – Ангстрем
404fest
 
ShareCafé: Office365 - Efficiënt samenwerken met minimum aan kosten en comple...
Orbit One - We create coherence
 
Pmp Certification
turnerwife
 
Ad

Similar to How the West was One Gold Rush Survival Kit (20)

PPTX
Simran deo- architectural conservation- neighbourhood design and planning
simrandeo3
 
PDF
APWA mid atlantic awards
Sandon Rogers, P.E., LS
 
PPTX
130423 pubmtgppt2
storrowkinsella
 
PDF
Orange Avenue Overlay Final Report
Brendan O'Connor
 
PDF
City of Salina Parks and Recreation Draft Master Plan-Section 3
City of Salina
 
PDF
Grandview District analysis + frameworks
Wigley and Associates
 
PPTX
Dranesville District 2018 Paving and Restriping
Fairfax County
 
PDF
Dj pow work samples
DanielJPow
 
PDF
Newsletter 2014 November
gscplanning
 
PDF
Gardiner East EA - Public Forum 5 Panels
GardinerEast
 
PDF
Gateway ASP_letter_print_Hews.Kalhori.Odogu
TEGA ODOGU
 
PDF
Nov 21 2018 Bathurst Quay Update Presentation
Waterfront for All
 
PDF
2017 Comp Plan/UDO Review
City of College Station
 
PDF
City of Salina Parks and Recreation Master Plan-Section 3
City of Salina
 
PPTX
MARINA BAY SINGAPORE - URBAN CASE STUDY
LAr. Siti Aishah Khairuddin
 
PDF
Eco Innovation District Summary
Jamie Granger
 
PDF
Trending developments vol 6 issue 03
froed
 
PDF
Capstone_Final V2
Cameron Savois
 
PDF
2015_Bridge_Road
Pinal Gandhi-Savdas
 
DOCX
Hatem Fawzi Aly-1
hatem aly
 
Simran deo- architectural conservation- neighbourhood design and planning
simrandeo3
 
APWA mid atlantic awards
Sandon Rogers, P.E., LS
 
130423 pubmtgppt2
storrowkinsella
 
Orange Avenue Overlay Final Report
Brendan O'Connor
 
City of Salina Parks and Recreation Draft Master Plan-Section 3
City of Salina
 
Grandview District analysis + frameworks
Wigley and Associates
 
Dranesville District 2018 Paving and Restriping
Fairfax County
 
Dj pow work samples
DanielJPow
 
Newsletter 2014 November
gscplanning
 
Gardiner East EA - Public Forum 5 Panels
GardinerEast
 
Gateway ASP_letter_print_Hews.Kalhori.Odogu
TEGA ODOGU
 
Nov 21 2018 Bathurst Quay Update Presentation
Waterfront for All
 
2017 Comp Plan/UDO Review
City of College Station
 
City of Salina Parks and Recreation Master Plan-Section 3
City of Salina
 
MARINA BAY SINGAPORE - URBAN CASE STUDY
LAr. Siti Aishah Khairuddin
 
Eco Innovation District Summary
Jamie Granger
 
Trending developments vol 6 issue 03
froed
 
Capstone_Final V2
Cameron Savois
 
2015_Bridge_Road
Pinal Gandhi-Savdas
 
Hatem Fawzi Aly-1
hatem aly
 

More from Ferndale Downtown Development Authority (16)

PDF
Downtown Ferndale West Nine Mile Streetscape Strategic Communication Plan
Ferndale Downtown Development Authority
 
PPTX
Tif original 2011 final council presentation
Ferndale Downtown Development Authority
 
PDF
DDA Budget presentation fye2013
Ferndale Downtown Development Authority
 
PDF
2006 Downtown Ferndale Parking Study_Section 6
Ferndale Downtown Development Authority
 
PDF
2006 Downtown Ferndale Parking Study_Section 3
Ferndale Downtown Development Authority
 
PDF
Ferndale DDA Budget Presentation FYE2012
Ferndale Downtown Development Authority
 
PDF
Downtown Ferndale Business Guide 2011
Ferndale Downtown Development Authority
 
PDF
Ferndale dda tif renewal rfp
Ferndale Downtown Development Authority
 
PDF
Fido Does Ferndale Program Guide for treasure hunting
Ferndale Downtown Development Authority
 
PPTX
Council Presentation Feb22
Ferndale Downtown Development Authority
 
PPT
Community Forum 2010v2
Ferndale Downtown Development Authority
 
PPTX
Main Street 101 2010
Ferndale Downtown Development Authority
 
PDF
Parking Presentation 12-14-09
Ferndale Downtown Development Authority
 
PPTX
Parking Study Session Presentation 12 7 09
Ferndale Downtown Development Authority
 
PPT
Downtown Ferndale Property Tour
Ferndale Downtown Development Authority
 
Downtown Ferndale West Nine Mile Streetscape Strategic Communication Plan
Ferndale Downtown Development Authority
 
Tif original 2011 final council presentation
Ferndale Downtown Development Authority
 
DDA Budget presentation fye2013
Ferndale Downtown Development Authority
 
2006 Downtown Ferndale Parking Study_Section 6
Ferndale Downtown Development Authority
 
2006 Downtown Ferndale Parking Study_Section 3
Ferndale Downtown Development Authority
 
Ferndale DDA Budget Presentation FYE2012
Ferndale Downtown Development Authority
 
Downtown Ferndale Business Guide 2011
Ferndale Downtown Development Authority
 
Ferndale dda tif renewal rfp
Ferndale Downtown Development Authority
 
Fido Does Ferndale Program Guide for treasure hunting
Ferndale Downtown Development Authority
 
Council Presentation Feb22
Ferndale Downtown Development Authority
 
Parking Presentation 12-14-09
Ferndale Downtown Development Authority
 
Parking Study Session Presentation 12 7 09
Ferndale Downtown Development Authority
 
Downtown Ferndale Property Tour
Ferndale Downtown Development Authority
 

Recently uploaded (20)

PDF
Dating And Courtship Quotes Handbook By Walter Tynash.pdf
Walter Tynash
 
PPTX
Understanding Value Education_Lect2.pptx
ssusera15ea5
 
PPTX
Discipline and Positive Behaviour Plan for A Great Day
DarmawanAmbari2
 
PDF
Quarterly project_20250727_112257_0000.pdf
monteroemilia873
 
PPTX
Escaping The Digital Noise And Finding Peace In Stillness.pptx
Peony Magazine
 
PDF
The Human Edge: Why A.I. Can’t Steal Your Story!
vijitsrivastava083
 
PPTX
Holistic Development Role of Edu v5.pptx
ssusera15ea5
 
PPTX
Self-Care Toolbox.advices and developmentpptx
eman youssif
 
PDF
Emotional Mastery for Police Officers.pdf
vastu724
 
PDF
creative pattern recognition journal for artists and writers.pdf
kathrynvercillo
 
PPTX
Healing Routine Presentation.exercisepptx
eman youssif
 
PPTX
Your Personal Growth Journal journaling.pptx
eman youssif
 
PDF
Despre calibrare: O abordare structurată
Răzvan Deaconescu
 
PDF
Brown AesthetIc Minimalist Thesis Defense Presentation.pdf
EsharveerSingh
 
PPTX
The Journey of Self Refinement and self improvement
Muhammad Musawar Ali
 
PPTX
When yu want to feel but you cant:Emotional Detatchment.pptx
Loofa
 
PPTX
Human_Self_Exploration1_Lecture-III.pptx
ssusera15ea5
 
PDF
Fueling Creativity and Change The Inspiring Path of Odeta Rose.pdf
odeta rose
 
PPTX
Combining Writing, Art, And Affirmations.pptx
eman youssif
 
PDF
Nep english aecc-2 about reading techniques
moharananilakantha87
 
Dating And Courtship Quotes Handbook By Walter Tynash.pdf
Walter Tynash
 
Understanding Value Education_Lect2.pptx
ssusera15ea5
 
Discipline and Positive Behaviour Plan for A Great Day
DarmawanAmbari2
 
Quarterly project_20250727_112257_0000.pdf
monteroemilia873
 
Escaping The Digital Noise And Finding Peace In Stillness.pptx
Peony Magazine
 
The Human Edge: Why A.I. Can’t Steal Your Story!
vijitsrivastava083
 
Holistic Development Role of Edu v5.pptx
ssusera15ea5
 
Self-Care Toolbox.advices and developmentpptx
eman youssif
 
Emotional Mastery for Police Officers.pdf
vastu724
 
creative pattern recognition journal for artists and writers.pdf
kathrynvercillo
 
Healing Routine Presentation.exercisepptx
eman youssif
 
Your Personal Growth Journal journaling.pptx
eman youssif
 
Despre calibrare: O abordare structurată
Răzvan Deaconescu
 
Brown AesthetIc Minimalist Thesis Defense Presentation.pdf
EsharveerSingh
 
The Journey of Self Refinement and self improvement
Muhammad Musawar Ali
 
When yu want to feel but you cant:Emotional Detatchment.pptx
Loofa
 
Human_Self_Exploration1_Lecture-III.pptx
ssusera15ea5
 
Fueling Creativity and Change The Inspiring Path of Odeta Rose.pdf
odeta rose
 
Combining Writing, Art, And Affirmations.pptx
eman youssif
 
Nep english aecc-2 about reading techniques
moharananilakantha87
 

How the West was One Gold Rush Survival Kit