03RD PRESENTATION
Create WBS is the process of subdividing project deliverables
and project work into smaller, more manageable components.
Dividing complex projects to simpler and manageable tasks is
the process identified as Work Breakdown Structure (WBS).
Usually, the project managers use this method for simplifying
the project execution.
In WBS, much larger tasks are broken-down to manageable
chunk/work package of work. These chunks can be easily
supervised and estimated.
DEFINATION Breakdown Structure Project Management
A work breakdown structure.
In project management and systems engineering,
is a deliverable oriented decomposition of a
project into smaller components.
A work breakdown structure element may be a
product, data, a service, or any combination.
A WBS also provides the necessary framework for
detailed cost estimating and control along with
providing guidance for schedule development and
control
DEFINATION Breakdown Structure Project Management
WBS helps manager Facilitates evaluation of cost, time, and
technical performance of the organization on a project.
Provides management with information appropriate to each
organizational level.
Helps in the development of the organization. breakdown
structure which assigns project responsibilities to organizational
units and individuals◦ Helps manager plan, schedule, and budget.
Defines communication channels and assists in coordinating the
various project elements.
Breakdown StructureExplain
Breakdown Structureexample of outlined WBS
Breakdown Structureexample of outlined WBS
The rule applies at all
levels within the
hierarchy: the sum of
the work at the "child"
level must equal 100%
of the work
represented by the
"parent" and the WBS
should not include any
work that falls outside
the actual scope of the
project, that is, it
cannot include more
than 100% of the work
Helps In accurate estimation of
Time,
Cost
Resources
Development of a predictable plan
Assignment & Responsibilities
Effective Monitoring and Control
Reducing project risk
Increase Quality
Breakdown StructureBenefits of WBS
An important design principle for work breakdown structures is
called the 100% rule
The 100% rule states that the WBS includes 100% of the work
defined by the project scope and captures all deliverables –
internal, external, interim – in terms of the work to be completed,
including project management. The 100% rule is one of the most
important principles guiding the development, decomposition
and evaluation of the WBS
It is important to remember that the 100% rule also applies to the
activity level. The work represented by the activities in each work
package must add up to 100% of the work necessary to complete
the work package
Breakdown StructureDesign principles
WBS: how far down ?
WBS is decomposed to the work package level
Dividing until you can track project performance
Progressive elaboration allows to refine progressively
No longer able to define planned outcomes
Only detail remains are actions
40 hour rule (40 hours week) rather than 4 levels
4% of the total project
No more than 60 WPs
Must be manageable
WBS: how far down Breakdown Structure
Helps In accurate estimation of
Time,
Cost
Resources
Development of a predictable plan
Assignment & Responsibilities
Effective Monitoring and Control
Reducing project risk
Increase Quality
Breakdown StructureBenefits of WBS

More Related Content

What's hot (20)

PPT
Project Management and Process
Muhammad Rehman
 
PPT
Project Management Tools and Techniques
MaRS Discovery District
 
PPT
Project Planning
megat zainurul anuar
 
PDF
Project Risk Management
Mauro Jasse
 
PDF
07 project cost management
Omer Alsayed PhD,MBA, PMP®
 
PDF
Project scope management
Anit Roy
 
PPT
Project Management
Hamdard University
 
PPTX
5 phases of project management
Jared C. Powell
 
PPTX
Project planning and scheduling techniques
Shivangi Saini
 
PPT
Project control
monisha pattnaik
 
PPT
WBS PROJECT
nurliyana Bakar
 
PDF
Project Team Powerpoint Presentation Slides
SlideTeam
 
PPTX
Smart project management - Best Practices to Manage Project effectively
Chetan Khanzode
 
PDF
IT Project Management - Aligning PMBOK Processes and SDLC
Crysanthus Raharjo, PMP
 
PDF
Project Scope Management
Andersson Lujan Ojeda
 
PPTX
Project Cost Management
Kateri Manglicmot
 
PPTX
Engineering Economics|Work Breakdown Structure
umair khan
 
PPTX
Project cost & control
AMARAYYA
 
PDF
Develop project charter
Shereef Sabri
 
PPTX
Triple Constraints of Projects: Scope, Cost & Schedule
shofiulalom
 
Project Management and Process
Muhammad Rehman
 
Project Management Tools and Techniques
MaRS Discovery District
 
Project Planning
megat zainurul anuar
 
Project Risk Management
Mauro Jasse
 
07 project cost management
Omer Alsayed PhD,MBA, PMP®
 
Project scope management
Anit Roy
 
Project Management
Hamdard University
 
5 phases of project management
Jared C. Powell
 
Project planning and scheduling techniques
Shivangi Saini
 
Project control
monisha pattnaik
 
WBS PROJECT
nurliyana Bakar
 
Project Team Powerpoint Presentation Slides
SlideTeam
 
Smart project management - Best Practices to Manage Project effectively
Chetan Khanzode
 
IT Project Management - Aligning PMBOK Processes and SDLC
Crysanthus Raharjo, PMP
 
Project Scope Management
Andersson Lujan Ojeda
 
Project Cost Management
Kateri Manglicmot
 
Engineering Economics|Work Breakdown Structure
umair khan
 
Project cost & control
AMARAYYA
 
Develop project charter
Shereef Sabri
 
Triple Constraints of Projects: Scope, Cost & Schedule
shofiulalom
 

Similar to How to create a work breakdown structure (wbs) (20)

PPTX
Work breakdown structure in project management ppt by kiran j
IIT delhi
 
PPTX
K.chaitanya pm
kongara
 
PDF
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
DipakBorse6
 
PDF
Workbreakdownstructureppt 130410021152-phpapp02
sayyed sabir
 
PPTX
workbreakdownstructureppt-130410021152-phpapp02.pptx
eborrego3
 
PDF
Work Breakdown Structure in Construction Management
Dr. Akshay Wayal
 
PDF
Work breakdown structure
RaoZaid1
 
PDF
Understanding the Work Breakdown Structure.pdf
Enterprise world
 
PPT
Chapter 2 Work Break down Structure1.ppt
ssuser4f8f65
 
PPT
Chapter 2 Work Break down Structure (1).ppt
ssuser8cd298
 
PDF
Lect 3 wbs&obs
Muhammad Bilal
 
PPTX
Work Break Down Structure
Somtel
 
PPTX
WBS-final-1.Project Management and Ethics.pptx
FillHackjack
 
PPTX
5. Work Breakdown Structure-- slides for help 1.pptx
my123lapto
 
PPTX
Work breakdown structure
Md Showrov Ahmed
 
DOCX
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
evonnehoggarth79783
 
PPTX
Work Breakdown Structure Aritrya Kumar.pptx
ARITRYAKUMAR
 
PPTX
Lec 05 wbs & obs 1
SAJID ALI RUK
 
PPTX
Babu 143
babasahebkadam3
 
PPTX
Work breakdown structure ppt
nazi2020
 
Work breakdown structure in project management ppt by kiran j
IIT delhi
 
K.chaitanya pm
kongara
 
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
DipakBorse6
 
Workbreakdownstructureppt 130410021152-phpapp02
sayyed sabir
 
workbreakdownstructureppt-130410021152-phpapp02.pptx
eborrego3
 
Work Breakdown Structure in Construction Management
Dr. Akshay Wayal
 
Work breakdown structure
RaoZaid1
 
Understanding the Work Breakdown Structure.pdf
Enterprise world
 
Chapter 2 Work Break down Structure1.ppt
ssuser4f8f65
 
Chapter 2 Work Break down Structure (1).ppt
ssuser8cd298
 
Lect 3 wbs&obs
Muhammad Bilal
 
Work Break Down Structure
Somtel
 
WBS-final-1.Project Management and Ethics.pptx
FillHackjack
 
5. Work Breakdown Structure-- slides for help 1.pptx
my123lapto
 
Work breakdown structure
Md Showrov Ahmed
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
evonnehoggarth79783
 
Work Breakdown Structure Aritrya Kumar.pptx
ARITRYAKUMAR
 
Lec 05 wbs & obs 1
SAJID ALI RUK
 
Babu 143
babasahebkadam3
 
Work breakdown structure ppt
nazi2020
 
Ad

More from Insaf Ali Soomro PMP (6)

PPTX
10 project management knowledge areas
Insaf Ali Soomro PMP
 
PDF
What is Project management
Insaf Ali Soomro PMP
 
PDF
12 Terms You Should Know Project Management Fundamentals
Insaf Ali Soomro PMP
 
PPTX
Successful project management
Insaf Ali Soomro PMP
 
PPTX
guide to Project charter
Insaf Ali Soomro PMP
 
10 project management knowledge areas
Insaf Ali Soomro PMP
 
What is Project management
Insaf Ali Soomro PMP
 
12 Terms You Should Know Project Management Fundamentals
Insaf Ali Soomro PMP
 
Successful project management
Insaf Ali Soomro PMP
 
guide to Project charter
Insaf Ali Soomro PMP
 
Ad

Recently uploaded (20)

PDF
Pokemon Leadership Lessons_2025WhitePaper.pdf
katjadm
 
PPTX
Grounding_Hypotheses_Presentation_Updated.pptx
truefollower1
 
PPTX
Ideation and Product Innovation: Solving Problems
Dr NIkhill Alok Jha
 
PDF
CISSP Domain 2: Asset Security - InfoSec
VICTOR MAESTRE RAMIREZ
 
PDF
Labirintos morais: um estudo sobre ética
Ivomar Schuler da Costa
 
PDF
Is an Information Security Policy Necessary for Small Businesses?
Writegenic AI
 
PPTX
Emergency Preparedness and Response.pptx
sumanthramlakkan
 
PDF
Criminology_and_Security_Studies_Syllabus.pdf
MOHAMED HERSI FARAH
 
PPTX
ANIn Bengaluru 2025 | Working Smarter: The Fusion of Agile Mindsets and AI Mi...
AgileNetwork
 
PPT
Fire Extinguisher Training powerpoint .ppt
sumanthramlakkan
 
PDF
CISSP Domain 4: Communication and Network Security
VICTOR MAESTRE RAMIREZ
 
PDF
CISSP Domain 3: Security Architecture and Engineering
VICTOR MAESTRE RAMIREZ
 
PDF
CISSP Domain 1: Security and Risk Management
VICTOR MAESTRE RAMIREZ
 
PPT
Fire Extinguishers Suppression Systems.ppt
sumanthramlakkan
 
PDF
SpatzAI Micro-conflict Resolution Toolkit
Desmond Sherlock
 
PPTX
Caleb followed God with his whole heart.pptx
RaraSolliborDumalian
 
DOCX
Process Confirmation and Product Tracecability Project Report.docx
himanshupersevering
 
PPT
Fire Safety Main powerpoint for training .ppt
sumanthramlakkan
 
PPT
leadership types and creativity in management.ppt
SubrataPaul74
 
Pokemon Leadership Lessons_2025WhitePaper.pdf
katjadm
 
Grounding_Hypotheses_Presentation_Updated.pptx
truefollower1
 
Ideation and Product Innovation: Solving Problems
Dr NIkhill Alok Jha
 
CISSP Domain 2: Asset Security - InfoSec
VICTOR MAESTRE RAMIREZ
 
Labirintos morais: um estudo sobre ética
Ivomar Schuler da Costa
 
Is an Information Security Policy Necessary for Small Businesses?
Writegenic AI
 
Emergency Preparedness and Response.pptx
sumanthramlakkan
 
Criminology_and_Security_Studies_Syllabus.pdf
MOHAMED HERSI FARAH
 
ANIn Bengaluru 2025 | Working Smarter: The Fusion of Agile Mindsets and AI Mi...
AgileNetwork
 
Fire Extinguisher Training powerpoint .ppt
sumanthramlakkan
 
CISSP Domain 4: Communication and Network Security
VICTOR MAESTRE RAMIREZ
 
CISSP Domain 3: Security Architecture and Engineering
VICTOR MAESTRE RAMIREZ
 
CISSP Domain 1: Security and Risk Management
VICTOR MAESTRE RAMIREZ
 
Fire Extinguishers Suppression Systems.ppt
sumanthramlakkan
 
SpatzAI Micro-conflict Resolution Toolkit
Desmond Sherlock
 
Caleb followed God with his whole heart.pptx
RaraSolliborDumalian
 
Process Confirmation and Product Tracecability Project Report.docx
himanshupersevering
 
Fire Safety Main powerpoint for training .ppt
sumanthramlakkan
 
leadership types and creativity in management.ppt
SubrataPaul74
 

How to create a work breakdown structure (wbs)

  • 1. Breakdown Structure Project Management How to Create a Work Breakdown Structure (WBS) in Project Management 03RD PRESENTATION
  • 2. Create WBS is the process of subdividing project deliverables and project work into smaller, more manageable components. Dividing complex projects to simpler and manageable tasks is the process identified as Work Breakdown Structure (WBS). Usually, the project managers use this method for simplifying the project execution. In WBS, much larger tasks are broken-down to manageable chunk/work package of work. These chunks can be easily supervised and estimated. DEFINATION Breakdown Structure Project Management
  • 3. A work breakdown structure. In project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control DEFINATION Breakdown Structure Project Management
  • 4. WBS helps manager Facilitates evaluation of cost, time, and technical performance of the organization on a project. Provides management with information appropriate to each organizational level. Helps in the development of the organization. breakdown structure which assigns project responsibilities to organizational units and individuals◦ Helps manager plan, schedule, and budget. Defines communication channels and assists in coordinating the various project elements. Breakdown StructureExplain
  • 6. Breakdown Structureexample of outlined WBS The rule applies at all levels within the hierarchy: the sum of the work at the "child" level must equal 100% of the work represented by the "parent" and the WBS should not include any work that falls outside the actual scope of the project, that is, it cannot include more than 100% of the work
  • 7. Helps In accurate estimation of Time, Cost Resources Development of a predictable plan Assignment & Responsibilities Effective Monitoring and Control Reducing project risk Increase Quality Breakdown StructureBenefits of WBS
  • 8. An important design principle for work breakdown structures is called the 100% rule The 100% rule states that the WBS includes 100% of the work defined by the project scope and captures all deliverables – internal, external, interim – in terms of the work to be completed, including project management. The 100% rule is one of the most important principles guiding the development, decomposition and evaluation of the WBS It is important to remember that the 100% rule also applies to the activity level. The work represented by the activities in each work package must add up to 100% of the work necessary to complete the work package Breakdown StructureDesign principles
  • 9. WBS: how far down ? WBS is decomposed to the work package level Dividing until you can track project performance Progressive elaboration allows to refine progressively No longer able to define planned outcomes Only detail remains are actions 40 hour rule (40 hours week) rather than 4 levels 4% of the total project No more than 60 WPs Must be manageable WBS: how far down Breakdown Structure
  • 10. Helps In accurate estimation of Time, Cost Resources Development of a predictable plan Assignment & Responsibilities Effective Monitoring and Control Reducing project risk Increase Quality Breakdown StructureBenefits of WBS