PROFILE for Presentation
17-09-2022, Saturday & 18-09-2022, Sunday
Day – 1 & 2:
• Observations
3
Observations
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Photo in the above Box
Description Here
*SITE PREPARATION & LEVELLING
4
Description DAY-1 & 2
Preparing Site for Construction Projects:
To construct excellent project, the condition of the project site including subsurface and surface condition must be
investigated and assessed thoroughly. Site assessment may involve determining the present and installation of
underground services, specify suitable foundation depend on recommendation of
Steps in Preparing Site for Construction Projects
-Stages or steps which are needed to undertake to prepare the construction project site are.
1} Geotechnical report related to site soil properties
2} Construction site clearing and excavation
3} Grading of project site
4} Project site compaction
- Land leveling is the process of modifying the surface relief by smoothening it. It is the process of flattening or
modifying existing (natural) slopes or undulations and thereby creating a level surface. Normally land leveling requires
excavation and movement of earth from higher elevations to lower elevations.
Types of Leveling Methods used in Surveying
- Direct Leveling.
- Trigonometric Leveling.
- Barometric Leveling.
- Stadia Leveling.
19-09-2022, Monday & 20-09-2022 Tuesday
Day – 3 & 4:
• Observations
5
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Observations
* MATERIALS USED IN CONSTRUCTION
Construction Raw-Materials
1. Iron steel
2. Bricks
3. Cements
4. Sand
5. Fine Aggregates
6. Wooden board
Construction Machines Like:
1. Cement mixture machine
2. Trolly or bucket
3. Lift & rolling-tracks
4. Generationer
5. Loder truck
6. JCB
6
Description DAY-3 & 4
CONSTRUCTION STAGE:-
SUBSTRUCTURE WORK:-
1) Excavation
2) PCC Work
3) Footing Work
4) Backfilling Work
* Excavation:
mark layout the plot and establish at least benchmark for
level and measurment.
Excavate the foundations as per the excavation drawing
*PCC Work:
pcc stans for plain cement concrete of grade M7.5-M10.
The PCC provides a leveled surface to the foundation
work. It has a thickness of 75-100 mm
21-09-2022, Wednesday & 22-09-2022, Thursday
Day – 5 & 6:
• Observations
7
Observations
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Brief Description
*Backfilling work:
After footing casting, remove the shuttering and cure the footing. The pits excavated for the foundation are filled with
soil and compacted by a suitable method. Compact the soil till it achieves 95% compaction
Plinth level is the floor finished level. The structure below the plinth level is filled with soil and called Sub-structure
*Foundation:
• Part of a structural system that supports and anchors the superstructure of a building and transmits its loads directly
to the earth.
1. Prepare the Foundation Layout.
2. Then, we need to dig ground until we come to subsoil.
3. After that fill Based Footing with; Stone, Small Bricks Pieces & Cement.
4. This we are using Box-Foundation, there for its dimension given by architect are:
» Area of the hole: 5’ X 6’
» Steel netting work: 4’ X 5’
» Distance of 10mm 1 rod to 2 rod is 10cm
» R.C.C=3’6” X 3’6” (L x B) & D= 3’8” (Depth)
» P.C.C= 4’6” X 4’6” (L x B)
» Column Size: 9” X 9”
» Steel: 8 Nos of 12mm.
8
Description DAY-5 & 6
23-09-2022, Friday & 24-09-2022 Saturday
Day – 7 & 8:
• Observations
9
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Observations
Brief Description
10
Description DAY-7 & 8
Coloumn
Column or pillar are used to model vertical load-bearing elements in a building Transferring load from the top of the
structure to the foundation.
Column sections can be rectangular, round, square shape.
Size of column should not be less than 9”x 9” 4 Main bars of 12mm Steel & 8mm ring on it.
Plinth beam
Plinth beam is a reinforced concrete beam constructed between the wall and its foundation.
Plinth beam is provided to prevent the extension or propagation of cracks from the foundation into the wall above when
the foundation suffers from settlement.
25-09-2022, Sunday & 26-09-2022, Monday
Day – 9 & 10:
• Observations
11
Observations
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Brief Description
WALL
A wall is a structure and a surface that defines an area; carries a load;
provides security, shelter, or soundproofing; or, is decorative.
Bricks
Rows of Bricks are bound together by a cementitious.
* Clay cement is used whose Ratio is 1:6 (1 bag cement & 6 Parts of sand).
* L x B x H in (mm) of one brick = 225 x 112 x 65 + 10mm joint (cement filling).
* Depending on worker speed the wall is constructed in 1 OR 3 days.
* When the plastering is complete for the brick wall, it is advised to water the wall for 7 days and keep the cement
wet for total 15 days.
* In order to Hydration of the cement is what gives the concrete its compressive strength.
12
Description DAY-9 & 10
27-09-2022, Tuesday & 28-09-2022 Wednesday
Day – 11 & 12:
• Observations
13
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Observations
Brief Description
14
Description DAY-11 & 12
slab construction process
1. The preparation of formwork.
2. Compaction of a slab bed.
3. Placing Electrical Wire Line & Pipe Lines.
4. Placement of reinforcement.
5. Pouring & Compacting.
6. Finishing the concrete.
7. Removing formwork, jack span and curing the concrete slab.
- Ratio of Concrete mix: 1:2:4 (1-Bag Cement, 2-Parts Sand, Part Aggregate)
It took 4 to 7 Hours for Slab to get Setting after filling.
However, For 28 days we need to stored water on the slab.
29-09-2022, Thursday & 30-09-2022, Friday
Day – 13 & 14:
• Observations
15
Observations
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Brief Description
16
Description DAY-13 & 14
Electricity LIne
They work according to given plan or client suggestion or need. Before slab casting work, electrician man visit
the side & installed all needy electrical line, selling lights box, fan hook, switch board box into wall.
They used two color plastic pipe line to pass wire through it.
1. Green color: for main wire line passes from main board to all switch board.
2. Blue color: for all points wire line passes from switch board to 1 or 2 lights or 1 or 2 selling fans, which will
work just by 1 switch.
Drainage or HAVC line
Plumbean is the process of installing the pipework and other assemblies for a functioning water supply and drainage
system.
UPVC pipes used for all purposes such as hand wash basin, Kitchen sinks to the toilets urinals and all other areas CPVC
Pipes used for hot water supply.
01-10-2022, Saturday
Day – 15:
• Observations
17
Observations
Photo in the above Box
Description Here
Photo in the above Box
Description Here
Brief Description
18
Description Day - 15
Plaster work:
• During your home's construction, plastering makes the rough surfaces of the walls smooth.
Plastering covers rough edges and uneven surfaces, thus increasing durability and
strengthening walls. Plastering also gives a good finish to the walls of your house and this
will make your home look appealing.
• Ratio of Plaster is 15:1 (15-part white sand & 1-bag cement)
• Types of wall plaster done:
1. Kitchen, Bath & W.C: Rough plaster
2. Rooms: Smooth finishing plaster
3. Outerwall: Double coated plaster
19

More Related Content

PPTX
Dda training presentation
PDF
Re development works at east kidwai nagar, New Delhi
PPT
Industrial Training Report-(2012-13)
PPTX
Concrete
DOCX
Site report 1
PPTX
Final PPT internship 4th year civil .pptx
PDF
KUY Limeng,e20190482(I4GCI-B)_4.pdf
PPTX
A valuable journey proposal
Dda training presentation
Re development works at east kidwai nagar, New Delhi
Industrial Training Report-(2012-13)
Concrete
Site report 1
Final PPT internship 4th year civil .pptx
KUY Limeng,e20190482(I4GCI-B)_4.pdf
A valuable journey proposal

Similar to kuku.pptx (20)

PPTX
Sample copy of IT PPT.pptx
PPTX
PRESENTATION ON THE INTERNSHIP
PPTX
Precast Concrete Structure: Architectural examples
PPTX
New materials and technologies used in some buildings in Mumbai
PDF
Construction work of a multi storied residential building
PPTX
Summer training report
PDF
3 RCD_Chapter 1 Introduction.pdf
PPTX
Ntpc summer training 2017
PDF
Building Construction II Report
PPTX
CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN)
PPTX
training1 (1).pptx
PPTX
internship ppt.pptx civil engineering institute
PDF
Speci vol1
DOCX
Site report assignment
PPT
Construction basic SIP
PPT
Formwork
PPTX
INTERNSHIP PPT.pptx
PPTX
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
PPTX
Practical field Training and Report submission
DOCX
Ayush
Sample copy of IT PPT.pptx
PRESENTATION ON THE INTERNSHIP
Precast Concrete Structure: Architectural examples
New materials and technologies used in some buildings in Mumbai
Construction work of a multi storied residential building
Summer training report
3 RCD_Chapter 1 Introduction.pdf
Ntpc summer training 2017
Building Construction II Report
CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN)
training1 (1).pptx
internship ppt.pptx civil engineering institute
Speci vol1
Site report assignment
Construction basic SIP
Formwork
INTERNSHIP PPT.pptx
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
Practical field Training and Report submission
Ayush
Ad

Recently uploaded (20)

PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PPT
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
PPT on Performance Review to get promotions
PPT
introduction to datamining and warehousing
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PPT
Total quality management ppt for engineering students
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PPTX
communication and presentation skills 01
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PPTX
Fundamentals of Mechanical Engineering.pptx
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPTX
Artificial Intelligence
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
R24 SURVEYING LAB MANUAL for civil enggi
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PPT on Performance Review to get promotions
introduction to datamining and warehousing
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Total quality management ppt for engineering students
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Categorization of Factors Affecting Classification Algorithms Selection
communication and presentation skills 01
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
Fundamentals of Mechanical Engineering.pptx
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Nature of X-rays, X- Ray Equipment, Fluoroscopy
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Artificial Intelligence
Ad

kuku.pptx

  • 1. 1 GOVERNMENT POLYTECHNIC, VALSAD Civil Engineering Department Name: Enrollment No: Presentation on 17-09-202z2 to 01-10-2022
  • 2. Full Name: Enrollment Number: Semester & Division: Subject Code: Site / Office Location: Site / Office Type: Site / Office In-charge: 2 PROFILE for Presentation
  • 3. 17-09-2022, Saturday & 18-09-2022, Sunday Day – 1 & 2: • Observations 3 Observations Photo in the above Box Description Here Photo in the above Box Description Here Photo in the above Box Description Here
  • 4. *SITE PREPARATION & LEVELLING 4 Description DAY-1 & 2 Preparing Site for Construction Projects: To construct excellent project, the condition of the project site including subsurface and surface condition must be investigated and assessed thoroughly. Site assessment may involve determining the present and installation of underground services, specify suitable foundation depend on recommendation of Steps in Preparing Site for Construction Projects -Stages or steps which are needed to undertake to prepare the construction project site are. 1} Geotechnical report related to site soil properties 2} Construction site clearing and excavation 3} Grading of project site 4} Project site compaction - Land leveling is the process of modifying the surface relief by smoothening it. It is the process of flattening or modifying existing (natural) slopes or undulations and thereby creating a level surface. Normally land leveling requires excavation and movement of earth from higher elevations to lower elevations. Types of Leveling Methods used in Surveying - Direct Leveling. - Trigonometric Leveling. - Barometric Leveling. - Stadia Leveling.
  • 5. 19-09-2022, Monday & 20-09-2022 Tuesday Day – 3 & 4: • Observations 5 Photo in the above Box Description Here Photo in the above Box Description Here Photo in the above Box Description Here Observations
  • 6. * MATERIALS USED IN CONSTRUCTION Construction Raw-Materials 1. Iron steel 2. Bricks 3. Cements 4. Sand 5. Fine Aggregates 6. Wooden board Construction Machines Like: 1. Cement mixture machine 2. Trolly or bucket 3. Lift & rolling-tracks 4. Generationer 5. Loder truck 6. JCB 6 Description DAY-3 & 4 CONSTRUCTION STAGE:- SUBSTRUCTURE WORK:- 1) Excavation 2) PCC Work 3) Footing Work 4) Backfilling Work * Excavation: mark layout the plot and establish at least benchmark for level and measurment. Excavate the foundations as per the excavation drawing *PCC Work: pcc stans for plain cement concrete of grade M7.5-M10. The PCC provides a leveled surface to the foundation work. It has a thickness of 75-100 mm
  • 7. 21-09-2022, Wednesday & 22-09-2022, Thursday Day – 5 & 6: • Observations 7 Observations Photo in the above Box Description Here Photo in the above Box Description Here Photo in the above Box Description Here
  • 8. Brief Description *Backfilling work: After footing casting, remove the shuttering and cure the footing. The pits excavated for the foundation are filled with soil and compacted by a suitable method. Compact the soil till it achieves 95% compaction Plinth level is the floor finished level. The structure below the plinth level is filled with soil and called Sub-structure *Foundation: • Part of a structural system that supports and anchors the superstructure of a building and transmits its loads directly to the earth. 1. Prepare the Foundation Layout. 2. Then, we need to dig ground until we come to subsoil. 3. After that fill Based Footing with; Stone, Small Bricks Pieces & Cement. 4. This we are using Box-Foundation, there for its dimension given by architect are: » Area of the hole: 5’ X 6’ » Steel netting work: 4’ X 5’ » Distance of 10mm 1 rod to 2 rod is 10cm » R.C.C=3’6” X 3’6” (L x B) & D= 3’8” (Depth) » P.C.C= 4’6” X 4’6” (L x B) » Column Size: 9” X 9” » Steel: 8 Nos of 12mm. 8 Description DAY-5 & 6
  • 9. 23-09-2022, Friday & 24-09-2022 Saturday Day – 7 & 8: • Observations 9 Photo in the above Box Description Here Photo in the above Box Description Here Photo in the above Box Description Here Observations
  • 10. Brief Description 10 Description DAY-7 & 8 Coloumn Column or pillar are used to model vertical load-bearing elements in a building Transferring load from the top of the structure to the foundation. Column sections can be rectangular, round, square shape. Size of column should not be less than 9”x 9” 4 Main bars of 12mm Steel & 8mm ring on it. Plinth beam Plinth beam is a reinforced concrete beam constructed between the wall and its foundation. Plinth beam is provided to prevent the extension or propagation of cracks from the foundation into the wall above when the foundation suffers from settlement.
  • 11. 25-09-2022, Sunday & 26-09-2022, Monday Day – 9 & 10: • Observations 11 Observations Photo in the above Box Description Here Photo in the above Box Description Here Photo in the above Box Description Here
  • 12. Brief Description WALL A wall is a structure and a surface that defines an area; carries a load; provides security, shelter, or soundproofing; or, is decorative. Bricks Rows of Bricks are bound together by a cementitious. * Clay cement is used whose Ratio is 1:6 (1 bag cement & 6 Parts of sand). * L x B x H in (mm) of one brick = 225 x 112 x 65 + 10mm joint (cement filling). * Depending on worker speed the wall is constructed in 1 OR 3 days. * When the plastering is complete for the brick wall, it is advised to water the wall for 7 days and keep the cement wet for total 15 days. * In order to Hydration of the cement is what gives the concrete its compressive strength. 12 Description DAY-9 & 10
  • 13. 27-09-2022, Tuesday & 28-09-2022 Wednesday Day – 11 & 12: • Observations 13 Photo in the above Box Description Here Photo in the above Box Description Here Photo in the above Box Description Here Observations
  • 14. Brief Description 14 Description DAY-11 & 12 slab construction process 1. The preparation of formwork. 2. Compaction of a slab bed. 3. Placing Electrical Wire Line & Pipe Lines. 4. Placement of reinforcement. 5. Pouring & Compacting. 6. Finishing the concrete. 7. Removing formwork, jack span and curing the concrete slab. - Ratio of Concrete mix: 1:2:4 (1-Bag Cement, 2-Parts Sand, Part Aggregate) It took 4 to 7 Hours for Slab to get Setting after filling. However, For 28 days we need to stored water on the slab.
  • 15. 29-09-2022, Thursday & 30-09-2022, Friday Day – 13 & 14: • Observations 15 Observations Photo in the above Box Description Here Photo in the above Box Description Here Photo in the above Box Description Here
  • 16. Brief Description 16 Description DAY-13 & 14 Electricity LIne They work according to given plan or client suggestion or need. Before slab casting work, electrician man visit the side & installed all needy electrical line, selling lights box, fan hook, switch board box into wall. They used two color plastic pipe line to pass wire through it. 1. Green color: for main wire line passes from main board to all switch board. 2. Blue color: for all points wire line passes from switch board to 1 or 2 lights or 1 or 2 selling fans, which will work just by 1 switch. Drainage or HAVC line Plumbean is the process of installing the pipework and other assemblies for a functioning water supply and drainage system. UPVC pipes used for all purposes such as hand wash basin, Kitchen sinks to the toilets urinals and all other areas CPVC Pipes used for hot water supply.
  • 17. 01-10-2022, Saturday Day – 15: • Observations 17 Observations Photo in the above Box Description Here Photo in the above Box Description Here
  • 18. Brief Description 18 Description Day - 15 Plaster work: • During your home's construction, plastering makes the rough surfaces of the walls smooth. Plastering covers rough edges and uneven surfaces, thus increasing durability and strengthening walls. Plastering also gives a good finish to the walls of your house and this will make your home look appealing. • Ratio of Plaster is 15:1 (15-part white sand & 1-bag cement) • Types of wall plaster done: 1. Kitchen, Bath & W.C: Rough plaster 2. Rooms: Smooth finishing plaster 3. Outerwall: Double coated plaster
  • 19. 19