Lean, Just-in-time, and Toyota Production System DSC 335 Zhibin Yang Assistant Professor, Decision Sciences
Toyota: The Auto Giant Source: Market cap data from Reuters.com (as of 4/18/06)
Toyota: Growing Market Share 2007 January Toyota Motor Sales (TMS) reported best-ever January sales of 175,850 vehicles, an  increase of 5.1%  over January 2006. GM reported deliveries of 247,464 vehicles in January,  down 19.7%  from January 2006. Ford’s January sales totaled 166,835,  down 19%  compared with a year ago. Chrysler Group reported sales for January 2007 of 156,308 units; an  increase of 1%  compared January 2006, based on Solid Retail Sales
Toyota Production System – Key to Success A production system that is steeped in the philosophy of the  complete elimination of all wastes  and what imbues all aspects of production with this philosophy in pursuit of the most efficient production method. From www.toyota.co.jp/en
Eight Types of Waste Waste Definition Overproduction Manufacturing an item before it is needed. Inappropriate Processing Using expensive high precision equipment when simpler machines would suffice.  Waiting Wasteful time incurred when product is not being moved or processed.  Transportation Excessive movement and material handling of product between processes. Motion Unnecessary effort related to the ergonomics of bending, stretching, reaching, lifting, and walking. Inventory Excess inventory hides problems on the shop floor, consumes space, increases lead times, and inhibits communication. Defects Quality defects result in rework and scrap, and add wasteful costs to the system in the form of lost capacity, rescheduling effort, increased inspection, and loss of customer good will. Underutilization of Employees Failure of the firm to learn from and capitalize on its employees’ knowledge and creativity impedes long term efforts to eliminate waste.
House of Toyota Highest quality, lowest cost, shortest lead time by eliminating wasted time and activity Just in Time (JIT) Takt time One-piece flow Pull system Culture of Continuous Improvement Jidoka Manual or automatic line stop Separate operator and machine activities Error-proofing Visual control Operational Stability Heijunka Standard Work TPM Supply Chain
Just-in-time (JIT): Pull vs. Push System In a  push  system, such as an Material Requirements Planning (MRP) system, we look at the  schedule  to determine what to produce next Driven by pre-determined production schedule In a  pull  system, such as JIT, we look only at the  next stage of production  and determine what is needed there, and then we produce only that Driven by demand JIT uses  Kanban  system to implement a pull system
Kanban System What is Kanban? “ card” or “visible record” How to use it? A Kanban is attached a container, when the container is filled with items produced  When the container is free up, the Kanban is removed from the container and put back to the receiving post
(cont’d) Kanbans are used to control flow of production A free kanban at the receiving post signals need for production Production stop, if all kanbans are used Kanbans are recycled when a container is unloaded at the next step of production More kanban    more containers used at the same time    larger WIP
Pull System – Kanban System Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Storage area Empty containers Full containers Assembly line 1 Assembly line 2
The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
The Kanban System Each container must have a card Assembly always withdraws from fabrication (pull system) Containers cannot be moved without a kanban Containers should contain the same number of parts Only good parts are passed along Production should not exceed authorization
Calculate Number of Containers Two determinations Number of units to be held by each container Determines lot size Number of containers  Estimate the average lead time needed to produce a container of parts Little’s law WIP = (demand rate)    (time in system per unit)
Number of Containers WIP = (average demand rate)   (average time a container spends in the manufacturing process) + safety stock WIP =  kc kc  =  d  ( w  +  p  )(1 +  α ) k  =   d  ( w  +  p  )(1 +  α ) c where  k  = number of containers d   = expected daily demand for the part w  = average waiting time p  = average processing time c  = number of units in each container α  = policy variable
Capacity Utilization and JIT Utilization of stations in your LT game 2 4-2-2 configuration, 0.5 day delivery promise (contract 3) 60% at station 1 50% at station 2 40% at station 3 Is high utilization always a good thing? Long lead time Large WIP
Capacity Utilization of JIT 10  20  30  40  50  60  70  80  90  100   30 10 20 % Capacity Utilization 60 Production Lead Times (days) 40 50 Traditional Manufacturing JIT Manufacturing
Increasing Production Capacity Reduces Manufacturing Lead Times Only slight increases in production capacities can lead to: Significant reduction of manufacturing lead times Significant reduction of work-in-process inventory Queuing models can be used to analyze waiting-line production problems
We know from queuing theory that the average time in the system (manufacturing  lead time ) is:  If we have an average lead time in mind, we can solve for the  required production rate : Necessary Production Capacity
Work-in-Process Inventory We also know from queuing theory that the average number of jobs in the system (work-in-process inventory) is:
Exercise:  Necessary Production Capacity A production manager believes reducing the firm’s manufacturing lead time will give the firm a significant competitive advantage.  Two days is the lead time goal. Currently, jobs are arriving at the rate of 6 per day and the operation can process an average of 6.125 jobs per day. What is the current average lead time for a job?  What is the necessary production rate to achieve the two-day lead time goal?
(cont’d) Current Lead Time Necessary Production Rate Conclusion
Exercise:  Reduction in WIP In the preceding exercise, the production rate was increased from 6.125 jobs per day to 6.5.  This 6% increase in the production rate yielded a 75% reduction in manufacturing lead time!  How much of a reduction in WIP will result from the 6 % production rate increase?
Example:  Reduction in WIP WIP  before  production rate increase WIP  after  production rate increase Conclusion
Continuous Improvement
Managed System “Stressing” JIT is a system of enforced problem solving. One approach is to lower inventory gradually to expose problems and force their solution. With no buffer inventories to rely on, in times of production interruptions, problems are highly visible and cannot be ignored. The job of eliminating production problems is never finished. Continuous improvement - a practice the Japanese call  kaizen  - is central to the philosophy of JIT.
Stress the System to See Problems We must lower the water level! Visible Production Problems are Only 5% of the Total! Quality Problems Material Shortages Machine Breakdowns Workload Imbalances Worker Absenteeism Out-of-Spec Materials Quality Problems In-Process Inventory

More Related Content

PPTX
JIT case study of Toyota
PPTX
toyota production system
PPTX
Toyota's jit revolution ppt
PPTX
TOYOTA PRODUCTION SYSTEM (TPS)
PPT
Lean Manufacturing - An Overview
PPTX
Overall equipment effectiveness
PPT
Jit In Toyota
PPT
Toyota Production System
JIT case study of Toyota
toyota production system
Toyota's jit revolution ppt
TOYOTA PRODUCTION SYSTEM (TPS)
Lean Manufacturing - An Overview
Overall equipment effectiveness
Jit In Toyota
Toyota Production System

What's hot (20)

PPTX
Toyota production system-JIT-Lean Operation
PDF
Just in time (jit), lean, and toyota production system (tps)
PPT
Value stream mapping (future state)
PPT
Value stream mapping (current state)
PPTX
Lean Manufacturing
PPTX
TOYOTA SUPPLY CHAIN MANAGEMENT
PPTX
What is TPS - Toyota Production System
PPT
Toyota Scm
PPTX
Line balancing and heuristics
PPTX
BASIC OF TOYOTA PRODUCTION SYSTEM
PDF
Optimized Production Technology
PPT
Toyota Production System
PDF
Toyota Production System
PPTX
Just in time manufacturing ppt
PPTX
Presentation on lean manufacturing
PPTX
Toyota production system
PPTX
CIM 15ME62 Module-3
PPT
79971255 assembly-line-balancing
PPTX
Just in Time and Lean Manufacturing
PPTX
Inventory Management - a ppt for PGDM/MBA
Toyota production system-JIT-Lean Operation
Just in time (jit), lean, and toyota production system (tps)
Value stream mapping (future state)
Value stream mapping (current state)
Lean Manufacturing
TOYOTA SUPPLY CHAIN MANAGEMENT
What is TPS - Toyota Production System
Toyota Scm
Line balancing and heuristics
BASIC OF TOYOTA PRODUCTION SYSTEM
Optimized Production Technology
Toyota Production System
Toyota Production System
Just in time manufacturing ppt
Presentation on lean manufacturing
Toyota production system
CIM 15ME62 Module-3
79971255 assembly-line-balancing
Just in Time and Lean Manufacturing
Inventory Management - a ppt for PGDM/MBA
Ad

Viewers also liked (6)

PPTX
Lean Manufacturing
PPTX
Бережливое производство
DOC
Sansera Project Report
PPTX
Toyota Production System and Lean Tools
PPTX
Supply Chain Management of TOYOTA.......case study by sabio bernard.
PDF
Lean Manufacturing - Toyota Production System
Lean Manufacturing
Бережливое производство
Sansera Project Report
Toyota Production System and Lean Tools
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Lean Manufacturing - Toyota Production System
Ad

Similar to Lean, Just-in-time, and Toyota Production System (20)

PPT
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
PPT
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
PPT
Slide Show Week #9 Chapter 11 Jit
PDF
Just in Time (JIT) manufacturing is a strategy
PPTX
Toyota way
PPTX
Mba om 12_japanese manufacturing systems
PPT
Session 8_OM
PPT
Session 8
PPTX
kanban an integrated jit system
PPTX
tpsandleanmanufacturing-130709101251-phpapp01.pptx
PPTX
Just in time technology (JIT)
PPT
11.1-JIT.pptjust in time for management th
PPTX
jit.pptx
PPT
Tps and lean manufacturing
PDF
JUST IN TIME PRODUCTION SYSTEM
PPTX
Ppt jit
PPTX
PDF
Overview on Kanban Methodology and its Implementation
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
Slide Show Week #9 Chapter 11 Jit
Just in Time (JIT) manufacturing is a strategy
Toyota way
Mba om 12_japanese manufacturing systems
Session 8_OM
Session 8
kanban an integrated jit system
tpsandleanmanufacturing-130709101251-phpapp01.pptx
Just in time technology (JIT)
11.1-JIT.pptjust in time for management th
jit.pptx
Tps and lean manufacturing
JUST IN TIME PRODUCTION SYSTEM
Ppt jit
Overview on Kanban Methodology and its Implementation

More from jasonhian (20)

PDF
Ppar life 2_lg
PDF
Discover the 90/10 Principle With Chinese
PPT
20 Tips to encourage kids to Read
PPTX
Success 090919135733 Phpapp01
PPTX
The self Empowerment pledge powerpointpresentation 100104123237 Phpapp01
PPT
Decision making Planning Organisation 1216640408319045 8
PPT
Cusersibrahimdesktopproblemsolvinganddecisionmaking 090321143622 Phpapp01
PPT
Decision Making4860
PPT
Capacity Planning 091025030548 Phpapp01
PPT
Process Analysis 091025030547 Phpapp02
PPT
Inventory management 091104161506 Phpapp02
PPT
Supply chain management 091116162848 Phpapp01
PPT
Quality andc apability hand out 091123200010 Phpapp01
PPT
Managers & Managing (Management)
PPT
Managing Your Professional Identity 1215439550849180 8
PPT
Fundamentals Of Mechanical D& T Part # 3
PPT
Fundamentals Of Mechanical D& T Part #1
PPT
Pmi 124796324233 Phpapp01
PPT
Triz2 15133
PPT
Fundamentals Of Mechanical D& T Part4
Ppar life 2_lg
Discover the 90/10 Principle With Chinese
20 Tips to encourage kids to Read
Success 090919135733 Phpapp01
The self Empowerment pledge powerpointpresentation 100104123237 Phpapp01
Decision making Planning Organisation 1216640408319045 8
Cusersibrahimdesktopproblemsolvinganddecisionmaking 090321143622 Phpapp01
Decision Making4860
Capacity Planning 091025030548 Phpapp01
Process Analysis 091025030547 Phpapp02
Inventory management 091104161506 Phpapp02
Supply chain management 091116162848 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01
Managers & Managing (Management)
Managing Your Professional Identity 1215439550849180 8
Fundamentals Of Mechanical D& T Part # 3
Fundamentals Of Mechanical D& T Part #1
Pmi 124796324233 Phpapp01
Triz2 15133
Fundamentals Of Mechanical D& T Part4

Lean, Just-in-time, and Toyota Production System

  • 1. Lean, Just-in-time, and Toyota Production System DSC 335 Zhibin Yang Assistant Professor, Decision Sciences
  • 2. Toyota: The Auto Giant Source: Market cap data from Reuters.com (as of 4/18/06)
  • 3. Toyota: Growing Market Share 2007 January Toyota Motor Sales (TMS) reported best-ever January sales of 175,850 vehicles, an increase of 5.1% over January 2006. GM reported deliveries of 247,464 vehicles in January, down 19.7% from January 2006. Ford’s January sales totaled 166,835, down 19% compared with a year ago. Chrysler Group reported sales for January 2007 of 156,308 units; an increase of 1% compared January 2006, based on Solid Retail Sales
  • 4. Toyota Production System – Key to Success A production system that is steeped in the philosophy of the complete elimination of all wastes and what imbues all aspects of production with this philosophy in pursuit of the most efficient production method. From www.toyota.co.jp/en
  • 5. Eight Types of Waste Waste Definition Overproduction Manufacturing an item before it is needed. Inappropriate Processing Using expensive high precision equipment when simpler machines would suffice. Waiting Wasteful time incurred when product is not being moved or processed. Transportation Excessive movement and material handling of product between processes. Motion Unnecessary effort related to the ergonomics of bending, stretching, reaching, lifting, and walking. Inventory Excess inventory hides problems on the shop floor, consumes space, increases lead times, and inhibits communication. Defects Quality defects result in rework and scrap, and add wasteful costs to the system in the form of lost capacity, rescheduling effort, increased inspection, and loss of customer good will. Underutilization of Employees Failure of the firm to learn from and capitalize on its employees’ knowledge and creativity impedes long term efforts to eliminate waste.
  • 6. House of Toyota Highest quality, lowest cost, shortest lead time by eliminating wasted time and activity Just in Time (JIT) Takt time One-piece flow Pull system Culture of Continuous Improvement Jidoka Manual or automatic line stop Separate operator and machine activities Error-proofing Visual control Operational Stability Heijunka Standard Work TPM Supply Chain
  • 7. Just-in-time (JIT): Pull vs. Push System In a push system, such as an Material Requirements Planning (MRP) system, we look at the schedule to determine what to produce next Driven by pre-determined production schedule In a pull system, such as JIT, we look only at the next stage of production and determine what is needed there, and then we produce only that Driven by demand JIT uses Kanban system to implement a pull system
  • 8. Kanban System What is Kanban? “ card” or “visible record” How to use it? A Kanban is attached a container, when the container is filled with items produced When the container is free up, the Kanban is removed from the container and put back to the receiving post
  • 9. (cont’d) Kanbans are used to control flow of production A free kanban at the receiving post signals need for production Production stop, if all kanbans are used Kanbans are recycled when a container is unloaded at the next step of production More kanban  more containers used at the same time  larger WIP
  • 10. Pull System – Kanban System Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Storage area Empty containers Full containers Assembly line 1 Assembly line 2
  • 11. The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
  • 12. The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
  • 13. The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
  • 14. The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
  • 15. The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
  • 16. The Kanban System Storage area Empty containers Full containers Receiving post Kanban card for product 1 Kanban card for product 2 Fabrication cell O 1 O 2 O 3 O 2 Assembly line 1 Assembly line 2
  • 17. The Kanban System Each container must have a card Assembly always withdraws from fabrication (pull system) Containers cannot be moved without a kanban Containers should contain the same number of parts Only good parts are passed along Production should not exceed authorization
  • 18. Calculate Number of Containers Two determinations Number of units to be held by each container Determines lot size Number of containers Estimate the average lead time needed to produce a container of parts Little’s law WIP = (demand rate)  (time in system per unit)
  • 19. Number of Containers WIP = (average demand rate)  (average time a container spends in the manufacturing process) + safety stock WIP = kc kc = d ( w + p )(1 + α ) k = d ( w + p )(1 + α ) c where k = number of containers d = expected daily demand for the part w = average waiting time p = average processing time c = number of units in each container α = policy variable
  • 20. Capacity Utilization and JIT Utilization of stations in your LT game 2 4-2-2 configuration, 0.5 day delivery promise (contract 3) 60% at station 1 50% at station 2 40% at station 3 Is high utilization always a good thing? Long lead time Large WIP
  • 21. Capacity Utilization of JIT 10 20 30 40 50 60 70 80 90 100 30 10 20 % Capacity Utilization 60 Production Lead Times (days) 40 50 Traditional Manufacturing JIT Manufacturing
  • 22. Increasing Production Capacity Reduces Manufacturing Lead Times Only slight increases in production capacities can lead to: Significant reduction of manufacturing lead times Significant reduction of work-in-process inventory Queuing models can be used to analyze waiting-line production problems
  • 23. We know from queuing theory that the average time in the system (manufacturing lead time ) is: If we have an average lead time in mind, we can solve for the required production rate : Necessary Production Capacity
  • 24. Work-in-Process Inventory We also know from queuing theory that the average number of jobs in the system (work-in-process inventory) is:
  • 25. Exercise: Necessary Production Capacity A production manager believes reducing the firm’s manufacturing lead time will give the firm a significant competitive advantage. Two days is the lead time goal. Currently, jobs are arriving at the rate of 6 per day and the operation can process an average of 6.125 jobs per day. What is the current average lead time for a job? What is the necessary production rate to achieve the two-day lead time goal?
  • 26. (cont’d) Current Lead Time Necessary Production Rate Conclusion
  • 27. Exercise: Reduction in WIP In the preceding exercise, the production rate was increased from 6.125 jobs per day to 6.5. This 6% increase in the production rate yielded a 75% reduction in manufacturing lead time! How much of a reduction in WIP will result from the 6 % production rate increase?
  • 28. Example: Reduction in WIP WIP before production rate increase WIP after production rate increase Conclusion
  • 30. Managed System “Stressing” JIT is a system of enforced problem solving. One approach is to lower inventory gradually to expose problems and force their solution. With no buffer inventories to rely on, in times of production interruptions, problems are highly visible and cannot be ignored. The job of eliminating production problems is never finished. Continuous improvement - a practice the Japanese call kaizen - is central to the philosophy of JIT.
  • 31. Stress the System to See Problems We must lower the water level! Visible Production Problems are Only 5% of the Total! Quality Problems Material Shortages Machine Breakdowns Workload Imbalances Worker Absenteeism Out-of-Spec Materials Quality Problems In-Process Inventory