SlideShare a Scribd company logo
- 1 -
“Hi Maturity in the CMMI Services
Context"
Chinmay Pradhan
QAI Global
CMMI For Services
- 2 -
• Helps Build Better Services
• Looks at Services from Strategic
perspective
• Applicable across broad spectrum
of work done
• Aligned and Leverages existing
service management frameworks
eg ITIL, CoBIT etc
Snapshot of Services Where CMMI SVC has been applied
- 3 -
• Majority is for Application Management
•Production Support
•Change Requests
•Bug Fixes
• Other Non Conventional work types
are also catching up
Work Types WIth SVC Implemented
Application Management and
Support
Training Services
Risk Consutling
ERP Configuration
ERP Support
Staff Augumentation
BPO
Service System
• Services are useful intangible and non-storable results
delivered through the operation of a service system.
Âť CMMI SVC
• Services are characterized by
–Simultaneity
–Heterogeneity
• A Service System is a combination of
–People using
•Tools and Resources to execute
–Process Steps to complete an service operation
- 4 -
Service Components: Elements that help deliver a Service
- 5 -
Work
products
Work
Processes
Tools
Infrastructure
People
Streamlined Service Delivery
Modeling in an Application Support
Service
- 6 -
Typical Expectations
- 7 -
Year-on-Year Savings
Technical Complexity
Assumed system
- 8 -
No of
Requests
per Day
• Based on actual average TAT per step and priority
•Helped analyze the capacity required per day and hence plan for the month
• Was simple to use and understand
But!!!
In Reality….
- 9 -
19
4
• Events are dynamic
with multiple factors
affecting the
performance
• The inflow of tickets
changes constantly
• The performance for
each of the steps is
not fixed, but variable
An animated view of the service system
In Reality….
• There were far too many dynamic factors to be considered in
the entire resolution process like
–If a high Priority ticket came in all others have to be
dropped till this is fixed
–If resources are busy then tickets will be in queue
–The Process Performance is a function of the complexity
and not just the priority,
• Additional complexity: can have high priority simple tickets and
also complex tickets.
- 10 -
- 11 -
… to control the Key Process Outputs
Key Process Inputs:
Control these …
Output Variability
“Outputs inherit variability from inputs.”
Sub Process and its Impact
One approach for Modeling Such a System
- 12 -
Let’s Take an example
The Service System we have picked up is
–Service to resolve Production support requests for large banking
application
–There are 2 different kinds of requests that come in to the queue,
Type 1 and Type 2. Each having its own priorities and SLA’s
–The Service provides a 6X18 hr support.
Some of the challenges faced by the service system are
–The resource allocation and utilization vis a vis the SLA performance
is sub optimal i.e if the SLA compliance is comfortable then there is
low utilization
–Team composition and shift allocation
- 13 -
Creating the Model
The service system was aptly described by a queue based system. To
model such a system we required:
• Standard Simulation Modeling Tool. E.g Process Model
• Resources with the knowledge of such modeling and the skill to use the
tools
• Process maps of actual events
• Map of all possible occurring conditions i.e high priority gets picked first,
there are shifts with breaks,
• Actual data with respect to the
–Request classifications i.e no of type 1 and type 2, breakup of their
priorities.
–The Turnaround time for each process steps
–Waiting time if any
- 14 -
The data required – Not very different from what is typically collected
• The data collected were
–A sample of the actual turnaround time for each process
steps by their priorities and types
–Request incoming patterns; quite an eye opener.
–Operating condition were
• Shifts of 9am to 6pm, 6pm to 3am
• Till now separate teams work on separate types
• If high priority request comes it is picked up immediately
- 15 -
The Model
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
- 16 -
•Daily incoming pattern
described as statistical
distributions for each
type of request
•Data was entered for the
entire time period for
support i.e 9 am to 6pm
and then 6pm to 3 am
•Requests had priority
assigned using
probabilities
•Requests arrive at a
system before they are
assigned and allocated
across
The Model
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
- 17 -
•Current team assignment was
depicted using the shift
timings
•One Resource was to
complete the whole request
before he or she was free
• Before the shift started or
during breaks the queues will
build up
•If a high priority ticket enters
the system, it will get
addressed immediately
•SLA are established for all
ticket categories and
priorities
Using the Model with current team settings
- 18 -
•Shift 1
•Engineer Group 1 (4
Resources)
•Engineer Group 3(4
Resources)
•Shift 2
•Engineer Group 2(4
Resources)
•Engineer Group 4( 4
Resources)
•Average idle time of 15%
for Eng 1 and 14% for Eng
3
Using the Model with current team settings
- 19 -
•Average SLA at 95% CI is
predicted to be
•Type 1
•P1 92%
•P2 91%
•P3 89%
•Type 2
•P1 89%
•P2 74%
•P3 98%
With a target of 90%
compliance there could be quite
some misses
Evaluating Strategies :
• The Model was used to
• Simulate various scenarios and Identify
–Evaluate available strategies to improve Utilization and
SLA compliance
–Identify the potential areas of improvement in the process
steps.
- 20 -
Evaluating Strategies
• One of the things noticed in the setup was the queue that
was getting built up in the non working period of 3 am to 9
am.
• Since the data for the inflow had not been analyzed before it
was not realized that the engineers used to start work with
the queue that was leading to SLA’s being breached
• What would be the impact if the team did not have the
queue?
• Also it was noticed that there was typically some free
resources in the day in the first shift but the second shift was
tight.
• What if we overlap shift timings?
• What if we cross skill the people in the night shift so that
anyone free can take in the other queue?
- 21 -
Changes Made in the rules
• The inflow was modified to evaluate the impact of yanking
away the requests logged during the non working hours.
• One of the resources was cross trained
and assigned to both the queue so that requests can be
resolved from both.
• The timings of this resource were made on an overlapping
slot of 2pm to 11 pm so that there is an availability in both
the shifts.
- 22 -
Using the Model with changes
- 23 -
•Shift 1
•Engineer Group 1 (4
Resources)
•Engineer Group 3(2
Resources)
•Shift 2
•Engineer Group 2(2
Resources)
•Engineer Group 4( 1
Resources)
•Mid Shift
•Engineer 5 ( 1
Resource)
•A reduction of 6 resources
from the team
•Average un-utilization was
the highest for Eng 4 at 53%
for the only person there
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
Engineer
5
- 24 -
•Average SLA at 95% CI
Predicted
•Type 1
•P1 93%
•P2 88%
•P3 90%
•Type 2
•P1 93%
•P2 88%
•P3 100%
SLA Compliance much
healthier
Using the Model with changes
- 25 -
0.00
10.00
20.00
30.00
40.00
50.00
60.00
StudyandResponse
StudyandResponse2
Analysis
Debugg
Analysis2
Debugg2
Storage
PercentofTotalMinutes
Top 7 Hot SpotsTop 7 Hot Spots
Percentage of NVA Minutes
Percentage of BVA Minutes
Percentage of VA Minutes
•The Study and Response
Process Step was seen to the
most variable process step
and identified for further
analysis and improvement
Using the Model with changes
Inferences
• “Yanking” the queue for the non working hours can reduce
the load on the system
• Cross training can be a significant leverage
• Overlapping shift timings can greatly impact the SLA’s as
well as the effective team utilization.
• The initial step of study and response is also identified as the
potential area for improvement
- 26 -
Key Takeaways
- 27 -
• Involve subject matter experience
–Meaningless (statistical) relationships should be
discarded
–Expected (statistical) relationships can be verified
• GIGO
–Review and feedback cycle
• Be clear on objectives and expectations from simulation
• Ensure adequate interactions between
–Model builder, Management, Practitioners
• Train personnel operating the model
–To know how to use it – make appropriate inferences
–To know when it is not working – seek help
• Check against known results
Tips and Tricks on Model usage in Project
Management
- 28 -
Service Transition
- 29 -
•Right turnaround time to
promise
•Right SLA
•Right Volume
Capacity Management
- 30 -
16 People handle 71 work requests
Is this Ok
If volume increases by 20% then
how many resources?? By when??
Capacity during Service
Continuity?? SLA during SCON
Setting Up Service Delivery
- 31 -
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
Engineer
5
Resource Overlapping
VS
Type 1
Type 2
Storage
Decision
Study and
Response
Study and
Response 2
Analysis
Analysis 2
Debugg
Debugg 2
Close Request
Engineer
1
Engineer 2
Engineer
3
Engineer 4
No Overlapping
Dependency Management
- 32 -
Dependency on customer answers
Common Examples of Controlled Factors: Enough?????
- 33 -
Sl No Y Parameter
(Outputs)
X ( Controllable
factors)
Impacted Sub Processes
Monitored
1 % SLA Met by
Priority
Skill of Resources in a
team/Shift
Optimal No of
Resources in a
shift/team
Usage of Knowledge
Database
TAT of Resolution for each Incidents
TAT of Response for each of the
incidents
Assignment Time for each incident
No of backlog incidents per day
2 Utilization of
Resources
Skill of Resources in a
team/Shift
Optimal No of
Resources in a
shift/team
Usage of Knowledge
Database
TAT of Resolution for each Incidents
TAT of Response for each of the
incidents
Assignment Time for each incident
No of backlog incidents per day
What is Critical!!!!:2013 Malayasian GP Pitstop2.05Secs
Time Difference between Winner and 2nd :4.2secs
- 34 -
Pit stops not mandatory
Critical Sub Process can be outside the chain of direct delivery process step
Watch Out for
- 35 -
Misaligned Goals: Improvement in Productivity in T&M
- 36 -
Swamped by information
- 37 -
Measurements at in-appropriate granularity
- 38 -
Measurement is a function of work complexity and Need for information not
convenience
Measurement does not always mean a permanent measurement system
Propagate beyond Delivery and Interweave
- 39 -
24X7 support is driven by transport: Do they do
capacity management???
Questions
- 40 -
References
• Using Process Performance Models to enhance CAM in CMMI for SVC-
Mukul Madan and Chinmay Pradhan; Presented at SEPG NA 2011
• Service Management: Operations, Strategy, and Information Technology-
- James A. Fitzsimmons, Mona J. Fitzsimmons
• Introduction To Operations Research- Billy Gilett
• Process Model User Guide and Tutorial. http://www.processmodel.com/
• CMMI® for Services, Version 1.3 – CMMI Product Team (CMU/SEI-
2010-TR-034)
• Improving Organizational Alignment Leveraging High Maturity Principles:
Sankararaman D: HMBP 2012
- 41 -
Please feel free to write in.
Chinmay Pradhan
QAI Global
Chinmay.Pradhan@qaiglobal.com
- 42 -

More Related Content

What's hot (20)

PPT
Realizing CMMI Spirit in Agile Form
Vernon Stinebaker
 
PPTX
RPALM for SAP S/4 Journey
Matt Angerer
 
PDF
AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...
DĂŠlio Almeida
 
PPT
matt heinzelman software quality assurance presentation technical & tool
CuongHoang80
 
PDF
Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...
Abdelrahman Elsheikh PMOC,PMP,CBAP,RMP,ACP,SP,MCITP,ITIL
 
PDF
Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...
DĂŠlio Almeida
 
PDF
Cutover Plan V2
Mahesh Vallampati
 
PPT
Agile transformation best practices
Allyson Chiarini
 
PPTX
Ccpm+
Larry Leach
 
PPTX
6.0 Auxiliary Agile and Lean Frameworks
DavidMcLachlan1
 
PDF
Deepak R (Process & Test Automation Lead)
Deepak R
 
PDF
Ms project training ver 01
Isidro Sid Calayag
 
PPTX
Agile transformation strategy
ajit.alwe
 
PPTX
Agile Scrum training
jagannathun manoharan
 
PPT
Agile And Cmmi
Vernon Stinebaker
 
PPTX
Pernille Fabricius, Global CFO at Damco - Global Offshoring
Global Business Events
 
PPT
Asap implementation methodology (2)
Pradipta Mallick
 
PPT
Sap implementation
Abdulrahman Abdulrahim
 
PPTX
CMMI & PMBOK & OPM3
DilekOzdemirci
 
PPTX
2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...
DavidMcLachlan1
 
Realizing CMMI Spirit in Agile Form
Vernon Stinebaker
 
RPALM for SAP S/4 Journey
Matt Angerer
 
AGILE PORTUGAL 2016: Adopted agile in a CMMI L5 enterprise: what were the fin...
DĂŠlio Almeida
 
matt heinzelman software quality assurance presentation technical & tool
CuongHoang80
 
Agile project from visibility to closing (مشروع الإدارة الرشيقة من الفكرة الى...
Abdelrahman Elsheikh PMOC,PMP,CBAP,RMP,ACP,SP,MCITP,ITIL
 
Agile Portugal 2013: Adoption of Agile/Scrum in a Portuguese CMMI L5 enterpri...
DĂŠlio Almeida
 
Cutover Plan V2
Mahesh Vallampati
 
Agile transformation best practices
Allyson Chiarini
 
Ccpm+
Larry Leach
 
6.0 Auxiliary Agile and Lean Frameworks
DavidMcLachlan1
 
Deepak R (Process & Test Automation Lead)
Deepak R
 
Ms project training ver 01
Isidro Sid Calayag
 
Agile transformation strategy
ajit.alwe
 
Agile Scrum training
jagannathun manoharan
 
Agile And Cmmi
Vernon Stinebaker
 
Pernille Fabricius, Global CFO at Damco - Global Offshoring
Global Business Events
 
Asap implementation methodology (2)
Pradipta Mallick
 
Sap implementation
Abdulrahman Abdulrahim
 
CMMI & PMBOK & OPM3
DilekOzdemirci
 
2.0 The Differences Between Agile and Waterfall, Incremental, Iterative and H...
DavidMcLachlan1
 

Similar to Hi Maturity in the CMMI Services Context (20)

PPTX
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
AhmadSajjad34
 
PDF
The Ins and Outs of CTMS Data Migration
Perficient
 
PPTX
SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...
Sencha
 
PDF
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
AgileNetwork
 
PDF
Structured NERC CIP Process Improvement Using Six Sigma
EnergySec
 
PPT
Software Project Management lecture 12
Syed Muhammad Hammad
 
PDF
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...
guestc990b6
 
PPTX
Creation of Information Systems.pptx
joelphillipGranada2
 
PDF
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
BinNguynVn3
 
PDF
Software engineering jwfiles 3
Azhar Shaik
 
PDF
Utils_Presentation_Richard U
Richard Uytdewilligen
 
PPT
Ch20ed12romney
woyaoni
 
PPTX
Deploying at will - SEI
Strongstep - Innovation in software quality
 
PPT
3. System development life cycle.ppt
calf_ville86
 
PPT
CC06 - Systems development lifecycle.ppt
colorsclosetmk
 
PPT
Seminar on Project Management by Rj
Shree M.L.Kakadiya MCA mahila college, Amreli
 
PPT
Process models
Preeti Mishra
 
PPT
Software Engineering (Requirements Engineering & Software Maintenance)
ShudipPal
 
PPTX
Chapter 04
andyburghardt
 
PPT
Magic of agile
Subodh Kumar
 
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
AhmadSajjad34
 
The Ins and Outs of CTMS Data Migration
Perficient
 
SenchaCon 2016: Creating a Flexible and Usable Industry Specific Solution - D...
Sencha
 
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
AgileNetwork
 
Structured NERC CIP Process Improvement Using Six Sigma
EnergySec
 
Software Project Management lecture 12
Syed Muhammad Hammad
 
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...
guestc990b6
 
Creation of Information Systems.pptx
joelphillipGranada2
 
0121_RESOURCE_SoftwareDevelopmentLifecycles.pdf
BinNguynVn3
 
Software engineering jwfiles 3
Azhar Shaik
 
Utils_Presentation_Richard U
Richard Uytdewilligen
 
Ch20ed12romney
woyaoni
 
3. System development life cycle.ppt
calf_ville86
 
CC06 - Systems development lifecycle.ppt
colorsclosetmk
 
Seminar on Project Management by Rj
Shree M.L.Kakadiya MCA mahila college, Amreli
 
Process models
Preeti Mishra
 
Software Engineering (Requirements Engineering & Software Maintenance)
ShudipPal
 
Chapter 04
andyburghardt
 
Magic of agile
Subodh Kumar
 
Ad

More from SPIN Chennai (20)

PPTX
Suresh spincon chennai 2019 saa s nation - india's trillion dollar opportu...
SPIN Chennai
 
PPTX
Cast cloud april_2019
SPIN Chennai
 
PPTX
Chandra mouli health care automaton apr 2019
SPIN Chennai
 
PPTX
Swami ibm deck
SPIN Chennai
 
PPTX
Automation 360 meera seshadri
SPIN Chennai
 
PPTX
Infosys agile scale_hyper_prod_platforms
SPIN Chennai
 
PPTX
Bill curtis Beyond process - a challenge for SEPGs
SPIN Chennai
 
PDF
GDPR Demystified
SPIN Chennai
 
PPTX
Industry 4.0
SPIN Chennai
 
PPTX
Cloud computing and innovations
SPIN Chennai
 
PPTX
Transforming learning into an experience
SPIN Chennai
 
PPTX
Centre for Innovation - IIT Madras
SPIN Chennai
 
PPTX
Consistent quality in the era of constant change
SPIN Chennai
 
PPSX
Quality in the new delivery paradigm
SPIN Chennai
 
PDF
Tortoise and Hare
SPIN Chennai
 
PPTX
bimodal it - kumar
SPIN Chennai
 
PPTX
Simple approach to roadmap in the cloud
SPIN Chennai
 
PDF
IT past present and promosed land
SPIN Chennai
 
PDF
Trends and innovation in Fintech
SPIN Chennai
 
PPTX
Role of CIO in Automation
SPIN Chennai
 
Suresh spincon chennai 2019 saa s nation - india's trillion dollar opportu...
SPIN Chennai
 
Cast cloud april_2019
SPIN Chennai
 
Chandra mouli health care automaton apr 2019
SPIN Chennai
 
Swami ibm deck
SPIN Chennai
 
Automation 360 meera seshadri
SPIN Chennai
 
Infosys agile scale_hyper_prod_platforms
SPIN Chennai
 
Bill curtis Beyond process - a challenge for SEPGs
SPIN Chennai
 
GDPR Demystified
SPIN Chennai
 
Industry 4.0
SPIN Chennai
 
Cloud computing and innovations
SPIN Chennai
 
Transforming learning into an experience
SPIN Chennai
 
Centre for Innovation - IIT Madras
SPIN Chennai
 
Consistent quality in the era of constant change
SPIN Chennai
 
Quality in the new delivery paradigm
SPIN Chennai
 
Tortoise and Hare
SPIN Chennai
 
bimodal it - kumar
SPIN Chennai
 
Simple approach to roadmap in the cloud
SPIN Chennai
 
IT past present and promosed land
SPIN Chennai
 
Trends and innovation in Fintech
SPIN Chennai
 
Role of CIO in Automation
SPIN Chennai
 
Ad

Recently uploaded (20)

PDF
🚀 Mohit Bansal_ Driving Urban Evolution Through GMI Infra (1).pdf
Mohit Bansal GMI
 
DOCX
Andrew C. Belton, MBA Resume - July 2025
Andrew C. Belton
 
PPTX
Integrative Negotiation: Expanding the Pie
badranomar1990
 
PPTX
Certificate of Incorporation, Prospectus, Certificate of Commencement of Busi...
Keerthana Chinnathambi
 
PPTX
Appreciations - July 25.pptxdddddddddddss
anushavnayak
 
DOCX
Navigating Environmental Excellence ISO 140012015 Implementation in Pretoria....
Norocke Consulting
 
PPTX
FINAL _ DB x Forrester x Workday Webinar Buying Groups July 2025 (1).pptx
smarvin1
 
PDF
12 Oil and Gas Companies in India Driving the Energy Sector.pdf
Essar Group
 
PPTX
Social Media Marketing for Business Growth
vidhi622006
 
PDF
Equinox Gold - Corporate Presentation.pdf
Equinox Gold Corp.
 
PDF
SMLE slides.pdf pediatric medical history
hananmahjoob18
 
PDF
Followers to Fees - Social media for Speakers
Corey Perlman, Social Media Speaker and Consultant
 
PDF
From Fossil to Future Green Energy Companies Leading India’s Energy Transitio...
Essar Group
 
PPTX
Appreciations - July 25.pptxffsdjjjjjjjjjjjj
anushavnayak
 
PDF
New Royals Distribution Plan Presentation
ksherwin
 
PDF
Infrastructure and geopolitics.AM.ENG.docx.pdf
Andrea Mennillo
 
PPTX
E-commerce and its impact on business.
pandeyranjan5483
 
DOCX
Apply for a Canada Permanent Resident Visa in Delhi with Expert Guidance.docx
WVP International
 
PPTX
Chapter 3 Distributive Negotiation: Claiming Value
badranomar1990
 
PDF
ANÁLISIS DE COSTO- PAUCAR RIVERA NEISY.pdf
neisypaucarr
 
🚀 Mohit Bansal_ Driving Urban Evolution Through GMI Infra (1).pdf
Mohit Bansal GMI
 
Andrew C. Belton, MBA Resume - July 2025
Andrew C. Belton
 
Integrative Negotiation: Expanding the Pie
badranomar1990
 
Certificate of Incorporation, Prospectus, Certificate of Commencement of Busi...
Keerthana Chinnathambi
 
Appreciations - July 25.pptxdddddddddddss
anushavnayak
 
Navigating Environmental Excellence ISO 140012015 Implementation in Pretoria....
Norocke Consulting
 
FINAL _ DB x Forrester x Workday Webinar Buying Groups July 2025 (1).pptx
smarvin1
 
12 Oil and Gas Companies in India Driving the Energy Sector.pdf
Essar Group
 
Social Media Marketing for Business Growth
vidhi622006
 
Equinox Gold - Corporate Presentation.pdf
Equinox Gold Corp.
 
SMLE slides.pdf pediatric medical history
hananmahjoob18
 
Followers to Fees - Social media for Speakers
Corey Perlman, Social Media Speaker and Consultant
 
From Fossil to Future Green Energy Companies Leading India’s Energy Transitio...
Essar Group
 
Appreciations - July 25.pptxffsdjjjjjjjjjjjj
anushavnayak
 
New Royals Distribution Plan Presentation
ksherwin
 
Infrastructure and geopolitics.AM.ENG.docx.pdf
Andrea Mennillo
 
E-commerce and its impact on business.
pandeyranjan5483
 
Apply for a Canada Permanent Resident Visa in Delhi with Expert Guidance.docx
WVP International
 
Chapter 3 Distributive Negotiation: Claiming Value
badranomar1990
 
ANÁLISIS DE COSTO- PAUCAR RIVERA NEISY.pdf
neisypaucarr
 

Hi Maturity in the CMMI Services Context

  • 1. - 1 - “Hi Maturity in the CMMI Services Context" Chinmay Pradhan QAI Global
  • 2. CMMI For Services - 2 - • Helps Build Better Services • Looks at Services from Strategic perspective • Applicable across broad spectrum of work done • Aligned and Leverages existing service management frameworks eg ITIL, CoBIT etc
  • 3. Snapshot of Services Where CMMI SVC has been applied - 3 - • Majority is for Application Management •Production Support •Change Requests •Bug Fixes • Other Non Conventional work types are also catching up Work Types WIth SVC Implemented Application Management and Support Training Services Risk Consutling ERP Configuration ERP Support Staff Augumentation BPO
  • 4. Service System • Services are useful intangible and non-storable results delivered through the operation of a service system. Âť CMMI SVC • Services are characterized by –Simultaneity –Heterogeneity • A Service System is a combination of –People using •Tools and Resources to execute –Process Steps to complete an service operation - 4 -
  • 5. Service Components: Elements that help deliver a Service - 5 - Work products Work Processes Tools Infrastructure People Streamlined Service Delivery
  • 6. Modeling in an Application Support Service - 6 -
  • 7. Typical Expectations - 7 - Year-on-Year Savings Technical Complexity
  • 8. Assumed system - 8 - No of Requests per Day • Based on actual average TAT per step and priority •Helped analyze the capacity required per day and hence plan for the month • Was simple to use and understand But!!!
  • 9. In Reality…. - 9 - 19 4 • Events are dynamic with multiple factors affecting the performance • The inflow of tickets changes constantly • The performance for each of the steps is not fixed, but variable An animated view of the service system
  • 10. In Reality…. • There were far too many dynamic factors to be considered in the entire resolution process like –If a high Priority ticket came in all others have to be dropped till this is fixed –If resources are busy then tickets will be in queue –The Process Performance is a function of the complexity and not just the priority, • Additional complexity: can have high priority simple tickets and also complex tickets. - 10 -
  • 11. - 11 - … to control the Key Process Outputs Key Process Inputs: Control these … Output Variability “Outputs inherit variability from inputs.” Sub Process and its Impact
  • 12. One approach for Modeling Such a System - 12 -
  • 13. Let’s Take an example The Service System we have picked up is –Service to resolve Production support requests for large banking application –There are 2 different kinds of requests that come in to the queue, Type 1 and Type 2. Each having its own priorities and SLA’s –The Service provides a 6X18 hr support. Some of the challenges faced by the service system are –The resource allocation and utilization vis a vis the SLA performance is sub optimal i.e if the SLA compliance is comfortable then there is low utilization –Team composition and shift allocation - 13 -
  • 14. Creating the Model The service system was aptly described by a queue based system. To model such a system we required: • Standard Simulation Modeling Tool. E.g Process Model • Resources with the knowledge of such modeling and the skill to use the tools • Process maps of actual events • Map of all possible occurring conditions i.e high priority gets picked first, there are shifts with breaks, • Actual data with respect to the –Request classifications i.e no of type 1 and type 2, breakup of their priorities. –The Turnaround time for each process steps –Waiting time if any - 14 -
  • 15. The data required – Not very different from what is typically collected • The data collected were –A sample of the actual turnaround time for each process steps by their priorities and types –Request incoming patterns; quite an eye opener. –Operating condition were • Shifts of 9am to 6pm, 6pm to 3am • Till now separate teams work on separate types • If high priority request comes it is picked up immediately - 15 -
  • 16. The Model Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 - 16 - •Daily incoming pattern described as statistical distributions for each type of request •Data was entered for the entire time period for support i.e 9 am to 6pm and then 6pm to 3 am •Requests had priority assigned using probabilities •Requests arrive at a system before they are assigned and allocated across
  • 17. The Model Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 - 17 - •Current team assignment was depicted using the shift timings •One Resource was to complete the whole request before he or she was free • Before the shift started or during breaks the queues will build up •If a high priority ticket enters the system, it will get addressed immediately •SLA are established for all ticket categories and priorities
  • 18. Using the Model with current team settings - 18 - •Shift 1 •Engineer Group 1 (4 Resources) •Engineer Group 3(4 Resources) •Shift 2 •Engineer Group 2(4 Resources) •Engineer Group 4( 4 Resources) •Average idle time of 15% for Eng 1 and 14% for Eng 3
  • 19. Using the Model with current team settings - 19 - •Average SLA at 95% CI is predicted to be •Type 1 •P1 92% •P2 91% •P3 89% •Type 2 •P1 89% •P2 74% •P3 98% With a target of 90% compliance there could be quite some misses
  • 20. Evaluating Strategies : • The Model was used to • Simulate various scenarios and Identify –Evaluate available strategies to improve Utilization and SLA compliance –Identify the potential areas of improvement in the process steps. - 20 -
  • 21. Evaluating Strategies • One of the things noticed in the setup was the queue that was getting built up in the non working period of 3 am to 9 am. • Since the data for the inflow had not been analyzed before it was not realized that the engineers used to start work with the queue that was leading to SLA’s being breached • What would be the impact if the team did not have the queue? • Also it was noticed that there was typically some free resources in the day in the first shift but the second shift was tight. • What if we overlap shift timings? • What if we cross skill the people in the night shift so that anyone free can take in the other queue? - 21 -
  • 22. Changes Made in the rules • The inflow was modified to evaluate the impact of yanking away the requests logged during the non working hours. • One of the resources was cross trained and assigned to both the queue so that requests can be resolved from both. • The timings of this resource were made on an overlapping slot of 2pm to 11 pm so that there is an availability in both the shifts. - 22 -
  • 23. Using the Model with changes - 23 - •Shift 1 •Engineer Group 1 (4 Resources) •Engineer Group 3(2 Resources) •Shift 2 •Engineer Group 2(2 Resources) •Engineer Group 4( 1 Resources) •Mid Shift •Engineer 5 ( 1 Resource) •A reduction of 6 resources from the team •Average un-utilization was the highest for Eng 4 at 53% for the only person there Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 Engineer 5
  • 24. - 24 - •Average SLA at 95% CI Predicted •Type 1 •P1 93% •P2 88% •P3 90% •Type 2 •P1 93% •P2 88% •P3 100% SLA Compliance much healthier Using the Model with changes
  • 25. - 25 - 0.00 10.00 20.00 30.00 40.00 50.00 60.00 StudyandResponse StudyandResponse2 Analysis Debugg Analysis2 Debugg2 Storage PercentofTotalMinutes Top 7 Hot SpotsTop 7 Hot Spots Percentage of NVA Minutes Percentage of BVA Minutes Percentage of VA Minutes •The Study and Response Process Step was seen to the most variable process step and identified for further analysis and improvement Using the Model with changes
  • 26. Inferences • “Yanking” the queue for the non working hours can reduce the load on the system • Cross training can be a significant leverage • Overlapping shift timings can greatly impact the SLA’s as well as the effective team utilization. • The initial step of study and response is also identified as the potential area for improvement - 26 -
  • 27. Key Takeaways - 27 - • Involve subject matter experience –Meaningless (statistical) relationships should be discarded –Expected (statistical) relationships can be verified • GIGO –Review and feedback cycle • Be clear on objectives and expectations from simulation • Ensure adequate interactions between –Model builder, Management, Practitioners • Train personnel operating the model –To know how to use it – make appropriate inferences –To know when it is not working – seek help • Check against known results
  • 28. Tips and Tricks on Model usage in Project Management - 28 -
  • 29. Service Transition - 29 - •Right turnaround time to promise •Right SLA •Right Volume
  • 30. Capacity Management - 30 - 16 People handle 71 work requests Is this Ok If volume increases by 20% then how many resources?? By when?? Capacity during Service Continuity?? SLA during SCON
  • 31. Setting Up Service Delivery - 31 - Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 Engineer 5 Resource Overlapping VS Type 1 Type 2 Storage Decision Study and Response Study and Response 2 Analysis Analysis 2 Debugg Debugg 2 Close Request Engineer 1 Engineer 2 Engineer 3 Engineer 4 No Overlapping
  • 32. Dependency Management - 32 - Dependency on customer answers
  • 33. Common Examples of Controlled Factors: Enough????? - 33 - Sl No Y Parameter (Outputs) X ( Controllable factors) Impacted Sub Processes Monitored 1 % SLA Met by Priority Skill of Resources in a team/Shift Optimal No of Resources in a shift/team Usage of Knowledge Database TAT of Resolution for each Incidents TAT of Response for each of the incidents Assignment Time for each incident No of backlog incidents per day 2 Utilization of Resources Skill of Resources in a team/Shift Optimal No of Resources in a shift/team Usage of Knowledge Database TAT of Resolution for each Incidents TAT of Response for each of the incidents Assignment Time for each incident No of backlog incidents per day
  • 34. What is Critical!!!!:2013 Malayasian GP Pitstop2.05Secs Time Difference between Winner and 2nd :4.2secs - 34 - Pit stops not mandatory Critical Sub Process can be outside the chain of direct delivery process step
  • 36. Misaligned Goals: Improvement in Productivity in T&M - 36 -
  • 38. Measurements at in-appropriate granularity - 38 - Measurement is a function of work complexity and Need for information not convenience Measurement does not always mean a permanent measurement system
  • 39. Propagate beyond Delivery and Interweave - 39 - 24X7 support is driven by transport: Do they do capacity management???
  • 41. References • Using Process Performance Models to enhance CAM in CMMI for SVC- Mukul Madan and Chinmay Pradhan; Presented at SEPG NA 2011 • Service Management: Operations, Strategy, and Information Technology- - James A. Fitzsimmons, Mona J. Fitzsimmons • Introduction To Operations Research- Billy Gilett • Process Model User Guide and Tutorial. http://www.processmodel.com/ • CMMIÂŽ for Services, Version 1.3 – CMMI Product Team (CMU/SEI- 2010-TR-034) • Improving Organizational Alignment Leveraging High Maturity Principles: Sankararaman D: HMBP 2012 - 41 -