Lean Management, Lean Leadership, and
Leader Standard Work
A Webinar Hosted by AME
8 April 2016
© David Mann 2016
www.dmannlean.com
Webinar Topics
„ Introduction
„ Nature of lean and difficulty sustaining its gains
„ Overview: Lean Management System (LMS)
„ Interdependence of lean’s tools and LMS
„ Process focus: Leader standard work
„ Value proposition in LMS
„ Meaningfully engaging executives in lean
„ Summary, Q&A
© David Mann 2016
www.dmannlean.com
What’s the nature of lean?
According to Shigeo Shingo*:
„ Lean is fundamentally about finding waste
„ Lean thinkers search out problems where none are
thought to exist
* The sayings of Shigeo Shingo: Key strategies for plant improvement. Translated by Andrew P.
Dillon. Productivity Press, 1987. Original publication 1985, The Nikkan Kogyo Shimbun, Ltd
3
© David Mann 2016
www.dmannlean.com
This seems simple enough...
„ But highlighting problems can be difficult - and
risky – in a conventional organization
„ Highlighting problems goes against
•  Habits
•  What conventional bosses expect
•  Personal reinforcement contingencies – that is,
rewards and punishments
4
© David Mann 2016
www.dmannlean.com
Because of habit and convention...
Lean is harder than it seems!
„ Many organizations begin the lean journey
„ Few (~ 5%) see it through to sustained gains
„ Kaizen and 6 sigma successes equally fail to last
„ Why? Failure to recognize implications for
managers’ practices and behaviors
„ Lean management addresses behaviors, tools,
practices to sustain, extend lean production’s gains
5
© David Mann 2016
www.dmannlean.com
A lean ecosystem
„ For sustained lean success, experience suggests the
need for a lean ecosystem
„ The ecosystem has two main sub-systems:
1.  Lean production system: tools to improve process
stability and performance
2.  Lean management system: leaders’ behaviors,
practices and tools to focus on the process, sustain
initial lean gains, drive further improvement
6
© David Mann 2016
www.dmannlean.com
1.  Lean tools: Improve stability
2.  Lean Mgt: Sustain gains, capture problems, assign actions
3.  Lean tools: Improve stability
4.  Lean Mgt: Sustai gains, capture problems, assign actions
5.  Lean tools: Improve stability
6.  Lean Mgt: Sustain ...
7.  Lean tools: Improve ...
8.  Continue until perfection!
.
Process
Focus	
  
Lean tools
Findproblems!
Process
Focus	
  
Lean tools
Findproblems!
Process
Focus	
  
Lean tools
Start
here
Findproblems!
A lean production + lean management ecosystem:
Healthy, sustainable, beneficial
7
© David Mann 2016
www.dmannlean.com
Lean production and LMS: Interdependent
„ Well established:
•  Gains from lean production are rarely sustained
„ Less well known but equally true:
•  Lean management – without the gains from lean
production – is seen as meaningless
•  LSW particularly seen as bureaucratic “check the box”
exercise, does not produce improvement
8
© David Mann 2016
www.dmannlean.com
Lean management’s value proposition
„ For leaders, for front line workers:
1.  Did lean tools eliminate a chronic problem,
frustration?
2.  Would you like to see this benefit sustained?
3.  In the past, would you expect the benefit to last?
4.  If it lasted, would it make for a better day at work?
5.  What’s in it for you: LMS sustains the benefit
6.  LMS captures next opportunities for improvement
9
© David Mann 2016
www.dmannlean.com
Lean management’s focus on process 

sustains gains and drives improvement

3. Leader Standard Work
2. Standard
(Visual)
Accountability
(Sustained behavior)
(Improvement)
(Frequent focus on
process health)
1. Visual Controls
Process
Focus!	
  
10
© David Mann 2016
www.dmannlean.com
Lean management’s focus on process 

sustains gains and drives improvement

3. Leader Standard Work
2. Standard
(Visual)
Accountability
(Sustained behavior)
(Improvement)
(Frequent focus on
process health)
1. Visual Controls
Process
Focus!	
  
11
© David Mann 2016
www.dmannlean.com
Visual controls: Key elements
What did we
expect?
What did we
actually get?
If we didn’t get it,
What happened?
What are we
looking for?
12
© David Mann 2016
www.dmannlean.com
Visual controls inhigh speed automated processes:

OEE six big losses - Minutes lost & why
Hour mtl operat’r min stop maj stop defect speed describe
13
6
7
8
9
10
11
12
1
2
3
etc
17 Forklift down
9 Wrong plate staged
Impression cylinder misagaligned27
© David Mann 2016
www.dmannlean.com
Expected vs actual and description of misses in a
takt paced assembly process
Supervisor
initialed every
hour
14
© David Mann 2016
www.dmannlean.com
Capturing interruptions, delays in variable duration
cardiac procedures
15
© David Mann 2016
www.dmannlean.com
Lean	
  management	
  -­‐	
  A	
  closer	
  look	
  
3. Leader Standard Work
2. Standard
(Visual)
Accountability
(Sustained behavior)
(Improvement)
1. Visual controls
Process
Focus!	
  
(Frequent focus on
process health)
© David Mann Lean Consulting 2010 Reproduced with permission
16
© David Mann 2016
www.dmannlean.com
Daily accountability process
17
Ø  Brief, timed, stand up, on or near the floor
Ø  Standard agenda:
•  Yesterday’s visuals for needed follow-up
•  Tasks assigned for follow-up – cause or action
•  Written as verb, noun – action is the idea!
•  Review tasks due today
•  Completed? Green
•  Not completed? Red, reason why
•  Help needed? Expected completion?
© David Mann 2016
www.dmannlean.com
Daily accountability: Did you complete
assigned tasks on time?
Names 4/4 4/5 4/6 4/7 4/8 4/9
John
Jane
George
Phan
Marie
bring
donuts
verb
noun
verb
noun
verb
noun
verb
noun
Today
18
verb
noun
verb
noun
verb
noun
verb
noun
© David Mann 2016
www.dmannlean.com
Lean	
  management	
  -­‐	
  A	
  closer	
  look	
  
3. Leader Standard Work
2. Standard
(Visual)
Accountability
(Sustained behavior)
(Improvement)
1. Visual controls
Process
Focus!	
  
(Frequent focus on
process health)
© David Mann Lean Consulting 2010 Reproduced with permission
19
© David Mann 2016
www.dmannlean.com
20
Leader standard closes the loop on process
focus, and keeps it closed
Improvement
Lean
gains
Leader
standard
work
Courtesy Scott Simmons
© David Mann 2016
www.dmannlean.com
Intent of leader standard work
„ Guarantee the integrity of the standardized lean
production system by consistent focus on the
production processes as they cycle
•  Being in the production area “grasping reality”
•  Observing adherence to standardized work (10 cycles or
10 minutes) each person for team leaders, 1 person per
team leader for supervisors, and so on
•  Talking with operators about recent changes in standard
work, and their thinking on further improvement
•  Reinforcing your personal relationships with them
© David Mann 2016
www.dmannlean.com
Date:
Zone Leader Std. Work Zone Leader Std. Work
Time TASKS
5:15 Check for call-in
Review vacation log
5:30 Hold Daily Start-up Mtg.
Review manpower needs
Review shortages
Review Cross-training and zone training plans
Review schedule - mix and daily APS requirements
Assign EE to work areas
Check for employee issues
5:45 Attend Dept. Zone Leader Mtg.
Review manpower needs
Review shortages
6:00 Adjust Labor Planning Board
Review 3rd shift production log/notes with counterpart
Review Cross-training and zone training plans
Review schedule/mix for late changes
Adjust EE assignments as needed
6:30 Check Kanban Inventories
Review Minimum Levels
Review Maximum Levels
Review 5's organization
8:00 Gemba Walk with Supv. & ZL's
Note assignments
9:45 Attend Lean Board Meeting - Daily
10:30 Attend Division Zone Leader mtg - Daily
1:30 Next Day Planning
Review vacation log
Review Cross-training and zone training plans
Review schedule - mix and daily APS requirements
Assign EE to work areas
1:45 Set-up night shift priorities
Id work centers to be manned
Id part numbers & quantities to be ran
2:00 Establish personal plan for next days activities
Lean Tasks
Employee Training
Process Improvement
Time TASKS
Monitor 40 min. clock (before and after all breaks)
1st break 2nd break Lunch
7:45 9:45 12:00
Zone Walk through (5X per day)
1st 2nd 3rd 4th 5th
Verify hourly production tracking, post results,
note and act on any flow interupters.
6:30 11:30
7:30 12:30
8:30 1:30
9:30 2:30
10:30 3:30
All Monitor Std. Work
the Check for compliance
Time Reinforce & correct operator behavior
Update Std. Work as needed
When Provide Operator Training (as needed)
Needed Train & Certify new employees
Review Cross-training and zone training plans
Keep skill versatility matrix current
Front Back
© David Mann 2016
www.dmannlean.com
Leader Standard Work-VS Manager
Task pad coded
daily or as recurring
Standard weekly or
specific-today tasks
Emergent
items
Notes,
working diary
Note: Outlook and Groupwise both have trifold formats
© David Mann 2016
www.dmannlean.com
Person dependent or process dependent?
„ Lean systems seek to be process dependent
„ In human systems, at some level a person must
monitor and reinforce consistent adherence
„ Leader standard work defines this monitoring and
reinforcement
„ Overlapping content between levels of LSW help
guarantee the system’s integrity, but...
„ Ultimate integrity depends on support by execs
„ So, what about executive standard work???
24
© David Mann 2016
www.dmannlean.com
Problem statement: 

Operations VP, precision machining, 2014
“I have hosted hundreds of tours at [our
company] since we began to apply the lean
management system starting in 2008.
The majority of Lean Champions that came
through confided in me that "getting their executives
on board was very difficult", and that they were
concerned that all the hard work of their teams would
go to waste if they could not garner support from
leadership/ownership of their organizations.”
Emphasis added
25
© David Mann 2016
www.dmannlean.com
Gemba walking execs: 

A cautionary tale and a lesson learned
◆ Execs wanted to support lean
◆ But they didn’t know how
◆ We weren’t helping them
◆ They were cancelling the walks
◆ “David, you have a problem!”
Why are gembas being
cancelled just as we’re
having such success?
26
© David Mann 2016
www.dmannlean.com
Reflec3on:	
  Execs	
  are	
  our	
  customers!	
  
What	
  do	
  we	
  know	
  about	
  them?	
  
„ Bright
„ Quick studies
„ Competitive
„ Achievement oriented
„ Strive to ace every test
„ Action oriented
„ Thirsty for hands-on
„ Expect staff prep work,
avoid embarrassment
„ Want to drive
improvement
27
© David Mann 2016
www.dmannlean.com
Design spec: Improved exec gemba walk process
What we were providing
1.  Execs in passive role
a.  Yammering sensi-yawn!
2.  Unprepared to participate
3.  Low confidence in lean
knowledge
4.  Uncomfortable discussing lean
5.  Felt incompetent in gemba
6.  Not a meaningful exercise:
boring, embarassing, wasted of
time
A better customer value
1.  Exec-driven experience
a.  Get the answer, ace the test
2.  Good staff prep, execs ready to
participate and lead
3.  Confident observer in gemba
4.  Comfortable coaching lean
management in gemba
5.  Competent in lean management
system
6.  Valued, fun(!) investment of time
28
© David Mann 2016
www.dmannlean.com
Gemba worksheets and a new exec gemba design
1.  Process-dependent: Predictable, repeatable
2.  Structure put exec “student” in control
3.  Sufficient preparation (staff work)
4.  Agenda for clear content focus
5.  Test underscored learning, made experience
personally meaningful: Ace the test!
29
Worksheets provided value from customer perspective:
© David Mann 2016
www.dmannlean.com
Lean management system
Standardized
Lean Processes
Supervisor/Manager
Director/Value stream leader
Executives
Proposition: If the lean management system is healthy, 

then the lean production system is healthy
Team Leader
30
© David Mann 2016
www.dmannlean.com
Full set of 8 gemba
worksheets available
as free download
at dmannlean.com
© David Mann 2016
www.dmannlean.com
Put execs in active role…
„  Brief prep / gemba worksheet
„  Questions to ask
„  Things to look for
„  Let them drive the bus!
„  After, compare ratings:
•  Exec ”4.5”; Sensei “2.5”
•  Teachable moment!!
“This	
  3me,	
  it’s	
  gemba	
  
for	
  visual	
  controls.	
  You	
  	
  
might	
  want	
  to	
  look	
  for…	
  
and	
  ask	
  about…”	
  
You,	
  on	
  the	
  way	
  to	
  
gemba:	
  	
  
Hi,	
  how’s	
  it	
  going	
  
today?	
  What’s	
  the	
  
process	
  here?	
  
32
© David Mann 2016
www.dmannlean.com
Summary
„ Lean production and lean management are interdependent
•  Together, they create and sustain a better day at work,
sustained and ongoing improvement
„ Lean’s value proposition depends on timing: Lean gains
first, then lean management to sustain them
•  Leader standard work keeps the loop closed
„ Lean’s value proposition for executives is fundamentally
different, supporting their unique managerial responsibilities
•  Lean management empowers execs to judge first-hand
the integrity of the chain of command and the fidelity of
execution of their lean strategy
33
© David Mann 2016
www.dmannlean.com
For details on these topics, see:
34
Or email me at
dmann@dmannlean.com
For more about lean management and leadership, be sure to check out the 
2017 AME International Conference in Boston this fall! For more information, 
visit the #AMEBoston website, www.ame.org/boston.

More Related Content

PDF
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
PPT
Lean Transformation Model
PPTX
Standard work for leaders
PDF
WEBINAR: How Leaders Can Support Lean Using Leader Standard Work
PDF
10 Keys to Lean Daily Management
PDF
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
PDF
UCSD Class: Lean Office
PPT
Core Lean Tools
How Leaders Can Support Lean Using Leader Standard Work with GoLeanSixSigma.com
Lean Transformation Model
Standard work for leaders
WEBINAR: How Leaders Can Support Lean Using Leader Standard Work
10 Keys to Lean Daily Management
Lean Leadership: Helping Leaders Understand Their Role In The Improvement Pro...
UCSD Class: Lean Office
Core Lean Tools

What's hot (20)

PDF
Lean Standard or Standardized Work Training Module
PPTX
8D Problem Solving - Automotive Industry
PPTX
Lean six sigma - Waste elimination (Yellow Belt)
PPTX
Kaizen
PDF
Lean Leadership: Part 1 of 3
PPTX
Kaizen
PDF
Kaizen Event Guide
PDF
Lean 6sigma and DMAIC
PPTX
Fundamentals of Lean
PPT
LeanKaizenTraining
PPT
Kaizen Training
PPT
Kaizen Innovation in Manufacturing
PDF
Introduction To Lean
PPT
Hourly Lean Introduction
PPTX
Shop floor management new flyer 1 day workshop - november 2016
PPTX
5 Why Training Slides Oct 14, 2009
PDF
Lean Quick Changeover (SMED) Training Module
PPT
Kaizen forms xls
PPTX
History of Lean manufacturing & TPS 14 Principal
PDF
Operational Excellence
Lean Standard or Standardized Work Training Module
8D Problem Solving - Automotive Industry
Lean six sigma - Waste elimination (Yellow Belt)
Kaizen
Lean Leadership: Part 1 of 3
Kaizen
Kaizen Event Guide
Lean 6sigma and DMAIC
Fundamentals of Lean
LeanKaizenTraining
Kaizen Training
Kaizen Innovation in Manufacturing
Introduction To Lean
Hourly Lean Introduction
Shop floor management new flyer 1 day workshop - november 2016
5 Why Training Slides Oct 14, 2009
Lean Quick Changeover (SMED) Training Module
Kaizen forms xls
History of Lean manufacturing & TPS 14 Principal
Operational Excellence
Ad

Viewers also liked (20)

PDF
Slide share presentation - building a people-centric culture
PPTX
Manufacturing excellence for future production perspective
PDF
Lean Manufacturing : Concept & Overview [email protected]
PPTX
Lean ppt
DOCX
Fisica 3 periodo fenomenos ondulatorios 2017
PPTX
Νοτιοαντολική Ασία
PPTX
Apresentação spring and values
PPT
Lean presentation ppt
PDF
Juntando as idéias I
DOCX
A vida sem empatia atividades
PDF
Value stream mapping for non manufacturing environments
PDF
2017 Microsoft Hosting and Cloud study. By 451 Research.
PDF
The Complete Lean Enterprise: Value Stream Mapping for Office and Services
PPTX
Rowing boat presentation slides
KEY
Standardizing and Managing Your Infrastructure - MOSC 2011
PPT
Regional project report
PPTX
Herding Cats: User Research Techniques for Standardizing an Organic Intranet
PDF
Efficient Rowing Boat Movement with Jimmy Joy
PPTX
5s a lean Tool,
Slide share presentation - building a people-centric culture
Manufacturing excellence for future production perspective
Lean Manufacturing : Concept & Overview [email protected]
Lean ppt
Fisica 3 periodo fenomenos ondulatorios 2017
Νοτιοαντολική Ασία
Apresentação spring and values
Lean presentation ppt
Juntando as idéias I
A vida sem empatia atividades
Value stream mapping for non manufacturing environments
2017 Microsoft Hosting and Cloud study. By 451 Research.
The Complete Lean Enterprise: Value Stream Mapping for Office and Services
Rowing boat presentation slides
Standardizing and Managing Your Infrastructure - MOSC 2011
Regional project report
Herding Cats: User Research Techniques for Standardizing an Organic Intranet
Efficient Rowing Boat Movement with Jimmy Joy
5s a lean Tool,
Ad

Similar to Lean management, lean leadership and leader standard work (AME Webinar) (20)

PDF
2016 Ohio State COE LSW Presentation
PPTX
Lean Manufacturing for automotive industries.pptx
PPT
Lean Management Systems &Standard Work for Leaders.ppt
PDF
How to create an effective lean daily work management system
PDF
WCM_World_Class_Manufacturing_Outline_v1
PPT
Womack Lean For The Long Term
PPTX
Lean Management System
PPT
The Challenge of Lean
PPT
The Lean Enterprise
PDF
AmericanLeanManufacturing--JKR
PPT
Scripps Health Lean Presentation 2-24-14
PDF
Lean Management System
PDF
How to create an effective lean daily work management system
PPT
introduction dans les prarique de Lean.ppt
PDF
Developing a Lean Hospital Management System
DOCX
LeanForNWAssociates
PPTX
How can lean help handout
PDF
Leading lean
PPTX
LEAN Practices
PDF
Lean daily work management system at the core of its operations
2016 Ohio State COE LSW Presentation
Lean Manufacturing for automotive industries.pptx
Lean Management Systems &Standard Work for Leaders.ppt
How to create an effective lean daily work management system
WCM_World_Class_Manufacturing_Outline_v1
Womack Lean For The Long Term
Lean Management System
The Challenge of Lean
The Lean Enterprise
AmericanLeanManufacturing--JKR
Scripps Health Lean Presentation 2-24-14
Lean Management System
How to create an effective lean daily work management system
introduction dans les prarique de Lean.ppt
Developing a Lean Hospital Management System
LeanForNWAssociates
How can lean help handout
Leading lean
LEAN Practices
Lean daily work management system at the core of its operations

More from Association for Manufacturing Excellence (20)

PPT
AME Chicago 2019 Conference Preview
PPTX
Value Stream Mapping: Things We've Learned Since Learning to See
PPT
AME San Diego 2018 Conference Preview
PDF
Applying for the AME Excellence Award
PDF
AME Boston International Conference Preview
PPT
PPTX
Sorry: LinkedIn "Event" app no longer exists
PPTX
Fundamentals of LinkedIn Groups
PPTX
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
PPTX
AME Leaders guide to LinkedIn: Networking & Connections
PDF
Advanced Social Networking
PDF
Getting started with social media
PDF
Difficulties With Changing To A Lean Culture Part 03 By Mike Thelen
PDF
Difficulties With Changing To A Lean Culture Part 12 By Mike Thelen
PDF
Difficulties With Changing To A Lean Culture Part 06 By Mike Thelen
PDF
Difficulties With Changing To A Lean Culture Part 02 By Mike Thelen
PDF
Lean Product Development by Ron Mascitelli
AME Chicago 2019 Conference Preview
Value Stream Mapping: Things We've Learned Since Learning to See
AME San Diego 2018 Conference Preview
Applying for the AME Excellence Award
AME Boston International Conference Preview
Sorry: LinkedIn "Event" app no longer exists
Fundamentals of LinkedIn Groups
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
AME Leaders guide to LinkedIn: Networking & Connections
Advanced Social Networking
Getting started with social media
Difficulties With Changing To A Lean Culture Part 03 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 12 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 06 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 02 By Mike Thelen
Lean Product Development by Ron Mascitelli

Recently uploaded (20)

PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
Construction Project Organization Group 2.pptx
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
DOCX
573137875-Attendance-Management-System-original
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
composite construction of structures.pdf
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
PPT on Performance Review to get promotions
PPTX
OOP with Java - Java Introduction (Basics)
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPT
Mechanical Engineering MATERIALS Selection
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PDF
Arduino robotics embedded978-1-4302-3184-4.pdf
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPTX
Internet of Things (IOT) - A guide to understanding
PPTX
CH1 Production IntroductoryConcepts.pptx
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
CYBER-CRIMES AND SECURITY A guide to understanding
Construction Project Organization Group 2.pptx
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
573137875-Attendance-Management-System-original
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
composite construction of structures.pdf
bas. eng. economics group 4 presentation 1.pptx
PPT on Performance Review to get promotions
OOP with Java - Java Introduction (Basics)
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
Mechanical Engineering MATERIALS Selection
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
Arduino robotics embedded978-1-4302-3184-4.pdf
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
Internet of Things (IOT) - A guide to understanding
CH1 Production IntroductoryConcepts.pptx
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...

Lean management, lean leadership and leader standard work (AME Webinar)

  • 1. Lean Management, Lean Leadership, and Leader Standard Work A Webinar Hosted by AME 8 April 2016
  • 2. © David Mann 2016 www.dmannlean.com Webinar Topics „ Introduction „ Nature of lean and difficulty sustaining its gains „ Overview: Lean Management System (LMS) „ Interdependence of lean’s tools and LMS „ Process focus: Leader standard work „ Value proposition in LMS „ Meaningfully engaging executives in lean „ Summary, Q&A
  • 3. © David Mann 2016 www.dmannlean.com What’s the nature of lean? According to Shigeo Shingo*: „ Lean is fundamentally about finding waste „ Lean thinkers search out problems where none are thought to exist * The sayings of Shigeo Shingo: Key strategies for plant improvement. Translated by Andrew P. Dillon. Productivity Press, 1987. Original publication 1985, The Nikkan Kogyo Shimbun, Ltd 3
  • 4. © David Mann 2016 www.dmannlean.com This seems simple enough... „ But highlighting problems can be difficult - and risky – in a conventional organization „ Highlighting problems goes against •  Habits •  What conventional bosses expect •  Personal reinforcement contingencies – that is, rewards and punishments 4
  • 5. © David Mann 2016 www.dmannlean.com Because of habit and convention... Lean is harder than it seems! „ Many organizations begin the lean journey „ Few (~ 5%) see it through to sustained gains „ Kaizen and 6 sigma successes equally fail to last „ Why? Failure to recognize implications for managers’ practices and behaviors „ Lean management addresses behaviors, tools, practices to sustain, extend lean production’s gains 5
  • 6. © David Mann 2016 www.dmannlean.com A lean ecosystem „ For sustained lean success, experience suggests the need for a lean ecosystem „ The ecosystem has two main sub-systems: 1.  Lean production system: tools to improve process stability and performance 2.  Lean management system: leaders’ behaviors, practices and tools to focus on the process, sustain initial lean gains, drive further improvement 6
  • 7. © David Mann 2016 www.dmannlean.com 1.  Lean tools: Improve stability 2.  Lean Mgt: Sustain gains, capture problems, assign actions 3.  Lean tools: Improve stability 4.  Lean Mgt: Sustai gains, capture problems, assign actions 5.  Lean tools: Improve stability 6.  Lean Mgt: Sustain ... 7.  Lean tools: Improve ... 8.  Continue until perfection! . Process Focus   Lean tools Findproblems! Process Focus   Lean tools Findproblems! Process Focus   Lean tools Start here Findproblems! A lean production + lean management ecosystem: Healthy, sustainable, beneficial 7
  • 8. © David Mann 2016 www.dmannlean.com Lean production and LMS: Interdependent „ Well established: •  Gains from lean production are rarely sustained „ Less well known but equally true: •  Lean management – without the gains from lean production – is seen as meaningless •  LSW particularly seen as bureaucratic “check the box” exercise, does not produce improvement 8
  • 9. © David Mann 2016 www.dmannlean.com Lean management’s value proposition „ For leaders, for front line workers: 1.  Did lean tools eliminate a chronic problem, frustration? 2.  Would you like to see this benefit sustained? 3.  In the past, would you expect the benefit to last? 4.  If it lasted, would it make for a better day at work? 5.  What’s in it for you: LMS sustains the benefit 6.  LMS captures next opportunities for improvement 9
  • 10. © David Mann 2016 www.dmannlean.com Lean management’s focus on process 
 sustains gains and drives improvement
 3. Leader Standard Work 2. Standard (Visual) Accountability (Sustained behavior) (Improvement) (Frequent focus on process health) 1. Visual Controls Process Focus!   10
  • 11. © David Mann 2016 www.dmannlean.com Lean management’s focus on process 
 sustains gains and drives improvement
 3. Leader Standard Work 2. Standard (Visual) Accountability (Sustained behavior) (Improvement) (Frequent focus on process health) 1. Visual Controls Process Focus!   11
  • 12. © David Mann 2016 www.dmannlean.com Visual controls: Key elements What did we expect? What did we actually get? If we didn’t get it, What happened? What are we looking for? 12
  • 13. © David Mann 2016 www.dmannlean.com Visual controls inhigh speed automated processes:
 OEE six big losses - Minutes lost & why Hour mtl operat’r min stop maj stop defect speed describe 13 6 7 8 9 10 11 12 1 2 3 etc 17 Forklift down 9 Wrong plate staged Impression cylinder misagaligned27
  • 14. © David Mann 2016 www.dmannlean.com Expected vs actual and description of misses in a takt paced assembly process Supervisor initialed every hour 14
  • 15. © David Mann 2016 www.dmannlean.com Capturing interruptions, delays in variable duration cardiac procedures 15
  • 16. © David Mann 2016 www.dmannlean.com Lean  management  -­‐  A  closer  look   3. Leader Standard Work 2. Standard (Visual) Accountability (Sustained behavior) (Improvement) 1. Visual controls Process Focus!   (Frequent focus on process health) © David Mann Lean Consulting 2010 Reproduced with permission 16
  • 17. © David Mann 2016 www.dmannlean.com Daily accountability process 17 Ø  Brief, timed, stand up, on or near the floor Ø  Standard agenda: •  Yesterday’s visuals for needed follow-up •  Tasks assigned for follow-up – cause or action •  Written as verb, noun – action is the idea! •  Review tasks due today •  Completed? Green •  Not completed? Red, reason why •  Help needed? Expected completion?
  • 18. © David Mann 2016 www.dmannlean.com Daily accountability: Did you complete assigned tasks on time? Names 4/4 4/5 4/6 4/7 4/8 4/9 John Jane George Phan Marie bring donuts verb noun verb noun verb noun verb noun Today 18 verb noun verb noun verb noun verb noun
  • 19. © David Mann 2016 www.dmannlean.com Lean  management  -­‐  A  closer  look   3. Leader Standard Work 2. Standard (Visual) Accountability (Sustained behavior) (Improvement) 1. Visual controls Process Focus!   (Frequent focus on process health) © David Mann Lean Consulting 2010 Reproduced with permission 19
  • 20. © David Mann 2016 www.dmannlean.com 20 Leader standard closes the loop on process focus, and keeps it closed Improvement Lean gains Leader standard work Courtesy Scott Simmons
  • 21. © David Mann 2016 www.dmannlean.com Intent of leader standard work „ Guarantee the integrity of the standardized lean production system by consistent focus on the production processes as they cycle •  Being in the production area “grasping reality” •  Observing adherence to standardized work (10 cycles or 10 minutes) each person for team leaders, 1 person per team leader for supervisors, and so on •  Talking with operators about recent changes in standard work, and their thinking on further improvement •  Reinforcing your personal relationships with them
  • 22. © David Mann 2016 www.dmannlean.com Date: Zone Leader Std. Work Zone Leader Std. Work Time TASKS 5:15 Check for call-in Review vacation log 5:30 Hold Daily Start-up Mtg. Review manpower needs Review shortages Review Cross-training and zone training plans Review schedule - mix and daily APS requirements Assign EE to work areas Check for employee issues 5:45 Attend Dept. Zone Leader Mtg. Review manpower needs Review shortages 6:00 Adjust Labor Planning Board Review 3rd shift production log/notes with counterpart Review Cross-training and zone training plans Review schedule/mix for late changes Adjust EE assignments as needed 6:30 Check Kanban Inventories Review Minimum Levels Review Maximum Levels Review 5's organization 8:00 Gemba Walk with Supv. & ZL's Note assignments 9:45 Attend Lean Board Meeting - Daily 10:30 Attend Division Zone Leader mtg - Daily 1:30 Next Day Planning Review vacation log Review Cross-training and zone training plans Review schedule - mix and daily APS requirements Assign EE to work areas 1:45 Set-up night shift priorities Id work centers to be manned Id part numbers & quantities to be ran 2:00 Establish personal plan for next days activities Lean Tasks Employee Training Process Improvement Time TASKS Monitor 40 min. clock (before and after all breaks) 1st break 2nd break Lunch 7:45 9:45 12:00 Zone Walk through (5X per day) 1st 2nd 3rd 4th 5th Verify hourly production tracking, post results, note and act on any flow interupters. 6:30 11:30 7:30 12:30 8:30 1:30 9:30 2:30 10:30 3:30 All Monitor Std. Work the Check for compliance Time Reinforce & correct operator behavior Update Std. Work as needed When Provide Operator Training (as needed) Needed Train & Certify new employees Review Cross-training and zone training plans Keep skill versatility matrix current Front Back
  • 23. © David Mann 2016 www.dmannlean.com Leader Standard Work-VS Manager Task pad coded daily or as recurring Standard weekly or specific-today tasks Emergent items Notes, working diary Note: Outlook and Groupwise both have trifold formats
  • 24. © David Mann 2016 www.dmannlean.com Person dependent or process dependent? „ Lean systems seek to be process dependent „ In human systems, at some level a person must monitor and reinforce consistent adherence „ Leader standard work defines this monitoring and reinforcement „ Overlapping content between levels of LSW help guarantee the system’s integrity, but... „ Ultimate integrity depends on support by execs „ So, what about executive standard work??? 24
  • 25. © David Mann 2016 www.dmannlean.com Problem statement: 
 Operations VP, precision machining, 2014 “I have hosted hundreds of tours at [our company] since we began to apply the lean management system starting in 2008. The majority of Lean Champions that came through confided in me that "getting their executives on board was very difficult", and that they were concerned that all the hard work of their teams would go to waste if they could not garner support from leadership/ownership of their organizations.” Emphasis added 25
  • 26. © David Mann 2016 www.dmannlean.com Gemba walking execs: 
 A cautionary tale and a lesson learned ◆ Execs wanted to support lean ◆ But they didn’t know how ◆ We weren’t helping them ◆ They were cancelling the walks ◆ “David, you have a problem!” Why are gembas being cancelled just as we’re having such success? 26
  • 27. © David Mann 2016 www.dmannlean.com Reflec3on:  Execs  are  our  customers!   What  do  we  know  about  them?   „ Bright „ Quick studies „ Competitive „ Achievement oriented „ Strive to ace every test „ Action oriented „ Thirsty for hands-on „ Expect staff prep work, avoid embarrassment „ Want to drive improvement 27
  • 28. © David Mann 2016 www.dmannlean.com Design spec: Improved exec gemba walk process What we were providing 1.  Execs in passive role a.  Yammering sensi-yawn! 2.  Unprepared to participate 3.  Low confidence in lean knowledge 4.  Uncomfortable discussing lean 5.  Felt incompetent in gemba 6.  Not a meaningful exercise: boring, embarassing, wasted of time A better customer value 1.  Exec-driven experience a.  Get the answer, ace the test 2.  Good staff prep, execs ready to participate and lead 3.  Confident observer in gemba 4.  Comfortable coaching lean management in gemba 5.  Competent in lean management system 6.  Valued, fun(!) investment of time 28
  • 29. © David Mann 2016 www.dmannlean.com Gemba worksheets and a new exec gemba design 1.  Process-dependent: Predictable, repeatable 2.  Structure put exec “student” in control 3.  Sufficient preparation (staff work) 4.  Agenda for clear content focus 5.  Test underscored learning, made experience personally meaningful: Ace the test! 29 Worksheets provided value from customer perspective:
  • 30. © David Mann 2016 www.dmannlean.com Lean management system Standardized Lean Processes Supervisor/Manager Director/Value stream leader Executives Proposition: If the lean management system is healthy, 
 then the lean production system is healthy Team Leader 30
  • 31. © David Mann 2016 www.dmannlean.com Full set of 8 gemba worksheets available as free download at dmannlean.com
  • 32. © David Mann 2016 www.dmannlean.com Put execs in active role… „  Brief prep / gemba worksheet „  Questions to ask „  Things to look for „  Let them drive the bus! „  After, compare ratings: •  Exec ”4.5”; Sensei “2.5” •  Teachable moment!! “This  3me,  it’s  gemba   for  visual  controls.  You     might  want  to  look  for…   and  ask  about…”   You,  on  the  way  to   gemba:     Hi,  how’s  it  going   today?  What’s  the   process  here?   32
  • 33. © David Mann 2016 www.dmannlean.com Summary „ Lean production and lean management are interdependent •  Together, they create and sustain a better day at work, sustained and ongoing improvement „ Lean’s value proposition depends on timing: Lean gains first, then lean management to sustain them •  Leader standard work keeps the loop closed „ Lean’s value proposition for executives is fundamentally different, supporting their unique managerial responsibilities •  Lean management empowers execs to judge first-hand the integrity of the chain of command and the fidelity of execution of their lean strategy 33
  • 34. © David Mann 2016 www.dmannlean.com For details on these topics, see: 34 Or email me at [email protected]