SlideShare a Scribd company logo
www.eng.it
Some thoughts and tips for a
progressive path to higher
maturity & capability levels
L4A – Lean for (being) Agile
Luigi Buglione, Ph.D.
Process Improvement & Measurement Specialist
Industry & Services Business Unit
Engineering Ing.Inf. SpA
ISMA11- IFPUG Int. Conference on Sw Measurement & Analysis
Sao Paulo (Brazil), November 18 2015
www.eng.it2 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
L4A Presentation goals
 G1. Analyze the most common measurement-related
practices in the Lean/Agile communities  towards a ‘L4A’
viewpoint (not the same thing!)
 G2. Discuss most relevant potential issues from a
measurement viewpoint
 G3. Propose possible counter-measures to overcome such
flaws for strengthening measurement practices also in L4A
teams/projects
www.eng.it3 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
L4A Let’s Social...ize!
If you want to share
comments/notes/pics…
 @IFPUG
 @engineeringspa
 @lbumeasure
 @Gufpi_Isma
 #Lean
 #Agile
 #L4A
 #AgileMeasurement
 #FSM
…
www.eng.it4 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Agenda
• Introduction
– Lean/Agile – what does it mean? Friends or Foes?
– Lean Six Sigma + Agile Manifesto – Values and Principles
– Lean/Agile Measurement – Main Issues
• Best Practices
1. Requirements - Elicitation
2. Requirements - Management
3. Measurement – Sizing Units
4. Estimation
5. Monitoring & Control
6. Estimation – Project Historical Data
7. Project Management – Standard definitions
8. Agile Measurement Plan
9. Agile RCA-based improvements
10. Lean Measurement – Automation (Data Collection)
• Conclusions & Prospects
• Lessons learned
• Q & A
L4A
www.eng.it5 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
www.eng.it6 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction L4A – Lean for (being) Agile
Not Lean Lean Agile
www.eng.it7 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Lean/Agile – Definition
Q:…but what about Measurement/Estimation practices in Lean/Agile?
www.eng.it8 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Agile is Lean? Which relationship?
www.eng.it9 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Lean & Agile – Comparing Approaches
www.eng.it10 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Lean & Agile – Comparing Approaches
www.eng.it11 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Lean – The Seven (7) Mudas
www.eng.it12 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Lean – The Eight (8) Mudas
www.eng.it13 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Lean & Measurement – Six Sigma DMAIC
www.eng.it14 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Agile Manifesto (2001) – The new values
Source: www.agilemanifesto.org
“We are uncovering better ways of developing software
by doing it and helping others do it.
Through this work we have come to value:
Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan
That is, while there is value in the items on the right,
we value the items on the left more”
www.eng.it15 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Agile Manifesto (2001) – 12 principles
Source: www.agilemanifesto.org
1. Our highest priority is to satisfy the customer through early and continuous delivery of valuable
software.
2. Welcome changing requirements, even late in development. Agile processes harness change for the
customer's competitive advantage.
3. Deliver working software frequently, from a couple of weeks to a couple of months, with a preference
to the shorter timescale.
4. Business people and developers must work together daily throughout the project.
5. Build projects around motivated individuals. Give them the environment and support they need, and
trust them to get the job done.
6. The most efficient and effective method of conveying information to and within a
development team is face-to-face conversation.
7. Working software is the primary measure of progress.
8. Agile processes promote sustainable development. The sponsors, developers, and users should be
able to maintain a constant pace indefinitely.
9. Continuous attention to technical excellence and good design enhances agility.
10.Simplicity--the art of maximizing the amount of work not done--is essential.
11.The best architectures, requirements, and designs emerge from self-organizing teams.
12.At regular intervals, the team reflects on how to become more effective, then tunes and
adjusts its behavior accordingly.
www.eng.it16 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Introduction Lean/Agile Measurement - Main issues
An initial list of issues from which moving for improving lean/agile measurement
practices:
1. Measurement is not an evaluation/assessment
2. Managing a project in an agile way does not mean to do not measure at all, but you cannot
measure anything  from data collection (lean) to Story Points (agile), let’s find a balance!
3. The attention paid to historical data risks to be less than needed for properly re-estimating an
artifact when the team composition will change over time
4. Story Points (SP)
 Are not a ‘size unit’ but an elaboration of effort needed to develop an artifact
 Are relative and specific to a team, not necessarily to several ones
 Have not a common, shared definition (repeatibility issue)
5. Bad perception from Agile teams/projects on ‘typical’ measurement practices and techniques
6. Some Agile Measurement best practices
 improving the current ones
 Moving from the Agile Manifesto principles and values
• …
www.eng.it17 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
L4A: Best Practices
www.eng.it18 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Best Practices 1) Lean Measurement – Automation #1
Some notes for starting:
• Often misunderstandings about which tools to adopt to make faster the measurement
process, not asking if they’re the right tools for obtaining the right result(s) at the right price
• Look at the final informative goal and its accuracy (e.g. what is a LOC?)
• Open Source Software (OSS) can be a good source of solutions for starting to automate and
allow an easier data collection for a Lean Measurement
• Need to choose the right tool without adapting it too much before adopting it, otherwise
better to choose another one
...ToFrom...
www.eng.it19 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Best Practices 1) Lean Measurement – Automation #2
Some notes for starting:
• Another risk separating Lean from Agile could be about the amount of data needed to
become Lean (before) and Agile (later)
• How many data should we need to understanding where are our ‘mudas’?
• Which non-intrusive ways to adopt for obtaining such result(s)?
From... ...To
www.eng.it20 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Best Practices 2) Requirements – Elicitation
Some notes for starting:
• User Stories (US) are not Use Cases, related but not the same thing
• US do not take much information from UML documentation (e.g. sequence diagrams)
• US typically contain the ‘functional’ side of the story but often miss the non-functional ones
and those related project-level activities/constraints to be mentioned for do not reducing the
real scope in terms of effort/cost,
• Move to US2, with MoSCoW priority criteria and fsu/nfsu for sizing FURs/NFRs
From... ...To
www.eng.it21 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
3) Requirements – Management
Some notes for starting:
• Using the INVEST (Independent, Negotiable, Valuable, Estimable, Small, Testable) criteria by
Mike Cohn a US should be evaluated both by customer and provider, but the ‘negotiation’ still
risk to be mostly on the qualitative/subjective side
• Move to the INVEST Grid and INVEST Process
From... ...To
Best Practices
www.eng.it22 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
4) Measurement – Sizing Units
Some notes for starting:
• US typically use Story Points (SP) that’s a manner to determine in a subjective way a
magnitude scale between the less (or more) complex requirement against the other ones
(e.g. 2x, 3x, …)
• US are currently not sized, as meant from a measurement viewpoint
• If a US would contain both the expression of FURs+NFRs, at least two sizing units should be
expressed in the card, not only one  US2!
From... ...To
Best Practices
www.eng.it23 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
5) Estimation
Some notes for starting:
• The Planning Game (and/or Planning Poker) are the typical way the Team discusses and
evaluates. Story Points and not sizing unit(s) are used, missing the determination of
quantities of work to be done, using historical data about specific productivities
• Assumed that CMMI (or other Maturity Models) are heavy-weight and not light-weight ones
From... ...To
Best Practices
www.eng.it24 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
6) Monitoring & Control
Some notes for starting:
• The Burndown chart logic is typically used ‘burning’ Story Points…
• …but it could be applied also to other (sizing) units, also FP and SNAP Points (SP) for
better tracking different entities (product, not project) and attributes (e.g. functional size, not
effort)
From... ...To
Best Practices
www.eng.it25 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Best Practices 7) Estimation – Project Historical Data
Some notes for starting:
• The Planning Game is a process for estimating Stories and Epics, determining on a local
base an estimation
• But what about the recording of data into a Knowledge Base (e.g. MEB – Measurement
Experience Base in ISO 15939)? Several frameworks/best practices as ITIL, CMMI and ISO
x-management systems ask for it
From... ...To
www.eng.it26 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Best Practices 8) Project Mgmt – Standards adoption
Some notes for starting:
• Story Points (SP) are a good example of ‘local definition’ for a team and not for the whole
organization, as well as a priority scale for implementing that SP by the related assigned
tasks…What is the ‘standard’ definition of a SP? Is it repeatable and consistent?
• A standard definition for a sizing unit, for instance, would lead more teams to exchange
their own project historical data and thus sharing a larger knowledge base across the
organization (higher value for mid-large organizations)
• Another buzzword is “velocity”…
From... ...To
Some possible definitions:
• Source #1
• Source #2
• Source #3
• Source #4
• Source #5
• …
www.eng.it27 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Best Practices 9) Agile Measurement Plan
Some notes for starting:
• Since SP represent the way to estimate the needed effort and each Sprint is time-boxed,
very few other measures are typically gathered in an agile project, often not collected under
an organic measurement plan
• What about a project measurement plan defining – as usual – the “5Ws+H” elements to
which add a second “H(ow much)” for upper/lower thresholds moving from historical data?
• What about to introduce GQM as a goal-oriented technique and EAM (Entity-Attribute-
Measure) analysis for not missing/overlapping measures in a balanced plan?
From... ...To
[US typical (old) structure]:
• As a [Role]
• I want [...]
• in order to [...]
• Acceptance Criteria: [...]
• Story Points: [...]
[US typical (new) structure]:
• As a [Role]
• I want [...]
• in order to [...]
• Measure by […]  EAM
• Acceptance Criteria: [...]
• Thresholds (UCL/LCL)
• Story Points: [...]
www.eng.it28 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Best Practices 10) Agile RCA-based improvement
Some notes for starting:
• Retrospectives are in Scrum the typical final Sprint meeting with a continuous improvement
purpose run out from the Team and participated also by the Scrum Master and the Product
Owner
• What about running an agile Root-Cause Analysis (RCA) using mind maps and adding details
about measures and historical data?  Q-RCA!
From... ...To
• Mind Maps software: http://goo.gl/ltxfao
www.eng.it29 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Best Practices Goal: Reinforcing Maturity & Capability
www.eng.it30 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Best Practices Goal: Reinforcing Maturity & Capability
Special cause
(GP.2.2 @ OT)
Common cause (GP.2.9 @
+PA)
• Source: http://goo.gl/i6IvI
www.eng.it31 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Some Conclusions...
www.eng.it32 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
L4A Some conclusions...
• Lean vs Agile: not the same thing...
 Misconception – complementary approaches
 Need to be Lean (before) in order to become Agile (after) – common stream is ‘measure well’
 Mixing techiques and approaches can return a better results, keeping the best from the two
• Lean/Agile vs Measurement: a false perception
 Lean is strongly based on Measurement  LSS (Lean Six Sigma)
 Not true that an agile project doesn’t measure and it’s only based on the time-box principle
 Measurement and measures can be apply with care, applying the lean/agile values-principles
• How many measures to apply?
 2-3 measures per informative goals could be a good target, as ITIL v3 CSI suggests
 Improve a typical Hypothesis/User Story (US) also specifying sizing units (e.g. FP/SP) and MoSCoW
prioritization criteria, together with a refinement of INVEST criteria using the INVEST Grid+Process
 Lean/Agile Measurement and Tools
 Data from log files could be a good way to gather data in automatic manner
 Apply the Burndown chart but also applying the concept to the sizing units used in a Sprint
 Lean/Agile Projects and Measurement Plans
 Measurement plans can be derived using few measures, possibly connected each other
 Base measures can be joined into derived measures (metrics) obtaining more informative value at
the same gathering costs and included as ‘new’ different measures into the plan
An optimist will tell you the glass is half-full;
the pessimist, half-empty; and the engineer will tell you the
glass is twice the size it needs to be
(Unknown)
www.eng.it33 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Lessons Learned...
URL: www.dilbert.com
L4A
URL: www.bitstrips.com
www.eng.it34 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Q & AL4A
Thanks for your attention!
Obrigado pela sua atenção!
www.eng.it35 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
Contact DataL4A
Luigi
Buglione
Engineering Ing. Inf. SpA
luigi.buglione@eng.it

More Related Content

Viewers also liked (7)

PDF
The LEGO Maturity & Capability Model Approach
Luigi Buglione
 
PDF
Agile Lean Conference 2016 - Buglione_Lean for (being) Agile
Agile Lean Conference
 
PDF
PIF or SNAP? That's the Question! Or maybe it's not? - A panel
Luigi Buglione
 
PDF
Experimental Study Using Functional Size Measurement in Building Estimation M...
Luigi Buglione
 
PPT
Improving the User Story Agile Technique Using the INVEST Criteria
Luigi Buglione
 
PDF
Risk Management: Achieving Higher Maturity & Capability Levels through the LE...
Luigi Buglione
 
PDF
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
SlideShare
 
The LEGO Maturity & Capability Model Approach
Luigi Buglione
 
Agile Lean Conference 2016 - Buglione_Lean for (being) Agile
Agile Lean Conference
 
PIF or SNAP? That's the Question! Or maybe it's not? - A panel
Luigi Buglione
 
Experimental Study Using Functional Size Measurement in Building Estimation M...
Luigi Buglione
 
Improving the User Story Agile Technique Using the INVEST Criteria
Luigi Buglione
 
Risk Management: Achieving Higher Maturity & Capability Levels through the LE...
Luigi Buglione
 
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
SlideShare
 

Similar to L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path to higher maturity & capability levels (20)

PDF
The Bumpy Road to Actionable SLOs
DevOps.com
 
PDF
Agile practices for management
Icalia Labs
 
PDF
agileBIResearch
ppetr82
 
PDF
Why Agile? Back to Basics.
Lucas Hendrich
 
PPT
DMAI Analytics Solutions Guide
Dan Meyer
 
PDF
Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...
Steven Parker
 
PDF
Surviving the Analytics Apocalypse_ The Death of Universal Analytics and the...
In Marketing We Trust
 
PPTX
Agile methodology
Dipanway Bhabuk
 
PPT
What is Analytics for Your Business?
tricia eunice baylon
 
PPTX
SplunkLive! Munich 2018: Predictive, Proactive, and Collaborative ML with IT ...
Splunk
 
PDF
The Agile Mindset: Easier Said Than Done
Rachel Gaddis (she - her)
 
PDF
Productivity measurement of agile teams (IWSM 2015)
Harold van Heeringen
 
PPTX
GIAF UK Winter 2015 - Analytical techniques: A practical guide to answering b...
Lauren Cormack
 
PPTX
Maximising likelihood of success: Applying Product Management to AI/ML/DS pr...
Kevin Wong
 
DOCX
PLEASE READ BACKGROUND INFO BELOW.  TURNIT IN IS USEDModule 4 .docx
janekahananbw
 
PDF
Performance measurement of agile teams harold van heeringen
IWSM Mensura
 
PDF
Productivity measurement of agile teams (IWSM 2015)
Harold van Heeringen
 
PDF
NUS-ISS Learning Day 2015 - Project Management - May the Agility be with You
NUS-ISS
 
DOCX
A Guide to Strategic Case AnalysisEach group is responsible for .docx
sleeperharwell
 
PDF
Financial analysis for product managers
Mike Claiborne
 
The Bumpy Road to Actionable SLOs
DevOps.com
 
Agile practices for management
Icalia Labs
 
agileBIResearch
ppetr82
 
Why Agile? Back to Basics.
Lucas Hendrich
 
DMAI Analytics Solutions Guide
Dan Meyer
 
Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...
Steven Parker
 
Surviving the Analytics Apocalypse_ The Death of Universal Analytics and the...
In Marketing We Trust
 
Agile methodology
Dipanway Bhabuk
 
What is Analytics for Your Business?
tricia eunice baylon
 
SplunkLive! Munich 2018: Predictive, Proactive, and Collaborative ML with IT ...
Splunk
 
The Agile Mindset: Easier Said Than Done
Rachel Gaddis (she - her)
 
Productivity measurement of agile teams (IWSM 2015)
Harold van Heeringen
 
GIAF UK Winter 2015 - Analytical techniques: A practical guide to answering b...
Lauren Cormack
 
Maximising likelihood of success: Applying Product Management to AI/ML/DS pr...
Kevin Wong
 
PLEASE READ BACKGROUND INFO BELOW.  TURNIT IN IS USEDModule 4 .docx
janekahananbw
 
Performance measurement of agile teams harold van heeringen
IWSM Mensura
 
Productivity measurement of agile teams (IWSM 2015)
Harold van Heeringen
 
NUS-ISS Learning Day 2015 - Project Management - May the Agility be with You
NUS-ISS
 
A Guide to Strategic Case AnalysisEach group is responsible for .docx
sleeperharwell
 
Financial analysis for product managers
Mike Claiborne
 
Ad

More from Luigi Buglione (20)

PDF
From Software to Service Sustainability: a still Broader Perspective
Luigi Buglione
 
PDF
The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...
Luigi Buglione
 
PDF
A Murphological View on Software Measurement: a serious joke or a funny seri...
Luigi Buglione
 
PDF
Do we really re-use our knowledge (or not)?
Luigi Buglione
 
PDF
Balanced Measurement Sets: Criteria for Improving Project Management Practices
Luigi Buglione
 
PDF
Software Sustainability: a Broader Perspective
Luigi Buglione
 
PDF
An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...
Luigi Buglione
 
PDF
Measurement Process: Improving the ISO 15939 Standard
Luigi Buglione
 
PDF
Sizing The Entire Development Process
Luigi Buglione
 
PDF
The LEGO Strategy: Guidelines for a Profitable Deployment
Luigi Buglione
 
PDF
ICEBERG: a different look at Software Project Management
Luigi Buglione
 
PDF
Improving Measurement Plans from multiple dimensions: Exercising with Balanci...
Luigi Buglione
 
PDF
Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...
Luigi Buglione
 
PDF
Derivation of Green Metrics for Software
Luigi Buglione
 
PDF
Software Architects’ Experiences of Quality Requirements: What we Know and ...
Luigi Buglione
 
PDF
La Resilienza e i Modelli di Maturità
Luigi Buglione
 
PDF
Mapping Automotive SPICE: Achieving Higher Maturity & Capability Levels
Luigi Buglione
 
PDF
The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...
Luigi Buglione
 
PDF
Tailoring Software Process Capability/Maturity Models for Telemedicine Systems
Luigi Buglione
 
PDF
Measuring Software Sustainability from a Process-Centric Perspective
Luigi Buglione
 
From Software to Service Sustainability: a still Broader Perspective
Luigi Buglione
 
The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...
Luigi Buglione
 
A Murphological View on Software Measurement: a serious joke or a funny seri...
Luigi Buglione
 
Do we really re-use our knowledge (or not)?
Luigi Buglione
 
Balanced Measurement Sets: Criteria for Improving Project Management Practices
Luigi Buglione
 
Software Sustainability: a Broader Perspective
Luigi Buglione
 
An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...
Luigi Buglione
 
Measurement Process: Improving the ISO 15939 Standard
Luigi Buglione
 
Sizing The Entire Development Process
Luigi Buglione
 
The LEGO Strategy: Guidelines for a Profitable Deployment
Luigi Buglione
 
ICEBERG: a different look at Software Project Management
Luigi Buglione
 
Improving Measurement Plans from multiple dimensions: Exercising with Balanci...
Luigi Buglione
 
Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...
Luigi Buglione
 
Derivation of Green Metrics for Software
Luigi Buglione
 
Software Architects’ Experiences of Quality Requirements: What we Know and ...
Luigi Buglione
 
La Resilienza e i Modelli di Maturità
Luigi Buglione
 
Mapping Automotive SPICE: Achieving Higher Maturity & Capability Levels
Luigi Buglione
 
The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...
Luigi Buglione
 
Tailoring Software Process Capability/Maturity Models for Telemedicine Systems
Luigi Buglione
 
Measuring Software Sustainability from a Process-Centric Perspective
Luigi Buglione
 
Ad

Recently uploaded (20)

PDF
Mobile CMMS Solutions Empowering the Frontline Workforce
CryotosCMMSSoftware
 
PPTX
Quality on Autopilot: Scaling Testing in Uyuni
Oscar Barrios Torrero
 
PPTX
CONCEPT OF PROGRAMMING in language .pptx
tamim41
 
PDF
Continouous failure - Why do we make our lives hard?
Papp Krisztián
 
PPTX
Automatic_Iperf_Log_Result_Excel_visual_v2.pptx
Chen-Chih Lee
 
PDF
Powering GIS with FME and VertiGIS - Peak of Data & AI 2025
Safe Software
 
PDF
interacting-with-ai-2023---module-2---session-3---handout.pdf
cniclsh1
 
PPTX
MailsDaddy Outlook OST to PST converter.pptx
abhishekdutt366
 
PDF
Understanding the Need for Systemic Change in Open Source Through Intersectio...
Imma Valls Bernaus
 
PPTX
Java Native Memory Leaks: The Hidden Villain Behind JVM Performance Issues
Tier1 app
 
PPTX
3uTools Full Crack Free Version Download [Latest] 2025
muhammadgurbazkhan
 
PDF
Efficient, Automated Claims Processing Software for Insurers
Insurance Tech Services
 
PDF
>Nitro Pro Crack 14.36.1.0 + Keygen Free Download [Latest]
utfefguu
 
PDF
Salesforce CRM Services.VALiNTRY360
VALiNTRY360
 
PPTX
ERP - FICO Presentation BY BSL BOKARO STEEL LIMITED.pptx
ravisranjan
 
PDF
2025年 Linux 核心專題: 探討 sched_ext 及機器學習.pdf
Eric Chou
 
PDF
Laboratory Workflows Digitalized and live in 90 days with Scifeon´s SAPPA P...
info969686
 
PPTX
EO4EU Ocean Monitoring: Maritime Weather Routing Optimsation Use Case
EO4EU
 
PPTX
How Apagen Empowered an EPC Company with Engineering ERP Software
SatishKumar2651
 
PPTX
Comprehensive Guide: Shoviv Exchange to Office 365 Migration Tool 2025
Shoviv Software
 
Mobile CMMS Solutions Empowering the Frontline Workforce
CryotosCMMSSoftware
 
Quality on Autopilot: Scaling Testing in Uyuni
Oscar Barrios Torrero
 
CONCEPT OF PROGRAMMING in language .pptx
tamim41
 
Continouous failure - Why do we make our lives hard?
Papp Krisztián
 
Automatic_Iperf_Log_Result_Excel_visual_v2.pptx
Chen-Chih Lee
 
Powering GIS with FME and VertiGIS - Peak of Data & AI 2025
Safe Software
 
interacting-with-ai-2023---module-2---session-3---handout.pdf
cniclsh1
 
MailsDaddy Outlook OST to PST converter.pptx
abhishekdutt366
 
Understanding the Need for Systemic Change in Open Source Through Intersectio...
Imma Valls Bernaus
 
Java Native Memory Leaks: The Hidden Villain Behind JVM Performance Issues
Tier1 app
 
3uTools Full Crack Free Version Download [Latest] 2025
muhammadgurbazkhan
 
Efficient, Automated Claims Processing Software for Insurers
Insurance Tech Services
 
>Nitro Pro Crack 14.36.1.0 + Keygen Free Download [Latest]
utfefguu
 
Salesforce CRM Services.VALiNTRY360
VALiNTRY360
 
ERP - FICO Presentation BY BSL BOKARO STEEL LIMITED.pptx
ravisranjan
 
2025年 Linux 核心專題: 探討 sched_ext 及機器學習.pdf
Eric Chou
 
Laboratory Workflows Digitalized and live in 90 days with Scifeon´s SAPPA P...
info969686
 
EO4EU Ocean Monitoring: Maritime Weather Routing Optimsation Use Case
EO4EU
 
How Apagen Empowered an EPC Company with Engineering ERP Software
SatishKumar2651
 
Comprehensive Guide: Shoviv Exchange to Office 365 Migration Tool 2025
Shoviv Software
 

L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path to higher maturity & capability levels

  • 1. www.eng.it Some thoughts and tips for a progressive path to higher maturity & capability levels L4A – Lean for (being) Agile Luigi Buglione, Ph.D. Process Improvement & Measurement Specialist Industry & Services Business Unit Engineering Ing.Inf. SpA ISMA11- IFPUG Int. Conference on Sw Measurement & Analysis Sao Paulo (Brazil), November 18 2015
  • 2. www.eng.it2 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione L4A Presentation goals  G1. Analyze the most common measurement-related practices in the Lean/Agile communities  towards a ‘L4A’ viewpoint (not the same thing!)  G2. Discuss most relevant potential issues from a measurement viewpoint  G3. Propose possible counter-measures to overcome such flaws for strengthening measurement practices also in L4A teams/projects
  • 3. www.eng.it3 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione L4A Let’s Social...ize! If you want to share comments/notes/pics…  @IFPUG  @engineeringspa  @lbumeasure  @Gufpi_Isma  #Lean  #Agile  #L4A  #AgileMeasurement  #FSM …
  • 4. www.eng.it4 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Agenda • Introduction – Lean/Agile – what does it mean? Friends or Foes? – Lean Six Sigma + Agile Manifesto – Values and Principles – Lean/Agile Measurement – Main Issues • Best Practices 1. Requirements - Elicitation 2. Requirements - Management 3. Measurement – Sizing Units 4. Estimation 5. Monitoring & Control 6. Estimation – Project Historical Data 7. Project Management – Standard definitions 8. Agile Measurement Plan 9. Agile RCA-based improvements 10. Lean Measurement – Automation (Data Collection) • Conclusions & Prospects • Lessons learned • Q & A L4A
  • 5. www.eng.it5 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione
  • 6. www.eng.it6 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction L4A – Lean for (being) Agile Not Lean Lean Agile
  • 7. www.eng.it7 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Lean/Agile – Definition Q:…but what about Measurement/Estimation practices in Lean/Agile?
  • 8. www.eng.it8 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Agile is Lean? Which relationship?
  • 9. www.eng.it9 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Lean & Agile – Comparing Approaches
  • 10. www.eng.it10 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Lean & Agile – Comparing Approaches
  • 11. www.eng.it11 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Lean – The Seven (7) Mudas
  • 12. www.eng.it12 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Lean – The Eight (8) Mudas
  • 13. www.eng.it13 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Lean & Measurement – Six Sigma DMAIC
  • 14. www.eng.it14 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Agile Manifesto (2001) – The new values Source: www.agilemanifesto.org “We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value: Individuals and interactions over processes and tools Working software over comprehensive documentation Customer collaboration over contract negotiation Responding to change over following a plan That is, while there is value in the items on the right, we value the items on the left more”
  • 15. www.eng.it15 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Agile Manifesto (2001) – 12 principles Source: www.agilemanifesto.org 1. Our highest priority is to satisfy the customer through early and continuous delivery of valuable software. 2. Welcome changing requirements, even late in development. Agile processes harness change for the customer's competitive advantage. 3. Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter timescale. 4. Business people and developers must work together daily throughout the project. 5. Build projects around motivated individuals. Give them the environment and support they need, and trust them to get the job done. 6. The most efficient and effective method of conveying information to and within a development team is face-to-face conversation. 7. Working software is the primary measure of progress. 8. Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely. 9. Continuous attention to technical excellence and good design enhances agility. 10.Simplicity--the art of maximizing the amount of work not done--is essential. 11.The best architectures, requirements, and designs emerge from self-organizing teams. 12.At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly.
  • 16. www.eng.it16 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Introduction Lean/Agile Measurement - Main issues An initial list of issues from which moving for improving lean/agile measurement practices: 1. Measurement is not an evaluation/assessment 2. Managing a project in an agile way does not mean to do not measure at all, but you cannot measure anything  from data collection (lean) to Story Points (agile), let’s find a balance! 3. The attention paid to historical data risks to be less than needed for properly re-estimating an artifact when the team composition will change over time 4. Story Points (SP)  Are not a ‘size unit’ but an elaboration of effort needed to develop an artifact  Are relative and specific to a team, not necessarily to several ones  Have not a common, shared definition (repeatibility issue) 5. Bad perception from Agile teams/projects on ‘typical’ measurement practices and techniques 6. Some Agile Measurement best practices  improving the current ones  Moving from the Agile Manifesto principles and values • …
  • 17. www.eng.it17 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione L4A: Best Practices
  • 18. www.eng.it18 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Best Practices 1) Lean Measurement – Automation #1 Some notes for starting: • Often misunderstandings about which tools to adopt to make faster the measurement process, not asking if they’re the right tools for obtaining the right result(s) at the right price • Look at the final informative goal and its accuracy (e.g. what is a LOC?) • Open Source Software (OSS) can be a good source of solutions for starting to automate and allow an easier data collection for a Lean Measurement • Need to choose the right tool without adapting it too much before adopting it, otherwise better to choose another one ...ToFrom...
  • 19. www.eng.it19 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Best Practices 1) Lean Measurement – Automation #2 Some notes for starting: • Another risk separating Lean from Agile could be about the amount of data needed to become Lean (before) and Agile (later) • How many data should we need to understanding where are our ‘mudas’? • Which non-intrusive ways to adopt for obtaining such result(s)? From... ...To
  • 20. www.eng.it20 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Best Practices 2) Requirements – Elicitation Some notes for starting: • User Stories (US) are not Use Cases, related but not the same thing • US do not take much information from UML documentation (e.g. sequence diagrams) • US typically contain the ‘functional’ side of the story but often miss the non-functional ones and those related project-level activities/constraints to be mentioned for do not reducing the real scope in terms of effort/cost, • Move to US2, with MoSCoW priority criteria and fsu/nfsu for sizing FURs/NFRs From... ...To
  • 21. www.eng.it21 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione 3) Requirements – Management Some notes for starting: • Using the INVEST (Independent, Negotiable, Valuable, Estimable, Small, Testable) criteria by Mike Cohn a US should be evaluated both by customer and provider, but the ‘negotiation’ still risk to be mostly on the qualitative/subjective side • Move to the INVEST Grid and INVEST Process From... ...To Best Practices
  • 22. www.eng.it22 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione 4) Measurement – Sizing Units Some notes for starting: • US typically use Story Points (SP) that’s a manner to determine in a subjective way a magnitude scale between the less (or more) complex requirement against the other ones (e.g. 2x, 3x, …) • US are currently not sized, as meant from a measurement viewpoint • If a US would contain both the expression of FURs+NFRs, at least two sizing units should be expressed in the card, not only one  US2! From... ...To Best Practices
  • 23. www.eng.it23 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione 5) Estimation Some notes for starting: • The Planning Game (and/or Planning Poker) are the typical way the Team discusses and evaluates. Story Points and not sizing unit(s) are used, missing the determination of quantities of work to be done, using historical data about specific productivities • Assumed that CMMI (or other Maturity Models) are heavy-weight and not light-weight ones From... ...To Best Practices
  • 24. www.eng.it24 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione 6) Monitoring & Control Some notes for starting: • The Burndown chart logic is typically used ‘burning’ Story Points… • …but it could be applied also to other (sizing) units, also FP and SNAP Points (SP) for better tracking different entities (product, not project) and attributes (e.g. functional size, not effort) From... ...To Best Practices
  • 25. www.eng.it25 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Best Practices 7) Estimation – Project Historical Data Some notes for starting: • The Planning Game is a process for estimating Stories and Epics, determining on a local base an estimation • But what about the recording of data into a Knowledge Base (e.g. MEB – Measurement Experience Base in ISO 15939)? Several frameworks/best practices as ITIL, CMMI and ISO x-management systems ask for it From... ...To
  • 26. www.eng.it26 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Best Practices 8) Project Mgmt – Standards adoption Some notes for starting: • Story Points (SP) are a good example of ‘local definition’ for a team and not for the whole organization, as well as a priority scale for implementing that SP by the related assigned tasks…What is the ‘standard’ definition of a SP? Is it repeatable and consistent? • A standard definition for a sizing unit, for instance, would lead more teams to exchange their own project historical data and thus sharing a larger knowledge base across the organization (higher value for mid-large organizations) • Another buzzword is “velocity”… From... ...To Some possible definitions: • Source #1 • Source #2 • Source #3 • Source #4 • Source #5 • …
  • 27. www.eng.it27 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Best Practices 9) Agile Measurement Plan Some notes for starting: • Since SP represent the way to estimate the needed effort and each Sprint is time-boxed, very few other measures are typically gathered in an agile project, often not collected under an organic measurement plan • What about a project measurement plan defining – as usual – the “5Ws+H” elements to which add a second “H(ow much)” for upper/lower thresholds moving from historical data? • What about to introduce GQM as a goal-oriented technique and EAM (Entity-Attribute- Measure) analysis for not missing/overlapping measures in a balanced plan? From... ...To [US typical (old) structure]: • As a [Role] • I want [...] • in order to [...] • Acceptance Criteria: [...] • Story Points: [...] [US typical (new) structure]: • As a [Role] • I want [...] • in order to [...] • Measure by […]  EAM • Acceptance Criteria: [...] • Thresholds (UCL/LCL) • Story Points: [...]
  • 28. www.eng.it28 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Best Practices 10) Agile RCA-based improvement Some notes for starting: • Retrospectives are in Scrum the typical final Sprint meeting with a continuous improvement purpose run out from the Team and participated also by the Scrum Master and the Product Owner • What about running an agile Root-Cause Analysis (RCA) using mind maps and adding details about measures and historical data?  Q-RCA! From... ...To • Mind Maps software: http://goo.gl/ltxfao
  • 29. www.eng.it29 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Best Practices Goal: Reinforcing Maturity & Capability
  • 30. www.eng.it30 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Best Practices Goal: Reinforcing Maturity & Capability Special cause (GP.2.2 @ OT) Common cause (GP.2.9 @ +PA) • Source: http://goo.gl/i6IvI
  • 31. www.eng.it31 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Some Conclusions...
  • 32. www.eng.it32 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione L4A Some conclusions... • Lean vs Agile: not the same thing...  Misconception – complementary approaches  Need to be Lean (before) in order to become Agile (after) – common stream is ‘measure well’  Mixing techiques and approaches can return a better results, keeping the best from the two • Lean/Agile vs Measurement: a false perception  Lean is strongly based on Measurement  LSS (Lean Six Sigma)  Not true that an agile project doesn’t measure and it’s only based on the time-box principle  Measurement and measures can be apply with care, applying the lean/agile values-principles • How many measures to apply?  2-3 measures per informative goals could be a good target, as ITIL v3 CSI suggests  Improve a typical Hypothesis/User Story (US) also specifying sizing units (e.g. FP/SP) and MoSCoW prioritization criteria, together with a refinement of INVEST criteria using the INVEST Grid+Process  Lean/Agile Measurement and Tools  Data from log files could be a good way to gather data in automatic manner  Apply the Burndown chart but also applying the concept to the sizing units used in a Sprint  Lean/Agile Projects and Measurement Plans  Measurement plans can be derived using few measures, possibly connected each other  Base measures can be joined into derived measures (metrics) obtaining more informative value at the same gathering costs and included as ‘new’ different measures into the plan An optimist will tell you the glass is half-full; the pessimist, half-empty; and the engineer will tell you the glass is twice the size it needs to be (Unknown)
  • 33. www.eng.it33 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Lessons Learned... URL: www.dilbert.com L4A URL: www.bitstrips.com
  • 34. www.eng.it34 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Q & AL4A Thanks for your attention! Obrigado pela sua atenção!
  • 35. www.eng.it35 IFPUG ISMA11 (Sao Paulo – Brazil) – 18/11/2015 © 2015 L.Buglione Contact DataL4A Luigi Buglione Engineering Ing. Inf. SpA [email protected]